Solicitation - W911KF26QA006.pdf

PDF 3 MB Posted

Attached to
Nuclear, Biological, and Chemical (NBC) Test Stand (TS)- Upgrade and Spare Parts
Solicitation number
W911KF26QA006
Issued by

About this file

This is a Solicitation/Contract for Commercial Products and Commercial Services (Standard Form 1449) issued by the Army Contracting Command at Anniston Army Depot for upgrading and providing spare parts for a Nuclear, Biological, and Chemical (NBC) Test Stand. The contract is set aside for a Women-Owned Small Business (WOSB) with a sole source notification to Company 91 LLC in Madison, WI.

Key details include a delivery date of 18 May 2026, a Product Service Code of 6695, and a firm fixed price pricing arrangement. The contract involves upgrading and providing spare parts for the NBC Test Stand located at Anniston Army Depot, with the manufacturer's CAGE code 75117 and part number W4-22-415-FP6M. The solicitation requires electronic submission through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module, with an offer due date of 5 January 2026 at 10:00 AM. Contractors must be registered in the System for Award Management (SAM) and complete electronic annual representations and certifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

calls)

Solicitation/Contract Form Continuation

NBC Test Stand- Upgrade and Spare Parts

Product Service Code: 6695

W911KF26QA006

Continuation of Supplies or Services and Prices/Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price

Amount

Contractor shall upgrade and provide spare parts for the Nuclear, Biological, and Chemical (NBC) Test Stand (TS), located at Anniston Army Depot (ANAD) in accordance with the attached statement of work (SOW).

Manufacturer's CAGE: 75117 Manufacturer's Part Number: W4-22-415-FP6M Product Service Code: 6695 Pricing Arrangement: Firm Fixed Price

1 Each

Continuation of Description

Local Narratives

NARRATIVE NN0001: SOLE SOURCE NOTIFICATION

This procurement is sole sourced to:

COMPANY 91 LLC,56 Corry St, Madison, WI, 53704

ANY ORGANIZATION WHICH BELIEVES ITSELF TO BE IN POSSESSION OF THESE CAPABILITIES CAN PROVIDE WRITTEN

EVIDENCE TO THIS EFFECT TO THE CONTRACTING OFFICER

AND MAY BE CONSIDERED FOR FUTURE PROCUREMENT ACTIONS.

NARRATIVE NN0002: POINTS OF CONTACT

Contract Specialist: Zena Johnson, zena.s.johnson.civ@army.mil, 1 520-669-6059

Contracting Officer: Heather N. Glover, heather.n.glover2.civ@army.mil, (571) 588-0964

NARRATIVE NN0003: LIST OF ATTACHMENTS

The following documents are incorporated as a part of this solicitation:

1. Statement of work

2. Evidence of Authority

3. Request for Technical Literature

NARRATIVE AS6311: ELECTRONIC CONTRACTING

All responses to this solicitation must be submitted in digitized/electronic format. Paper copy responses shall not be accepted. Any clauses or provisions of this solicitation which mention writing, returning, or submission of offer will mean electronic submission. All solicitation responses must be submitted through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. Responses sent by email will not be accepted. Instructions for "Posting Offer" can be found under the Solicitation Module Documentation>Training and Resources.

It is the responsibility of the offeror to confirm receipt and ensure its offer, in its entirety, reaches the Army Contracting Command-Detroit, Anniston Army Depot (ANAD), before the time set for closing of the solicitation. Attachments may be rejected once scanned by our email system and the Contract Specialist does not receive a notification.

Offers submitted using any other means shall not be accepted, unless stated otherwise in the solicitation.

The System for Award Management (SAM) provides industry with a single point of access to all U.S. Army contract opportunities. Offerors must be registered in SAM and complete the electronic annual representations and certifications within SAM before being able to respond to a solicitation. In order to register in SAM, a Data Universal Numbering System (DUNS) must first be obtained. After contract award, companies must ensure that their SAM registration remains valid and current to avoid problems with invoicing and payment. For SAM access and navigation issues, follow the instructions provided at "User Guides and Helpful Hints" on SAM Home page: WWW.SAM.GOV.

Electronic offers must identify the solicitation and the opening/closing date, and include, as a minimum, the following:

The applicable SF Form (SF33/SF1449/SF18/SF1442) filled out and signed.

All applicable fill-in provisions from the solicitation must be completed.

Any other information required by the solicitation.

It is offeror responsibility to furnish all information requested. We will not confirm information by telephone. If you do not fully respond (such as price, delivery date) to the Request for Quotation, you shall be determined non-responsive.

PASSWORDS: If you choose to password-protect access to your offer, you must provide the password to ANAD before the opening or closing date.

Contact the buyer identified on the cover page of this solicitation to arrange a means of providing the password. Passwords used only for the purpose of write protecting files need not be provided.

FILE VIRUSES: Offerors shall make every effort to ensure that their offer is virus-free. Offers (or portions thereof) submitted which DO reflect the presence of a virus, or which are otherwise rendered unreadable by damage in either physical or electronic transit, shall be treated as "unreadable."

See Federal Acquisition Regulation 14.406 or 15.207(c) for a description of the steps the Government shall take with regard to unreadable offers.

BID BOND: Any bid bond required by this solicitation must be submitted with the offer. The properly completed original bid bond must be furnished to the Army Contracting Command-Detroit, Anniston Army Depot (ANAD), 7 Frankford Ave, Anniston, AL 36201-4199, prior to the opening or closing of the solicitation.

NARRATIVE NN0004: CONTRACTOR CHOICE OF PAYMENT

The contractor must accept payment be either Government Smart Pay Credit Card (MasterCard) or Defense Finance Accounting Service (DFAS).

PROVIDE THE FOLLOWING INFORMATION WITH ANY OFFER.

Chosen Payment Method: MasterCard _____ DFAS _____

Contractor Contact Information:

POC: _______________________________________________

Telephone Number: ____________________________________

FAX Number: ________________________________________

Email: ______________________________________________

If your order is to be paid by credit card, you must:

Submit a receiving report in Wide Area Workflow (WAWF) (https://piee.eb.mil/piee-landing/) in accordance with DFARS 232.7002(a)(5) and

Submit an invoice to the Contract Specialist

If your order will be paid by DFAS, you must submit your invoice through WAWF, https://piee.eb.mil/piee-landing/.

Helpful information follows.

To obtain a CAGE code or for other assistance, contact the WAWF helpdesk at 1-866-618- 5988

Questions concerning payment should be directed to the responsible Defense Finance Accounting Services (DFAS). Please have the order number and invoice number ready when calling about payment status.

The accounts payable mailing address can be located in Block 18a of your order.

You can easily access payment information using the DFAS web site at http://www.dfas.mil. Your purchase order/contract number or invoice will be required to inquire status of your payment.

THE CODES WILL ROUTE AND EMAILS CORRECTLY FOLLOWING BE REQUIRED TO YOUR INVOICES ADDITIONAL

THROUGH WAWF:

WAWF

Data/CODES

Needed for Invoice

SUPPLIES/

MATERIALS

(PRs that with start W31G1Y)

SERVICES/

EQUIPMENT

SUPPLIES/ MATERIALS

(PRs DO NOT that start with W31G1Y)

CONSTRUCTION

CAGE CODE SAM Cage code listed in field of Contractor/Offeror contract

ISSUE/ADMIN

BY DODAAC

W911KF W911KF W911KF W911KF

INSPECT BY DODAAC

(If needed)

W31G1Y

(Must have inspector code)

W911KF

W911KF

(Unless Inspected by DCMA)

W911KF

SHIP TO W911KF N/A W911KF W911KF

ACCEPTOR N/A W911KF N/A N/A

Type of Invoice COMBO 2 1 IN COMBO CONSTRUCTION

Pay DODAAC HQ0303 HQ0303 HQ0303 HQ0303

NARRATIVE LS7015: HQ-AMC LEVEL PROTEST PROCEDURES

Complete AMC Protest Procedures can be found at: http://www.amc.army.mil/Connect/Legal-Resources/

An agency protest may be filed with either the contracting officer or to HQAMC but not both following the procedures listed on the website above

NARRATIVE CS1008: LOCAL RULES AND REGULATIONS

1. Contractors shall submit the name of a company point of contact responsible for security requirements through the Contracting Officer to the Installation Security Management Office (ISMO) upon notification of contract award.

2. Anniston Army Depot uses the Pass Visitor Pre-Registration System for installation access. Contractors must submit an electronic visit request 7-10 days prior to the visit at:

https://pass.aie.army.mil/steps/branch_selection

SHOULD A VISIT BE REQUIRED IN LESS THAN 7 DAYS, INCLUDING SAME DAY VISITS, INSTRUCTIONS WILL BE PROVIDED BY

THE GATE GUARDS UPON ARRIVAL.

Beginning 7 May 2025, U.S. citizens must have an ID Card that is REAL ID compliant to access federal facilities to include military installations.

REAL ID Cards are: A state issued driver's license (also known as a Star ID) or a Common Access Card (CAC).

After 7 May, contractors and visitors will need to present a form of identification that is REAL ID compliant, when requesting access to ANAD.

Current CACs and other access badges can still be used to access ANAD until expiration. All renewals will require a Real ID compliant ID Card.

There will also be an option to register a Star ID driver's license at the Visitor Control Center (VCC). Once registered, the license may be presented at the Main Gate Access Control Point (ACP) when entering the depot.

3. Contractors may only submit visit requests for personnel who are current employees of the contractor or who hold a letter of intent to hire issued by the Contractor. NO PRE-EMPLOYMENT LOCAL BACKGROUND CHECKS WILL BE CONDUCTED BY ANNISTON ARMY DEPOT.

4. Violation of any security or safety requirements will be grounds for immediate suspension of the individual's badge. DES will notify the Contracting Officer when suspension actions are taken. The Contractor can appeal the suspension to DES, who is the final adjudication authority of the individual's reinstatement or revocation of badge privileges.

5. Derogatory information that may cause denial of an individual's access to ANAD includes, but it not limited to, the following:

Criminal arrest information that causes the Installation Commander to determine that the individual presents a potential threat to good order, discipline, or health and safety on the installation.

The installation is unable to verify the individual's claimed identity based on the reasonable belief that the individual has submitted fraudulent information concerning his or her identity in the attempt to gain access.

The individual has a current arrest warrant regardless of the offense or violation.

The individual is currently barred from entry to a Federal installation or facility.

The individual has EVER been convicted of crimes encompassing sexual assault, armed robbery, rape, child molestation, production or possession of child pornography, trafficking in humans, drug possession with intent to sell or drug distribution.

The individual has a U.S. conviction for espionage, sabotage, treason.

The individual is a registered sex offender.

The individual has a felony conviction within the past 10 years, regardless of the offense or violation.

The individual has been convicted of a felony firearms or explosives violation.

The individual has engaged in acts or activities designed to overthrow the U.S. government by force.

The individual is identified in the Terrorist Screening database as a known to be or suspected of being a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity.

B. ANAD NETWORK ACCESS.

For access to the ANAD network, send a letter stating that a National Agency Check with Inquiries (NACI) has been initiated and furnish a copy of the SF 85, Questionnaire for Non-Sensitive Positions, for review prior to issuance of an interim password. The results of the NACI investigation shall be furnished to the Security Management Office, Security Office Identifier number A077, for the final adjudication.

C. CONTRACTOR OWNED PROPERTY

1. When contractors bring in contractor owned property onto Anniston Army Depot for use in performing contracted work to repair, replace, or install, all contractor owned equipment must have 'company name' stenciled, laser marked, or marked in some other permanent way on the equipment.

2. No unauthorized materials of any type may be brought onto or left unattended on the installation. Contractors must have a process in place to receive and store materials and have visibility of the location of those materials at all times while on ANAD. This includes construction materials, equipment, and miscellaneous items. This visibility/accountability of materials applies to the Contractor, its subcontractors, and its material suppliers.

3. All Contractor, subcontractor, and material supplier employees are prohibited from bringing personal belongings of any nature onto the installation if such items are to be left unattended at any time.

4. The Contractor is further required to have a plan of action for implementing these procedures and must submit it to the Contracting Officer upon request. This plan of action must include a provision for informing all employees and subcontractors of these procedures. The plan of action must also address monitoring and procedures the Contractor has in place to ensure compliance with this contractual provision.

5. Should the Contractor fail to comply with this mandatory contractual provision, the Contractor may be held responsible for all direct and indirect cost incurred by the Government in identifying, securing, segregating, removing, and otherwise properly disposing of improper or abandoned materials/equipment.

D. CONTRACTOR TRANSPORT OF GOVERNMENT OWNED PROPERTY

If contractors are picking up or returning Government Furnished Property, Government Furnished Material, or Government Furnished Equipment, contractors must have proper government-issued documents in possession such as DD Form 1149 Requisition and Invoice/ Shipping Document, DD250 Material Inspection and Receiving Report, DD1348-1A Issue Release/Receipt Document, OF7 Property pass, or some other document or memorandum indicating Government ownership.

E. TRAFFIC

The Contractor shall conform to Depot regulations concerning:

1. Designated routes

2. Parking regulations

3. Insurance. See narrative entitled "Insurance Requirements (HS1001)"

4. Highway Barricades, Warning Signs, and Parking: The Contractor shall comply with Depot Regulation ANADR 190-5 and Manual on Uniform Traffic Control Devices, ANSI D6.1, Part VI, Latest Edition.

Contractors are permitted to drive their vehicles inside buildings to load and unload supplies and equipment. However, when finished loading and unloading, the Contractor should move the vehicle outside to a designated parking space.

F. CAMERA USE:

Use of any camera, including cellular telephone cameras, is prohibited on this installation. Any camera illegally used on this installation is subject to confiscation Any violation may be punishable by fine or imprisonment or both. To use any camera on ANAD, a camera pass and photgraphic permit must be obtained from the Depot Operations Office (DOO). A request must be made for possession or use of a company-owned camera; permits will not be granted for possession or use of a personal camera or for use of a cell phone camera on the depot. Requirements for photography must be included in the Statement of Work. The request for a permit must state the specific purpose, location, and expected distribution of photographs made on the installation. Such photographs will not be released or otherwise disclosed into the public domain without first completing the STA255 Form (OPSEC Review Certification) with the DOO, and obtain release authority from the Strategic Communications Office.

G. NOTICE TO CONTRACTOR: SEXUAL ASSAULT AND HARASSMENT IN THE WORKPLACE

Contractor employees working in areas with Federal employees must be aware of the workplace rules and requirements prohibiting and responding to sexual harassment and sexual assault incidents and claims. Sexual assault is an involuntary sexual act in which a person is threatened, coerced, or forced to engage against their will, or any sexual touching of a person who has not consented. Sexual assault and sexual harassment are strictly forbidden and the Depot Commander has mandated that everyone on the premises of ANAD has a responsibility to prevent assault and harassment and report it if discovered. The COR will provide a Fact Sheet defining sexual harassment to be distributed to contractor employees working in government facilities.

As with any workforce, there is opportunity for inappropriate behavior between Contractor and Government employees. Prevention and prompt reporting and resolution of any such incidents are Top Priorities at Anniston Army Depot. Offending employees are subject to barment from ANAD.

Contract performance requirements will not be adjusted for reasons related to an incident involving an offense by contractor employees.

In order to prevent problems from arising, Contractor supervisors must provide the following information to each employee working on ANAD premises.

If you believe you are a victim of sexual harassment:

It is important that you take action. Ignoring sexual harassment seldom makes it stop; in most cases, sexual harassment continues or becomes worse when it is tolerated. While removing yourself from the uncomfortable situation may seem to be a solution, it is probably not in your best interest or the interests of other potential victims around you.

Tell the harasser that the behavior is unwelcome and must stop. Any way of telling them to stop is acceptable, including directly telling him or her, calling, e-mailing or sending a memo.

Tell someone; do not keep it to yourself. There are things that other people can do to help you

Document the incident. Write down dates, places, names of witnesses and what happened. Keep e-mails, text messages, instant messages, voice mails, and all history of the incidents.

Report harassment to your supervisor, director, EEO staff, Victim Advocate, or union representative.

Follow whatever complaint procedures apply with your employer

If you witness sexual harassment or it is reported to you:

Report it to your supervisor

Report it to the Depot Sexual Harassment/Assault Response and Prevention (SHARP) Coordinator, Ms. Wendy Suttles-walker, at (256) 240-3447.

Cooperate with any investigative agencies

H. TEMPORARY STRUCTURES:

The Contractor shall comply with Corps of Engineers Manual (EM) 385-1-1.

I. FIRE PREVENTION AND PROTECTION:

The Contractor shall comply with all fire prevention measures prescribed in the installation fire prevention and protection regulation, a copy of which is on file in the office of the Contracting Officer. A written hot work permit shall be obtained from the installation fire department for use of any heat producing devices such as blowtorches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment. The Contractor shall be liable for any fire loss to Government property attributable to negligence on the part of the Contractor, including failure to comply with fire prevention measures prescribed by the terms of this contract.

J. UTILITIES

Government-owned and operated utilities are adequate for the needs and use of the Contractor as well as the Government. All reasonably required amounts of water and electricity are available to the Contractor without charge.

K LAND USE CONTROL

Contractors who will be required to "disturb soil" in the performance of this contract shall review and strictly adhere to the Standard Operating Procedure for Land Use Control Implementation. The SOP is available in the Directorate of Risk Management, Building 199, for review by Contractors.

L. AIR EMISSIONS

The contractor is responsible for early coordination with the Directorate of Risk Management on any action that might result in air emissions (dust, volatile substances, etc). ANAD's Title V Air Permit requires the installation to obtain construction permits for new or modified air sources. The Alabama Department of Environmental Management (ADEM) must issue a construction permit before ANAD purchases and installs any equipment which will produce air emissions. Installation and/or start-up of this equipment without the proper permit and coordination with ADEM is a violation of State and federal environmental law. The violation could result in a possible civil penalty or fine of $32,500 per day per violation from the Federal Environmental Protection Agency. Contractors considering a new process or device, or a modification to an existing unit, must first coordinate with the Environmental Compliance Division, Directorate of Risk Management.

M. ENVIRONMENTAL MANAGEMENT SYSTEM, ISO 14001

The contractor and its subcontractors shall conform to Anniston Army Depot's Environmental Management System (EMS) including all policies and procedures required by the EMS. All activities conducted within the installation are subject to the EMS and any plans, goals, objectives, targets, etc.

established through the EMS. It is the contractor's responsibility to ensure that any work performed under this contract is accomplished in accordance with the Anniston Army Depot's Environmental Policy (Commander's Policy #72). Information about the EMS can be obtained from the Directorate of Risk Management by calling (256) 235-7746.

The contractor or subcontractors shall be responsible for stopping work (or stopping the work of subcontractors) and reporting any operation or condition on ANAD that could adversely affect the environment or the health and safety of employees or the public. In such situations, the contractor should immediately advise the COR or an appropriate authority. Emergencies should be reported by dialing "911" from any Anniston Army Depot base telephone.

N. CONTRACTOR SAFETY AND ACCIDENT PREVENTION

Contractors shall adhere to all ANAD safety rules and regulations.

Applicable Publication: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

Code of Federal Regulation (CFR): OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication V2206; OSHA Construction Industry Standards (29 CFR 1926). One source of these regulations is OSHA Publication 2207, which includes a combination of both parts 1910 and 1926 as they relate to construction safety and health. It is for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402. National Emission Standards for Hazardous Air Pollutants (40 CFR, Part 61).

Title 29 of the Code of Federal Regulations, Subtitle B, Part 1926 provides the safety and health regulations for construction. Under the general provisions, it gives each contractor responsibility to "...initiate and maintain such programs as may be necessary to comply with this part (29CFR1926)." The general company safety plan should address the how the company will comply with the basic requirements of the standard.

For 29 CFR 1926 and other OSHA standards and interpretations plus other resources are available from the Occupational Safety and Health web site, www.osha.gov.

In addition to FAR Clause 52.236-13 "Accident Prevention", the contractor shall comply with all regulations, publications and manuals current at the time the Task Order is being performed to include but are not limited to Army Material Command (AMC) Regulation 385-100, Safety and Occupational Health Regulation ANADR 385-1, Engineering Manual (EM) 385-1-1, 29 Code of Federal Regulations (CFR) 1926/1910, other related Department of Transportation (DOT) Regulations (49 CFR), Federal Standard (Fed Std): 313A Material Safety Data Sheets, ANSI BHMA A156, National Electric Safety Code ANSI C2, NFPA Codes and Standards, National Electric Code Handbook, UFGS (Unified Facilities Guide Specification) and all local policies. Definition of Hazardous Materials: Refer to hazardous and toxic materials/substances included in Subparts H and Z of 29 CFR 1910 and to others as additionally defined in Fed. Std 313. Those most commonly encountered include asbestos, polychlorinated biphenyl's (PCB's) explosives and radioactive material, but may include others. The most likely products to contain asbestos are sprayed-on fireproofing, insulation, boiler lagging and pipe covering. Engineering Manual 385-1-1 outlines safety requirements for construction. A copy of it is available for review in the Anniston Army Depot safety office, or from the Army Corp of Engineers web site, www.usace.mil/publications.

The contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his/her part or that of his/her employees or subcontractors, which results in illness, injury, or death. Contractors prior year OSHA logs (form 300A) and a site specific safety plan for work to be performed on Anniston Army Depot must be provided for approval by the Anniston Army Depot Safety Office no more than 10 days after award of contract. The contractor shall maintain an accurate record of accidents resulting in traumatic injury or death and accidents resulting in damage to Government property, supplies, and equipment. The contractor shall report incidents causing disruption of contract services, or any accidents in connection with performance of this contract, to the Contracting Officer Representative within two (2) hours of occurrence. contractor will notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/by local, State, and Federal Regulators in which the violation or alleged violation is attributed to the action of the contractor or its subcontractors. contractor will provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation.

The contractor shall safeguard and maintain all Government property, as well as, provide for the safety and well being of personnel employed in the administration of this contract. Local PPE requirements are at minimum long pants, long sleeved shirts, protective footwear, protective eyewear, hearing protection and shall be used and provided by contractor.

The Government reseres the right to conduct unannounced safety inspections at any time, all OSHA required records to include OSHA form 300 and 300A will be made available to COR or ANAD Safety Office Staff upon request or during unannounced safety inspections. OSHA logs must be produced for review within 3 working days of initial request. The contractor will notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/ by local, State, and Federal Regulators in which the violation is attributed to the action of the contractor or its subcontractors. The contractor will provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation with in 1 day of receipt of documentation.

If a contractor employee is observed performing an activity in a manner inconsistent with any of the above cited regulations or is engaged in any activity that is dangerous to life, limb, or government property, the ANAD Safety Representative shall have the authority to notify the employee and /or the contractor's on-site supervisor of the hazardous activity and require correction of the hazardous activity. If necessary, the ANAD Safety Representative shall have the authority on behalf of the Contracting Officer to require the contractor and/or its employee to stop the hazardous activity until corrective action is taken to eliminate a hazardous condition or safety violation. Said action shall not be considered to be the basis of a claim against the government and shall be at no cost to the Government.

The contractor must have a Drug Free Workplace plan that includes post accident testing. This shall be part of their Safety Plan.

O. CONTRACTOR SAFETY PROGRAMS AND ACCIDENT PREVENTION PLANS:

For each specific job or contract, an accident prevention plan (or job safety plan) must be submitted by the contractor. This plan is specific for the current project, and must address the particular hazards which will be inherent in the project and how they will control them. This plan must be submitted to the ANAD Safety Office not more than 10 calendar days after contract award. The contractor must have an approved plan in place prior to any work being performed on ANAD. Listed below are some of the items that must be covered in the plan, the plan must also meet current standards listed in section N.

1. SIGNATURE SHEET. This must include the title, signature, and phone number of the following:

Plan preparer

Plan approver, e.g., owner, company president, etc.

Other applicable personnel plan concurrers (other corporate and project contractor personnel, such as their safety officer, project manager, or superintendent)

2. BACKGROUND INFORMATION. List the following:

a. Contractor

b. Contract number

c. Project name

d. Brief description of the work to be performed and location

e. Contractor accident experience (provide information such as OSHA 200 logs, company safety trend analysis)

f. Listing of phases of work and hazardous activities requiring activity hazards analyses.

3. STATEMENT OF SAFETY AND HEALTH POLICY.

4. RESPONSIBILITIES AND LINES OF AUTHORITIES.

a. Identification and accountability of personnel responsible for safety - at both corporate and project level if applicable.

b. Lines of authority.

5. SUBCONTRACTORS AND SUPPLIERS.

a. Identification of subcontractors and suppliers (if known).

b. Means for controlling and coordinating subcontractors and suppliers.

c. Safety responsibilities of subcontractors and suppliers.

6. TRAINING.

a. List subjects to be discussed with employees in safety indoctrination.

b. List mandatory training and certifications, which are applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, vehicle operator, HAZWOPER training and certification, personal protective equipment, electrical hazards, elevated surfaces.).

c. Identify requirements for emergency response training.

d. Outline requirements (who attends, when given, who will conduct etc.) for supervisory and employee safety meetings.

7. SAFETY AND HEALTH INSPECTIONS. Provide details on:

a. Who will conduct safety inspections (e.g. project manager, safety professional, QC, supervisor, employees, etc.)

b. Any external inspections/certifications that may be required.

8. SAFETY AND HEALTH EXPECTATIONS, INCENTIVE PROGRAMS, AND COMPLIANCE.

a. The company's written safety program goals, objectives, and accident experience.

b. A brief description of the company's safety incentive programs (if any)

c. Policies and procedures for holding managers and supervisors accountable for safety.

9. ACCIDENT REPORTING. The contractor shall identify who shall complete the following, how, and when:

a. Exposure data (man hours worked)

b. Accident investigations, reports and logs

c. Immediate notification of accidents

10. PLANS (PROGRAMS, PROCEDURES) AS APPLICABLE TO THE WORK TO BE CONDUCTED.

This list is not all-inclusive, nor will all topics apply to all contractors.

a. Hazard communication

b. Emergency response plans (spills, posting of emergency telephone numbers, fire prevention, etc.)

c. Layout plans

d. Respiratory protection plan

e. Health hazard control program

f. Lead abatement plan

g. Asbestos abatement plan

h. Abrasive blasting

i. Confined space

j. Hazardous energy control plan

k. Critical lift procedures

l. Contingency plan for severe weather

m. Access and haul road plan

n. Demolition plan (engineering and asbestos survey)

o. Material handling equipment licensing

p. Plan for prevention of alcohol and drug abuse

q. Fall protection

11. Detailed site-specific hazards and controls shall be provided in the activity hazard analysis for each phase of the operation.

NARRATIVE HS1001: INSURANCE REQUIREMENTS

A. In accordance with Insurance--Work on a Government Installation clause, FAR Reference 52.228-5, incorporated herein, the following amounts of insurance are required:

INSURANCE TYPE MINIMUM AMOUNT

Workers' Compensation and Employer's Liability $100,000.00

General Liability, Bodily Injury Liability $500,000.00 per occurrence

Property Damage Liability $500,000.00 per occurrence

Automobile Coverages

Liability $200,000.00 per person

Bodily Injury $500,000.00 per occurrence

Property Damage $ 20,000.00 per occurrence

B. A certificate of insurance, showing that the required amounts of insurance have been obtained, will be furnished. Special attention is directed to the cancellation notice of the insurance certificate. The cancellation notice must state:

"In the event that this policy is cancelled or any material change in the policy is made that would adversely affect the interest of the Government, such change or cancellation shall not be effective for such period as may be prescribed by the laws of the state in which this contract is to be performed and in no event sooner than thirty (30) days after written notice thereof to the Contracting Officer."

NARRATIVE FS1002: SCHEDULING DELIVERIES

All open delivery trucks or other delivery vehicles shall be covered with a tarp or other means to preclude paper or other materials from blowing out along the roadways.

The contractor shall provide the time of delivery in calendar days to the contract specialist.

Prior to making a delivery at Anniston Army Depot, trucking companies MUST schedule an appointment. Attempted deliveries without an appointment shall be turned away - no exceptions.

DLA DELIVERY: To schedule a delivery appointment, contact ddaa.transportation@dla.mil..

NON-DLA DELIVERY: To schedule a delivery appointment contact the COR or technical POC.

WORK HOURS RECEIVING HOURS DAY(S) OF WEEK

7:00 AM - 4:30 PM 7:00 AM - 2:00 PM Monday - Thursday

7:00 AM - 3:30 PM 7:00 AM - 2:00 PM Every other Friday

CLOSED 7:00 AM - 2:00 PM Every other Friday

CLOSED CLOSED Saturday, Sunday, Federal Holidays

A. Federal Holidays. Federal holidays may cause the Depot to be closed for one or more of the work days identified. The contract performance period has taken this possibility into consideration.

B. Shutdown Periods. The Government may choose to shut down for up to a week to perform maintenance and conduct other activities. These shut downs typically revolve around the Independence Day Holiday or the Christmas Holiday. During these shutdowns, and unless otherwise stated, only those Government personnel essential for equipment/facility maintenance will be permitted to work. In addition, The Government may choose to conduct Safety Stand-Down Day(s) or Employee Appreciation Day(s). These activities typically occur on a Friday and usually do not exceed eight (8) work hours per year. The Contractor's services may not be required during these periods. In all cases, the Contractor will be notified in writing by the Government. These interruptions shall be at no cost to the Government.

C. Schedule Changes. When situations warrant, the Government may change the hours of operation to adjust for certain conditions, i.e., weather conditions (extreme heat or cold). For example, during summer production, shops may begin work at 6:00 am and leave work at 3:30 pm to avoid the afternoon heat. The Contractor shall be provided as much advance written notice as possible when these situations occur and will be expected to support any schedule change provided by the Contracting Officer.

D. Traffic: The Contractor shall conform to Depot regulations concerning:

1. Designated routes

2. Parking regulations

3. Insurance. See narrative entitled "Insurance Requirements (HS1001)"

4. Highway Barricades, Warning Signs, and Parking: The Contractor shall comply with Depot Regulation ANADR 190-5 and Manual on Uniform Traffic Control Devices, ANSI D6.1, Part VI, Latest Edition.

Contractors are permitted to drive their vehicles inside buildings to load and unload supplies and equipment. However, when finished loading and unloading, the Contractor should move the vehicle outside to a designated parking space.

E. CAMERA USE:

Use of any camera, including cellular telephone cameras, is prohibited on this installation. Any camera illegally used on this installation is subject to confiscation Any violation may be punishable by fine or imprisonment or both. To use any camera on ANAD, a camera pass and photgraphic permit must be obtained from the Depot Operations Office (DOO). A request must be made for possession or use of a company-owned camera; permits will not be granted for possession or use of a personal camera or for use of a cell phone camera on the depot. Requirements for photography must be included in the Statement of Work. The request for a permit must state the specific purpose, location, and expected distribution of photographs made on the installation. Such photographs will not be released or otherwise disclosed into the public domain without first completing the STA255 Form (OPSEC Review Certification) with the DOO, and obtain release authority from the Strategic Communications Office.

NARRATIVE NN0010: ADDENDUM TO FAR CLAUSE 52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (DEVIATION

2018-O0018) (OCT 2018)

The offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers.

NARRATIVE NN0011: DISCLOSURE OF UNIT PRICE INFORMATION

Pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial Information (June 23, 1987), this is notification of our intention to release unit prices in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the contracting officer is notified of your objection to such posting prior to submission of initial proposals.

Requirements CLIN 0001 Compressor upgrading the Nucle

CLIN only - Requisition Document Number (MILSTRIP, DLMS, FEDSTRIP): W31G1Y521100VY

Bill to Party: W31G1Y

CLIN only - Requisition Document Number (MILSTRIP, DLMS, FEDSTRIP): W31G1Y521100VY

Bill to Party: W31G1Y

Continuation of Deliveries or Performance

Delivery On Or Before Delivery Date 18 May 2026

Line Item Delivery Schedule Quantity Address and POC Special Handling/Notes

Delivery On Or Before Delivery Date 18 May 2026

1 Each Place of Performance DoDAAC: W911KF CountryCode: USA

W6QK ACC ANAD

ACC ANNISTON ARMY DEPOT, 7

FRANKFORD AVE

ANNISTON, AL 36201-4199

UNITED STATES

FoB Details

Party to Pay Transportation Cost:

Contractor

Point Type: Destination

Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.204-21 Basic Safeguarding of Covered Contractor Information Systems. Nov 2021 52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services. Nov 2023

FAR Clauses Incorporated by Full Text

52.219-28 Postaward Small Business Program Rerepresentation. (Jan 2025)

Postaward Small Business Program Rerepresentation (Jan 2025)

(a) Definitions. As used in this clause-

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern-

(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (d) of this clause.

(2) Affiliates, as used in this definition, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.

(b) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, upon occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts-

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) If the Contractor represented its status as any of the small business concerns identified at 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, for the NAICS code assigned to an order (except that paragraphs (c)(1) through (3) of this clause do not apply to an order issued under a Federal Supply Schedule contract at subpart 8.4)-

(1) Set aside exclusively for a small business concern identified at 19.000(a)(3) that is issued under an unrestricted multiple-award contract, unless the order is issued under the reserved portion of an unrestricted multiple-award contract ( e.g., an order set aside for a woman-owned small business under a multiple-award contract that is not set-aside, unless the order is issued under the reserved portion of the multiple-award contract);

(2) Issued under a multiple-award contract set aside for small businesses that is further set aside for a specific socioeconomic category that differs from the underlying multiple-award contract ( e.g., an order set aside for a HUBZone small business concern under a multiple-award contract that is set aside for small businesses);

(3) Issued under the part of the multiple-award contract that is set aside for small businesses that is further set aside for a specific socioeconomic category that differs from the underlying set-aside part of the multiple-award contract ( e.g., an order set aside for a WOSB concern under the part of the multiple-award contract that is partially set aside for small businesses); and

(4) When the Contracting Officer explicitly requires it for an order issued under a multiple-award contract, including for an order issued under a Federal Supply Schedule contract (see 8.405-5(b) and 19.301-2(b)(2)).

(d) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size-standards.

(e) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition-

(1) Was set aside for small business and has a value above the simplified acquisition threshold;

(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or

(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(f) Except as provided in paragraph (h) of this clause, the Contractor shall make the representation(s) required by paragraphs (b) and (c) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting officer in writing within the timeframes specified in paragraph (b) of this clause, or with its offer for an order (see paragraph (c) of this clause), that the data have been validated or updated, and provide the date of the validation or update.

(g) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (f) or (h) of this clause.

(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under ____NAICS Code assigned to ____contract number.

(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1001.

(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.

(4) Women-owned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: ____.]

(5) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: ____ .]

(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause. ] The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.

(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.

(8) Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under the SDVOSB Program. The Contractor represents that it [ ] is, [ ] is not an SDVOSB joint venture eligible under the SDVOSB Program that complies with the requirements of 13 CFR 128.402. [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: ____.]

(9) [ Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause. ] The Contractor represents that-

(i) It [ ] is, [ ] is not a HUBZone small business concern…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .