Solicitation - W50S8K26QA001.pdf
PDF 3 MB Posted
- Attached to
- LTUY252022 Repair B37 MTS by Removal
- Solicitation number
- W50S8K26QA001
About this file
This is a Request for Quotation (RFQ) for repair services issued by the National Guard Bureau on behalf of Jefferson Barracks Air National Guard Station in St. Louis, Missouri.
The solicitation (W50S8K26QA001) seeks quotations for project LTUY252022 Repair Building 37 ATS by Removal, a construction project to repair Building 37's primary and backup electrical systems to ensure proper functionality during power outages. The Government's target price range is $16,000 to $18,500, with a preferred completion schedule of 60 calendar days after notice to proceed (NTP), though alternative schedules are negotiable. The Government intends to award a single firm fixed price contract to the responsible quoter offering the best value. This solicitation is a 100% small business set-aside under NAICS 238210. Quotations must be submitted via email to MSgt Joe Bernier at joseph.bernier.1@us.af.mil by 19 May 2026 at 10:00 AM. A pre-quotation conference and mandatory site visit will occur on 7 May 2026 at 1:00 PM at Building 37 on the installation; registration is required by 30 April 2026 with specific personal identification information. The Government expects to issue the NTP within 30 calendar days of award. A payment bond will be required if the award amount exceeds $35,000. Construction Wage Rate Requirements (Davis Bacon wages) apply. Standard federal contracting clauses are incorporated, including Buy American requirements for construction materials, insurance requirements (Workmen's Compensation $100,000, Comprehensive General Liability $500,000, Comprehensive Automobile Liability $200,000/$500,000/$20,000), and inspection per FAR 52.246-12. Quotations must include a completed Standard Form 1449, a one-page capability statement with relevant experience and points of contact, and acknowledgement of all amendments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
29. AWARD OF CONTRACT: REFERENCE OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
calls)
Solicitation/Contract Form Continuation
LTUY252022 Repair B37 ATS by RemovalInstrument Name:
1. INTRODUCTION
a. You are invited to submit a quotation for project LTUY252022 Repair Building 37 ATS by Removal at Jefferson Barracks Air National Guard Station (ANGS), St. Louis MO 63125. As a result of this solicitation, the Government intends to award a single Firm Fixed Price (FFP) contract to the responsible quoter whose quotation represents the best value after evaluation in accordance with the factors in the solicitation.
b. This solicitation is 100% set-aside for small businesses.
c. The Government point(s) of contact (POC) for this solicitation are:
MSgt Joe Bernier
Email: joseph.bernier.1@us.af.mil
Phone: (314) 527-8033
SMSgt Mark Phillips
Email: mark.phillips.18@us.af.mil
Phone: (314) 527-8031
d. The purpose of this project is to repair Building 37 so that its primary and backup electrical systems function correctly in the event of a power outage.
e. The Government's target price range is between $16,000 and $18,500.
f. The Government's preferred project schedule is 60 calendar days after Contractor's receipt of notice to proceed (NTP); however, this is negotiable and quoters may include alternative terms in their quotation, see quotation submission instructions in FAR 52.212-1. The Government intends to issue the NTP within 30 calendar days of award.
g. A payment bond will be required if award amount exceeds $35,000. Alternative forms of payment protections will not be considered per National Guard Bureau policy.
2. NOTICE OF PRE-QUOTATION CONFERENCE AND SITE VISIT
W50S8K26QA001
a. A pre-quotation conference will be conducted at 7 May 2026 at 1:00 PM local time for the purpose of briefing the solicitation requirements and answering questions. This conference will be held at project site at Building 37 on Jefferson Barracks ANGS (see map in Statement of Work).
The site visit will immediately follow the conference.
b. The clauses at FAR 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, quoters are urged and expected to inspect the site where the work will be performed.
c. Due to base security requirements, all quoters must register to attend this conference and site visit no later than 30 April 2026 at 5:00 PM local time. Email the following information for all attendees to the POC(s) above.
Last name, first name, and middle initial. If no middle initial, indicate with "NMI". Use full first and last names as shown on your REAL-ID compliant Government issued identification.
Date of Birth: MM/DD/YR
Driver's License Number and State of Issue
d. If you have existing base access credentials, only the attendee(s)'s name is required to register.
The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government's denial of your access to the conference and site visit. This information will be provided to Base Security Forces who will authorize your entrance to the installation.
e. Visitors must stop at the installation's main gate at 21 Hancock Ave., St. Louis, MO 63125 (across the street from the Jefferson Barracks Telephone Museum) and present the identification used to register. Please note: Jefferson Barracks ANGS is separate from the Veteran's Affairs Hospital and National Cemetery. You will be required to present your driver's license upon arrival.
Ensure you have the following documentation for your vehicle when entering the installation:
registration, proof of insurance, and if applicable, rental car agreement. All vehicles entering the installation are subject to random inspection and review of required documentation. Any of the above information furnished by you in protected by the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
f. The site visit is intended to be interactive and responses to questions will be provided at the site visit; however, information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation. Terms of the solicitation remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgement and receipt of solicitation amendments shall apply. Meeting minutes will not be taken at the site visit, so all interested quoters are highly encouraged to attend.
3. REQUEST FOR INFORMATION
Any request for information (RFI) or questions regarding this solicitation shall be submitted via email to the POC(s) above no later than 5 business days following the site visit. Questions/RFI submitted after this date may not be answered by the Government before the solicitation due date /time. Answers to questions/RFI, on a non-attribution basis, will be posted to SAM.gov.
4. AMENDMENTS PRIOR TO DATE SET FOR RECEIPT OF QUOTATIONS
The right is reserved, as the interest of the Government may require, to revise or amend the project requirements prior to and/or after the date set for receipt of quotations as necessary. Such amendments, if any, will be announced by an amendment or amendments to this solicitation. All information relating to this solicitation, including pertinent changes/amendments and information prior to the date set for receipt of quotations will be posted to www.sam.gov.
5. WAGE DETERMINATION
a. The Construction Wage Rate Requirements, formerly known as Davis Bacon Wage Rates, are applicable to this project. Current prevailing wage determination(s) at time of issuance of the solicitation are included in the attachments. The current wage determination(s) at time of award will be incorporated into the contract.
6. QUOTATION EXPENSES AND PRE-CONTRACT COSTS
This solicitation does not commit the Government to pay costs incurred in preparation and submission of initial and subsequent quotations or for other costs incurred prior to contract award.
7. REMOVAL OF SECTIONS AT TIME OF AWARD
All solicitation instruction and representation and certification sections will not physically be included an award but will be deemed to be incorporated by reference in the contract.
8. EXCEPTIONS
If the quoters takes exceptions to any of the requirements specified in the solicitation, the quoter shall clearly identify each exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements and supporting rationale shall be included in an addendum to the quotation and clearly labeled "Exceptions". An addendum is only required if the quoter takes exception to any requirement in the solicitation. The addendum does not have a page limitation but shall include only information relevant to exceptions taken to the solicitation requirements. The Government will assume a quoter takes no exceptions to any solicitation requirement if the quoter does not submit an addendum identifying exceptions. Quoters are advised that solicitation requirements are not necessarily negotiable and such exceptions may render a quotation unacceptable and ineligible for award.
9. NATIONAL GUARD BUREAU AGENCY PROTEST PROGRAM
a. National Guard Bureau, Agency Protest Program: NG Agency Protest Program is intended to encourage interested parties to seek resolution of their concerns with the National Guard (NG) as an Alternative Dispute Resolution forum, rather than filing a protest with the Government Accountability Office (GAO) or other external forum.
b. Contract award or performance is suspended during the protest to the same extent, and within the same time periods as if filed at the GAO. The NG protest decision goal is to resolve protests within 35 calendar days from filing. An agency protest may be filed with either the Contracting Officer or the NG Agency's Protest Decision Authority, but not both, in accordance with NG protest procedures.
c. To be timely, the protests must be filed within the periods specified in FAR 33.103. d. To file a protest under the NG Agency Protest Program, the protest must request resolution under that program and be sent to the address below: National Guard Bureau Office of the Director of Acquisitions
ATTN: NGB-AQ-P
111 S. George Mason Dr.
Arlington, VA 22204
Email: ng.ncr.ngb-arng.mbx.ngb-task-order-ombudsman@mail.mil
e. All other agency-level protests should be sent to the Contracting Officer for resolution at the address in the solicitation. See provision FAR 52.233-2. NG public-facing, general protest information is found at: https://www.nationalguard.mil/Leadership/Joint-Staff/Special-Staff /Director-of-Acquisitions/
10. REPORTING EXECUTIVE COMPENSATION
If the resultant contract of this solicitation is subject to executive compensation and first tier subcontract awards reporting in accordance with clause FAR 52.204-10, the following codes are provided to accomplish the reporting:
TAS: 3840
Agency: 5700
*** END OF NARRATIVE ***
Continuation of Supplies or Services and Prices/Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price
Amount
0001 Non personal services: Provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance, and supervision necessary to complete project LTUY252022 Repair B37 ATS by Removal in accordance with the Statement of Work.
Product Type Code: Z2AZ Pricing Arrangement: Firm Fixed Price
1 Job
Continuation of Description
Requirements LTUY252022 Repair B37 ATS by Removal
Product Service Code : Z2AZ North American Industry Classification System (NAICS) : 238210
Continuation of Inspection and Acceptance
Overall Contract Inspection/Acceptance Locations
0001 Inspection and Acceptance Location
Both Destination Instructions: Inspection and acceptance will be in accordance with FAR 52.246-12, Inspection of Construction.
DoDAAC: F7M3CE CountryCode: USA
F7M3CE 131 BW CES
AF NO MILSBILLS PROC CP 3145278373, 1 GRANT RD
ST. LOUIS, MO 63125-4117
UNITED STATES
John Matthews
Continuation of Deliveries or Performance
0001 Delivery Schedule From date of lead time event to completion of performance 60 Calendar Days
Date of Notice to Proceed Receipt 1 JobQuantity
Address and POC Place of Performance DoDAAC: F7M3CE CountryCode: USA
F7M3CE 131 BW CES
AF NO MILSBILLS PROC CP 3145278373, 1 GRANT RD ST. LOUIS, MO 63125-4117
UNITED STATES
John Matthews
Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
2017-01
52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038)
2026-02
52.219-6 Notice of Total Small Business Set-Aside. (Deviation 2026- O0038)
2026-02
52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038)
2026-02
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.
2024-05
52.232-33 Payment by Electronic Funds Transfer-System for Award Management.
2018-10
52.232-40 Providing Accelerated Payments to Small Business Subcontractors.
2023-03
52.233-3 Protest after Award. (Deviation 2026-O0038)
2026-02
52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026-
2026-02
O0038)
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials.
2011-09
252.203-7002 Requirement to Inform Employees of Whistleblower Rights.
2022-12
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. (DEVIATION 2024-
O0013 REVISION 1)
2024-05 Deviation 2024- O0013
2024-05
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
2023-01
252.223-7008 Prohibition of Hexavalent Chromium.
2023-01
252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime.
2023-01
252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.
2023-06
252.232-7003 Electronic Submission of 2018-12
Payment Requests and Receiving Reports.
252.232-7010 Levies on Contract Payments. 2006-12
252.247-7023 Transportation of Supplies by Sea.
2024-10
FAR Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
52.212-4 Terms and Conditions- Commercial Products and Commercial Services. (Deviation 2026-O0038) (Tailored)
2026-02
Terms and Conditions-Commercial Products and Commercial Services (Feb 2026) (Deviation 2026-O0038)
(a) . The clause at Federal Acquisition Regulation (FAR) 52.202-1, Definitions, is Definitions incorporated by reference.
(b) . See clause FAR 52.246-12, Inspection of ConstructionInspection/Acceptance .
(c) . The Contractor or its assignee may assign its rights to receive payment due as Assignment a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.
C. 3727). However, when a third party makes payment ( use of the Governmentwide e.g., commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(d) . See clause FAR 52.243-5, Changes and Changed Conditions.Changes
(e) . This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the Disputes parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal, or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause FAR 52.233-1, Disputes, which is incorporated in this contract by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(f) . See clause FAR 52.249-10, Default (Fixed-Price Construction)Excusable delays .
(g) Invoice. The Government will handle invoices according to the Prompt Payment Act (31 U.S.
C. 3903) and 5 CFR part 1315. The Contractor shall submit invoices to the address designated in the contract to receive invoices. An invoice must include the information required by 5 CFR part 1315.9(b).
(h) . The Contractor shall indemnify the Government and its officers, Patent indemnity employees, and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark, or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) -Payment
(1) . Payment shall be made for items accepted by the Government that have Items accepted been delivered to the delivery destinations set forth in this contract.
(2) . The Government will make payment in accordance with the Prompt Prompt payment Payment Act ( 31 U.S.C. 3903) and prompt payment regulations at .5 CFR part 1315
(3) . In connection with any discount offered for early payment, time shall be computed Discount from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(4) . If the Contractor becomes aware of a duplicate contract financing or invoice Overpayments payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall-
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-
(A) Circumstances of the overpayment ( , duplicate payment, erroneous payment, liquidation e.g.
errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable;
(D) Contractor point of contact; and
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(5) .Interest
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) . The Contracting Officer will issue a final decision as required by FAR part Final decisions 33 if-
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see FAR part 32).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a termination for cause.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures for interest credits prescribed in FAR part 32 in effect on the date of this contract.
(j) . See clause FAR 52.236-7, Permits and ResponsibilitiesRisk of loss .
(k) . The contract price includes all applicable Federal, State, and local taxes and duties.Taxes
(l) . The Government reserves the right to Termination for the Government's convenience terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) . See clause FAR 52.249-10, Default (Fixed-Price Construction).Termination for cause
(n) . Unless specified elsewhere in this contract, title to items furnished under this contract Title shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) . See clause FAR 52.246-21, Warranty of Construction.Warranty
(p) . Except as otherwise provided by an express warranty, the Contractor Limitation of liability will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) . The Contractor agrees to comply Compliance with laws unique to Government contracts with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C.
chapter 87, Kickbacks; 49 U.S.C. 40118, Government-financed air transportation; and 41 U.S.
C. chapter 21 relating to procurement integrity.
(r) . See clause FAR 52.236-21, Specifications and Drawings for Order of precedence Construction.
(s) .Unauthorized obligations
(1) Except as stated in paragraph (s)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the
Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:
(i) Any such clause is unenforceable against the Government.
(ii) Neither the Government nor any Government-authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an "I agree" click box or other comparable mechanism (e.g., "click-wrap" or "browse-wrap" agreements), execution does not bind the Government or any Government authorized end user to such clause.
(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.
(2) Paragraph (s)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.
(t) . This paragraph applies if this contract was Comptroller General examination of record awarded using other than sealed bid procedures and is in excess of the simplified acquisition threshold on the date of award of this contract.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices, at all reasonable times, the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR part 4, longer period required by statute, or periods specified in other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This clause does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(u) . The Contractor's representations and certifications, including Incorporation by reference those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
(v) . The Contractor shall be required to Commencement, Prosecution, and Completion of Work commence work under this contract within 14 calendar days after the date the Contractor receives the notice to proceed (NTP), prosecute the work diligently, and complete the entire work for use not later than the time specified in the Continuation of Deliveries or Performance Section, in number of calendar days after the Contractor receives the NTP. The time stated for completion shall include final cleanup of the premises.
(w) . The Contractor will be required to attend a preconstruction Preconstruction conference conference prior to receiving the NTP. The Contracting Officer will notify the Contractor after award specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.
(x) . See clause FAR 52.236-14, Availability and Use of Utilities Furnished for Contractor Use Utility Services. Electric at the project site, where available, may be used by the Contractor during performance of the project.
(End of clause)
DFARS Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
252.232-7006 Wide Area WorkFlow Payment Instructions.
2023-01
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process Electronic invoicing.
vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF WAWF training.
Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web WAWF methods of document submission.
entry, Electronic Data Interchange, or File Transfer Protocol.
(f) The Contractor shall use the following information when WAWF payment instructions.
submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following Document type.
document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
N/A
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Construction and Facilities Invoice
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Document routing.
Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC F87700
Issue By DoDAAC W50S8K
Admin DoDAAC W50S8K
Inspect By DoDAAC
Ship To Code
Ship From Code
Mark For Code
Service Approver (DoDAAC)
Service Acceptor (DoDAAC)
F7M3CE
Accept at Other DoDAAC
LPO DoDAAC
DCAA Auditor DoDAAC
Other DoDAAC(s)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the Receiving report.
requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Invoices: John Matthews; john.matthews.17@us.af.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
Addendum to 52.212-4, Contract Terms and Conditions - Commercial Products and Commercial Services
INSURANCE - MINIMUM AMOUNTS
1. Reference contract clause FAR 52.228-5, Insurance-Work on a Government Installation. Types and minimum amounts are as follows:
Workmen's Compensation: $100,000 (see paragraph 2, below)
Comprehensive General Liability: $500,000 per occurrence for bodily injury
Comprehensive Automobile Liability: $200,000 per person and $500,000 per accident for bodily injury and $20,000 for property damage
2. Except in states with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.
3. NOTE: Before commencing work under this contract, the Contractor shall certify to the Contracting Officer, in writing, that the required insurance has been obtained. The policies referenced in the certification(s) shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the state in which this contract is to be performed prescribe or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer. The Contractor shall maintain a copy of proofs of required insurance and shall make copies available to the Contracting Officer upon request. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance and shall makes copies available to the Contracting Officer upon request.
*** END OF NARRATIVE ***
Addendum to Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.
(Deviation 2026-O0038)
2026-02
52.222-3 Convict Labor. (Deviation 2026- O0038)
2026-02
52.222-6 Construction Wage Rate Requirements. (Deviation 2026- O0038)
2026-02
52.222-7 Withholding of Funds. (Deviation 2026-O0038)
2026-02
52.222-8 Payrolls and Basic Records.
(Deviation 2026-O0038)
2026-02
52.222-9 Apprentices and Trainees.
(DEVIATION 2025-O0003)
2026-02 Deviation 2025- O0003
2025-03
52.222-10 Compliance with Copeland Act Requirements. (Deviation 2026- O0038)
2026-02
52.222-11 Subcontracts (Labor Standards).
(Deviation 2026-O0038)
2026-02
52.222-12 Contract Termination-Debarment. 2014-05
52.222-13 Compliance with Construction Wage Rate Requirements and
2014-05
Related Regulations.
52.222-14 Disputes Concerning Labor Standards. (Deviation 2026- O0038)
2026-02
52.222-15 Certification of Eligibility. 2014-05
52.223-23 Sustainable Products. (Deviation 2026-O0038)
2026-02
52.228-5 Insurance-Work on a Government Installation.
1997-01
52.232-27 Prompt Payment for Construction Contracts.
2017-01
52.236-2 Differing Site Conditions.
(Deviation 2026-O0038)
2026-02
52.236-3 Site Investigation and Conditions Affecting the Work. (Deviation 2026-O0038)
2026-02
52.236-5 Material and Workmanship.
(Deviation 2026-O0038)
2026-02
52.236-7 Permits and Responsibilities.
(Deviation 2026-O0038)
2026-02
52.236-8 Other Contracts. (Deviation 2026- O0038)
2026-02
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (Deviation 2026-O0038)
2026-02
52.236-10 Operations and Storage Areas.
(Deviation 2026-O0038)
2026-02
52.236-11 Use and Possession Prior to Completion. (Deviation 2026- O0038)
2026-02
52.236-12 Cleaning Up. (Deviation 2026- O0038)
2026-02
52.236-13 Accident Prevention. (Deviation 2026-O0038)
2026-02
52.236-14 Availability and Use of Utility Services. (Deviation 2026-O0038)
2026-02
52.236-21 Specifications and Drawings for Construction. (Deviation 2026- O0038)
2026-02
52.240-91 Security Prohibitions and Exclusions. (Deviation 2026- O0038)
2026-02
52.242-14 Suspension of Work. 1984-04
52.243-5 Changes and Changed Conditions. (Deviation 2026- O0038)
2026-02
52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026-O0038)
2026-02
52.246-12 Inspection of Construction. 1996-08
52.246-21 Warranty of Construction. 1994-03
52.249-10 Default (Fixed-Price Construction).
1984-04
DFARS Clauses Incorporated by Reference
Date
Alternate Deviation
Variation Effective Date
252.236-7000 Modification Proposals--Price Breakdown.
1991-12
252.240-7997 NIST SP 800-171 DoD Assessment Requirements.
(DEVIATION 2026-O0025)
2026-02 Deviation 2026- O0025
2026-02
FAR Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
52.225-9 Buy American-Construction Materials. (Deviation 2026- O0038)
2026-02
Buy American-Construction Materials (Feb 2026) (Deviation 2026-O0038)
(a) . As used in this clause-Definitions
Commercially available off-the-shelf (COTS) item-
(1) Means any item of supply (including construction material) that is-
(i) A commercial product (as defined in paragraph (1) of the definition of "commercial product" at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.
However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.
Domestic construction material means-
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if-
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States.
Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows: none.
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable.
(A) For domestic construction material that is not a critical item or does not contain critical .components
(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A) of this clause.(1)
(3) The procedures in paragraph (b)(3)(i)(A) of this clause will no longer apply as of January (2) 1, 2030.
(B) .For domestic construction material that is a critical item or contains critical components
(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.
(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United
States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3) (i)(B) of this clause.(1)
(3) The procedures in paragraph (b)(3)(i)(B) of this clause will no longer apply as of January (2) 1, 2030.
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)
(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute or Balance of Payments Program.
(d) . To permit evaluation of requests under paragraph (c) of this clause based on Data unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars)*
Item 1:
Foreign construction material.
Domestic construction material.
Item 2:
Foreign construction material.
Domestic construction material.
[* Include all delivery costs to the construction site and any applicable duty (whether or not a ].duty-free entry certificate is issued)
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of ]response; if oral, attach summary.
[ ]Include other applicable supporting information.
(End of clause)
52.232-5 Payments under Fixed-Price Construction Contracts.
2014-05
Payments under Fixed-Price Construction Contracts (May 2014)
(a) Payment of price. The Government shall pay the Contractor the contract price as provided in this contract.
(b) Progress payments. The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.
(1) The Contractor's request for progress payments shall include the following substantiation:
(i) An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment requested.
(ii) A listing of the amount included for work performed by each subcontractor under the contract.
(iii) A listing of the total amount of each subcontract…
This is the start of the file's text. The full file is on GovTribe.