EINF90524 - Specialized Data Center Cleaning
Solicitation number
EINF90524
Issued by
Shasta County, California

About this file

This is an Invitation for Bid (IFB #03A3910) issued by the California Department of Transportation (Caltrans) for trash collection, hauling, and disposal services in El Dorado County. The services requested include providing one six cubic yard bin for general trash and debris at the Kyburz Maintenance Station, with pickups required at least once per week. The IFB was released on January 23, 2025, with written questions due by January 30, 2025 at 2:00 PM, and bids due February 6, 2025 at 2:00 PM. The bid opening will occur on February 6, 2025 at 2:30 PM, with an estimated award date of February 13, 2025. The contract term is from February 28, 2025 through February 27, 2028 (estimated dates), with services to be performed during normal working hours of 7:30 AM to 4:00 PM Monday through Thursday, except holidays.

The contractor must possess a valid Motor Carrier Permit from the California DMV. While there is no Disabled Veteran Business Enterprise (DVBE) participation requirement, DVBE participation is encouraged with a 5% incentive for 100% DVBE participation. A Small Business preference of 5% will be granted to certified Small Business or Micro Business enterprises. All bid rates must include employer payments, travel costs, insurance premiums, taxes, and any other associated costs. The contractor must comply with SB 1383 regarding organic waste recycling requirements and provide proof of proper disposal through written receipts. The agreement includes standard provisions for insurance requirements including $1,000,000 per occurrence in general liability coverage and workers' compensation insurance.

View the file

Other files

File Type Posted
Bid_Packet.pdf PDF
24WS0034_-_Addendum_2.pdf PDF
24WS0035_-_Addendum_1.pdf PDF
24WS0035_-_DVBE_SFQ.pdf PDF
24WS0035_-_Exhibits_A-E.pdf PDF
24WS0035_-_Rate_Sheet_Pharmacy_Technician.xlsx XLSX spreadsheet
24WS0035_-_STD_1000_GENAI_Reporting_and_Factsheet.pdf PDF
24WS0035_-_SFQ_Question_and_Answers.pdf PDF
24WS0035_-_Addendum_3.pdf PDF
24WS0035_-_Additional_Forms.pdf PDF
24WS0035_-_Sample_Agreement.pdf PDF
Bidder_Instructions.pdf PDF
gspd05-106.pdf PDF
2023Mar6Form74R3_(7).pdf PDF
Darfur_Certification_CAL_FIRE-720_.pdf PDF
STD_204.pdf PDF
RFQ_5PA4K00178.01_-_Redding_Training_Center_-_Fire_Props_2.pdf PDF
std1000.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR

California Department of Transportation

ADMINISTRATION

DIVISION OF PROCUREMENT AND CONTRACTS

1727 30th STREET, MS 65

SACRAMENTO, CA 95816-7006

PHONE (916) 227-6000

TTY 711

https://dot.ca.gov/programs/procurement-and-contracts/

January 23, 2025

Invitation for Bid (IFB)

IFB # 03A3910

Notice to Prospective Bidders

You are invited to review and respond to this IFB 03A3910, titled Trash Collection, Hauling, and Disposal Services in El Dorado County. In submitting your bid, you shall comply with the instructions found herein. In addition to those programs and preferences that are specified in this solicitation, Prospective Contractors are encouraged to consider programs and preferences that are available, such as those for the use of small businesses, disadvantaged businesses, disabled veteran businesses, and other businesses covered by State and Federal programs and preferences.

As required by Executive Order S-02-06, the California Department of Transportation (Caltrans) is committed to meeting the State’s twenty-five percent (25%) Small Business (SB) participation goal.

Certified SBs, Micro Businesses (MB) and Contractors willing to commit to subcontracting a minimum of twenty-five percent (25%) of their net price to certified SBs or MBs (if applicable) are encouraged to submit bids. See Section D, Special Programs in this IFB for requirements.

A Disabled Veteran Business Enterprise (DVBE) participation requirement is not required, but DVBE participation is encouraged, and a DVBE incentive does apply to this IFB. See Section D, Special Programs in this IFB for requirements.

The designated contact person for this IFB is:

Christian Miller California Department of Transportation (Caltrans) Email address: christian.miller@dot.ca.gov Phone: (279) 599-1491

Please note that no verbal information given will be binding upon Caltrans unless such information is issued in writing as an official addendum.

*Technical questions regarding this solicitation will be addressed, in writing, and in accordance with the Questions and Answers portion of this IFB. See Section C, Time Schedule for more details.

ALL REQUIRED DOCUMENTS ARE EITHER ATTACHED (ATTACHMENTS 1 & 2) OR THE

DOCUMENT LINK IS PROVIDED ON ATTACHMENT 3, REQUIRED DOCUMENTS.

Sincerely, Christian Miller Contract Analyst

Invitation for Bid IFB Number 03A3910

A) Purpose and Description of Services

1. Contractor shall furnish all labor, trash bins, equipment, travel, and incidentals, and to pay all associated costs, fees (including disposal fees), and taxes, necessary to provide on call, as-needed trash collection, hauling, and disposal services to Caltrans.

2. Refer to the Proposed Form of Agreement, Exhibit A, which is attached to this IFB, for a more complete description of services.

B) Bidder’s Minimum Qualifications

1. Bidder shall possess at the time of bid submittal and for the duration of the Agreement, a valid and current Motor Carrier Permit issued from the California Department of Motor Vehicles (DMV).

2. Failure of Bidder to sufficiently meet any or all the minimum qualifications, in the opinion of Caltrans, will result in the Bidder’s bid deemed non-responsive.

C) Bid Requirements and Information

1. Time Schedule

It is recognized that time is of the essence. All bidders are hereby advised of the following schedule and will be expected to adhere to the required dates and times.

Event Date Time

(Pacific Time)

IFB available to prospective bidders January 23, 2025

Written Question Submittal January 30, 2025 2:00 p.m.

Final Date and Time for Bid Submission February 6, 2025 2:00 p.m.

Bid Opening February 6, 2025 2:30 p.m.

Proposed Award Date (estimate) February 13, 2025

2. Questions and Answers

A. Questions regarding this IFB must be submitted by January 30, 2025. Bidders must submit their questions via e-mail to christian.miller@dot.ca.gov.

B. Written questions must include: the individual's name, firm name, e-mail address and must reference IFB No. 03A3910.

C. Written responses to all questions will be collectively compiled and posted, as an Addendum, to the Cal eProcure website (https://caleprocure.com/pages/index.aspx). It is the responsibility of the bidder to access the Cal eProcure website for any changes or addenda that may be posted. Refer to this Section C, Time Schedule for the schedule of events and dates/times.

Bidder can contact the Contract Analyst named above.

3. Costs Included in Bid Rates Bid prices/rates shall include the cost of employer payments to or on behalf of employees, subsistence, travel, compensation insurance premiums, unemployment contributions, social security taxes, contract bond premiums, and any other taxes or assessments, including but not limited to, sales and use taxes required by law or otherwise and no additional allowance will be paid unless separate payment provisions in the Agreement should specifically provide otherwise.

4. Small Business Preference

SB Preference will be granted on this IFB. Only firms certified as a “Small Business” or “Micro

Business” with the Department of General Services (DGS), Office of Small Business and DVBE

Service (OSDS) will be granted this preference. For more information, refer to Section D, Special Programs.

5. Mandatory Organic Waste Recycling

Contractor generating organic waste or commercial solid waste shall comply with SB 1383; also Contractor will arrange for the recycling services required by this section in a manner that is consistent with State and local laws and requirements, including a local ordinance or local jurisdiction’s franchise agreement, applicable to the collection, handling, or recycling of organic waste and commercial solid waste. This requirement does not modify, limit, or abrogate Contractor’s right to sell or donate its recyclable organic waste materials consistent with the requirements of Public Resources Code Sections 42649.8 et seq. When applicable, Contractor must comply with these provisions.

6. Motor Carrier Permit Requirements

A. Contractor must have a valid Motor Carrier Permit(s) (MCP) issued from the Department of Motor Vehicles (DMV) for its services as a Motor Carrier of Property under this Agreement.

Contractor shall pay any required fees necessary to obtain and maintain in good standing the required MCP(s).

B. The MCP(s) required for the Contractor’s Motor Carriers of Property under California Vehicle Code Sections 34601 and 34620 shall be on file with Contractor for the duration of this Agreement. Upon request of Caltrans Contract Manager, Contractor must immediately provide to Caltrans a copy of the required MCP(s).

7. Standard Title VI/Nondiscrimination Assurances (DOT Order No. 1050.2A)

Caltrans, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Statute 252, 42 USC Sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any Agreement entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

8. Insurance

A. The bidder who receives the Agreement award, will be requested to provide a Certificate of Insurance providing proof of insurance to the Division of Procurement and Contracts within 10 working days after the date of notification of award. The State’s Office of Risk and Insurance Management will review insurance certificates and/or proof of self-insurance documentation before execution of the Agreement. Refer to the Proposed Form of Agreement, Exhibit E, for the applicable and specific Insurance requirements and coverage limits.

B. The insurance carrier shall provide an endorsement for the additional insured statement as follows:

Caltrans, State of California, its officers, agents, and employees shall be included as additional insured, but only with respect to work performed for the State of California under this Agreement.

C. The additional insured endorsement must accompany the certificate of insurance.

D. Satisfying A Self-Insured Retention (SIR)

All insurance required by this Agreement must allow, but not require, the State to pay any SIR and/or act as Contractor’s agent in satisfying any SIR. The choice to pay any SIR and/or act as Contractor’s agent in satisfying any SIR is at the State’s discretion. If the State chooses to pay any SIR and/or act as Contractor’s agent in satisfying any SIR, Contractor shall reimburse the State for the same.

E. Available Coverages/Limits

In the event the insurance coverages obtained by Contractor is broader in scope than, and/or the limits are higher than, those required under the Agreement, all such broader coverage and/or higher limits available to Contractor shall also be available and applicable to the State.

9. Darfur Contracting Act

A. The Darfur Contracting Act, Public Contract Code Section 10475-10481, applies to any company that currently or within the previous three (3) years has had business activities or other operations outside of the United States. The Act was passed by the California Legislature and signed into law by the Governor to preclude State agencies generally from contracting with “scrutinized” companies that do business in the African nation of Sudan (of which the Darfur region is a part), for the reasons described in Public Contract Code Section 10475. All bidders shall complete the Darfur Contracting Act Certification (DOT ADM- 0077), provided as a link in Attachment 3, Required Documents, and submit with the proposal.

B. If your company has not, within the previous three (3) years, had any business activities or other operations outside of the United States, complete Option 1 on DOT ADM-0077.

C. A scrutinized company is a company doing business in Sudan as defined in Public Contract Code Section 10476. Scrutinized companies are ineligible to, and cannot bid on, or submit a bid or proposal for an Agreement with a State agency for goods or services. (Pub. Cont. Code Section 10477(a)).

D. Therefore, Public Contract Code Section 10478(a) requires a company that currently has (or within the previous three (3) years has had business activities or other operations outside of the United States to certify that it is not a “scrutinized” company when it submits a bid or proposal to a State agency.

E. A scrutinized company may still, however, submit a bid or proposal for an Agreement with a State agency for goods or services if the company first obtains permission from the Department of General Services according to the criteria set forth in Public Contract Code Section 10477(b).

10. Executive Order N-6-22 – Russia Sanctions

On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law unless the contract has been Federalized (i.e., there is federal participation in any phase). By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.

11. Executive Order N-12-23 – Generative Artificial Intelligence (GenAI) Technology Use and Reporting

A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.

B. Bidder/Offeror/Contractor must notify the State in writing if their solution or service includes, or makes available, any GenAI including GenAI from third parties or subcontractors.

C. The State has developed a GenAI Reporting and Factsheet (STD 1000) to be completed by the Bidder/Offeror/Contractor.

D. Failure to submit the GenAI Reporting and Factsheet (STD 1000) will result in disqualification of the Bidder/Offeror/Contractor.

E. Failure to report GenAI to the State may void any resulting contract. The State reserves its right to seek any and all relief it may be entitled to as a result of such non-disclosure.

F. Upon receipt of a Bidder / Offeror / Contractor GenAI Reporting and Factsheet (STD1000), the state reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the state.

12. Bid Submittal

A. All bids must be submitted and received by Caltrans Division of Procurement and Contracts, Bid Unit, by dates and times shown in Section C, Bid Requirements and Information.

B. The mailing package/envelope should be labeled as follows:

Note: All packages not clearly or properly labeled as indicated below, including overnight mail and hand delivered packages, may be rejected.

YOUR RETURN ADDRESS Agreement No. 03A3910 Bid Due Date: February 6, 2025 Bid Due Time: 2:00 p.m.

Bid Opening Date: February 6, 2025

Bid Opening: 2:30 p.m.

Attention: Christian Miller

California Department of Transportation (Caltrans) Division of Procurement and Contracts ATTN: Bid Unit 1727 30th Street, 4th Floor, MS 65 Sacramento, CA 95816-7006

BID SUBMITTAL DO NOT OPEN

C. Late bids will not be considered.

D. All bids shall include the documents identified on the IFB’s Required Documents, located at the end of the solicitation. Bids not including the required documents may be deemed non-responsive. A non-responsive bid is one that does not meet the basic bid requirements.

E. Only an individual who is legally authorized to bind the proposing firm contractually shall sign all documents requiring a signature, and each document must bear a signature.

F. If your bid is hand delivered, you must date, and time stamp the sealed envelope/package immediately upon arrival. The date/time stamp machine is located in the lobby on the first floor to the right of the security guard station at the address noted above. After date/time stamping, the bid should be placed in the locked bid cabinet located below the time stamp. If the bid package is too large to be electronically stamped, date/time stamp one of the labels provided and attach it to the proposal package. When the bid package is too large for the locked bid cabinet, ask the security guard to call the Division of Procurement and Contracts reception desk at (916) 227-6000 to have your bid package picked up.

G. Bid opening will be held via teleconference at 2:30 p.m. on the date specified in Section C, Bid Requirements and Information. Bidders may participate via teleconference by calling 1- 866-700-7952 and entering the pass code 7089821#. Calls will be accepted beginning at 2:20 p.m. until the conclusion of the bid opening. Bids will be read in Agreement numeric order;

questions will not be allowed; and information will not be repeated. Initial bid opening results will be posted online on the Division of Procurement and Contracts website at https://dot.ca.gov/programs/procurement-and-contracts/bid-results by 3:00 p.m. on the day following the bid opening. The Agreement will be awarded to the lowest responsible bidder meeting the requirements outlined in the IFB after verification and applicable incentives are applied as stated in Evaluation and Selection below.

H. Bids must include the performance of all the services described herein. Any attempt to modify the bid document to deviate from the work specifications will not be considered and will cause a bid to be rejected.

I. A bid may be rejected if it is conditional, incomplete, or if it contains any alterations of form or other irregularities of any kind. Caltrans may reject any bid on the basis that it is not responsive or from a non-responsible bidder and may waive any immaterial deviation in a bid.

Caltrans waiver of an immaterial defect shall in no way modify the IFB document or excuse the bidder from full compliance with all requirements if awarded the Agreement.

J. Costs for developing bids and in anticipation of award of an agreement is entirely the responsibility of the bidder and shall not be charged to the State.

K. Only an individual who is authorized to bind the bidding firm contractually shall sign the attached Bid/Bidder Certification Sheet. The signature must also indicate the title or position that the individual holds in the firm. A bid with an unsigned Bid/Bidder Certification Sheet may be rejected.

L. A bidder may modify a bid after its submission by first withdrawing the original bid and then by resubmitting a new bid prior to the bid submittal deadline. Bidder modifications offered in any other manner, oral or written, will not be considered.

M. A bidder may withdraw a bid by, prior to bid opening, submitting a written withdrawal request to Caltrans, at DPAC.BidUnit@dot.ca.gov, signed by the bidder or an agent authorized in accordance with Section K above. A bidder may thereafter submit a new bid prior to the bid submittal deadline. Bids may not be withdrawn without cause subsequent to bid submittal deadline. Please contact the Caltrans analyst located on page 1 of this IFB with any questions.

N. Caltrans may modify the IFB prior to the date fixed for submission of bids by the issuance of an addendum sent to all parties who received a bid package.

O. Caltrans reserves the right to reject all bids for reasonable cause.

P. Bidders are cautioned not to rely on Caltrans during its evaluation process to discover and report to the bidder any defects and/or errors in the submitted documents. Before submitting their documents, bidders should carefully proof them for errors and full adherence to the IFB requirements.

Q. Where applicable, the bidder should carefully examine work sites and specifications. Bidder shall investigate conditions, character, and quality of surface or subsurface materials or obstacles that might be encountered. No additions or increases to the Agreement amount will be made due to a lack of careful examination of work sites and specifications.

R. Caltrans does not accept alternate agreement language from a bidder. A bid with such language will be considered a counter proposal and will be rejected. The State’s General Terms and Conditions (GTC) are not negotiable. Also, the winning bidder(s) must complete, sign, and submit all pages of the Contractor Certification Clauses (CCC 04/2017) as part of the Agreement award process. Both the GTC 04/2017 and CCC 04/2017 may be viewed at:

https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources- List-Folder/Standard-Contract-Language.

13. Evaluation and Selection

A. At the time of bid opening, each bid proposal’s total and any small business and/or micro business information (if applicable) will be read aloud. Bids are considered preliminary pending review and verification of applicable bid requirements such as: small business preference, incentives, DVBE, DBE, licensing, bonding, qualifications, or other requirements as stated in the IFB. Agreements will be awarded to the lowest responsive and responsible bidder.

B. Each bid will be checked for the presence or absence of required information in conformance with the submission requirements of this IFB. Caltrans will check the bid submittal package to verify it received all required documents. Positive verification of required documents will be performed to determine its responsiveness to the State's needs.

C. Bids that contain false or misleading statements, or which provide references, which do not support an attribute or condition claimed by the bidder, shall be rejected.

D. The Agreement, if awarded, shall be awarded to the responsible bidder who submits the lowest bid and meets all the specifications. A bid meets the specifications if it complies with all the requirements in this solicitation. In the event of a tie bid, Caltrans will draw lots to determine the successful bidder. Only one (1) bid may be submitted by an entity: individual, firm, partnership, corporation, joint venture, or combination thereof. Receipt of more than one

(1) bid from an entity will result in all bids from that entity being rejected and returned to the bidder.

14. Award

A. Preliminary bid results may be viewed on the internet after 3:00 p.m. on the first (1st) business day following the bid due date at https://dot.ca.gov/programs/procurement-and-contracts/bid-results.

B. Whenever an Agreement is awarded under a procedure that provides for competitive bidding, but the Agreement is not to be awarded to the low bidder, the low bidder shall be given notice five (5) working days prior to the award of the Agreement by email.

C. Upon written request by any bidder, the Notice of the Intent to Award shall be posted in a public place in the office of the awarding agency, as well as online at https://dot.ca.gov/programs/procurement-and-contracts/notices-of-intent-to-award, for at least five (5) working days prior to awarding the Agreement. This information can also be obtained by contacting the Contract Analyst directly.

D. Upon award of the Agreement, Contractor shall complete and submit to Caltrans, the Payee Data Record (STD 204), to determine if Contractor is subject to State income tax withholding pursuant to California Revenue and Taxation Code Section 18662 et seq. This form can be found on the Internet at https://www.dgs.ca.gov/PD under the heading Forms. No payment shall be made unless a completed STD 204 has been returned to Caltrans.

15. Protest

Bidders have the right to protest the award of Caltrans Agreements subject to the following processes and procedures.

A. Filing a Protest: The initial protest must be submitted to DGS, Office of Legal Services, and Caltrans, Protest Unit, prior to the award of the Agreement. When a protest has been submitted, the Agreement shall not be awarded until either the protest has been withdrawn or DGS has decided the matter. The written protest must be sent, either via e-mail or regular mail, to the addresses below:

California Department of Transportation (Caltrans) Division of Procurement and Contracts Attention: Bid, Protest, and Dispute Branch Chief 1727 30th Street, MS 65 Sacramento, CA 95816 Phone Number: (916) 639-6322 Email:

DPAC.Protest.Disputes.Terminations@dot.ca.gov

Department of General Services Office of Legal Services Attention: Bid Protest Coordinator 707 Third Street, 7th Floor, Suite 7-330 West Sacramento, CA 95605 Phone Number: (916) 376-5080 Email: OLSProtests@dgs.ca.gov

B. Within five (5) days after filing the initial protest, the protesting bidder shall file with DGS and Caltrans, Protest Unit a full and complete written statement specifying the grounds for the protest. The full written protest statement must be sent to the same addresses above.

Note: E-mail is the preferred method of protest delivery. If a bidder uses regular mail, It is suggested that you submit any protest by certified or registered mail.

16. Standard Conditions of Service

A. Service shall not begin prior to the express date set by Caltrans Contract Manager and Contractor, after all approvals have been obtained, and the Agreement is fully executed.

Should Contractor fail to commence work at the agreed upon time, Caltrans Contract Manager, upon five (5) days written notice to Contractor, reserves the right to terminate the Agreement. In addition, Contractor shall be liable to Caltrans for the difference between Contractor's bid price and the actual cost of performing work by the second lowest bidder or by another Contractor.

B. All performance under the Agreement shall be completed on or before the termination date of the Agreement.

C. Antitrust Provisions

1) In submitting a bid to a public purchasing body, the bidder offers and agrees that if the bid is accepted, it will assign to the purchasing body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 USC Section 15 or under the Cartwright Act Chapter 2, commencing with Section 16700, of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, materials, or services by the bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and become effective at the time the purchasing body tenders final payment to the bidder (Gov. Code Section 4552).

2) If the awarding body or public purchasing body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under this chapter, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the public body any portion of the recovery, including treble damages, attributable to overcharges that were paid.

3) Upon demand in writing by the assignor, the assignee shall, within one (1) year from such demand, reassign the cause of action assigned under this part if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action (Gov. Code Section 4554).

D. If the bidder is awarded the Agreement and refuses to sign the Agreement presented for signature within the time and manner required, the bidder will be liable to Caltrans for actual damages resulting to Caltrans therefrom or 10 percent (10%) of the amount bid, whichever is less.

E. Loss Leader usage is prohibited in this solicitation: It is unlawful for any person engaged in business within this State to sell or use any article or product as a “loss leader” as defined in California Business and Professions Code Section 17030. “Loss Leader” means any article or product sold at less than cost: a) where the purpose is to induce, promote or encourage the purchase of other merchandise; or b) where the effect is a tendency or capacity to mislead or deceive purchasers of prospective purchasers; or c) where the effect is to divert trade from or otherwise injure competitors.

F. No oral understanding or agreement shall be binding on either party.

D) Special Programs

The following Special Programs are applicable to this IFB.

1. Small Business (SB) or Microbusiness (MB) Preference

A. Government Code Section 14835 et seq. requires that a five percent (5%) preference be given to contractors who qualify as a Certified SB or MB. References to a small business (SB) shall also include micro-business (MB). The rules and regulations of this law, including the definition of a SB for the delivery of services, are contained in Title 2, California Code of Regulations, Section 1896 (2 CCR Section 1896) et seq.

B. To claim the SB or MB preference, Contractor must have its principal place of business located in California, satisfy all of the SB or MB requirements, and be certified by the California Department of General Services (DGS), Office of Small Business and Disabled Veteran Business (DVBE) Services (OSDS). The preference amount may not exceed fifty thousand dollars ($50,000) for any bid. If prospective contractor is claiming the five percent (5%) certified SB or MB preference, complete Section 16 of the attached Bid/Bidder Certification Sheet. Additionally, Contractor may satisfy the non-SB requirements described below.

C. Certified SB and MB bidder(s) shall have precedence over NSB bidders in the application of SB preference(s).

D. SB preferences may not be applied to any bid deemed non-responsive with the solicitation instructions or from a non-responsible bidder.

E. Questions regarding the certification approval process or SB program should be directed to OSDS at (800) 559-5529 or (916) 375-4940, or by email:osdshelp@dgs.ca.gov.

F. SB or MB bidders or bidders using the “Non-Small Business” preference shall be granted a preference consisting of five percent (5%) of the lowest responsible bidder’s total bid if the lowest bid is from a non-certified SB or MB.

G. Additional references are at https://www.dgs.ca.gov/PD/Services/Page-Content/Procurement- Division-Services-List-Folder/Certify-or-Re-apply-as-Small-Business-Disabled-Veteran- Business-Enterprise.

2. Disabled Veteran Business Enterprise (DVBE) Programs

A. DVBE Participation Program with No Participation Requirements:

DVBE participation is not required, but DVBE participation is encouraged, and a DVBE incentive will apply to this IFB as described below. Please review the DVBE Program Requirements: https://www.dgs.ca.gov/- /media/Divisions/PD/OSDS/Certification/DVBE/DVBEProgramRequirements.pdf?la=en&hash=

FBCA257A3ED083F3DBB85ECEEB37013CBCF0545C

B. DVBE Incentive Program

1) The DVBE Incentive Program applies to this solicitation. It is separate from the DVBE Participation Program and was established in Military and Veterans Code Sections 999 et seq., and Title 2, California Code of Regulations, Section 1896.99 (2 CCR Section1896.99) et seq. A dollar cap of $100,000 is set for all combined incentives and preferences. The incentive is used only for evaluation purposes to arrive at the successful bidder and does not alter the amounts of the actual bid. Any responsive and responsible bidder with the confirmed DVBE participation per the Table in paragraph 3) below is eligible to receive the incentive. Bidders who are not responsive and responsible are not eligible to receive the incentive.

2) Caltrans will apply an incentive to bids from DGS-certified DVBE firms. The bidders who claim to be DGS-certified DVBE firms will be verified by Caltrans prior to award of the Agreement. The incentive amount is equal to the percentage of the lowest responsive and responsible bid being evaluated per the Table below.

3) Table able for IFB (Low Price Method):

Verified DVBE Participation DVBE Incentive Amount

100% 5%

4) When applying the DVBE Incentive, an NSB shall not displace or otherwise supersede an award to a DGS Certified Small Business.

5) Please review the DVBE Program Requirements: https://www.dgs.ca.gov/- /media/Divisions/PD/OSDS/Certification/DVBE/DVBEProgramRequirements.pdf?la=en&ha sh=FBCA257A3ED083F3DBB85ECEEB37013CBCF0545C.

6) Additional information: https://www.dgs.ca.gov/PD/Services/Page-Content/Procurement- Division-Services-List-Folder/Certify-or-Re-apply-as-Small-Business-Disabled-Veteran- Business-Enterprise.

STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION Agreement Number 03A3910 BID PROPOSAL Page 1 of 1 ADM-1412 (REV. 10/2024) Attachment 1

Contractor’s Name (Please Print):

Item No.

Estimated Quantity

Unit of Measure Item

Unit Price (Price Per Unit of

Measure)

Total (Estimated Quantity

X Unit Price)

1 186 Per Bin

All labor, trash bins, equipment, travel, and incidentals and all associated costs, fees, and taxes, necessary to provide trash collection, hauling, and disposal services of six (6) Cubic Yard (CY) bin at the Kyburz Maintenance Station, per STD 213, Exhibit A, Scope of Work

1) The above quantities are estimates only and are given as a basis for comparison of bids. No guarantee is made or implied as to the exact quantity that will be needed.

2) In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail.

3) Do not alter, modify, or change this bid proposal sheet. Any alterations, modifications, or changes to this bid proposal sheet will be grounds to reject the bid.

4) Each line item must be bid. Do not leave any unit price column blank or this bid proposal sheet will be deemed non-responsive.

Total Proposal $

Attachment 2 Bid/Bidder Certification Sheet

Only an individual who is authorized to bind the bidding firm contractually shall sign the Bid/Bidder Certification Sheet. The signature must indicate the title or position that the individual holds in the firm. This Bid/Bidder Certification Sheet must be signed and returned along with all required documents as an entire package with original signatures. The bid must be transmitted in a sealed envelope in accordance with IFB instructions.

A. Our all-inclusive bid is submitted in a sealed envelope marked “Bid Submittal–Do Not Open.”

B. All required attachments are included with this certification sheet.

C. The signature affixed hereon and dated certifies compliance with all the requirements of this bid document. The signature below authorizes the verification of this certification.

D. The signature and date affixed hereon certifies that this bid is a firm offer for a 90-day period.

An Unsigned Bid/Bidder Certification Sheet May Be Cause for Bid Rejection

1. Company Name 2. Telephone Number 2a. Fax Number

2b. Email Address

3. Address

Indicate your organization type:

4. Sole Proprietorship 5. Partnership 6. Corporation

Indicate the applicable employee and/or corporation number:

7. Federal Employee ID No. (FEIN) 8. California Corporation No.

Indicate the Department of Industrial Relations information:

9. Contractor Registration Number

Indicate applicable license and/or certification information:

10. Contractor’s State Licensing Board Number 11.

CAL-T-

12. Bidder’ Name (Print) 13. Title

14. Signature 15. Date

16. Are you certified with the Department of General Services, Office of Small Business and Disabled Veteran Business Enterprise Services (OSDS) as:

a. Small Business Enterprise Yes No If yes, enter certification number:

b. Disabled Veteran Business Enterprise Yes No If yes, enter your service code below:

Note: A copy of your Certification is required to be included if either of the above items is checked “Yes”.

Date application was submitted to OSDS, if an application is pending: _________________

Attachment 2 Bid/Bidder Certification Sheet

Completion Instructions for Bid/Bidder Certification Sheet

Complete the numbered items on the Bid/Bidder Certification Sheet by following the instructions below.

Item Numbers Instructions

1, 2, 2a, 2b, 3 Must be completed. These items are self-explanatory.

Check if your firm is a sole proprietorship. A sole proprietorship is a form of business in which one person owns all the assets of the business in contrast to a partnership and corporation. The sole proprietor is solely liable for all the debts of the business.

Check if your firm is a partnership. A partnership is a voluntary agreement between two or more competent persons to place their money, effects, labor, and skill, or some or all of them in lawful commerce or business, with the understanding that there shall be a proportional sharing of the profits and losses between them. An association of two or more persons to carry on, as co-owners, a business for profit.

Check if your firm is a corporation. A corporation is an artificial person or legal entity created by or under the authority of the laws of a state or nation, composed, in some rare instances, of a single person and his successors, being the incumbents of a particular office, but ordinarily consisting of an association of numerous individuals.

7 Enter your federal employee tax identification number.

Enter your corporation number assigned by the California Secretary of State’s Office.

This information is used for checking if a corporation is in good standing and qualified to conduct business in California.

Enter your Contractor Registration Number assigned by the Department of Industrial Relations (DIR). This Information will be used to determine if you are registered with

DIR.

Complete if your firm holds a California contractor’s license. This information will BE used to verify possession of a contractor’s license for public works agreements.

11 Cal-T

12, 13, 14, 15 Must be completed. These items are self-explanatory.

If certified as a Small Business Enterprise, place a check in the “yes” box, and enter your certification number on the line. If certified as a Disabled Veterans Business Enterprise, place a check in the “Yes” box and enter your service code on the line. If you are not certified to one or both, place a check in the “No” box. If your certification is pending, enter the date your application was submitted to the Department of General Services, Office Small Business and DVBE Services. To get certified, go to https://www.dgs.ca.gov/PD/Services/Page-Content/Procurement-Division-Services-List- Folder/Certify-or-Re-apply-as-Small-Business-Disabled-Veteran-Business- Enterprise?search=SB/DVBE%20Certification

Attachment 3 Required Documents

The following documents should be submitted, or your bid may be considered non-responsive.

Do not submit this checklist, the Proposed Form of Agreement, company advertisements, brochures, informational pamphlets, or any other document unless specifically noted in the IFB Requirements and/or as listed below.

☐ Attachment 1 - Bid Proposal (ADM-1412)

☐ Attachment 2 - Bid/Bidder Certification Sheet

☐ Copy of current and valid Motor Carrier Permit issued from the California Department of Motor Vehicles (DMV)

☐ STD 1000 GenAI Reporting and Factsheet

☐ Darfur Contracting Act Certification (DOT ADM-0077) Darfur Contracting Act Certification

The following documents will be requested of the WINNING BIDDER at time of contract award;

they are NOT required at time of bid submittal:

☐ Contractor Certification Clauses (CCC 04/2017) Contractor Certification Clauses

☐ Insurance (Requirements outlined in Proposed Form of Agreement, Exhibit E, Items 1 & 2)

☐ Payee Data Record (STD 204) Payee Data Record

Attachment 4

Proposed Form of Agreement

Note to Bidders: The following pages represent a sample of the Agreement that will be awarded, if any, from this IFB. Please review it carefully and present any questions in writing to the contact identified for this IFB. Do not return this Attachment with your bid.

2. The term of this Agreement is:

Contractor’s Name TBD Agreement Number 03A3910

Exhibit A Commercial Services–State

Scope of Work

1. Purpose

The purpose of this Agreement is to set forth the terms and conditions under which Contractor is to provide trash services. Contractor agrees to provide to the California Department of Transportation (Caltrans) all labor, trash bins, equipment, travel, and incidentals, and to pay all associated costs, fees (including disposal fees), and taxes, necessary to provide on call, as-needed trash collection, hauling, and disposal services as described herein.

2. Subcontracting

Subcontracting is not permitted under this Agreement. All references to subcontracting or subcontractors as found herein are not applicable to this Agreement.

3. Location

The services shall be performed at the following location in El Dorado County:

Kyburz Maintenance Station (MS) at Highway 50, Post Mile 48.7

4. All references to Caltrans Contact Manager shall also include designee.

5. Term

This Agreement will commence on February 28, 2025 (estimate), or upon approval by Caltrans, whichever is later, and no work shall begin before that time. This Agreement is of no effect unless approved by Caltrans. Contractor shall not receive payment for work performed prior to approval of the Agreement and before receipt of notice to proceed by Caltrans Contract Manager. This Agreement will expire on February 27, 2028 (estimate). Except in emergencies, the services shall be provided during normal working hours of 7:30 a.m. to 4:00 p.m., Monday through Thursday, except holidays. On occasion, Contractor may be required to provide services outside of normal business hours, including on weekends and holidays, to complete emergency services, as determined in the sole discretion of Caltrans Contract Manager. The parties may amend this Agreement as permitted by law.

6. Project Representative

All inquiries during the term of this Agreement will be directed to the project representatives listed below. Contractor shall provide advance written notice and receive advance written approval by Caltrans Contract Manager, without the necessity of an amendment, before changing the Project Manager noted below.

California Department of Transportation (Caltrans)

Contractor Name TBD

Section/Unit: District 03/Maintenance Project Manager:

Contract Manager: TBD

Address: 11323 Sanders Drive Rancho Cordova, CA 95742

Address:

Business Phone Number: Business Phone Number:

Email: Email:

7. Detailed Description of Work to be Performed and Duties of all Parties:

A. Contractor shall furnish the following: trash pick-up, transport, and disposal services per location:

1) Location:

a) (1) six (6) Cubic Yard (CY) bin for general trash and debris.

B. All containers shall be placed in a location approved by Caltrans Contract Manager.

C. All containers shall have retractable covers that operate smoothly and with ease, so containers remain covered in accordance with National Pollutant Discharge Elimination System (NPDES) storm water requirements. All bins shall be in good condition without any holes.

D. Trash pick-ups will occur on weekdays between 7:30 a.m. to 4:00 p.m. No trash shall be removed on designated State legal holidays. In the event that a State legal holiday falls on a scheduled pick-up date, Contractor shall remove the trash on the following business day. When a designated State holiday falls on a Sunday, the following Monday shall be designated a legal holiday. State observed holidays are as follows:

January 1 New Year’s Day

Third Monday in January Martin Luther King Day

Third Monday in February Presidents’ Day

March 31

Last Monday in May

Cesar Chavez Day

Memorial Day

July 4 Independence Day

First Monday in September Labor Day

November 11 Veterans Day

Fourth Thursday in November Thanksgiving Day

Fourth Friday in November Day after Thanksgiving

December 25 Christmas Day

E. Upon Agreement approval, Caltrans Contract Manager will call Contractor to arrange a mutually agreeable trash pick-up schedule, to assure that the yard gates will be open for access to the trash pick-up area. Contractor shall begin work upon notification by Caltrans Contract Manager.

Failure to begin work or to prosecute the work diligently shall be grounds for termination of this Agreement as noted in Exhibit D, Item 2, Termination.

F. Contractor shall remove and replace or empty the bins according to the schedule agreed on by Contractor and Caltrans Contract Manager as follows:

Kyburz MS: not less than one (1) time per week, six (6) CY bin.

G. Pick-ups may be requested beyond that which is listed above (item 7.F) by Caltrans Contract Manager. Contractor shall make requested pick-ups within three (3) working days of notification by Caltrans Contract Manager. If Contractor does not pick up the bin(s) within three (3) working days, Contractor shall be responsible for cleaning up all trash overflow placed on or adjacent to the bin(s) at no additional cost to Caltrans.

H. Contractor will not be paid for any “dry runs” or unscheduled trips.

I. All travel costs shall be included as a part of Contractor’s Bid Proposal, Attachment 1 and no additional compensation shall be paid for travel time.

J. Caltrans Contract Manager must sign and date all pick-up tickets. If Caltrans employees are not available to sign the pick-up ticket within 24 hours, Contractor shall email the pick-up ticket to Caltrans Contract Manager. All pick-up tickets are to be included with the disposal receipts and all invoices for verification of pick-ups.

K. Contractor shall conduct operations in such a manner as to avoid damage to Caltrans property or to adjacent property. If any such property is damaged by reason of Contractor’s operation, it shall be replaced or restored at Contractor’s expense and to the satisfaction of Caltrans Contract Manager.

L. Contractor shall take all necessary precautions to prevent injury or hazard to Caltrans employees or visitors and shall avoid causing unreasonable inconvenience to any person(s) doing business on Caltrans property.

M. Contractor is solely responsible for any injuries, losses, and damages caused by Contractor, its employees, or its agents.

N. Caltrans and its employees are not responsible for any injury, loss, or damage that may occur to Contractor, its employees, vehicles, equipment, tools, or materials.

O. Contractor shall pick up any trash strewn in the bin area during the process of bin hauling, and the bin area shall be left in a clean and orderly condition. If a site is not left in a clean and orderly condition, Contractor shall be called back to correct the condition at no extra charge to Caltrans. Contractor must respond within a 24-hour period following the request to correct any unacceptable condition, unless instructed otherwise by Caltrans Contract Manager.

P. Contractor’s vehicles shall be in good operating condition and free of leaking fluids. Vehicles not meeting these requirements will not be allowed to haul away trash until the requirements are met. Any spills or leaks will be cleaned up by Contractor at no additional charge.

Q. At all times for the duration of this Agreement, Contractor and its employees shall maintain all current permits/licenses from local enforcement agencies (such as city and county) required for the services described in this Agreement.

R. Contractor shall abide by all applicable laws regarding trash pick-up, hauling, and disposal services.

S. A filled bin leaving any Caltrans facility or site shall be properly and lawfully covered and tarped.

T. Contractor shall utilize disposal sites that are licensed and legally authorized to accept the trash that is the subject matter of this Agreement.

U. Contractor must provide written receipts from the chosen disposal site to ensure Contractor followed the proper disposal process for each bin and legally dispose of the contents of same.

Disposal receipts shall include the following:

1) Agreement 03A3910

2) Date(s) of service

3) Weight of trash (tonnage)

4) Name of disposal site

5) Signature of disposal site employee

V. Contractor shall dispose of all material in the containers, which includes, but is not limited to, tires, metal, plastic, fiberglass, fabric, glass, asphalt, dirt, concrete, wood, and landscape trimmings.

W. The trash is not expected to, but may unintentionally, include hazardous waste. If hazardous waste is encountered, Contractor will notify Caltrans Contract Manager for removal of the hazardous waste by a Caltrans hazardous waste removal contractor. Caltrans will not be responsible for any hazardous waste picked up along Contractor's route.

X. Tire carcasses, metal, plastic, fiberglass, glass, asphalt, dirt, concrete, and other trash may include constitutes of concern. These materials are not pre-determined to be hazardous waste.

Contractor shall inspect the materials before taking possession of the materials.

Y. Once Contractor takes possession of the materials, Contractor shall take ownership of the materials and shall dispose of or recycle the materials in a lawful manner.

Z. Transportation of trash and recycle materials shall be in compliance with all laws and regulations of the State of California. Neither the State nor Caltrans will be responsible for any mishandling and/or any unlawful acts that Contractor or its workers might perform or violate in the performance of this Agreement. Trash and recycle materials shall be disposed of in a legal manner.

8. General Contractor Responsibilities

A. Contractor shall ensure that only qualified and competent employee(s) are permitted on the job site and that the work shall be safely performed by the highest industry standards. Contractor shall take all the necessary precautions to prevent injury or hazard to Caltrans employee(s), invitee(s), and/or the general public.

B. Contractor shall avoid causing unreasonable inconvenience to any person(s) doing business on Caltrans property. In the event Contractor’s operation creates a condition hazardous to Caltrans property, its occupants, or the general public, Contractor shall provide warning signs alerting to any dangerous conditions at Contractor’s own expense and without cost to Caltrans.

C. Personal property, items that have apparent value and are not fouled with human waste or other hazardous materials, encountered by Contractor on Caltrans property shall be collected by Contractor and turned over to Caltrans.

D. Prior to the commencement of waste disposal, Contractor must adhere to the provisions highlighted in Senate Bill 1383 (Lara)of 2016 Title 14, CCR, General Provisions section 18981.2, Public Resources Code sections 42652 et. seq.

9. Contractor Project Manager Responsibilities

A. Contractor Project Manager shall coordinate work-related matters and Contractor’s operations under this Agreement.

B. In addition to other responsibilities described in this Agreement, Contractor Project Manager shall be responsible for all matters related to Contractor’s personnel including, but not limited to, the following:

1) Ensure deliverables meet the criteria established by the Agreement.

2) Supervise, review, monitor, train, and direct Contractor’s personnel.

3) Include Caltrans Contract Manager in written communications to other Caltrans personnel for any clarification on the scope of work.

4) Assign qualified personnel to complete the required work, as specified, on an “as-needed” basis in coordination with Caltrans Contract Manager.

5) Administer personnel actions for Contractor personnel.

6) Implement and maintain quality control procedures to ensure product and service accuracy.

7) Ensure all applicable safety measures are in place.

8) Provide invoices in a timely manner.

9) Review invoices for accuracy and completion before billing to Caltrans.

10) Ensure the schedules, deliverables and the deliverables’ requirements set forth in the Agreement are satisfied.

11) Ensure compliance with the provisions in this Agreement and all specific work requirements.

10. Discovery of Asbestos, Lead-based Paint, or Other Hazardous Substances/Material

A. If Contractor discovers or suspects asbestos, lead-based paint, or other known hazardous substances/materials in the area affected by the Agreement, Contractor must stop work…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .