About this file

This solicitation requests proposals for an indefinite delivery indefinite quantity construction management services contract to be awarded by the US Army Corps of Engineers New Orleans District. The contractor shall provide construction management, quality assurance, flood fight inspection, and related services. The contract ceiling is $25 million over five years. A minimum guarantee of $10,000 will be obligated initially, with additional funds ordered via task orders. Required services include project management, scheduling, estimating, inspection, testing, and reporting to support construction projects in areas assigned to the New Orleans District and other districts as directed.

View the file

Other files

File Type Posted
Amendment 0003_W912P820R0071.pdf PDF
Amendment 0004_W912P820R0071.pdf PDF
Amendment 0002_W912P820R0071.pdf PDF
Amendment 0001_W912P820R0071.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 11:00 AM local time 19 Jan 2021

X

A X B X C

D

EX

X G F 70 - 98

99 - 112 X H 113 - 117

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 117

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912P8 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and handcarried, in the depository located in *Please refer to Instructions to Offerors, COVID Instructions conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 22

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

23 - 43 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 46 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 47 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

48 - 61

PART II - CONTRACT CLAUSES

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

62 - 69

6. REQUISITION/PURCHASE NO.

W42HEM02904203

5. DATE ISSUED

17 Dec 2020

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912P820R0071

Section B - Supplies or Services and Prices

BID SCHEDULE

CONSTRUCTION

MANAGEMENT SERVICES,

USACE, MVN,

ANNOUNCEMENT NO.

W912P820R0071

YEAR

ITEM PAY ITEM EST UNIT UNIT EST AMT

NO. QTY PRICE

0001A A

QAR II (S.T.) 200 HR

0001A B

QAR II

(O.T.)

20 HR

0001A C

QAR II

(S.D.)

2 HR

0002A A

QAR III

(S.T.)

20,000 HR

0002A B

QAR III

(O.T.)

2,000 HR

0002A C

QAR III

(S.D.)

200 HR

0003A A

QAR V (S.T.) 1,000 HR

0003A B

QAR V

(O.T.)

100 HR

0003A C

QAR V

(S.D.)

10 HR

0004A A

SUPV CONST REP (S.T.) 1,000 HR

0004A B

SUPV CONST REP (O.T.) 100 HR

0004A C

SUPV CONST REP (S.D.) 10 HR

0005A A

QUALITY ASSURANCE MANAGER (S.T.) 200 HR

0005A B

QUALITY ASSURANCE MANAGER (O.T.) 20 HR

0005A C

QUALITY ASSURANCE MANAGER (S.D.) 2 HR

0006A A

SECRETARY

(S.T.)

2,000 HR

0006A B

SECRETARY

(O.T.)

200 HR

0006A C

SECRETARY

(S.D.)

20 HR

0007A A

SCHEDULER

(S.T.)

1,000 HR

0007A B

SCHEDULER

(O.T.)

100 HR

0007A C

SCHEDULER

(S.D.)

10 HR

0008A A

EXPERT SCHEDULER

(S.T.)

200 HR

0008A B

EXPERT SCHEDULER

(O.T.)

20 HR

0008A C

EXPERT SCHEDULER

(S.D.)

2 HR

0009A A

COST ESTIMATOR

(S.T.)

4,000 HR

0009A B

COST ESTIMATOR

(O.T.)

400 HR

0009A C

COST ESTIMATOR

(S.D.)

40 HR

0010A A

PROGRAM ANALYST

(S.T.)

200 HR

0010A B

PROGRAM ANALYST

(O.T.)

20 HR

0010A C

PROGRAM ANALYST

(S.D.)

2 HR

0011A A

CONST MANAGER

(S.T.)

2,000 HR

0011A B

CONST MANAGER

(O.T.)

200 HR

0011A C

CONST MANAGER

(S.D.)

20 HR

0012A A

PROJECT ENGINEER

(S.T.)

4,000 HR

0012A B

PROJECT ENGINEER

(O.T.)

400 HR

0012A C

PROJECT ENGINEER

(S.D.)

40 HR

0013A A

SENIOR ENGINEER

(S.T.)

1,000 HR

0013A B

SENIOR ENGINEER

(O.T.)

100 HR

0013A C

SENIOR ENGINEER

(S.D.)

10 HR

0014A A

CIVIL ENGR TECH I

(S.T.)

200 HR

0014A B

CIVIL ENGR TECH I

(O.T.)

20 HR

0014A C

CIVIL ENGR TECH I

(S.D.)

2 HR

0015A A

CIVIL ENGR TECH II

(S.T.)

2,000 HR

0015A B

CIVIL ENGR TECH II

(O.T.)

200 HR

0015A C

CIVIL ENGR TECH II

0016 4X2 PICKUP

TRUCK

6,000 DA

0017 4X4 PICKUP

TRUCK

100 DA

0018 ADDITIONAL

MILEAGE

TBD FTR

0019A A

PER DIEM

LODGING

TBD FTR

0019A B

PER DIEM

MEALS

500 DA

0020 SPECIAL

EQUIPMENT

TBD DA

0021 SPECIAL

TESTING

TBD TBN

CONCRETE INSPECTION &

TESTING

0022 ACI LEVEL 1 FIELD CONCRETE TECH 100 HR

0023 REINFORCED CONCRETE SPECIAL INSP 50 HR

0024 PRESTRESSED CONCRETE SPECIAL INSP 50 HR

0025 ASTM C 117 MATLS FINER #200 SIEVE WASH 10 EA

0026 ASTM C 136 SIEVE ANALYS FINE & COARSE

AGGREGATES

10 EA

0027 ASTM C 190 COMPRESSIVE STRENGTH MORTARS

CUBE

10 EA

0028 ASTM C 39 COMPRESSIVE STRENGTH CONCRETE

SPEC

10 EA

SOILS INSPECTION &

TESTING

0029 NOISE & VIBRATION MONITORING WITH

EQUIPMENT

TBD HR

0030 VIBRATION MONITORING WITH EQUIPMENT TBD HR

0031 SENIOR FIELD SOILS TECHNICIAN 10 HR

0032 SOILS SPECIAL

INSPECTOR

10 HR

0033 ASTM D 1140 AMOUNT OF MATL FINER THAN #200

SIEVE

10 EA

0034 ASTM D 1557 LAB COMPACTION SOIL MODIFIED

EFFORT

10 EA

0035 ASTM D 2216 MOISTURE CONTENT BY OVEN 10 EA

0036 ASTM D 2487 SOILS CLASSIFICATION 10 EA

0037 ASTM D 2974 ORGANIC SOILS TEST 10 EA

0038 ASTM D 422 GRAIN SIZE ANALYSIS SIEVE

w/HYDROMETER

10 EA

0039 ASTM D 4253 & ASTM D 4254 MAX & MIN INDEX

DENSITY

10 EA

0040 ASTM D 4318 LIQUID, PLASTIC LIMIT AND

PLASTICITY INDEX

10 EA

0041 ASTM D 4643 MOISTURE CONTENT MICROWAVE

OVEN

10 EA

0042 ASTM D 698 LABORATORY COMPACTION STD

EFFORT

10 EA

0043 ASTM D 698 LABORATORY COMPACTION 1 POINT 10 EA

0044 ASTM D 854 SPECIFIC

GRAVITY

10 EA

STEEL INSPECTION &

TESTING

0045 CERTIFIED WELDING INSPECTOR LEVEL II (CWI) 100 HR

0046 STRUCTURAL STEEL AND BOLTING SPECIAL

INSPECTOR

10 HR

0047 ASTM E 709 MAGNETIC

TEST

10 EA

0048 ASTM E 164

ULTRASONIC TEST

10 EA

0049 ASTM E 165 LIQUID PENETRANT TEST 10 EA

0050 ASTM E 94

RADIOGRAPHIC TEST

10 EA

NONDESTRUCTIVE

TESTING

0051 ASNT NOT

TECHNICIAN LEVELL

III

10 HR

0052 ASNT NOT TECHNICIAN LEVEL II (NON CWI) 10 HR

0053 DISCONTINUITY (HOLIDAY) COATING TEST 55 EA

0054 COATING THICKNESS

TEST

5 EA

0055 HARDNESS

TEST

5 EA

0056 ASTM E 488 HYDRAULIC RAM & JACK FOR

ANCHOR PULL

5 EA

SUBTOTAL YEAR 1

CONSTRUCTION

MANAGEMENT SERVICES

YEAR

ITEM PAY ITEM EST UNIT UNIT EST AMT

NO. QTY

PRICE

0057A A

QAR II (S.T.) 200 HR

0057A B

QAR II

(O.T.)

20 HR

0057A C

QAR II

(S.D.)

2 HR

0058A A

QAR III

(S.T.)

20,000 HR

0058A B

QAR III

(O.T.)

2,000 HR

0058A C

QAR III

(S.D.)

200 HR

0059A A

QAR V (S.T.) 1,000 HR

0059A B

QAR V

(O.T.)

100 HR

0059A C

QAR V

(S.D.)

10 HR

0060A A

SUPV CONST REP (S.T.) 1,000 HR

0060A B

SUPV CONST REP (O.T.) 100 HR

0060A C

SUPV CONST REP (S.D.) 10 HR

0061A A

QUALITY ASSURANCE MANAGER (S.T.) 200 HR

0061A B

QUALITY ASSURANCE MANAGER (O.T.) 20 HR

0061A C

QUALITY ASSURANCE MANAGER (S.D.) 2 HR

0062A A

SECRETARY

(S.T.)

2,000 HR

0062A B

SECRETARY

(O.T.)

200 HR

0062A C

SECRETARY

(S.D.)

20 HR

0063A A

SCHEDULER

(S.T.)

1,000 HR

0063A B

SCHEDULER

(O.T.)

100 HR

0063A C

SCHEDULER

(S.D.)

10 HR

0064A A

EXPERT SCHEDULER

(S.T.)

200 HR

0064A B

EXPERT SCHEDULER

(O.T.)

20 HR

0064A C

EXPERT SCHEDULER

(S.D.)

2 HR

0065A A

COST ESTIMATOR

(S.T.)

4,000 HR

0065A B

COST ESTIMATOR

(O.T.)

400 HR

0065A C

COST ESTIMATOR

(S.D.)

40 HR

0066A A

PROGRAM ANALYST

(S.T.)

200 HR

0066A B

PROGRAM ANALYST

(O.T.)

20 HR

0066A C

PROGRAM ANALYST

(S.D.)

2 HR

0067A A

CONST MANAGER

(S.T.)

2,000 HR

0067A B

CONST MANAGER

(O.T.)

200 HR

0067A C

CONST MANAGER

(S.D.)

20 HR

0068A A

PROJECT ENGINEER

(S.T.)

4,000 HR

0068A B

PROJECT ENGINEER

(O.T.)

400 HR

0068A C

PROJECT ENGINEER

(S.D.)

40 HR

0069A A

SENIOR ENGINEER

(S.T.)

1,000 HR

0069A B

SENIOR ENGINEER

(O.T.)

100 HR

0069A C

SENIOR ENGINEER

(S.D.)

10 HR

0070A A

CIVIL ENGR TECH I

(S.T.)

200 HR

0070A B

CIVIL ENGR TECH I

(O.T.)

20 HR

0070A C

CIVIL ENGR TECH I

(S.D.)

2 HR

0071A A

CIVIL ENGR TECH II

(S.T.)

2,000 HR

0072A B

CIVIL ENGR TECH II

(O.T.)

200 HR

0072A C

CIVIL ENGR TECH II

(S.D.)

20 HR

0073 4X2 PICKUP

TRUCK

6,000 DA

0074 4X4 PICKUP

TRUCK

100 DA

0075 ADDITIONAL

MILEAGE

TBD FTR

0076A A

PER DIEM

LODGING

TBD FTR

0076A B

PER DIEM

MEALS

500 DA

0077 SPECIAL

EQUIPMENT

TBD DA

0078 SPECIAL

TESTING

TBD TBN

CONCRETE INSPECTION &

0079 ACI LEVEL 1 FIELD CONCRETE TECH 100 HR

0080 REINFORCED CONCRETE SPECIAL INSP 50 HR

0081 PRESTRESSED CONCRETE SPECIAL INSP 50 HR

0082 ASTM C 117 MATLS FINER #200 SIEVE WASH 10 EA

0083 ASTM C 136 SIEVE ANALYS FINE & COARSE

AGGREGATES

10 EA

0084 ASTM C 190 COMPRESSIVE STRENGTH MORTARS

CUBE

10 EA

0085 ASTM C 39 COMPRESSIVE STRENGTH CONCRETE

SPEC

10 EA

SOILS INSPECTION &

TESTING

0086 NOISE 7 VIBRATION MONITORING WITH

EQUIPMENT

TBD HR

0087 VIBRATION MONITORING WITH EQUIPMENT TBD HR

0088 SENIOR FIELD SOILS TECHNICIAN 10 HR

0089 SOILS SPECIAL

INSPECTOR

10 HR

0090 ASTM D 1140 AMOUNT OF MATL FINER THAN #200

SIEVE

10 EA

0091 ASTM D 1557 LAB COMPACTION SOIL MODIFIED

EFFORT

10 EA

0092 ASTM D 2216 MOISTURE CONTENT BY OVEN 10 EA

0093 ASTM D 2487 SOILS CLASSIFICATION 10 EA

0094 ASTM D 2974 ORGANIC SOILS TEST 10 EA

0095 ASTM D 422 GRAIN SIZE ANALYSIS SIEVE

w/HYDROMETER

10 EA

0096 ASTM D 4253 & ASTM D 4254 MAX & MIN INDEX

DENSITY

10 EA

0097 ASTM D 4318 LIQUID, PLASTIC LIMIT AND

PLASTICITY INDEX

10 EA

0098 ASTM D 4643 MOISTURE CONTENT MICROWAVE

OVEN

10 EA

0099 ASTM D 698 LABORATORY COMPACTION STD

EFFORT

10 EA

0100 ASTM D 698 LABORATORY COMPACTION 1 POINT 10 EA

0101 ASTM D 854 SPECIFIC

GRAVITY

10 EA

STEEL INSPECTION &

0102 CERTIFIED WELDING INSPECTOR LEVEL II (CWI) 100 HR

0103 STRUCTURAL STEEL AND BOLTING SPECIAL

INSPECTOR

10 HR

0104 ASTM E 709 MAGNETIC

TEST

10 EA

0105 ASTM E 164

ULTRASONIC TEST

10 EA

0106 ASTM E 165 LIQUID PENETRANT TEST 10 EA

0107 ASTM E 94

RADIOGRAPHIC TEST

10 EA

NONDESTRUCTIVE

TESTING

0108 ASNT NOT

TECHNICIAL LEVELL

III

10 HR

0109 ASNT NOT TECHNICIAN LEVEL II (NON CWI) 10 HR

0110 DISCONTINUITY (HOLIDAY) COATING TEST 55 EA

0111 COATING THICKNESS

TEST

5 EA

0112 HARDNESS

TEST

5 EA

0113 ASTM E 488 HYDRAULIC RAM & JACK FOR

ANCHOR PULL

5 EA

SUBTOTAL YEAR 2

CONSTRUCTION

MANAGEMENT SERVICES

YEAR

ITEM PAY ITEM EST UNIT UNIT EST AMT

NO. QTY PRICE

0114A A

QAR II (S.T.) 200 HR

0114A B

QAR II

(O.T.)

20 HR

0114A C

QAR II

(S.D.)

2 HR

0115A A

QAR III

(S.T.)

20,000 HR

0115A B

QAR III

(O.T.)

2,000 HR

0115A C

QAR III

200 HR

0116A

QAR V (S.T.) 1,000 HR

0116A B

QAR V

(O.T.)

100 HR

0116A C

QAR V

(S.D.)

10 HR

0117A A

SUPV CONST REP (S.T.) 1,000 HR

0117A B

SUPV CONST REP (O.T.) 100 HR

0117A C

SUPV CONST REP (S.D.) 10 HR

0118A A

QUALITY ASSURANCE MANAGER (S.T.) 200 HR

0118A B

QUALITY ASSURANCE MANAGER (O.T.) 20 HR

0118A C

QUALITY ASSURANCE MANAGER (S.D.) 2 HR

0119A A

SECRETARY

(S.T.)

2,000 HR

0119A B

SECRETARY

(O.T.)

200 HR

0119A C

SECRETARY

(S.D.)

20 HR

0120A A

SCHEDULER

(S.T.)

1,000 HR

0120A B

SCHEDULER

(O.T.)

100 HR

0120A C

SCHEDULER

(S.D.)

10 HR

0121A A

EXPERT SCHEDULER

(S.T.)

200 HR

0121A B

EXPERT SCHEDULER

(O.T.)

20 HR

0121A C

EXPERT SCHEDULER

(S.D.)

2 HR

0122A A

COST ESTIMATOR

(S.T.)

4,000 HR

0122A B

COST ESTIMATOR

(O.T.)

400 HR

0122A C

COST ESTIMATOR

(S.D.)

40 HR

0123A A

PROGRAM ANALYST

(S.T.)

200 HR

0123A B

PROGRAM ANALYST

(O.T.)

20 HR

0123A C

PROGRAM ANALYST

(S.D.)

2 HR

0124A A

CONST MANAGER

(S.T.)

2,000 HR

0124A B

CONST MANAGER

(O.T.)

200 HR

0124A C

CONST MANAGER

0125A

PROJECT ENGINEER

(S.T.)

4,000 HR

0125A B

PROJECT ENGINEER

(O.T.)

400 HR

0125A C

PROJECT ENGINEER

(S.D.)

40 HR

0126A A

SENIOR ENGINEER

(S.T.)

1,000 HR

0126A B

SENIOR ENGINEER

(O.T.)

100 HR

0126A C

SENIOR ENGINEER

(S.D.)

10 HR

0127A A

CIVIL ENGR TECH I

(S.T.)

200 HR

0127A B

CIVIL ENGR TECH I

(O.T.)

20 HR

0127A C

CIVIL ENGR TECH I

(S.D.)

2 HR

0128A A

CIVIL ENGR TECH II

(S.T.)

2,000 HR

0128A B

CIVIL ENGR TECH II

(O.T.)

200 HR

0128A C

CIVIL ENGR TECH II

(S.D.)

20 HR

0129 4X2 PICKUP

TRUCK

6,000 DA

0130 4X4 PICKUP

TRUCK

100 DA

0131 ADDITIONAL

MILEAGE

TBD FTR

0132A A

PER DIEM

LODGING

TBD FTR

0132A B

PER DIEM

MEALS

500 DA

0133 SPECIAL

EQUIPMENT

TBD DA

0134 SPECIAL

TESTING

TBD TBN

CONCRETE INSPECTION &

TESTING

0135 ACI LEVEL 1 FIELD CONCRETE TECH 100 HR

0136 REINFORCED CONCRETE SPECIAL INSP 50 HR

0137 PRESTRESSED CONCRETE SPECIAL INSP 50 HR

0138 ASTM C 117 MATLS FINER #200 SIEVE WASH 10 EA

0139 ASTM C 136 SIEVE ANALYS FINE & COARSE

AGGREGATES

10 EA

0140 ASTM C 190 COMPRESSIVE STRENGTH MORTARS

CUBE

10 EA

0141 ASTM C 39 COMPRESSIVE STRENGTH CONCRETE

SPEC

SOILS INSPECTION &

0142 NOISE 7 VIBRATION MONITORING WITH

EQUIPMENT

TBD HR

0143 VIBRATION MONITORING WITH EQUIPMENT TBD HR

0144 SENIOR FIELD SOILS TECHNICIAN 10 HR

0145 SOILS SPECIAL

INSPECTOR

10 HR

0146 ASTM D 1140 AMOUNT OF MATL FINER THAN #200

SIEVE

10 EA

0147 ASTM D 1557 LAB COMPACTION SOIL MODIFIED

EFFORT

10 EA

0148 ASTM D 2216 MOISTURE CONTENT BY OVEN 10 EA

0149 ASTM D 2487 SOILS CLASSIFICATION 10 EA

0150 ASTM D 2974 ORGANIC SOILS TEST 10 EA

0151 ASTM D 422 GRAIN SIZE ANALYSIS SIEVE

w/HYDROMETER

10 EA

0152 ASTM D 4253 & ASTM D 4254 MAX & MIN INDEX

DENSITY

10 EA

0153 ASTM D 4318 LIQUID, PLASTIC LIMIT AND

PLASTICITY INDEX

10 EA

0154 ASTM D 4643 MOISTURE CONTENT MICROWAVE

OVEN

10 EA

0155 ASTM D 698 LABORATORY COMPACTION STD

EFFORT

10 EA

0156 ASTM D 698 LABORATORY COMPACTION 1 POINT 10 EA

0157 ASTM D 854 SPECIFIC

GRAVITY

10 EA

STEEL INSPECTION &

TESTING

0158 CERTIFIED WELDING INSPECTOR LEVEL II (CWI) 100 HR

0159 STRUCTURAL STEEL AND BOLTING SPECIAL

INSPECTOR

10 HR

0160 ASTM E 709 MAGNETIC

TEST

10 EA

0161 ASTM E 164

ULTRASONIC TEST

10 EA

0162 ASTM E 165 LIQUID PENETRANT TEST 10 EA

0163 ASTM E 94

RADIOGRAPHIC TEST

10 EA

NONDESTRUCTIVE

TESTING

0164 ASNT NOT

TECHNICIAL LEVEL III

10 HR

0165 ASNT NOT TECHNICIAN LEVEL II (NON CWI) 10 HR

0166 DISCONTINUITY (HOLIDAY) COATING TEST 55 EA

0167 COATING THICKNESS

TEST

5 EA

0168 HARDNESS

TEST

5 EA

0169 ASTM E 488 HYDRAULIC RAM & JACK FOR

ANCHOR PULL

5 EA

SUBTOTAL YEAR 3

CONSTRUCTION

MANAGEMENT SERVICES

YEAR

ITEM PAY ITEM EST UNIT

NO. QTY

0170A A

QAR II (S.T.) 200 HR

0170A B

QAR II

(O.T.)

20 HR

0170A C

QAR II

(S.D.)

2 HR

0171A A

QAR III

(S.T.)

20,000 HR

0171A B

QAR III

(O.T.)

2,000 HR

0171A C

QAR III

(S.D.)

200 HR

0172A A

QAR V (S.T.) 1,000 HR

0172A B

QAR V

(O.T.)

100 HR

0172A C

QAR V

(S.D.)

10 HR

0173A A

SUPV CONST REP (S.T.) 1,000 HR

0173A B

SUPV CONST REP (O.T.) 100 HR

0173A C

SUPV CONST REP (S.D.) 10 HR

0174A A

QUALITY ASSURANCE MANAGER (S.T.) 200 HR

0174A B

QUALITY ASSURANCE MANAGER (O.T.) 20 HR

0174A C

QUALITY ASSURANCE MANAGER (S.D.) 2 HR

0175A A

SECRETARY

(S.T.)

2,000 HR

0175A B

SECRETARY

(O.T.)

200 HR

EST AMT

PRICE

UNIT

0175A C

SECRETARY

(S.D.)

20 HR

0176A A

SCHEDULER

(S.T.)

1,000 HR

0176A B

SCHEDULER

(O.T.)

100 HR

0176A C

SCHEDULER

(S.D.)

10 HR

0177A A

EXPERT SCHEDULER

(S.T.)

200 HR

0177A B

EXPERT SCHEDULER

(O.T.)

20 HR

0177A C

EXPERT SCHEDULER

(S.D.)

2 HR

0178A A

COST ESTIMATOR

(S.T.)

4,000 HR

0178A B

COST ESTIMATOR

(O.T.)

400 HR

0178A C

COST ESTIMATOR

(S.D.)

40 HR

0179A A

PROGRAM ANALYST

(S.T.)

200 HR

0179A B

PROGRAM ANALYST

(O.T.)

20 HR

0179A C

PROGRAM ANALYST

(S.D.)

2 HR

0180A A

CONST MANAGER

(S.T.)

2,000 HR

0180A B

CONST MANAGER

(O.T.)

200 HR

0180A C

CONST MANAGER

(S.D.)

20 HR

0181A A

PROJECT ENGINEER

(S.T.)

4,000 HR

0181A B

PROJECT ENGINEER

(O.T.)

400 HR

0181A C

PROJECT ENGINEER

(S.D.)

40 HR

0182A A

SENIOR ENGINEER

(S.T.)

1,000 HR

0182A B

SENIOR ENGINEER

(O.T.)

100 HR

0182A C

SENIOR ENGINEER

(S.D.)

10 HR

0183A A

CIVIL ENGR TECH I

(S.T.)

200 HR

0183A B

CIVIL ENGR TECH I

(O.T.)

20 HR

0183A C

CIVIL ENGR TECH I

(S.D.)

2 HR

0184A A

CIVIL ENGR TECH II

(S.T.)

2,000 HR

0184A B

CIVIL ENGR TECH II

(O.T.)

200 HR

0184A C

CIVIL ENGR TECH II

(S.D.)

20 HR

0185 4X2 PICKUP

TRUCK

6,000 DA

0186 4X4 PICKUP

TRUCK

100 DA

0187 ADDITIONAL

MILEAGE

TBD FTR

0188A A

PER DIEM

LODGING

TBD FTR

0188A B

PER DIEM

MEALS

500 DA

0189 SPECIAL

EQUIPMENT

TBD DA

0190 SPECIAL

TESTING

TBD TBN

CONCRETE INSPECTION &

TESTING

0191 ACI LEVEL 1 FIELD CONCRETE TECH 100 HR

0192 REINFORCED CONCRETE SPECIAL INSP 50 HR

0193 PRESTRESSED CONCRETE SPECIAL INSP 50 HR

0194 ASTM C 117 MATLS FINER #200 SIEVE WASH 10 EA

0195 ASTM C 136 SIEVE ANALYS FINE & COARSE

AGGREGATES

10 EA

0196 ASTM C 190 COMPRESSIVE STRENGTH MORTARS

CUBE

10 EA

0197 ASTM C 39 COMPRESSIVE STRENGTH CONCRETE

SPEC

10 EA

SOILS INSPECTION &

TESTING

0198 NOISE 7 VIBRATION MONITORING WITH

EQUIPMENT

TBD HR

0199 VIBRATION MONITORING WITH EQUIPMENT TBD HR

0200 SENIOR FIELD SOILS TECHNICIAN 10 HR

0201 SOILS SPECIAL

INSPECTOR

10 HR

0202 ASTM D 1140 AMOUNT OF MATL FINER THAN #200

SIEVE

10 EA

0203 ASTM D 1557 LAB COMPACTION SOIL MODIFIED

EFFORT

10 EA

0204 ASTM D 2216 MOISTURE CONTENT BY OVEN 10 EA

0205 ASTM D 2487 SOILS CLASSIFICATION 10 EA

0206 ASTM D 2974 ORGANIC SOILS TEST 10 EA

0207 ASTM D 422 GRAIN SIZE ANALYSIS SIEVE

w/HYDROMETER

0208 ASTM D 4253 & ASTM D 4254 MAX & MIN INDEX

DENSITY

10 EA

0209 ASTM D 4318 LIQUID, PLASTIC LIMIT AND

PLASTICITY INDEX

10 EA

0210 ASTM D 4643 MOISTURE CONTENT MICROWAVE

OVEN

10 EA

0211 ASTM D 698 LABORATORY COMPACTION STD

EFFORT

10 EA

0212 ASTM D 698 LABORATORY COMPACTION 1 POINT 10 EA

0213 ASTM D 854 SPECIFIC

GRAVITY

10 EA

STEEL INSPECTION &

TESTING

0214 CERTIFIED WELDING INSPECTOR LEVEL II (CWI) 100 HR

0215 STRUCTURAL STEEL AND BOLTING SPECIAL

INSPECTOR

10 HR

0216 ASTM E 709 MAGNETIC

TEST

10 EA

0217 ASTM E 164

ULTRASONIC TEST

10 EA

0218 ASTM E 165 LIQUID PENETRANT TEST 10 EA

0219 ASTM E 94

RADIOGRAPHIC TEST

10 EA

NONDESTRUCTIVE

TESTING

0220 ASNT NOT

TECHNICIAL LEVELL

III

10 HR

0221 ASNT NOT TECHNICIAN LEVEL II (NON CWI) 10 HR

0222 DISCONTINUITY (HOLIDAY) COATING TEST 55 EA

0223 COATING THICKNESS

TEST

5 EA

0224 HARDNESS

TEST

5 EA

0225 ASTM E 488 HYDRAULIC RAM & JACK FOR

ANCHOR PULL

5 EA

SUBTOTAL YEAR 4

CONSTRUCTION

MANAGEMENT SERVICES

YEAR

ITEM PAY ITEM EST UNIT

NO. QTY PRICE

EST AMTUNIT

0226A

QAR II (S.T.) 200 HR

0226A B

QAR II

(O.T.)

20 HR

0226A C

QAR II

(S.D.)

2 HR

0227A A

QAR III

(S.T.)

20,000 HR

0227A B

QAR III

(O.T.)

2,000 HR

0227A C

QAR III

(S.D.)

200 HR

0228A A

QAR V (S.T.) 1,000 HR

0228A B

QAR V

(O.T.)

100 HR

0228A C

QAR V

(S.D.)

10 HR

0229A A

SUPV CONST REP (S.T.) 1,000 HR

0229A B

SUPV CONST REP (O.T.) 100 HR

0229A C

SUPV CONST REP (S.D.) 10 HR

0230A A

QUALITY ASSURANCE MANAGER (S.T.) 200 HR

0230A B

QUALITY ASSURANCE MANAGER (O.T.) 20 HR

0230A C

QUALITY ASSURANCE MANAGER (S.D.) 2 HR

0231A A

SECRETARY

(S.T.)

2,000 HR

0231A B

SECRETARY

(O.T.)

200 HR

0231A C

SECRETARY

(S.D.)

20 HR

0232A A

SCHEDULER

(S.T.)

1,000 HR

0232A B

SCHEDULER

(O.T.)

100 HR

0232A C

SCHEDULER

(S.D.)

10 HR

0233A A

EXPERT SCHEDULER

(S.T.)

200 HR

0233A B

EXPERT SCHEDULER

(O.T.)

20 HR

0233A C

EXPERT SCHEDULER

(S.D.)

2 HR

0234A A

COST ESTIMATOR

(S.T.)

4,000 HR

0234A B

COST ESTIMATOR

(O.T.)

400 HR

0234A C

COST ESTIMATOR

40 HR

0235A

PROGRAM ANALYST

(S.T.)

200 HR

0235A B

PROGRAM ANALYST

(O.T.)

20 HR

0235A C

PROGRAM ANALYST

(S.D.)

2 HR

0236A A

CONST MANAGER

(S.T.)

2,000 HR

0236A B

CONST MANAGER

(O.T.)

200 HR

0236A C

CONST MANAGER

(S.D.)

20 HR

0237A A

PROJECT ENGINEER

(S.T.)

4,000 HR

0237A B

PROJECT ENGINEER

(O.T.)

400 HR

0237A C

PROJECT ENGINEER

(S.D.)

40 HR

0238A A

SENIOR ENGINEER

(S.T.)

1,000 HR

0238A B

SENIOR ENGINEER

(O.T.)

100 HR

0238A C

SENIOR ENGINEER

(S.D.)

10 HR

0239A A

CIVIL ENGR TECH I

(S.T.)

200 HR

0239A B

CIVIL ENGR TECH I

(O.T.)

20 HR

0239A C

CIVIL ENGR TECH I

(S.D.)

2 HR

0240A A

CIVIL ENGR TECH II

(S.T.)

2,000 HR

0240A B

CIVIL ENGR TECH II

(O.T.)

200 HR

0240A C

CIVIL ENGR TECH II

(S.D.)

20 HR

0241 4X2 PICKUP

TRUCK

6,000 DA

0242 4X4 PICKUP

TRUCK

100 DA

0243 ADDITIONAL

MILEAGE

TBD FTR

0244A

PER DIEM

LODGING

TBD FTR

0244A B

PER DIEM

MEALS

500 DA

0245 SPECIAL

EQUIPMENT

TBD DA

0246 SPECIAL

TBD TBN

CONCRETE INSPECTION &

0247 ACI LEVEL 1 FIELD CONCRETE TECH 100 HR

0248 REINFORCED CONCRETE SPECIAL INSP 50 HR

0249 PRESTRESSED CONCRETE SPECIAL INSP 50 HR

0250 ASTM C 117 MATLS FINER #200 SIEVE WASH 10 EA

0251 ASTM C 136 SIEVE ANALYS FINE & COARSE

AGGREGATES

10 EA

0252 ASTM C 190 COMPRESSIVE STRENGTH MORTARS

CUBE

10 EA

0253 ASTM C 39 COMPRESSIVE STRENGTH CONCRETE

SPEC

10 EA

SOILS INSPECTION &

TESTING

0254 NOISE 7 VIBRATION MONITORING WITH

EQUIPMENT

TBD HR

0255 VIBRATION MONITORING WITH EQUIPMENT TBD HR

0256 SENIOR FIELD SOILS TECHNICIAN 10 HR

0257 SOILS SPECIAL

INSPECTOR

10 HR

0258 ASTM D 1140 AMOUNT OF MATL FINER THAN #200

SIEVE

10 EA

0259 ASTM D 1557 LAB COMPACTION SOIL MODIFIED

EFFORT

10 EA

0260 ASTM D 2216 MOISTURE CONTENT BY OVEN 10 EA

0261 ASTM D 2487 SOILS CLASSIFICATION 10 EA

0262 ASTM D 2974 ORGANIC SOILS TEST 10 EA

0263 ASTM D 422 GRAIN SIZE ANALYSIS SIEVE

w/HYDROMETER

10 EA

0264 ASTM D 4253 & ASTM D 4254 MAX & MIN INDEX

DENSITY

10 EA

0265 ASTM D 4318 LIQUID, PLASTIC LIMIT AND

PLASTICITY INDEX

10 EA

0266 ASTM D 4643 MOISTURE CONTENT MICROWAVE

OVEN

10 EA

0267 ASTM D 698 LABORATORY COMPACTION STD

EFFORT

10 EA

0268 ASTM D 698 LABORATORY COMPACTION 1 POINT 10 EA

0269 ASTM D 854 SPECIFIC

GRAVITY

10 EA

STEEL INSPECTION &

TESTING

0270 CERTIFIED WELDING INSPECTOR LEVEL II (CWI) 100 HR

0271 STRUCTURAL STEEL AND BOLTING SPECIAL

INSPECTOR

10 HR

0272 ASTM E 709 MAGNETIC

TEST

10 EA

0273 ASTM E 164

ULTRASONIC TEST

0274 ASTM E 165 LIQUID PENETRANT TEST 10 EA

0275 ASTM E 94

RADIOGRAPHIC TEST

10 EA

NONDESTRUCTIVE

TESTING

0276 ASNT NOT

TECHNICIAL LEVELL

III

10 HR

0277 ASNT NOT TECHNICIAN LEVEL II (NON CWI) 10 HR

0278 DISCONTINUITY (HOLIDAY) COATING TEST 55 EA

0279 COATING THICKNESS

TEST

5 EA

0280 HARDNESS

TEST

5 EA

0281 ASTM E 488 HYDRAULIC RAM & JACK FOR

ANCHOR PULL

5 EA

SUBTOTAL YEAR 5

GRAND TOTAL

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 25,000,000 Job

Contract ceiling is $25,000,000.00

FFP

Minimum guarantee for award $10,000 will be obligated in CEFMS only.

Minimum guarantee will be met with issuance of first task order(s). Contract duration will be five (5) years or $25,000,000.00, which ever is met first.

FOB: Destination

PURCHASE REQUEST NUMBER: W42HEM02904203

PSC CD: R425

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job

OPTIONAL 6-MONTH PERIOD

FFP

FOB: Destination

PURCHASE REQUEST NUMBER: W42HEM02904203

PSC CD: R425

NET AMT

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

1.00 $10,000.00 25,000,000.00 $25,000,000.00

DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE

The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

1.00 $10,000.00 25,000,000.00 $25,000,000.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

0001 $ $

0002 $ $

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

CONSTRUCTION SERVICES

SECTION C DESCRIPTION/

SPECIFICATIONS

C.1 DESCRIPTION

C.1.1 Location of Work - Construction management services for this contract will be performed primarily within the limits of the U.S. Army Engineer District, New Orleans and as directed by the Contracting Officer (KO) and in coordination with the Contracting Officer’s Representative (COR). As a regional contract, work may be located in areas assigned to other USACE Districts however, work will be primarily located within the boundaries of the New Orleans District.

C.1.2 Description of Work - The Contractor shall perform a broad range of construction management, quality assurance activities, flood fight inspection capabilities, and related services to satisfy fluctuating needs and conditions in accordance with plans developed by the Government, and other Government policy and regulations. The purpose of these activities is to manage the construction contracts and assure that construction of projects is in accordance with construction contract plans and specifications. Quality assurance activities to be performed shall include, but not be limited to:

coordinating, reading plans and specifications, monitoring, documenting, and reporting on construction contractor quality control activities and construction safety, progress, and testing. Section C.2 contains applicable technical references. Construction management services including tracking and management of project funds, submittal tracking and coordination, coordination with field personnel and other district elements concerning construction activities, modification and claim activities, and plan and specification review shall be required for the construction of levees, revetments and various structures, hydraulic and bucket dredging, the repair and/or maintenance of various structures, drainage structures and channels, debris removal, and other emergency services, but shall not be limited to the above.

C.1.2.1 As used within this description of work, the terms “assign” or “assignment” shall refer to defined work that the contractor is required to perform pursuant to issued task orders. In no event shall the terms “assign” or “assignment” be construed to mean that the Government has the right, or is intending to exercise the right, of continuous control over contractor personnel who are performing under the contract.

C.1.3 Authorization and Performance of Work - The general procedural guide for the authorization and subsequent performance of work under this contract is as follows:

a. Task Orders shall be either negotiated for the overall management of a particular project or work assignment or issued by the level of effort required for a stated duration. Written task orders (SF Form 1449) for a designated period will be issued by the Contracting Officer. These task orders will in general define the work and will state the end product required, or the level of effort required for a stated duration. Task Orders will identify projects and the funds obligated against those projects.

b. The task orders issued by the Contracting Officer will be clarified as necessary, either verbally or in writing by the Contracting Officer's Representative, to furnish details governing each work assignment under the task order, including the date for commencement of work on each respective task order and the work items that shall be performed.

C.1.4 Contractor Responsibilities - The Contractor shall be held responsible for the accuracy, quality and completeness of the services to be provided. In case of unsatisfactory work, the Contractor will be held responsible as stated in C.3.4 and reviewed in accordance with the Quality Assurance Surveillance Plan (QASP) referenced in C.1.13. In performing required services, the contractor shall provide all management necessary in receiving assignments, planning, training personnel, checking completed work, and reporting results. Full time Quality Assurance is required during construction activities. Additional services that may be required include preparation of cost estimates for changes, scheduling, review and verification of progress pay estimates, quality assurance activities, performing QA Testing, funds management, preparation of scope changes, and submittal management. Except as otherwise provided in the specifications, the Contractor shall furnish all plant, personnel, transportation, fuel and supply materials as necessary to perform the services required in each task order. All of the above shall be done in accordance with the specifications of this contract.

C.1.5 Contractor Performance - The Contractor shall be prepared to commence work on each task order within 3 calendar days after date of issuance of the task order by the Contracting Officer. The Contractor will be required to commence work on each task order at the designated locations at the time specified by the Contracting Officer or his Authorized Representative. The Contractor will be notified by the Contracting Officer after issuance of the task order of the date and time to commence work on each assignment. The Contractor will perform each assignment continuously as working conditions permit or as deemed necessary by the Contracting Officer or his Authorized Representative as it relates to the construction progress and requirements, except that the Government retains the right to adjust, suspend or terminate assignments as per paragraph C.1.5.2 of this contract. The Contractor is expected to review work in progress to monitor personnel performance in accordance with the contract specifications, Government policy and regulations. The Contractor shall furnish to the Government timely notification when problems arise.

C.1.5.1 Commencement of Work on a task order - Prior to beginning work assignments, each contract employee is to meet with the COR’s designated Government Official indicated as the point of contact, to discuss specifics of the work assignment. Each proposed assignment will be discussed by the Contractor's personnel and the COR’s designated Contract Coordinator as necessary to develop a mutual understanding of:

a. Type of work to be done.

b. End result expected by the Contracting Officer.

c. Methods to be used by the Contractor.

d. Reports to be submitted.

The foregoing discussions shall be only for the purpose of developing a mutual understanding of the items described; in no event will the COR or designated Government official exercise, or have the right to exercise, continuous control over contractor personnel who are performing under the contract.

Payment shall be made to the contractor for applicable personnel attending prework meetings and shall be in accordance with the provisions of Paragraph C.1.3, Authorization and Performance of Work. The contractor shall ensure that all contractor personnel will be properly oriented relative to the responsibilities and publications listed in C.2.1 prior to beginning a work assignment.

The Contractor shall bear any costs to accomplish the above orientation for initial assignments, for substitutions, or replacements of personnel once work has begun, whether dictated by contractor or Government.

C.1.5.2 Modifications to task orders - The Government reserves the right to increase or decrease the amount of services being furnished under each task order, or to discontinue completely or in part the services being furnished as may be deemed necessary by the Contracting Officer or the Authorized Representative. The Contractor agrees that no claim will be made for additional adjustments based upon increase, decrease, or discontinuance of services.

C.1.6 Verifications - For task orders utilizing level of effort, no payment will be made for services in excess of 8 hours in any one calendar day unless work is actually performed. The Contractor will obtain documented authorization prior to working more than 8 hours in any one calendar day, on a weekend, or on a holiday. Should the contractor perform services in an overtime status, or on holidays due to emergencies, or in the event of other unforeseen circumstances without having obtained prior acceptance, he (contractor) must provide written justification to the Contracting Officer or the Authorized Representative on the first workday after performing the overtime or holiday work. The Contracting Officer or the Authorized Representative will review and verify the contractor's justification to determine if post-authorization is warranted. No payment for overtime or holiday work will be made where prior written authorization or post-authorization is not granted.

C.1.7 Distribution of Work - The Government will determine which projects are to be furnished construction services by the Contractor and reserves the right to discontinue at any time the services provided herein subject to the guaranteed minimum. Insofar as distribution of work assignments is concerned, the Contractor agrees that additional adjustments based upon alleged diversion of orders to Government or other forces shall not be a basis for a claim.

C.1.8 Contractor Mobilization - When so ordered by the Contracting Officer, the Contractor must furnish the required contract employees in compliance with paragraph C.1.5.

C.1.9 Completed Work - All completed work, including survey field notes, hydrographic survey recordings, computations and adjustments, lab test results, and other applicable reports shall be delivered to the appropriate

Contracting Officer's Representative as needed in a timely manner.

C.1.10 Remote Areas - Services may be required to be performed in remote areas.

C.1.11 Travel - The contractor will furnish all necessary transportation. Except as may otherwise be provided in this contract, all travel will be at the contractor's expense. Time of service rendered will be computed on the basis of actual duty at the worksite except for instances where personnel are required to travel in a boat to reach the worksite, in which case time of service shall start when the boat providing transportation disembarks to transport personnel to the worksite. If Air Travel is necessary to perform job duties, travel expenses will be negotiated prior to travel and in accordance with the

JTR.

C.1.12 Insurance Requirements – The Contractor shall procure and maintain during the entire period of their performance under this contract the following minimum insurance:

a. Employer’s Liability Insurance. The Contractor shall furnish evidence of Employer’s Liability Insurance in an amount of not less than $100,000.00.

b. General Liability Insurance. Bodily liability insurance in the minimum limits of $500,000.00 per occurrence on the comprehensive form of policy.

c. Automobile Liability Insurance. Minimum limits are $200,000.00 per person, $500,000.00 per occurrence for bodily injury and $20,000.00 per accident for property damage. This insurance shall cover the operation of all automobiles used in performance of the contract. All vehicles to be used in performance of this contract shall be expressly designated in the insurance policy. A copy of the list of such vehicles shall be submitted to the Contracting Officer. In the event that the contractor acquires a new vehicle for use on this contract after his insurance policy has been obtained, he shall immediately amend his policy to reflect the inclusion of the new vehicle on the policy. In no event shall the contractor drive a vehicle on the Government installation or construction work site without first obtaining the required coverage for said vehicle.

C.1.13 Government Quality Assurance Surveillance Plan

a. Purpose.

The purpose of the Quality Assurance Surveillance Plan (QASP) is to identify the methods and procedures the government will use to evaluate contractor performance. These methods and procedures are designed to ensure contract standards detailed in this section of the contract are achieved.

b. Objective.

This QASP has been developed by the requiring activity to ensure that Construction Management (CM) services are performed in a timely and accurate manner to support the New Orleans District Construction Division.·

c. Roles and Responsibilities:

1. Contracting Officer Representative (COR): The COR is charged with implementing this plan and ensuring successful contractor performance.

2. Contracting Officer: The Contracting Officer will take action when the COR identifies non-conforming CM services by the contractor.

d. Methods of Surveillance.

The COR and his representatives distribute work and verify attendance. Also, contractor's QA personnel complete daily reports documenting all QA activities.

In addition, Quality Assurance Personnel in Construction Division will perform surveillance of contractor's field activities.

Details of these inspections are provided to the COR and his representatives as needed.

e. Performance Requirements Summary:

All contractor activities meet established CM standards, including compliance with Construction Division Operating Manual (CDOM), Quality Assurance Plans, BCOE processes, ASTM standards. etc.

C.2 TECHNICAL SPECIFICATIONS

C.2.1 Technical Publications - All work performed under this contract shall be in accordance with the following publications. These publications, with the exception of the ASTM which needs to be purchased separately, will be provided electronically. The contractor's personnel shall be familiar with, comply with, and enforce the provisions of the following:

a. Corps of Engineers Manual EM 385-1-1 - Safety and Health Requirements Manual.

b. Corps of Engineers, Labor Relations Manual ER 1180-1-8.

c. Quality Assurance Representatives Guide EP 415-1-261, Volumes 1 through 4.

d. Department of the Army, Engineering Regulation ER 1180-1-6, 30 September 1995 - Construction Quality Management.

e. Corps of Engineers, ER 1110-1-261, Quality Assurance of Laboratory Testing Procedures.

f. ASTM E 329-06a, Agencies Engaged in the Construction Inspection and/or Testing.

g. All applicable processes in the USACE Quality Management System

(QMS)

h. New Orleans Construction Control Manual (NOCCM)

C.2.2 Technical Discrepancies - When construction contract plans and specifications (applicable for construction work to which construction personnel are assigned) are in conflict with the publications listed in C-

2.1 above, then the construction contract plans and specifications shall govern. When there appears to be a discrepancy between two or more construction contract specifications, in the construction contract plans, between any other regulations applicable to the construction contracts, or when there appears to be an ambiguity in any of these documents, then the construction quality assurance personnel shall appeal to the Contracting Officer's Representative to resolve discrepancies or ambiguities.

C.3 PERSONNEL

C.3.1 Personnel Requirements

C.3.1.1 General Qualifications - All personnel must be duly qualified and experienced to perform the type of required services in accordance with applicable Government regulations, policies, and standard operating procedures including, but not limited to that set forth in publications listed in Section C.2, TECHNICAL SPECIFICATIONS. The Contractor shall also be responsible for providing and maintaining a fully trained staff knowledgeable in compliance of all federal, state and local regulations applicable to Title VII and the Civil Rights Act of 1964, as amended. All personnel will be required to sign a procurement integrity form provided by the Government. The determination of whether personnel are duly qualified and experienced or whether the Contractor's work is unsatisfactory will be made by the Contracting Officer or the Authorized Representatives.

Personnel who are determined to be not qualified and/or experienced, or who do not perform the required services in accordance with the provisions herein, or who compromise or jeopardize the Government's position in any way, shall be replaced immediately by the Contractor at their (the Contractor's) expense. Correction of work or reimbursement to the Government by the Contractor shall be as set forth in C.3.4 - Unsatisfactory Work. Contract employees shall be thoroughly familiar with the construction phases of the respective work to which they are assigned. A Contractor employee may perform work on any construction project wherein he/she meets the minimum qualifications for the level required, which will be determined by the Contracting Officer's Representative.

C.3.1.2 Specific Qualifications - The Contract employee must, at a minimum, have had experience and training described below: (Applicable education may be substituted for experience).

Position Description

Equiv Gov’t Pay Grade

Spec Exp Yrs

Gen Exp Yrs

Total Yrs

USACE

Safety Trng Req’d

CQM

Trng Req’d

Deg Req’d

Const QAR II GS-06 2 2 4 Yes Yes HS Const QAR III GS-07 3 2 5 Yes Yes HS Const QAR V GS-09 4 3 7 Yes Yes HS Sprv Const Rep GS-11 6 3 9 Yes Yes HS Const Manager GS-12 3 3 6 Yes Yes BS(eng or construction management)

Quality Assurance Manager

GS-12 3 3 6 Yes No BS(Science or eng)

Project Engineer GS-11 2 3 5 Yes Yes BS (eng) Senior Engineer GS-12 5 3 8 Yes Yes BS (eng) Cost Estimator GS-11 3 2 5 Yes No HS Scheduler GS-12 3 3 6 Yes No BS Expert Scheduler GS-13 5 3 8 Yes No BS Program Analyst GS-11 3 2 5 Yes No BS Secretary GS-05 0 3 3 Yes No HS Civil Engr Tech I GS-09 3 3 6 Yes No HS Civil Engr Tech II GS-11 5 3 8 Yes No HS

The specialized experience shall be limited to experience in concrete and earthwork placement, structural, electrical, mechanical, dredging, revetment, and emergency repairs, as deemed applicable by the Contracting Officer or Authorized Representative. Typical duties of Government Personnel who perform quality assurance and other construction duties are set forth in job descriptions and are available for review at the U. S. Army Engineer District, New Orleans. All assigned Contract employees must comply with the education levels listed above. If an education requirement is not listed, the employee must be a high school graduate. All employees shall comply with the training requirements of C.3.1.5 prior to being qualified at the position required by the Contracting Officer or the Authorized Representative. With approval, QAR III's will be permitted to work at the next lower level until the training requirements of C.3.1.5 are met in full.

Personnel classified as a Scheduler should have experience with Primavera and scheduling in the fields of heavy civil and marine construction. An Expert Scheduler should have experience in construction contract claim scheduling.

Personnel classified as program analysts should have experience in contract funds management and programming.

Personnel classified as Civil Engineering Technician I must be capable of assisting the Civil Engineer in application of principles, methods, and techniques of civil engineering technology, reviewing project specifications and conferring with the Civil Engineer concerning assistance required, such as plan preparation, acceptance testing, evaluation of field conditions, design changes, modifications, cost estimates and reports. The Civil Engineering Technician reviews survey notes, field computations and contract quantity computations. This work involves performing duties such as calculating dimensions, profile specifications, and quantities of materials using calculator or software programs. This technician shall develop a working knowledge of software programs utilized to develop modification packages.

Personnel assigned as Civil Engineering Technician II must be capable of assisting the Civil Engineer in application of principles, methods, and techniques of civil engineering technology, reviewing project specifications and conferring with the Civil Engineer concerning assistance required, such as plan preparation, acceptance testing, evaluation of field conditions, design changes, modifications, cost estimates and reports. The Civil Engineering Technician reviews survey notes, field computations and contract quantity computations. This work involves performing duties such as calculating dimensions, profile specifications, and quantities of materials using calculator or software programs. This technician shall develop a working knowledge of software programs utilized to develop modification packages. This technician shall be proficient in the file management program PROJECTWISE or similar and PRIMAVERA or similar software programs. In addition, this technician should have the knowledge and experience with reading and interpreting construction schedules and sequencing.

C.3.1.3 Acceptance of Personnel - The contractor shall be responsible for furnishing personnel who meet the minimum qualifications as per Section C of the contract and for the requirements level as determined by the Contracting Officer's Representative for each work assignment. The Contractor shall furnish a resume of experience and qualifications for each employee he proposes to furnish under this contract prior to any work being performed by each respective person. Each employee proposed will be evaluated by the Quality Assurance Branch of Construction Division to determine his/her respective highest qualification level. Resumes should, at a minimum, document education level, relevant work experience with start and stop dates and references. Resumes should be mailed to the address given in Section D or emailed to the Contract coordinator, except that attention should be indicated for Chief, Quality Assurance Branch, Construction Division. For the services required at the beginning of the contract period, the contractor shall only submit for review and acceptance the resumes of individuals which were included in the contractor's proposal. Substitutions will only be allowed with acceptance from the Contracting Officer or Authorized Representative.

C.3.1.4 Exceptions - When the Contracting Officer or Authorized Representative determines that services are required which, due to exigency, do not allow sufficient time for acceptance of suitable personnel as indicated in para. C.3.1.3, the Contractor will be allowed to commence work pending said acceptance. The allowance by the Government for the Contractor to perform services pending acceptance of personnel as per para.

C.3.1.3 shall not constitute waiver of the qualifications provisions of Section C of the contract. Further, payment by the Government to the Contractor for services satisfactorily performed, prior to acceptance, shall not constitute agreement of personnel who performed said services.

C.3.1.5 Training – The following training is required for all Senior Engineers, Project Engineers, Construction Managers, Supervisory Construction Representatives and Quality Assurance Representatives. Training of these employees is the responsibility of the Contractor and each individual employee. As such the Contractor and his employee will bear all cost for training. The training requirements of this paragraph shall not be performed during contract work hours, whether straight time, overtime, or holiday time.

a. OSHA 30 hr Safety – All QAR’s must have successfully completed a 30-hour OSHA Construction safety class or as an equivalent 30 hours of formal construction safety and health training covering the subjects of the OSHA 30- hour course. Employees will be given a 6 month grace period from initial employment to complete this requirement.

b. Construction Quality Management - The Contractor’s field personnel will be required to take the Construction Quality Management course offered periodically by the Corps of Engineers, and score seventy (70) percent or higher on the post-test and possess a valid course certificate from the Government. It is the Contractor's responsibility to ensure that all personnel are adequately trained within 30 days after beginning work. The Contractor shall submit, as soon as completed, a printed copy of the course certificate, validating successful completion. This certificate remains valid for a period of five years.

C.3.1.6 Training compensated by the Government – Any USACE mandated training that may arise throughout the duration of this contract, not described in these specifications, shall be compensated by the Government.

C.3.2 Personnel Management - Management of employees and the tasks they perform are the Contractor's responsibility. The contractor is expected to furnish all supervision necessary in planning, organizing, performing and checking the work to produce the end products required by the Contracting Officer or Authorized Representative. All costs in connection with the Contractor's management personnel are considered to be included in the contract unit prices listed in the Schedule of Prices and shall not be paid for as a separate item.

C.3.3 Contractor's Authorized Representative - The Contractor will designate within seven (7) calendar days after execution of the contract an individual to act as his Authorized Representative responsible for overall administration of this contract. This representative will be authorized to review all necessary work assignments from the Contracting Officer or the Authorized Representative. The Authorized Representative of the Contractor shall be fully qualified to ensure compliance with all work assignments issued by the Contracting Officer or the Authorized Representative. This representative of the Contractor shall work out of the Contractor's office.

All costs in connection with the Contractor's Authorized Representative are considered to be included in the contract unit prices listed in the Schedule of Prices and shall not be paid for as a separate item.

C.3.4 Unsatisfactory Work - If The Contractor's work is found to be unsatisfactory during an assignment or after an assignment is completed, and if it is determined that fault or negligence on the part of the Contractor or his employee had caused the unsatisfactory condition, the Contractor will be liable for all costs in connection with correcting the unsatisfactory work. The work may be performed by Government forces or contractor forces at the direction of the Contracting Officer or the Authorized Representative.

In any event, the Contractor will be held responsible for all costs required for correction of the unsatisfactory condition including payments for services, automotive expenses, equipment rental, supervision, and any other costs in connection therewith. For situations where it is impractical for unsatisfactory work to be corrected, the contractor shall reimburse the Government for the unsatisfactory work by deducting the appropriate costs from the next invoice or by direct repayment.

C.3.5 Daily Quality Assurance Reports - Each Quality Assurance Representative, Supervisory Construction Representative, and Project…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .