Solicitation - N6449826Q5111.pdf

PDF 2 MB Posted

Attached to
Spare Electrical Parts
Solicitation number
26-44-0041
Issued by

About this file

This is a Request for Quote (RFQ) for spare electrical parts issued by the Naval Sea Systems Command (NAVSEA) Naval Surface Warfare Center Philadelphia Division. The solicitation N6449826Q5111 was issued on 02 April 2026 with quotes due by 13 April 2026 at 5:00 PM local time via email to Zachary.f.mccurry.civ@us.navy.mil.

The procurement requests three Caterpillar electrical controller components and associated shipping: (1) Controller Group Part Number 458-7750 (quantity 2), (2) Controller Assembly Electronics Part Number 334-2668 (quantity 2), and (3) ADAM Controller Part Number 11R-1262 (quantity 2), plus one shipping job. All supplies must be brand name Caterpillar parts and are to be packaged per ASTM-D-3951-18 standards. Delivery is required within 60 calendar days from award receipt to NSWC Philadelphia Division at 1601 Langley Avenue Building 542, Philadelphia, PA 19112. The contract will be firm fixed-price with inspection and acceptance at both the contractor's facility and destination. This is a women-owned small business (WOSB) set-aside with an unrestricted acquisition classification. Quoters must be registered in the System for Award Management (SAM) and submit quotes through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module portal at https://piee.eb.mil. The contracting officer is Shawn Waters and the contract specialist is Zach McCurry.

View the file

Other files

File Type Posted
Brand Name Justification_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

Section A - Solicitation/Contract Form

Spare Electrical Parts

CONTINUATION SHEET

1. Block 8

Quote Due Date / Local Time: 13 April 2026 by 5:00 P.M. Local Time; Any quote received after the exact date /time specified for receipt of quotes is "late" and will be treated in accordance with 52.212-1(f).

EMAIL QUOTES ARE AUTHORIZED

Emailed Quotes shall be sent to: Zachary.f.mccurry.civ@us.navy.mil

FACSIMILE QUOTES ARE NOT AUTHORIZED

2. Block 17a: Quoter's assigned DUNS Number: ___________________________.

Quoter's CAGE CODE: ________________________.

3. Are you registered in System for Award Management (SAM)?

( ) YES ( ) NO

You will not be eligible for award if you are not registered in the System for Award Management (SAM). If you have previously registered, make sure that your registration has not expired.

NOTE: Quoter's should ensure that all clauses, certifications, and representations within this RFQ have been accurately completed. Upon receipt of a Government Order in response to a vendor's quotation, the vendor shall indicate acceptance of the order in writing within three (3) business days. Submission of Quotes: See Standard Form 1449 (Continuation Sheet) for any specific instructions on how to submit your offer if mailed. Please note that Faxed orders are NOT authorized for this RFQ.

VERY IMPORTANT: The vendor must certify their agreement to these terms and conditions of the RFQ By signing and dating page one (1) of form SF1449.

NOTE: ALL supplies are to be brand name Caterpillar parts.

N6449826Q5111

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price Amount

Controller Group. Caterpillar Part Number 458-7750

Company Part Number: 458-7750 Pricing Arrangement: Firm Fixed Price

2 Each

Controller Assembly Electronics. Caterpillar Part Number 334-2668.

Company Part Number: 334-2668 Pricing Arrangement: Firm Fixed Price

2 Each

ADAM Controller. Caterpillar Part Number 11R-1262.

Company Part Number: 11R-1262 Pricing Arrangement: Firm Fixed Price

2 Each

Shipping

Generic Name Description: Shipping Pricing Arrangement: Firm Fixed Price

1 Job

Section C - Description/Specifications/Statement of Work

Requirements Spare Electrical Parts

Additional Regulation or Supplemental Clauses Incorporated by Full Text

C-202-H001 ADDITIONAL DEFINITIONS--BASIC (Oct 2018)

(a) Department means the Department of the Navy.

(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) . The number assigned to each approved Item Identification under the National Item Identification Number (NIIN) Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit nonsignificant number.

(2) . The National Stock Number (NSN) for an item of supply consists of the applicable National Stock Number (NSN) four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

(Endof Text)

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (Oct 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as "protected information". File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

(End of Text)

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019) (Jan 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

(End of Text)

C-212-W001 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS ADDENDUM

TO 52.212-4 (NAVSEA) (OCT 2018)

(Oct 2018)

(o) Warranty -- append the following to paragraph (o):

The contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale at no additional cost to the Government. Acceptance of the standard commercial warranty does not waive the Government's rights under the "Inspection" clause nor does it limit the Government's rights with regard to the other terms and conditions of this contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty. The standard commercial warranty period shall begin upon final acceptance of the applicable material and/or services listed in the Schedule.

The contractor shall provide a copy of its standard commercial warranty (if applicable) with its offer. The warranty covers a period of months. ( Offeror is to insert number.)

The following information is hereby appended to the clause:

(w) Data Rights. The Government shall have data rights to all data generated under this contract or order in accordance with

DFARS 252.227-7015.

(x) Ordering. The agency authorized to place delivery orders against this contract is: [Add ordering activity name]. Delivery orders will be placed against this contract, by the Government, using the SF 1449.

(End of Text)

C-215-H001 PRICE ADJUSTMENT FOR CHANGES IN FEDERAL LAW (NAVSEA) (OCT 2018) (Oct 2018)

(a) Definitions

(1) For the purpose of this requirement:

(i) The term "Currently Applicable Federal Laws" is defined to mean and include only the statutes listed below and regulations thereunder, promulgated by Federal authorities as in effect on the date of contract award.

(A) Contract Work Hours and Safety Standards Act

(B) Occupational Safety and Health Act

(C) Atomic Energy Act

(D) National Environmental Policy Act

(E) Clean Air Act

(F) Clean Water Act

(G) Refuse Act

(H) Noise Control Act

(I) Toxic Substances Control Act

(J) Solid Waste Disposal Act

(K) Marine Protection, Research and Sanctuaries Act

(L) Comprehensive Environmental Response, Compensation, and Liability Act

(M) Act to Prevent Pollution from Ships

(N) Hazardous Materials Transportation Act

(ii) The term "New Federal Law" is defined to mean a new Federal Statute enacted subsequent to the contract award date pertaining to (1) workplace conditions affecting employees or the public, or (2) environmental standards and requirements, and regulations thereunder promulgated by Federal authorities.

(iii) The term "change" shall be deemed to mean the amendment or repeal of any Currently Applicable Federal Law or New Federal Law or regulations promulgated thereunder by Federal authorities.

(b) If, at any time after the effective date of this contract, a New Federal Law is enacted or a change is made to a Currently Applicable Federal Law or a New Federal Law or regulations thereunder promulgated by Federal authorities, and compliance with such new law or change directly results in an increase or decrease in the Contractor's cost of performance of this contract, the contract price(s) shall be adjusted as provided in paragraph (c) below. No such adjustment shall be made for contract costs incurred or projected to be incurred during the two (2) year period after the effective date of this contract.

(c) The price adjustment provided for in paragraph (b) above shall be made, in the same amount, in each of the Target Cost(s), the Target Price(s), and the Ceiling Price(s) or Fixed Price(s) of this contract, as appropriate, and shall include only the properly allowable and allocable direct and indirect costs of additional labor and materials directly resulting from compliance with the new law or with the change, but shall not include:

(1) Costs of delay, disruption, or acceleration of performance;

(2) Increases or decreases in prices charged by subcontractors or suppliers; or

(3) Costs of additional facilities or of any portion thereof constructed or acquired after the contract award date unless such additional facilities or the portion thereof have been constructed or acquired by the Contractor solely in order to comply with a New Federal law or a change in Currently Applicable Federal Laws or New Federal Laws, or regulations thereunder promulgated by Federal authorities.

The price adjustment shall consider and exclude any tax, depreciation, or other special allowances provided to the Contractor in the New Federal Law or change for compliance therewith. No adjustment shall be made in the Profit or Delivery Schedule of the contract, provided, however, that the Contractor's right, if any, to extension of the delivery schedule under any other requirement of this contract shall not be prejudiced thereby. No adjustment shall be made unless a New Federal Law or a change directly causes an increase or decrease in the Contractor's cost of performance of this contract in excess of $250,000 per ship.

(d) The Contractor shall promptly notify the Contracting Officer, in writing, of the enactment of New Federal Laws or of a change that reasonably may be expected to result in an adjustment under the provisions of this requirement.

(e) Requests for price adjustments hereunder shall be made in accordance with the procedures of the contract requirement entitled "Documentation of Requests for Equitable Adjustment".

(End of Text)

C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018) (Oct 2018)

(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with detailed obligations to which the Contractor committed itself in Proposal dated in response to NAVSEA Solicitation No.

N6449826Q5111 .

(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.

(End of Text)

C-232-H001 PAYMENTS, LIENS AND INSURANCE (NAVSEA) (OCT 2018) (Oct 2018)

(a) (1) Until such time as the physical progress of the contract as a whole is fifty percent (50%) complete, the Government, upon submission by the Contractor, of invoices certified by the Contractor as hereinafter provided, will promptly make payments on account of the total contract price of ninety percent (90%) of an amount determined by applying to the contract price of each craft the percentage of physical progress in the performance of the contract as a whole as certified by the Contractor subject to the approval of the Supervisor; , that no such payment shall be made in an amount which when provided added to the total of all payments previously made under this requirement (other than payments made pursuant to the paragraphs

(b) and (c)) exceeds onehundred percent (100%) of the allowable cost which has been certified by the Contractor on the related invoice to have been incurred by it in the performance of the contract.

(2) After the percentage of physical progress in the performance of the contract as a whole has reached fifty percent (50%), the Government, upon submission by the Contractor of invoices certified by the Contractor as hereinafter provided, will promptly make payments on account of the total contract price of onehundred percent (100%) of an amount determined by applying to the contract price of each craft the percentage of physical progress in the performance of the contract as a whole as certified by the Contractor subject to the approval of the Supervisor, less two and onehalf percent (2.5%) of the contract price of each craft. However, no such payment shall be made in an amount which when added to the total of all payments previously made under this requirement (other than payments made pursuant to the paragraphs (b) and (c)) exceed onehundred seven percent (107%) of the allowable cost which has been certified by the Contractor on the related invoice to have been incurred by it in the performance of this contract.

(3) Notwithstanding subparagraph (a)(2) above, after the percentage of physical progress in the performance of the contract as a whole has reached seventyfive percent (75%), the total amount of contract withholdings (as defined in subparagraph (a)(iv) below) with respect to any craft shall not exceed the amount withheld at the point at which the performance of the contract as a whole is seventyfive percent (75%) complete. Therefore, after the percentage of physical progress in the performance of the contract as a whole is seventyfive percent (75%), the Government upon submission by the Contractor of invoices certified by the Contractor as hereinafter provided, will promptly make payments on account of the total contract price of onehundred percent (100%) of the amount determined by: (i) multiplying the total contract price of each craft by the percentage of physical progress in the performance of the contract as a whole as certified by the Contractor subject to the approval of the Supervisor, and (ii) subtracting from that product the total amount of contract withholding with respect to each craft that was withheld at the point at which the total contract performance was seventyfive percent (75%) complete on the basis of physical progress, that provided each craft under contract is (or has been) delivered on or before the contract delivery date, or such later date as may be set by the Contracting Officer. If each craft is not (or has not been) delivered on or before the contract delivery date, or such later date as may be set by the Contracting Officer, the requirement above in subparagraph (a)(2) shall apply in full. If the application of the requirements in subparagraph (a)(2) above results in an amount owed to the Navy by the Contractor, collection will be deferred but no further payment will be made on any account against cost or progress until the deferred obligations are repaid.

(4) For the purposes of this requirement, any amount earned based on the percentage of a physical completion times contract price but not paid is defined as a "withholding".

(5)(a) On each of the occasions listed in (5)(C) immediately below, the Contractor shall submit a written report to the Contracting Officer containing the following information;

(i) The amount of the allowable costs which have been incurred by the Contractor in the performance of the contract as a whole; and

(ii) The percentage of physical completion achieved in the performance of the contract as a whole;

(iii) The total cost for completion of the contract work as projected by the Contractor on the basis of its incurred cost of performance and physical completion achieved;

(iv) Explanation of any variance between the presently projected cost for completion of the contract work and the projected costs for such completion as stated in the last previous report made by the Contractor;

(v) The dollar amount of profit which the Contractor expects to earn from performance of the contract based upon the information described in (i), (ii), and (iii) above.

(b) The format of the report described in (5)(A) immediately above shall provide for cost category reporting of incurred and projected costs in accordance with the Contractor's normal accounting system and broken down into labor hours, labor dollars, material dollars and indirect dollars. The Contracting Officer may require the Contractor to submit, or make available for examination by the Contracting Officer or his designated representative, the supporting documentation upon which the report is based.

(c) The report described in (5)(A) and (5)(B) immediately above shall be submitted by the Contractor to the Contracting Officer on each of the following occasions:

(i) together with, and as part of, the first invoice for payment submitted by the Contractor under this requirement in which the percentage of physical progress in the performance of contract as a whole is certified by the Contractor to have reached fifty percent (50%) or more; and

(ii) within ninety (90) days after the close of the Contractor's fiscal year during which the report described in (i) immediately above was rendered and within ninety (90) days after the close of each subsequent Contractor's fiscal year; and

(iii) within thirty (30) days after written request of the Contracting Officer.

(6) "Incurred costs" are those costs identified through the use of the accrual method of accounting as supported by the records maintained by the Contractor and which are allowable in accordance with Part 31 of the Federal Acquisition Regulation and Part 231 of the Department of Defense FAR Supplement (DFARS) in effect on the effective date of this contract and include only:

(a) Costs for items or services purchased directly for the contract that have been paid by cash, check, or other form of actual payment; or when the Contractor is not delinquent in paying costs of contract performance in the ordinary course of business, costs incurred, but not necessarily paid, for items or services purchased directly for the contract and associated financing payments to subcontractors provided payments will be made;

(i) In accordance with the terms and conditions of a subcontract or invoice; and

(ii) Ordinarily prior to the submission of the Contractor's next payment request to the Government; and

(b) Costs incurred, but not necessarily paid, for materials issued from the Contractor's stores inventory and placed in the production process for use on the contract, for direct labor, for direct travel, for other direct in-house costs and for properly allocable and allowable overhead (indirect) costs, all as shown by records maintained by the Contractor for the purposes of obtaining payment under Government contracts; provided that the Contractor is not delinquent in payment in the ordinary course of business; and

(c) With respect to allocated and allowable costs of pension contributions, when pension contributions are paid by the Contractor to the retirement fund less frequently than quarterly, accruals of the costs of these pension contributions shall be excluded from Contractor's incurred costs until such costs are paid. If pension contributions are paid on a quarterly or more frequent basis, accruals of such costs may be included in Contractor's incurred costs, provided that the pension contributions are paid to the retirement fund within thirty (30) days after the close of the period covered by the payment. If payments are not paid within such thirty (30) day period, pension contributions shall be excluded from the Contractor's incurred cost until payment therefor has been made.

(d) Incurred costs shall not include any costs which are required, under any requirement of this contract to be reimbursed or paid by the Government to the Contractor or reimbursed or paid by the Contractor to the Government other than through an equitable adjustment in contract price. If an overpayment is made relative to this paragraph, interest shall be charged at the prevailing per annum rate established by the Secretary of the Treasury, pursuant to Public Law 92-41, from the date such overpayment is made until the date the overpayment is fully recovered.

(7) At any time or times prior to final payment under this contract, the Contracting Officer may have invoices and statements or certifications of costs audited. Each payment theretofore made shall be subject to reduction as necessary to reflect the exclusion of amounts included in the invoices or statements or certifications of costs which are found by the Contracting Officer, on the basis of such audit, not to constitute allowable costs. Any payment may be reduced for overpayments, or increased for underpayments, on preceding invoices.

(8) Invoices may be submitted every two weeks or more frequently, as the Contracting Officer, in his sole and non-appealable discretion, determines to be warranted by expenditures of the Contractor. Invoices shall be based upon the total contract price as adjusted from time to time pursuant to the terms of the contract. The Contractor shall certify on each invoice

(i) the percentage of physical progress in the performance of the contract as a whole as a decimal carried to four places and (ii) the allowable costs incurred by it in performance of the contract as a whole as of the date the invoice is submitted. No payment will be required to be made under this paragraph (a) upon invoices aggregating less than .fivethousand dollars ($5,000)

(b) Upon acceptance of each craft and upon the submission of properly certified invoices, the Government will pay to the Contractor the amount of withholding under paragraph (a)(2) with respect of that craft in excess of (i) one and onehalf percent (1-1/2%) of the contract price for such craft, constituting a final settlement reserve, and (ii) one percent (1%) of the contract price for such craft, constituting a final settlement reserve, provided however that the amount of such final settlement reserve for the entire contract shall not exceed . If at any time it shall appear to the Government onehundred thousand dollars ($100,000) that the amount of the performance reserve may be insufficient to meet the cost to the Government of finishing any unfinished work under the contract for which the Contractor is responsible or of correcting defects for which the Contractor is responsible which are discovered prior to acceptance or during the guaranty period (if the requirement "Guaranty Period" is included in this contract) of any craft, the Government may, in making payments under this requirement, deduct or withhold such additional amounts as it may determine to be necessary to render such reserve adequate. Any such additional amounts deducted or withheld on account of defects which are discovered during the guaranty period of the craft shall not exceed the limit of the Contractor's liability, under the requirement entitled "Limitation of Contractor's Liability for Correction of Defects" (if such requirement is included in this contract).

(c) At any time or times prior to final payment under this contract, the Contracting Officer may have any invoices and statements or certifications of costs audited. The Contracting Officer may require the Contractor to submit, or make available for examination by the Contracting Officer or his designated representative, the supporting documentation upon which invoices, statements or certifications of costs are based. Each payment theretofore made shall be subject to reduction as necessary to reflect the exclusion of amounts included in the invoices or statements or certifications of costs which are found by the Contracting Officer, on the basis of such audit, not to constitute allowable costs. Any payment may be reduced for overpayments, or increased for underpayments on preceding invoices.

(d) The Contracting Officer may reduce or suspend payments after finding on substantial evidence any of the following conditions:

(1) The Contractor failed to comply with any material requirement of this contract (including but not limited to such requirements as quality, safety, care and protection).

(2) Performance of this contract is endangered by the Contractor's

(i) Failure to make progress; or

(ii) Unsatisfactory financial condition

(3) Inventory allocated to this contract substantially exceeds reasonable requirements.

(e) Upon completion and acceptance of all work hereunder, the balance due the Contractor under this contract will be paid upon the presentation of a properly executed and duly certified invoice therefor. The Contractor and each assignee under an assignment in effect at the time of final settlement shall execute and deliver at the time of and a condition precedent to final payment, a release in form and substance satisfactory to and containing such exceptions as may be found appropriate by the Contracting Officer, discharging the Government, its officers, agents, and employees of and from all liabilities, obligations and claims arising under this contract. The Contracting Officer may, in his discretion, authorize payments on account of any such balance to be made in advance of final settlement subject to such conditions precedent as the Contracting Officer may prescribe. If this contract shall have been terminated in whole, or in part, any such release shall also contain such a release of all claims against the Government arising out of or by virtue of such termination.

(f) Any and all payments made hereunder shall be secured when made, by lien in favor of the Government upon craft, articles, and things contracted for on account of all payments so made and on all material, equipment, and other property acquired for or allocated to the performance of this contract, except to the extent that the Government, by virtue of any other requirements of this contract, or otherwise shall have valid title to such articles, things, materials, or other property as against other creditors of the Contractor. If such property is not identified by marking or segregation, the Government shall be deemed to have a lien upon a proportionate part of any mass of property with which such property is commingled. Any lien provided for by virtue of this paragraph is paramount to all other liens under the provisions of 10 U.S.C. sec 7521.

(g) Title to the craft under construction shall vest in the Government and title to all materials and equipment acquired for the performance of the contract shall vest in the Government upon delivery thereof to the plant of the Contractor or other place of storage selected by the Contractor, whichever of said events shall first occur; provided however, that notwithstanding the foregoing requirements concerning title, in the event of loss, theft or destruction of or damage to any such property before acceptance by the Government, the Contractor shall bear the risk of any such loss, theft, destruction or damage.

(h) The Contractor, to the extent determined necessary and practicable by the Supervisor of Shipbuilding, shall identify by marking or segregation all property which is subject to a lien or title in favor of the Government by virtue of any requirements of this contract in such a way as to indicate that it is subject to such a lien or title and that it has been acquired for or allocated to the performance of this contract. The Contractor shall also maintain adequate accounting control over such property on its books and records which shall be subject to examination by the Supervisor of Shipbuilding at all reasonable times to assure compliance with these requirements.

(i) The Contractor shall immediately discharge or cause to be discharged any lien or right of any kind, other than in favor in rem of the Government, which at any time exists or arises with respect to the craft, machinery, fittings, equipment, or materials for the craft. If any such lien or right is not immediately discharged, the Government may discharge or cause to be in rem discharged said lien or right , at the expense of the Contractor.in rem

(j) Until each craft has been accepted by the Department, each craft and all materials, equipment and appliances, therefor, including materials, equipment to be furnished by the Government to the Contractor for installation in the craft, shall, at the expense of the Contractor, be kept fully and duly insured by the Contractor in the name of the United States of America and the Contractor under the form of Builder's Risk Insurance (Navy Form Syndicate) Policy, including the rider attached to the "Free of Capture and Seizure" clause thereof where applicable. Where such insurance is not applicable the Contractor shall procure and thereafter maintain in the name of the United States of America and the Contractor until each craft has been accepted by the Department, fire and extended coverage insurance during construction and inland or ocean marine all risk cargo insurance during delivery with respect to each craft and all materials, equipment and appliances therefor, including materials and equipment to be furnished by the Government to the Contractor for installation in each craft. Where none of the foregoing is applicable during water trials the Contractor shall procure and thereafter maintain such other insurance for each craft as will cover the usual marine perils during such trials. The amount of the insurance shall not be less than aggregate of the amount paid to the Contractor under this contract by the Department plus the value of any materials, equipment and appliance furnished by the Government as determined from time to time by the Contracting Officer. Loss under the aforementioned insurance shall be payable to the Secretary of the Navy, or order, for use of the United States of America to the extent of payment made to the Contractor under this contract plus the amount of loss of or damage to the material, equipment, and appliance furnished by the Government and for use of the Contractor to the extent of any remaining balance.

(k) All policies shall be delivered to the Administrative Contracting Officer for approval and custody. The terms of the policies, the insurance companies, and the underwriters shall at all times be satisfactory to the Contracting Officer. Policies not in conformance herewith shall be surrendered and cancelled upon the direction of the Contracting Officer and new policies procured in conformance herewith.

(l) In the event that the Contractor shall procure or maintain other insurance upon any materials or other property upon which a lien exists in favor of the Government or to which the Government has title pursuant to the terms of this contract, the policy or policies shall contain a loss payable clause making losses payable to the Secretary of the Navy or as referred by the Contracting Officer. Any payments thereunder shall inure to the benefit of the Government and to the Contractor as to any remaining balance. The requirements of this paragraph (l) shall not be deemed to require that the Contractor procure or maintain any such other insurance.

(m) The foregoing insurance requirements shall not be construed as limiting in any way the full responsibility of the Contractor for the supplies under the contract.

(End of Text)

C-233-H001 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--BASIC

(NAVSEA) (OCT 2018)

(Oct 2018)

(a) For the purposes of this special contract requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (1) an engineering change proposed by the Government or by the Contractor and (2) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment.

(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect to a change made pursuant to a written order designated as a "change order" or in respect to a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect to any other act or omission to act on the part of the Government, the proposal supporting such request shall contain the following information for each individual item or element of the request:

(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work. Items of raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;

(2) Description of work necessary to undo work already completed which has been deleted by the change;

(3) Description of work not required by the terms hereof before the change, which is substituted or added by the change. A list of components and equipment (not bulk materials or items) involved should be included. Separate descriptions are to be furnished for design work and production work;

(4) Description of interference and inefficiencies in performing the change;

(5) Description of each element of disruption and exactly how work has been, or will be disrupted:

(i) The calendar period of time during which disruption occurred, or will occur;

(ii) Area(s) aboard the vessel where disruption occurred, or will occur;

(iii) Trade(s) disrupted, with a breakdown of manhours for each trade;

(iv) Scheduling of trades before, during, and after period of disruption;

(v) Description of measures taken to lessen the disruptive effect of the change;

(6) Delay in delivery attributable solely to the change;

(7) Other work attributable to the change;

(8) Supplementing the foregoing, a narrative statement of the direct "causal" relationship between any alleged Government act or omission and the claimed consequences therefor, crossreferenced to the detailed information provided as required above;

and

(9) A statement setting forth a comparative enumeration of the amounts "budgeted" for the cost elements, including the material costs, labor hours and pertinent indirect costs, estimated by the Contractor in preparing its initial and ultimate proposal

(s) for this contract, and the amounts claimed to have been incurred and/or projected to be incurred corresponding to each such "budgeted cost" elements.

(c) Each proposal in excess of $100,000 submitted in support of a claim for equitable adjustment under any requirement of this contract shall, in addition to the information required by paragraph (b) hereof, contain such information as the Contracting Officer may require with respect to each individual claim item.

(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in paragraph (b) above. Accordingly, the Contractor is required to set forth in its proposal information only with respect to those factors which are comprehended in the individual claim for equitable adjustment. In any event, the information furnished hereunder shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, submitted pursuant to paragraph (c) of this requirement, with the information submitted pursuant to paragraph (b) hereof.

(End of Text)

C-243-H001 CONTRACTOR PROBLEM IDENTIFICATION REPORTS (NAVSEA) (OCT 2018) (Oct 2018)

(a) Contract Problem Identification Reports (CPIRs) shall be used by the Contractor for the purpose of alerting the Government to actual or potential contract problems and of establishing an early dialogue between the Contractor and the Government with regard thereto.

(b) A "contract problem" is a fact or circumstance of which the Contractor is aware that does, will or reasonably is anticipated to (1) have a significant or substantial impact on the delivery schedule or completion of contract performance or the cost of performance of the contract (increase or decrease) or (2) requires modification to the contract or specification(s). The terms "significant" and "substantial" shall be interpreted in the same manner as they would be interpreted by a reasonably prudent business person under the relevant circumstances.

(c) The Contractor shall report each contract problem promptly and in no event later than ten (10) calendar days, after the Contractor identifies such contract problem. A written CPIR shall be transmitted via the Administrative Contracting Officer (ACO) to the Procuring Contracting Officer and to the cognizant NAVSEA Program Office. Each CPIR shall be entitled "Contract Problem Identification Report", shall be dated, numbered sequentially and shall set forth the following based on the best and most complete information then known or available to the Contractor:

(1) The nature of the contract problem;

(2) The date on which the contract problem arose and the date on which the contract problem was identified as such;

(3) The anticipated direct and consequential effects of the contract problem upon the delivery schedule or completion of contract performance or the cost of performance of the contract;

(4) Identification of the supplies and/or services which are or may be affected; and

(5) The Contractor's recommended solution to the reported contract problem

(d) Follow-up status reports of each contract problem, identified by the original CPIR number, shall be furnished monthly or more frequently as required by the Contracting Officer. A final follow-up report shall be furnished immediately following resolution of each contract problem.

(e) CPIRs shall not be submitted when notice of the same contract problem is required to be furnished to the Government pursuant to any other requirement of this contract. The submission of a CPIR, however, does not relieve the Contractor of its obligations to provide notice required under any other requirement of this contract.

(End of Text)

C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018) (Dec 2018)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.

(End of Text)

Section D - Packaging and Marking

Additional Regulation or Supplemental Clauses Incorporated by Full Text

D-247-H002 PACKAGING OF SUPPLIES—BASIC (NAVSEA) (DEC 2020) (Dec 2020)

Item(s) The supplies furnished hereunder shall be packaged in accordance with ASTM-D-3951-18, Standard Practice for Commercial 0001 - 0003 Packing.

(End of Text)

Section E - Inspection and Acceptance

Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: See Contract Terms and Conditions for Inspection and Acceptance criteria.

DoDAAC: N64498 CountryCode: USA

NSWC PHILADELPHIA DIV

5001 S BROAD STREET, PHILADELPHIA PA 19112-1403

PHILADELPHIA, PA 19112-1403

UNITED STATES

Shane Docks, Inspection/Acceptance POC Email: shane.k.docks.civ@us.navy.mil Telephone: 267-965-4207

Inspection and Acceptance Location

Both Destination Instructions: See Contract Terms and Conditions for Inspection and Acceptance criteria.

DoDAAC: N64498 CountryCode: USA

NSWC PHILADELPHIA DIV

5001 S BROAD STREET, PHILADELPHIA PA 19112-1403

PHILADELPHIA, PA 19112-1403

UNITED STATES

Shane Docks, Inspection/Acceptance POC Email: shane.k.docks.civ@us.navy.mil Telephone: 267-965-4207

Inspection and Acceptance Location

Both Destination Instructions: See Contract Terms and Conditions for Inspection and Acceptance criteria.

DoDAAC: N64498 CountryCode: USA

NSWC PHILADELPHIA DIV

5001 S BROAD STREET, PHILADELPHIA PA 19112-1403

PHILADELPHIA, PA 19112-1403

UNITED STATES

Shane Docks, Inspection/Acceptance POC Email: shane.k.docks.civ@us.navy.mil Telephone: 267-965-4207

Inspection and Acceptance Location

Both Destination Instructions: See Contract Terms and Conditions for Inspection and Acceptance criteria.

DoDAAC: N64498 CountryCode: USA

NSWC PHILADELPHIA DIV

5001 S BROAD STREET, PHILADELPHIA PA 19112-1403

PHILADELPHIA, PA 19112-1403

UNITED STATES

Shane Docks, Inspection/Acceptance POC Email: shane.k.docks.civ@us.navy.mil Telephone: 267-965-4207

Section F - Deliveries or Performance

Overall Contract Delivery Period

From date of lead time event to delivery 60 Calendar Days Date of Award Receipt

Contractor Destination

Line Item Delivery Schedule Quantity Address and POC Special Handling/Notes

Delivery Schedule From date of lead time event to delivery 60 Calendar Days Date of Award Receipt

2 Each Ship To DoDAAC: N64498 CountryCode: USA

NSWC PHILADELPHIA DIV

1601 LANGLEY AVE BUILDING 542,

PHILADELPHIA PA 19112

PHILADELPHIA, PA 19112

UNITED STATES

Shane Docks, Delivery POC Email: shane.k.docks.civ@us.navy.mil Telephone: 267-865-4207

FoB Details Contractor Destination

Delivery Schedule From date of lead time event to delivery 60 Calendar Days Date of Award Receipt

2 Each Ship To DoDAAC: N64498 CountryCode: USA

NSWC PHILADELPHIA DIV

1601 LANGLEY AVE BUILDING 542,

PHILADELPHIA PA 19112

PHILADELPHIA, PA 19112

UNITED STATES

Shane Docks, Delivery POC Email: shane.k.docks.civ@us.navy.mil Telephone: 267-865-4207

FoB Details Contractor Destination

Delivery Schedule From date of lead time event to delivery 60 Calendar Days Date of Award Receipt

2 Each Ship To DoDAAC: N64498 CountryCode: USA

NSWC PHILADELPHIA DIV

1601 LANGLEY AVE BUILDING 542,

PHILADELPHIA PA 19112

PHILADELPHIA, PA 19112

UNITED STATES

Shane Docks, Delivery POC Email: shane.k.docks.civ@us.navy.mil Telephone: 267-865-4207

FoB Details Contractor Destination

Delivery Schedule From date of lead time event to delivery 60 Calendar Days Date of Award Receipt

1 Job Ship To DoDAAC: N64498 CountryCode: USA

NSWC PHILADELPHIA DIV

1601 LANGLEY AVE BUILDING 542,

PHILADELPHIA PA 19112

PHILADELPHIA, PA 19112

UNITED STATES

Shane Docks, Delivery POC Email: shane.k.docks.civ@us.navy.mil Telephone: 267-865-4207

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.

authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.

Protocol.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.

WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s): Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

Combo

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .