Solicitation - W912CH27BA017.pdf
PDF 5 MB Posted
- Solicitation number
- W912CH-27-B-A017
- Issued by
-
Department of the Army
About this file
This is an Invitation for Bids (IFB) for the procurement of Troop Seat Toolkits under a firm-fixed-price contract with a 100% option for increased quantity. The Army Contracting Command-Detroit Arsenal seeks three (3) kits of NSN 2540-01-497-3374, Part Number 57K2015, with an identical optional quantity of three (3) kits. This is a total small business set-aside. Bidders must access the Technical Data Package (TDP), distribution code "C," prior to submission or face bid rejection. The solicitation requires sealed bids submitted electronically via email to Lauren DeRoche and Katie MacFarland at Army Contracting Command-Detroit Arsenal by December 3, 2026, at 1:00 p.m. local time (Warren, Michigan), with virtual bid opening via Microsoft Teams. All bids must remain valid for a minimum of 180 calendar days. Bidders must complete Standard Form 33, acknowledge all amendments, and provide unit pricing for CLINs 0011 (production) and 0012 (option). If a bidder fails to submit a unit price for the option quantity, the basic contract unit price will apply, and the bid will be evaluated accordingly.
Delivery of the production quantity is required within 180 days of contract award to DLA Distribution DDSP New Cumberland Facility in Pennsylvania, with the contractor responsible for transportation costs (FOB Destination). The option quantity follows the same delivery terms. The contractor must also deliver data deliverables by 365 days after award to the Army Contracting Command-Detroit Arsenal in Warren, Michigan. Inspection and acceptance occurs at the contractor's facility (origin). Bidders must provide detailed information on inspection/acceptance points, delivery locations, and facility CAGE codes. The contract includes requirements for Chemical Agent Resistant Coating (CARC) pretreatment procedures, item unique identification markings using data matrix symbology for items costing $5,000 or more, compliance with configuration management documentation, OPSEC training and coordination, and counterintelligence awareness training. The solicitation incorporates numerous FAR and DFARS clauses addressing small business programs, buy American requirements, export controls, intellectual property rights, payment procedures via Wide Area WorkFlow (WAWF), and quality standards including ISO 9001:2015 certification. Technical questions must be submitted by November 13, 2026, at 11:00 a.m. local time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 0002-Special Packaging Instruction (SPI) AK14973374.pdf | ||
| A001-A004 Contract Data Requirements List .docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION
15A. NAME AND
ADDRESS
OF OFFEROR
SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.
RATING PAGE OF PAGES
2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. EMAIL ADDRESS
11. TABLE OF CONTENTS
(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION
A B C D E F G H
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
PACKAGING AND MARKING
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause Number 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)
DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE
UNITED STATES CODE AT:
10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
SEALED BID (IFB) INVITATION FOR BID
NEGOTIATED (RFP) REQUEST FOR
PROPOSAL
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
Section A - Solicitation/Contract Form
Toolkits, Troop SeatsInstrument Name:
Product Service Code : 2540
A.1. DESCRIPTION OF ACTION
(a) This Invitation for Bids (IFB) is intended to result in the award of a firm-fixed-price (FFP) contract with 100% option for Troop Seat Toolkit, National Stock Number (NSN): 2540-01-497- 3374, Part Number: 57K2015
(b) This IFB is a total small business set-aside in accordance with Revolutionary FAR Overhaul (RFO) Federal Acquisition Regulation (FAR) 19.104-1.
(c) There is a Technical Data Package (TDP) associated with this procurement. The TDP is distribution code "C" Distribution is authorized to the U.S. Government agencies and their contractors. Please see Section C.1. TDP Information for instructions on how to access this data. BIDDERS MUST ACCESS THE TDP PRIOR TO SUBMITTING A BID OR THE BID
SUBMISSION WILL BE REJECTED.
(d) Bidders are advised to carefully read and understand this entire IFB, including Sections L and M, prior to submitting a bid for evaluation. The Government will evaluate bids without discussions /negotiations and does not assume the duty to search for data to cure problems it finds in any bid. Therefore, all information necessary for the review and evaluation of a bid is to be contained within the bid submission.
(e) Bidders must complete all necessary fill-ins and representations (if applicable) throughout this IFB, including but not limited to:
(1) STANDARD FORM 33 (IFB COVER PAGE): Blocks 14 through 18;
(2) SECTION B: The unit prices and dollar amounts requested for CLINs 0011 and 0012;
(3) SECTION E: E.1: Inspection and Acceptance Points - Origin;
(4) SECTION F: F.1: FOB Point; Destination;
(5) SECTION F: F.2: Required Delivery Schedule;
(6) SECTION I: RFO FAR 52.209-1: Qualification Requirements
(7) SECTION I 252.227-7989: - Rights in Technical Data, Computer Software, and Computer Software Documentation--Other Than Commercial Products and Commercial Services
W912CH27BA017
(8) SECTION K: RFO FAR 52.203-2 - Certificate of Independent Price Determination;
(9) SECTION K: RFO FAR 52.204-5 - Women-Owned Business (Other Than Small Business);
(10) SECTION K: RFO FAR 52.209-5 - Certification Regarding Responsibility Matters;
(11) SECTION K: RFO FAR 52.209-13 - Violation of Arms Control Treaties or Agreements - Certification;
(12) SECTION K: RFO FAR 52.214-14 - Place of Performance-Sealed Bidding;
(13) SECTION K RFO FAR 52.214-16 - Minimum Bid Acceptance Period;
(14) SECTION K: RFO FAR 52.225-18 - Place of Manufacture;
(15) SECTION K: RFO FAR 52.229-11 - Tax on Certain Foreign Procurements - Notice and Representation
(16) SECTION K: RFO DFARS 252.204-7017 - Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services-Representation'
(17) SECTION K: RFO DFARS 252.204-7998 - Alternate A, Annual Representations and Certifications (DEVIATION 2026-O0043)
(18) SECTION K: RFO DFARS 252.225-7000 - Buy American--Balance of Payments Program Certificate;
(19) SECTION K: RFO DFARS 252.227-7992 - Identification and Assertion of Use, Release, or Disclosure Restrictions (DEVIATION 2026-O0036);
(20) SECTION L: RFO FAR 52.207-4 - Economic Purchase Quantity-Supplies; and
(21) SECTION M: RFO FAR 52.219-2 - Equal Low Bids
Failure to complete all required fill-ins and representations may result in the rejection of a bid.
(f) Bidders shall acknowledge receipt of all IFB amendments by the date and time indicated for receipt of bids. If this IFB is amended, all terms and conditions not modified remain unchanged. Please see Section A.4 Acknowledgement of Amendments and RFO FAR 52.214-3:
Amendments to IFBs for additional information.
(g) All bids received in response to this IFB shall be valid for a minimum of 180 calendar days. Please see RFO FAR 52.214-16: Minimum Bid Acceptance Period for additional information.
(h) Bid opening will be held with all Bidders and shall commence on Thur 03 DEC 2026 at 1:00 P.
M. local time (Warren, MI). Due to security protocols at the Detroit Arsenal, bid opening will be held virtually. Bidder attendance at this event is not required. The Government will provide a Microsoft Teams link, teleconference number, and passcode prior to bid opening. Please contact the following personnel via email at 11:00 a.m. to receive this information:
Lauren DeRoche, Lead Contract Specialist
Army Contracting Command-Detroit Arsenal (ACC-DTA)
EMAIL: lauren.r.deroche.civ@army.mil and
Katie MacFarland, Contracting Officer, Army Contracting Command-Detroit Arsenal (ACC-DTA)
EMAIL: katherine.e.macfarland.civ@army.mil
A.2. IFB STRUCTURE
(a) NAICS. The Government will utilize NAICS code 336390-Other Motor Vehicle Manufacturing for this procurement. Failure to register via the System for Award Management (SAM) website for this NAICS code, prior to submitting a bid in response to this IFB, may preclude your firm from receiving an award. Bidders should be aware of how U.
S. small business concerns are defined in RFO FAR Part 19, RFO FAR DFARS Part 219, and 13 CFR 121 Small Business Size Regulations. Bidders are advised to review 13 CFR 121.103, "How does SBA determine affiliation?", if applicable to this IFB.
W912CH27BA017
mailto://ciara.l.woodard-brown.civ@army.mil
A.3. ELECTRONIC CONTRACTING
(a) All Army Contracting Command - Detroit Arsenal IFBs will be publicized on the SAM website: https://www.SAM.gov. Any additional attachments, including the TDP(s) when available electronically, will be separate attachments or links embedded in the IFB.
(b) Interested Bidders shall submit a completed IFB, including the Standard Form 33, via email with the subject line "IFB Submission - W912CH-26-B-A002 (Contractor Name)" to the following personnel:
Lauren DeRoche, Lead Contract Specialist
Army Contracting Command-Detroit Arsenal (ACC-DTA)
EMAIL: lauren.r.deroche.civ@army.mil and
Katie MacFarland, Contracting Officer, Army Contracting Command-Detroit Arsenal (ACC-DTA)
EMAIL: katherine.e.macfarland.civ@army.mil
Once a bid is received, the Contract Specialist will reply to the respective Bidder indicating receipt of the submission. NOTE: FAX, HARDCOPY (PAPER), AND DVD/CD-ROM BIDS WILL NOT BE
ACCEPTED. HAND-CARRIED BIDS, WHETHER HARDCOPY OR ELECTRONIC, WILL ALSO
NOT BE ACCEPTED.
(c) Please pay close attention to the Issued By block on the cover page of this IFB for a closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with RFO 52.214-7: Late Submissions, Modifications, and Withdrawals of Bids, Bidders are responsible for submitting bids, and any revisions /modifications, so as to be received by the Government office designated in the IFB by the date and time specified.
(d) It is the Bidder's responsibility to ensure the bid is received by the date and time specified on the cover page of this IFB. In accordance with RFO 52.214-7: Late Submissions, Modifications, and Withdrawals of Bids, if the bid was not received at the initial point of entry to the Government
W912CH27BA017
infrastructure (in this case, received via email) by the exact date and time specified on the cover page of this IFB, it will be determined late. Bid is defined to mean ALL volumes or parts required by the IFB are included in the electronic submission.
NOTE: There is no "expected" or "target" length of time for bid submission; size and content may be factors, therefore Bidders are strongly cautioned when submitting bids to allow adequate time for submission.
(e) IFBs may remain posted on SAM.gov after the IFB closing date. If the response deadline has passed for the IFB, vendors will no longer be able to submit electronic responses.
(f) Any award issued as a result of this IFB will be distributed electronically. In the event of a Freedom of Information Act (FOIA) request for a copy of any award issued as a result of this IFB, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price(s). This is the notice required by Executive Order 12600 (June 23, 1987) of the Government's intention to release unit prices in response to any request under FOIA, 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include cost or pricing data/information. If a Bidder objects to such release in the base contract or contract modifications, the Bidder must notify the Contracting Officer in writing prior to the closing date identified in this IFB and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on the rationale given.
(g) All questions pertaining to this IFB shall be submitted via email to the following personnel by 13 NOV 2026 11:00 A.M. local time (Warren, MI):
Lauren DeRoche, Lead Contract Specialist
Army Contracting Command-Detroit Arsenal (ACC-DTA)
EMAIL: lauren.r.deroche.civ@army.mil and
Katie MacFarland, Contracting Officer, Army Contracting Command-Detroit Arsenal (ACC-DTA)
EMAIL: katherine.e.macfarland.civ@army.mil
W912CH27BA017
Responses will be furnished via a Q&A log posting to SAM.gov or as an IFB amendment, if the information is necessary in submitting bids or if the lack thereof would be prejudicial to other prospective Bidders. Please see RFO FAR 52.214-6: Explanation to Prospective Bidders for additional information. The Government will review all questions received but is not obligated to answer questions submitted after the date/time noted above, prior to IFB close.
(h) For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement Technical Assistance Center (PTAC) website to locate a regional center at: http://www.aptac-us.org
A.4 ALL OR NONE - COMMERCIAL ITEM ACQUISITION - SEALED BIDDING
(a) This provision serves as notice that all bid submissions must offer to provide the total quantity of all items identified in this solicitation.
(b) Only one award will be made as a result of this solicitation. Bids submitted for less than the total quantity of all items identified in this solicitation will not be considered for award.
(c) Note: This provision supersedes any other solicitation language that pertains to or references multiple awards
A.5 ACKNOWLEDGMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
A.6 ARMY CONTRACTING COMMAND - DETROIT
ARSENAL (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website:
https://tacom.army.mil/ombudsman (Best viewed using Google Chrome or Microsoft Edge).
A.7 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA
PACKAGE
(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provision of DoD Directive 5230.25 and DoD Instruction 2040.02. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(b) To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, "Militarily Critical Technical Data Agreement" certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at: http://www.dla.mil/HQ/InformationOperations/Offers/Products /LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's Section C "Technical Data Package" instructions.
(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
*** END OF NARRATIVE 1 ***
https://tacom.army.mil/ombudsman https://tacom.army.mil/ombudsman
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
B. 1 SUPPLIES OR SERVICE & PRICES OR COSTS
In the four-digit Contract Line Item Number (CLINs) that follow, the numbering system that is used is as follows:
The first three numbers signify item, and the fourth (last) digit signifies the applicable year:
CLIN 0011 is for the first item, first ordering year.
CLIN 0012 is for the unexercised option quantity.
B.2 UNEXERCISED OPTION QUANTITY
Unexercised Option quantity, pursuant to RFO FAR 52.217-7: Option for Increased Quantity- Separately Priced Line Item.
The quantity states for the option CLIN DOES NOT form a part of the basic contractual quantity.
Part or all if it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.
***The failure of the bidder to insert a unit price applicable to the option quantity shall mean that the bidder will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the bid will be evaluated for award accordingly***
*** END OF NARRATIVE 1 ***
Item Supplies/Service Quanti ty
Unit Unit Price Amount
0011 Production Quantity, Troop Seat Toolkit
3 Kit
National Stock Number:
2540014973374
Manufacturer's Part Number:
57K2015
Part Number Description: Toolkits, Troop Seats
Product Service Code: 2540
North American Industry Classification System (NAICS):
336390
Defense Priorities Allocation System (DPAS) Priority Rating: DO- A4
Drawing Number: 57K2015
Pricing Arrangement: Firm Fixed Price
Option Line Item
Unexercised Option, Troop Seat Toolkit
National Stock Number:
2540014973374
Manufacturer's Part Number:
57K2015
Part Number Description: Toolkits, Troop Seat
Product Service Code: 2540
North American Industry Classification System (NAICS):
336390
3 Kit
Defense Priorities Allocation System (DPAS) Priority Rating: DO- A4
Drawing Number: 57K2015
Pricing Arrangement: Firm Fixed Price
Additional Descriptive Data:
Option quantity, pursuant to RFO FAR 52.217-7: Option for Increased Quantity- Separately Priced Line Item.
The quantity states for the option CLIN DOES NOT form a part of the basic contractual quantity. Part or all if it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.
***The failure of the bidder to insert a unit price applicable to the option quantity shall mean that the bidder will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the bid will be evaluated for award accordingly***
9000 Contract Line Item Number (CLINs) CLINs are associated with the Data Item Numbers on the Contract Data Requirements List (CDRLs) DD Form 1423, in Section J
Exhibit Identifier: CONTRACT
DATA REQUIREMENTS LIST
(CDRLs)
Product Service Code: R699
Pricing Arrangement: Firm Fixed Price
1 Lot
Additional Descriptive Data:
Not Separately Priced (NSP)
Please see Section J, Exhibit A, DD Form 1423 - Contract Data Requirements List (CDRLs) for a complete list of data items associated with this solicitation and the resulting contract.
Section C - Description/Specifications/Statement of Work
C.1 TECHNICAL DATA PACKAGE INFORMATION
The following "X"d item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[X] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov) associated with this solicitation number: W912CH-26-B-A006
To access the data through SAM:
a. Log on to the SAM web site: https://SAM.gov.
b. Search for the solicitation number.
c. Click on the attachment you would like to view.
d. If the attachment is restricted, request access to the document.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code).
(2) Further dissemination of the TDP must be in accordance with provisions of DoD Directive 5230.25, DoDI 5230.24, its Distribution Statement markings, and U.S. export control laws. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). To obtain certification, go to and DD FORM 2345 Instructions DD 2345.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select "Request Explicit Access." This will generate an email to the Contract Specialist and Contracting Officer at Army Contract Command - Warren
W912CH27BA017
https://www.dla.mil/Portals/104/Documents/J3LogisticOperations/FIC/JCP/J3_DDForm2345Instructions(Oct2022)_221005.pdf?ver=dLEK75KpKWRfj3e5wMI8BQ%3d%3d https://www.esd.whs.mil/Portals/54/Documents/DD/forms/dd/dd2345.pdf
(DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.
f. If multiple individuals in the contractor's organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP. Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.
g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed "Use and Non-Disclosure Agreement" at the same time if the solicitation requires both to gain access to view the TDP.
C.2 DRAWING LIMITATIONS
(a) The drawings supplied with this contract are shop or process drawings. The drawings are not engineering design drawings, are adequate to permit manufacture, and:
(1) depict the completed (item(s), and
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.
(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.
(d) The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.
C.3 ACQUISITION OF MANUFACTURER'S PART NUMBER
This acquisition is restricted to the item description set forth in the Schedule which specifies a manufacturer's part number. Since complete Government data for the item are not available, it is understood and agreed that references to specifications and drawings herein shall be deemed to include all changes or revisions thereto which the contractor has made effective as of the date of delivery of any of the items provided for in this contract; provided, that no such change or revision which affects the interchangeability of the item (ability to be interchanged with previous parts or to connect with all mating parts when assembled) shall be effected without the approval of the Contracting Officer. The contractor agrees that he will furnish to the Administrative Contracting Officer or Government Inspector, for the purpose of making inspection under any resulting contract, copies of the applicable specifications and drawings indicating all changes or revisions.
C.4 ACQUISITION OF SOURCE-CONTROLLED PART NUMBER
Acquisition under this contract is restricted to: PEI-GENESIS; PART NUMBERS 12258939-1 & 12258939-2
(1) The manufacturer's part number or numbers set forth in the Schedule or the Technical Data Package; and
(2) Other manufacturer's part numbers that are physically, functionally, and mechanically interchangeable with the manufacturer's part number(s) listed in the Technical Data Package;
provided the nonlisted part numbers have been furnished to one of the approved manufacturers listed in the Technical Data Package and that manufacturer has substituted the nonlisted part with one of the approved part numbers, without making any changes in the characteristics or properties of the part.
C.5 ACQUISITION OF MANUFACTURER'S PART NUMBER:
COMPONENTS
One or more of the drawings for part of the contract item set forth in the Schedule and in the Technical Data Package specify manufacturer's part numbers. Since complete Government technical data for such part or parts are not available, it is understood that the Contractor, by accepting this contract, agrees to furnish only the listed manufacturer's part number(s) for those components of the contract item. It is further understood and agreed that references to manufacturer's part numbers herein shall be deemed to include all changes or revisions thereto which the approved manufacturer has made effective as of the first date of delivery of any of the items under this contract; provided, that no change or revision that affects the interchangeability
(ability to be interchanged with previous parts and to match with all mating parts when assembled) of the listed manufacturer's part shall be incorporated into the contract item without the prior written approval of the Procuring Contracting Officer.
C.6 CONFIGURATION MANAGEMENT DOCUMENTATION
The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).
a. The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).
b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248- 1 - Value Engineering.
d. All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent;
that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
e. For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.
(i) for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A002.
(ii) for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A003.
(iii) for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A004.
f. The Government's acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-
(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government's sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.
g. The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the Administrative Contracting Officer (ACO).
h. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.
C.7 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE
/PLAN
(a) The contractor is subject to, at a minimum, the provisions of the current TACOM OPSEC Plan, or other approved U.S. Government OPSEC plan, per AR 530-1, Operations Security. This Plan specifies the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.
(b) The contractor will receive a copy of the Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by TACOM G3/G2 or individual organizations supporting AT/OPSEC Officers.
(c) The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is OPSEC Level I.
C.8 OPSEC TRAINING REQUIREMENT
Per AR 530-1, Operations Security and CDRL A001, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:
. Within 10 days of completing the training, the https://securityawareness.dcsa.mil/opsec/index.htm Contractor shall provide certificates/proof of completion to the Contracting Officer's Representative (COR), if assigned to the contract, or the Procuring Contracting Officer (PCO).
C.9 Counterintelligence Awareness and Reporting (CIAR); formerly known as Threat Awareness Reporting Program (TARP):
Per AR 381-12, all Department of the Army (DA) personnel (Military/Civilian/Contractor) must complete CIAR training within 30 days of assignment or employment to an organization/contract, W912CH27BA017 https://securityawareness.dcsa.mil/opsec/index.htm and then once every 12 months thereafter pursuant to DoDD 5240.06. DA personnel will complete "Counterintelligence Awareness and Reporting for DoD Employees" - CI116.16, located at https://www.cdse.edu/, to satisfy most Army annual training requirements.
In addition, per AR 381-12 Chapter 5, the following individual(s) must receive an in-person CIAR briefing directly from an ACI Special Agent or a CI-experienced person in addition to the annual training requirement:
DA personnel scheduled to travel (official, unofficial, permanent change of station) to or through countries with a high foreign intelligence or terrorist threat level as identified by Defense Intelligence Agency or the Department of State, will receive a special CIAR briefing prior to the travel and will be debriefed upon return. AR 381-12 13 June 2025 11.
DA personnel who have security clearances travelling to foreign locations in any duty status must fulfill pre-and-post travel security briefing and debriefing requirements in accordance with the DoD Foreign Clearance Guide and DoDD 4500.54E.
DA personnel deploying in support of military exercises or contingency operations will receive a special CIAR briefing prior to departure.
DA personnel taking part in bilateral or multilateral engagements with foreign governments or international organizations will receive a CIAR briefing prior to the event.
Foreign visitors, personnel, and personal connections. Commanders will coordinate with unit security managers to identify personnel potentially vulnerable to FIE exploitation and ensure they are referred to ACI to receive specialized CIAR briefing.
Such personnel will receive foreign intelligence threat briefings prior to foreign travel or event.
Personnel with access to Sensitive Compartmented Information and Special Access Programs.
Personnel assigned to or supporting defense critical infrastructure or associated assets, pursuant to DoDD 3020.40 and DoDI 5240.19, will receive an in-person special CIAR briefing on an annual basis. Such personnel will notify their local ACI office of all projected foreign travel or foreign visits.
Foreign government employment. Current and retired DA personnel seeking employment with foreign government entities will have CIAR training and support made available.
Information technology professionals System administrators, privileged users, and those with privileged access that provides an individual capability to alter the properties, behavior, or control of a DoD information system will receive in-person special CIAR briefings on an annual basis.
Professional and educational exchange programs with foreign governments.
These briefings will be tailored to the particular risk or threat involved, including methods the person may use to minimize the risk, and will place special emphasis on reporting responsibilities.
Debriefings will be conducted as soon as feasible following completion of travel, duty, or visit to a foreign country, or attendance at a conference with foreign personnel by an ACI Special Agent.
Failure to receive training does not relieve individuals from their reporting responsibilities in chapter 4 of this regulation.
C.10 REQUIREMENTS FOR PRETREATMENTS AND CHEMICAL AGENT RESISTANT
COATINGS LOCAL WARREN - PAINTED MATERIEL
(a) Scope
(1) This clause applies to contracts requiring Chemical Conversion Coatings and Pretreatments for Metallic Substrates, Chemical Agent Resistant Coating (CARC), and their related materials. The requirements in this clause clarify and supplement those in the contract, unless nullified elsewhere in the contract or through an approved Request for Deviation.
(2) Coating qualification, spot paint repair, and MIL-DTL-16232 Phosphate Coating, Heavy, Manganese or Zinc Base coatings are not within the scope of this clause.
(b) Definitions
(1) The "contracting agency," "appropriate agency," "procuring authority," "engineering authority," "procuring agency," and "procuring activity" is the PCO or designee.
(2) The "prime contractor" is the company awarded this contract, and the "subcontractors" comprise all companies involved in providing coated parts to the prime contractor, including companies that apply the coatings.
(c) General Requirements Clarifications
(1) The government retains the right for onsite verification of the prime contractors' and its subcontractors' products, processes, procedures, and test reports.
(2) The prime contractor shall be responsible for itself and its subcontractors to produce and maintain detailed process control plans, process control data, pre-production approval testing, ongoing quality control & quality control testing, and test reports. This information shall be available upon government request.
(3) The prime contractor shall immediately notify the PCO and the Defense Contract Management Agency (DCMA) of any failure to meet preproduction and production requirements.
(4) All painting operations, to include production validation, process quality control, and application activities shall be carried out in accordance with the requirements of AOPN 12585018 - Chemical Agent Resistant Coating Systems for Exterior and Interior Army Materiel and the additional clarifications within this clause.
(5) When a substrate is cleaned using multiple methods, each cleaning method shall be treated as a separate step in the process documentation.
(6) CARC primer and CARC topcoat shall not be applied directly to bare metal or plastic, except as provided for in MIL-DTL-53072.
(7) If the contract specifies application of CARC materials over a non-CARC coating, then both CARC primer and CARC topcoat are required. The complete coating system shall meet the requirements for CARC defined in MIL-DTL-53072.
(d) Pre-Production Approval Clarifications
(1) Test procedures shall be submitted IAW the Contract Data Requirements List (CDRL) DI- NDTI-80603 documenting Pretreatment and Chemical Agent Resistant Coating procedures when this CDRL is included in the contract.
(2) Test reports from the ISO 17025 accredited labs shall be submitted for Pretreatment and Chemical Agent Resistant Coating testing IAW the Contract Data Requirements List (CDRL) DI- NDTI-80809 when this CDRL is included in the contract.
(e) Production Testing Clarifications
(1) At a minimum, ongoing production quality tests shall be conducted and recorded daily for coating adhesion and coating thickness, and monthly for salt spray testing. Use of ISO accredited laboratories is optional for these ongoing tests of production parts.
*** END OF NARRATIVE 1 ***
Requirements NSN: 2540-01-497-3374, Toolkits, Troop Seats (FMTV) Part Number: 57K2015
Section D - Packaging and Marking
D.1 PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS)
a) The preservation, packing, and marking requirements for this contract/order shall be accomplished in accordance with the requirements in the specification/standard defined below.
(b) The following requirements shall apply:
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: A
(3) Unit Pack Weight (LBS): 742
(4) Unit Pack Length (IN): 74.8
(5) Unit Pack Width (IN): 44
(6) Unit Pack Depth (IN): 26
(7) Unit Pack Cube (Cubic Feet): 49.521
(8) QUANTITY PER UNIT PACKAGE: 001
(c) The specification/standard cited is intended to give a clear and accurate description of the technical packaging requirements for the item being procured, including the procedure by which it can be determined that the requirements have been met. Specific instructions and/or tailoring of the specification/standard is detailed in the supplemental instructions below. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing and without affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO with copies to the ACO. The government reserves the right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing.
(d) Marking:
In addition to any special markings called out by the specification/standard above, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive material will not identify the nature of the material. NOTE: When an item has Unique
Item Identifier (UII) markings as indicated by the inclusion of contract clause DFARS 252.211- 7003, refer to the DoD Guide to Uniquely Identifying Items (available at: https://www.acq.osd.mil
) for development of the UII and MIL-STD-129 for UII package marking /dpap/pdi/uid/guides.html requirements. Contractors must verify the UII clause cited above are included in this solicitation /contract.
(e) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), "Regulation of Wood Packaging Material in International Trade," current edition, (hereinafter "ISPM 15"), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organization's compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
(f) Hazardous Materials (As applicable):
(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
W912CH27BA017
https://www.acq.osd.mil/dpap/pdi/uid/guides.html https://www.acq.osd.mil/dpap/pdi/uid/guides.html
(2) When applicable, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I) /DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(g) SUPPLEMENTAL INSTRUCTIONS: Please see Section J, Attachment 0002-Special Packaging Instruction (SPI) AK14973374, for additional packaging instructions.
*** END OF NARRATIVE 1 ***
Section E - Inspection and Acceptance
E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN. Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
E.2 TECHNICAL DATA FOR INSPECTION
(a) When requested, the Contractor shall make available to the Government Inspector, the drawings, specifications, and any applicable Engineering Exceptions associated to the technical data, to which the product was manufactured. Upon completion of product inspection and acceptance by the Government Inspector, all drawings, specifications and Engineering Exceptions, will be returned to the Contractor.
(b) If the contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.) the contractor shall ensure that subcontractor technical data is available for review to support the Government's inspection requirements.
E.3 REQUIREMENTS FOR PRETREATMENTS AND CHEMICAL AGENT RESISTANT
COATINGS LOCAL WARREN - PAINTED MATERIEL
(a) Scope
(1) This clause applies to contracts requiring Chemical Conversion Coatings and Pretreatments for Metallic Substrates, Chemical Agent Resistant Coating (CARC), and their related materials. The requirements in this clause clarify and supplement those in the contract, unless nullified elsewhere in the contract or through an approved Request for Deviation.
(2) Coating qualification, spot paint repair, and MIL-DTL-16232 Phosphate Coating, Heavy, Manganese or Zinc Base coatings are not within the scope of this clause.
(b) Definitions
(1) The "contracting agency," "appropriate agency," "procuring authority," "engineering authority," "procuring agency," and "procuring activity" is the PCO or designee.
(2) The "prime contractor" is the company awarded this contract, and the "subcontractors" comprise all companies involved in providing coated parts to the prime contractor, including companies that apply the coatings.
(c) General Requirements Clarifications
(1) The government retains the right for onsite verification of the prime contractors' and its subcontractors' products, processes, procedures, and test reports.
(2) The prime contractor shall be responsible for itself and its subcontractors to produce and maintain detailed process control plans, process control data, pre-production approval testing, ongoing quality control & quality control testing, and test reports. This information shall be available upon government request.
(3) The prime contractor shall immediately notify the PCO and the Defense Contract Management Agency (DCMA) of any failure to meet preproduction and production requirements.
(4) All painting operations, to include production validation, process quality control, and application activities shall be carried out in accordance with the requirements of AOPN 12585018 - Chemical Agent Resistant Coating Systems for Exterior and Interior Army Materiel and the additional clarifications within this clause.
(5) When a substrate is cleaned using multiple methods, each cleaning method shall be treated as a separate step in the process documentation.
(6) CARC primer and CARC topcoat shall not be applied directly to bare metal or plastic, except as provided for in MIL-DTL-53072.
(7) If the contract specifies application of CARC materials over a non-CARC coating, then both CARC primer and CARC topcoat are required. The complete coating system shall meet the requirements for CARC defined in MIL-DTL-53072.
(d) Pre-Production Approval Clarifications
(1) Test procedures shall be submitted IAW the Contract Data Requirements List (CDRL) DI- NDTI-80603 documenting Pretreatment and Chemical Agent Resistant Coating procedures when this CDRL is included in the contract.
(2) Test reports from the ISO 17025 accredited labs shall be submitted for Pretreatment and Chemical Agent Resistant Coating testing IAW the Contract Data Requirements List (CDRL) DI- NDTI-80809 when this CDRL is included in the contract.
(e) Production Testing Clarifications
(1) At a minimum, ongoing production quality tests shall be conducted and recorded daily for coating adhesion and coating thickness, and monthly for salt spray testing. Use of ISO accredited laboratories is optional for these ongoing tests of production parts.
*** END OF NARRATIVE 1 ***
FAR Clauses Incorporated by Full Text
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.246-11 Higher-Level Contract Quality Requirement.
2014-12
Higher-Level Contract Quality Requirement (Dec 2014)
The Contractor shall comply with the higher-level quality standard(s) listed below.(a)
ISO 9001:2015 or equivalent.
The Contractor shall include applicable requirements of the higher-level quality standard(s) (b) listed…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .