Solicitation - FA875126Q0002.pdf
PDF 394 KB Posted
- Solicitation number
- FA875126Q0002
About this file
This is an Invitation for Bid (IFB) for construction services to repair and replace roof Areas 1 and 4 of Building 3 located at Rome, New York. The Air Force Research Laboratory (AFRL) in Rome, New York is the issuing contracting activity (FA8751), with Jennifer Calandra and John Haberer serving as primary contacts. The solicitation number is FA875126Q0002, and sealed bids are due by 11:00 AM local time on April 13, 2026, at the address specified in the solicitation. The acquisition is structured as a 100% Small Business Set-Aside under FAR 19.5, with the applicable NAICS code 238160 and a small business size standard of $19,000,000 average annual revenue. The contract type is Firm-Fixed-Price, with pricing to be submitted on the included price schedule (Attachment 5). Contractors must provide all labor, materials, equipment, transportation, supervision, and other necessary work in accordance with attached specifications and drawings for Areas 1 and 4 (Attachments 1-4) and supplemental requirements (Attachment 7). The anticipated period of performance is 120 calendar days from issuance of Notice to Proceed, with contractors required to begin within 14 days of award. Performance and payment bonds are required within 14 calendar days of award. Offers must provide at least 45 days for Government acceptance after the bid submission date.
The inspection and acceptance location is at F4HBC1 AFRL RIO RRS in Rome, New York, with Kenneth Pfendler designated as the point of contact. Payment will be made in accordance with FAR 52.232-5 (Payments under Fixed-Price Construction Contracts) through the Wide Area Workflow (WAWF) system. Key compliance requirements include adherence to Davis-Bacon wage rates (Attachment 8), Buy American construction materials provisions, hazardous material identification and safety data submission, cybersecurity maturity model certification (CMMC Level 1), and various federal contracting regulations governing labor standards, environmental protection, and security. The solicitation incorporates extensive FAR and DFARS clauses addressing contract administration, cybersecurity, export controls, and other federal requirements. Contractors must obtain base identification passes for personnel accessing the Air Force installation and comply with health and safety standards. All technical requirements, drawings, and specifications are referenced in the attachments, which form the basis for bid preparation and contract performance.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION
NUMBER
FA875126Q0002
2. TYPE OF SOLICITATION
SEALED BID (IFB) INVITATION FOR BID
NEGOTIATED (RFP) REQUEST FOR
PROPOSAL
3. DATE ISSUED
13 Mar 2026
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
ULDF 210201 and ULDF 210204
7. ISSUED BY CODE: FA8751
FA8751 AFRL RIKO
26 ELECTRONIC PKWY BLDG 106, CP 315 330 7298
ROME, NY 13441-4514
UNITED STATES
Jennifer Calandra, Email: Jennifer.Calandra@us.af.mil Telephone: 3153304009 John Haberer, Email: John.Haberer@us.af.mil Telephone: 315-330-4378
8. ADDRESS OFFER TO
FA8751 AFRL RIKO
ADMIN ONLY NO REQTN CP 315 330 7298, 26 ELECTRONIC PKWY BLDG 106
ROME, NY 13441-4514
UNITED STATES
9. FOR
INFORMATION CALL:
a. NAME Jennifer Calandra
b. TELEPHONE NUMBER (include area code) (NO COLLECT CALLS) 3153304009
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10.THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
Project Title: Repair/Replace Roof, Areas 1 & 4, Building 3 Project Location: Rome, NY
A. Contractor shall provide all labor, materials, equipment, transportation, supervision, and other necessary work to perform repair/ replacement of Areas 1 and 4 of Building 3's roof (Rome, NY 13441) in accordance with all applicable specifications/drawings (attached) and other federal and local regulations.
B. This acquisition will be a 100% Small Business Set- Aside in accordance with FAR 19.5. The applicable NAICS code is 238160 with an associated small business size standard of $19,000,000 average annual revenue.
C. Anticipated period of performance is 120 calendar days after issuance of Notice to Proceed.
D. The Government reserves the right to cancel this solicitation at any time before or after the closing date.
11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving 14 120 award, notice to proceed. This performance period is mandatory negotiable. (See ). FAR 52.211-10
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
YES NO
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) 11:00 AM local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes 13 Apr 2026 containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. 45
Computer generated. STANDARD FORM 1442 (REV. 12/2022) Prescribed by GSA-FAR (48CFR) 53.236-1(d)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
10 U.S.C 3204(A) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document
Contractor agrees to furnish and return copies to issuing office.)
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
Computer generated. STANDARD FORM 1442 (REV. 12/2022) BACK
Section A - Solicitation/Contract Form Repair/Replace Roof - Areas 1&4, Building 3
NAICS: 238160
Size Standard: USD 19,000,000.00 Annual receipts
Small Business Type: Small Business Set Aside Percent: 100
Product Service Code: Y1QA
FA875126Q0002
Section B - Supplies or Services & Prices or Costs Additional Information/Notes
Item Supplies / Services Quantity Unit Unit Price Amount
REPAIR/REPLACE ROOF RESEARCH
LABORATORY B3 - PHASES I & II
(Areas 1 & 4)
Construction services to repair/replace roof in accordance with the following:
Attachment 1 - Area 1 Full Spec Attachment 2 - Area 1 Drawings Attachment 3 - Area 4 Full Spec Attachment 4 - Area 4 Drawings Attachment 7 - Supplemental Requirements
Product Service Code: Y1QA Pricing Arrangement: Firm Fixed Price
1 Job
Section C - Description/Specifications/Statement of Work
Requirements Repair/Replace Roof, Areas 1/4, Building 3.
See attachments for requirements.
Section D - Packaging and Marking
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
52.246-12 Inspection of Construction. Aug 1996 Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: Acceptance and Inspection will be conducted in accordance with contract terms and conditions.
DoDAAC: F4HBC1 CountryCode: USA
F4HBC1 AFRL RIO RRS
AF BPN NO MLSBLS PROC CP3153307433, 148 ELECTRONIC PKWY
ROME, NY 13441-4516
UNITED STATES
Kenneth Pfendler Email: Kenneth.Pfendler@us.af.mil Telephone: 3153302592
Section F - Deliveries or Performance Overall Contract Delivery Period
Line Item Delivery Schedule Quantity Address and POC
Delivery Schedule From date of lead time event to completion of performance 120 Calendar Days Date of Notice to Proceed Receipt
1 Job Place of Performance DoDAAC: F4HBC1 CountryCode: USA
F4HBC1 AFRL RIO RRS
AF BPN NO MLSBLS PROC CP3153307433, 148 ELECTRONIC PKWY
ROME, NY 13441-4516
UNITED STATES
Kenneth Pfendler Email: Kenneth.Pfendler@us.af.mil Telephone: 3153302592
Period of Performance From 15 Apr 2026 To 28 Aug 2026
Section G - Contract Administration Data
DFARS PGI 204.202-77(c) PAYMENT INSTRUCTIONS (DEVIATION 2026-O0043) (FEB 2026)
The payment office must allocate and record the amounts paid from the ACRNs in the contract using Table 204-1 (https://www.acq.osd.mil/dpap/dars/classdev/ DFARS_RFO/Part-204/2026-O0043_TAB_A_Deviation_Memo_Part_204.pdf) based on the type of payment request submitted (see DFARS 252.232-7006) and the type of effort identified by the Product Service Code for each deliverable line item or subline item (see FAR 4.202-4)
DFARS Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
252.201-7000 Contracting Officer's Representative. Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Electronic invoicing.
Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before WAWF training.
submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol. WAWF methods of document submission.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract WAWF payment instructions.
or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Construction Invoice
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment Document routing.
requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC F03000
Issue By DoDAAC FA8751
Admin DoDAAC FA8751
Inspect By DoDAAC F4HBC1
Ship To Code N/A
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) FA8751
Service Acceptor (DoDAAC) FA8751
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the Payment request.
payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
(1) The contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
WAWF, Ogden Help Desk, E-Mail: disa.global.servicedesk.mbx.eb-ticket-requests@mail.mil Phone, 1-866-618-5988 / 1-801-605-7095
(i) CONCURRENT WITH OR SUBSEQUENT TO THE DELIVERY OF THE FINAL UPDATED TECHNICAL REPORT, the FINAL Receiving Report may be submitted to WAWF
(ii) DO NOT ATTACH TECHNICAL REPORTS TO WAWF DOCUMENTS. However, you may attach financial information supporting your voucher or documents supporting inspection and acceptance.
(iii) Payment information may be accessed using the DFAS website at http://www.dod.mil/dfas under MyInvoice. Your contract number or invoice will be required to check status of your payment.
(iv) Please add the following email addresses for processing to documents created in WAWF:
Contracting Officer's Representative (COR): Peder Messina - Peder.Messina@us.af.mil
Contract Specialist: Jennifer Calandra - Jennifer.Calandra@us.af.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
Section I - Contract Clauses DFARS Clause 252.227-7033 is incorporated by reference.
FAR Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
52.202-1 Definitions. Jun 2020 52.203-3 Gratuities. Apr 1984 52.203-6 Restrictions on Subcontractor Sales to the Government. Jun 2020 52.203-6 Restrictions on Subcontractor Sales to the Government. (Alternate I) Jun 2020 Alternate I Nov 2021 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-9 Personal Identity Verification of Contractor Personnel. Jan 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (Deviation) Feb 2026 52.204-13 System for Award Management-Maintenance. (Deviation) Feb 2026 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation) Feb 2026
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. (Deviation) Feb 2026 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation) Feb 2026 52.212-4 Terms and Conditions-Commercial Products and Commercial Services. (Deviation) Feb 2026 52.219-6 Notice of Total Small Business Set-Aside. (Deviation) Feb 2026 52.219-8 Utilization of Small Business Concerns. (Deviation) Feb 2026 52.222-3 Convict Labor. (Deviation) Feb 2026 52.222-4 Contract Work Hours and Safety Standards-Overtime Compensation. (Deviation) Feb 2026 52.222-6 Construction Wage Rate Requirements. (Deviation) Feb 2026 52.222-7 Withholding of Funds. (Deviation) Feb 2026 52.222-8 Payrolls and Basic Records. (Deviation) Feb 2026 52.222-9 Apprentices and Trainees. (Deviation) Feb 2026 52.222-10 Compliance with Copeland Act Requirements. (Deviation) Feb 2026 52.222-11 Subcontracts (Labor Standards). (Deviation) Feb 2026 52.222-12 Contract Termination-Debarment. May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. May 2014 52.222-14 Disputes Concerning Labor Standards. (Deviation) Feb 2026 52.222-15 Certification of Eligibility. May 2014 52.222-35 Equal Opportunity for Veterans. (Deviation) Feb 2026 52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation) Feb 2026 52.222-37 Employment Reports on Veterans. (Deviation) Feb 2026 52.222-40 Notification of Employee Rights Under the National Labor Relations Act. (Deviation) Feb 2026 52.222-50 Combating Trafficking in Persons. (Deviation) Feb 2026 52.222-54 Employment Eligibility Verification. (Deviation) Feb 2026 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. (Deviation) Feb 2026 52.222-62 Paid Sick Leave Under Executive Order 13706. (Deviation) Feb 2026 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts. (Deviation) Feb 2026 52.223-5 Pollution Prevention and Right-to-Know Information. May 2024 52.223-23 Sustainable Products. (Deviation) Feb 2026 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.227-1 Authorization and Consent. Jun 2020 52.227-4 Patent Indemnity-Construction Contracts. Dec 2007 52.228-5 Insurance-Work on a Government Installation. Jan 1997 52.228-11 Individual Surety-Pledge of Assets. Feb 2021 52.228-12 Prospective Subcontractor Requests for Bonds. Dec 2022 52.228-14 Irrevocable Letter of Credit. Nov 2014 52.229-12 Tax on Certain Foreign Procurements. Feb 2021 52.232-27 Prompt Payment for Construction Contracts. Jan 2017 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023 52.233-3 Protest after Award. (Deviation) Feb 2026 52.233-4 Applicable Law for Breach of Contract Claim. (Deviation) Feb 2026 52.236-2 Differing Site Conditions. (Deviation) Feb 2026 52.236-3 Site Investigation and Conditions Affecting the Work. (Deviation) Feb 2026 52.236-5 Material and Workmanship. (Deviation) Feb 2026 52.236-6 Superintendence by the Contractor. (Deviation) Feb 2026 52.236-7 Permits and Responsibilities. (Deviation) Feb 2026 52.236-8 Other Contracts. (Deviation) Feb 2026 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (Deviation) Feb 2026 52.236-10 Operations and Storage Areas. (Deviation) Feb 2026 52.236-11 Use and Possession Prior to Completion. (Deviation) Feb 2026 52.236-12 Cleaning Up. (Deviation) Feb 2026 52.236-13 Accident Prevention. (Deviation) Feb 2026 52.236-15 Schedules for Construction Contracts. (Deviation) Feb 2026 52.236-17 Layout of Work. (Deviation) Feb 2026 52.236-21 Specifications and Drawings for Construction. (Alternate I) Feb 2026 Alternate I Apr 1984
52.236-21 Specifications and Drawings for Construction. (Deviation) Feb 2026 52.240-91 Security Prohibitions and Exclusions. (Deviation) Feb 2026 52.240-93 Basic Safeguarding of Covered Contractor Information Systems. (Deviation) Feb 2026 52.242-14 Suspension of Work. Apr 1984 52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation) Feb 2026 52.249-2 Termination for Convenience of the Government (Fixed-Price). (Alternate I) Apr 2012 Alternate I Sep 1996 52.249-10 Default (Fixed-Price Construction). Apr 1984 52.253-1 Computer Generated Forms. (Deviation) Feb 2026
DFARS Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7003 Control of Government Personnel Work Product. Apr 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. Jan 2023 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. May 2024 252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services. Jan 2023 252.204-7022 Expediting Contract Closeout. May 2021 252.205-7000 Provision of Information to Cooperative Agreement Holders. Oct 2024 252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials. (Alternate I) Sep 2014 Alternate I Sep 2014 252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7012 Preference for Certain Domestic Commodities. Apr 2022 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023 252.225-7058 Postaward Disclosure of Employment of Individuals Who Work in the People's Republic of China. Jan 2023 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region. Jun 2023 252.226-7001 Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small
Business Concerns.
Jan 2023
252.232-7010 Levies on Contract Payments. Dec 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. Jan 2023 252.243-7001 Pricing of Contract Modifications. Dec 1991 252.243-7002 Requests for Equitable Adjustment. Dec 2022 252.244-7000 Subcontracts for Commercial Products or Commercial Services. Nov 2023 252.247-7023 Transportation of Supplies by Sea. Oct 2024
FAR Clauses Incorporated by Full Text
52.219-14 Limitations on Subcontracting. (Deviation) (Feb 2026)
Limitations on Subcontracting (Feb 2026) (Deviation)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Definition. Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that-
(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and
(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.
(c) Applicability. This clause applies only to-
(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(3) Contracts that have been awarded on a sole-source basis in accordance with sections 19.105, 19.106, 19.107, and 19.108;
(4) Orders expected to exceed the simplified acquisition threshold and that are set aside for small business concerns under multiple-award contracts, as described in 8.4 and 16.5;
(5) Orders, regardless of dollar value, that are set aside in accordance with sections 19.105, 19.106, 19.107, and 19.108 under multiple-award contracts, as described in
8.4 and 16.5; and
(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.
(d) Independent contractors. An independent contractor shall be considered a subcontractor.
(e) By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for-
(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract;
(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;
(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.
(f) The Contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause-
[Contracting Officer check as appropriate.]
[X] By the end of the base term of the contract and then by the end of each subsequent option period; or
[ ] By the end of the performance period for each order issued under the contract.
(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.
(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protégé in the joint venture must be more than administrative functions.
(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.
(End of clause)
52.223-3 Hazardous Material Identification and Safety Data. (Deviation) (Feb 2026)
Hazardous Material Identification and Safety Data (Feb 2026) (Deviation)
(a) Hazardous material, as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract).
(b) The Offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Safety Data Sheet submitted under this contract.
Material (If none, insert None) Identification No.
(c) This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered under this contract is hazardous.
(d) The apparently successful offeror agrees to submit, for each item as required prior to award, a Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with Federal Standard No. 313, whether or not the apparently successful offeror is the actual manufacturer of these items. Failure to submit the Safety Data Sheet prior to award may result in the apparently successful offeror being considered nonresponsible and ineligible for award.
(e) If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No. 313, which renders incomplete or inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.
(f) Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the Contractor of any responsibility or liability for the safety of Government, Contractor, or subcontractor personnel or property.
(g) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.
(h) The Government's rights in data furnished under this contract with respect to hazardous material are as follows:
(1) To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to-
(i) Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazardous materials;
(ii) Obtain medical treatment for those affected by the material; and
(iii) Have others use, duplicate, and disclose the data for the Government for these purposes.
(2) To use, duplicate, and disclose data furnished under this clause, in accordance with subparagraph (h)(1) of this clause, in precedence over any other clause of this contract providing for rights in data.
(3) The Government is not precluded from using similar or identical data acquired from other sources.
(End of clause)
52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items. (May 2008)
Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008)
(a) Definitions. As used in this clause-
Postconsumer materialmeans a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of "recovered material."
"Recovered material" means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b) The Contractor, on completion of this contract, shall-
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and
(2) Submit this estimate to Jaclyn HolbritterJaclyn.Holbritter@us.af.mil____[Contracting Officer complete in accordance with agency procedures].
(End of clause)
52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items. (Alternate I) (May 2008) Alternate I (May 2008)
Alternate I (May 2008). As prescribed in 23.109(b)(2), redesignate paragraph (b) of the basic clause as paragraph (c) and add the following paragraph (b) to the basic clause:
(b) The Contractor shall execute the following certification required by the Resource Conservation and Recovery Act of 1976 (42 U.S.C. 6962(i)(2)(C)):
Certification
I, ____(name of certifier), am an officer or employee responsible for the performance of this contract and hereby certify that the percentage of recovered material content for EPA-designated items met the applicable contract specifications or other contractual requirements.
____[Signature of the Officer or Employee]
____[Typed Name of the Officer or Employee]
____[Title]
____[Name of Company, Firm, or Organization]
____[Date]
(End of certification)
52.225-9 Buy American-Construction Materials. (Deviation) (Feb 2026)
Buy American-Construction Materials (Feb 2026) (Deviation)
(a) . As used in this clause-Definitions
Commercially available off-the-shelf (COTS) item-
(1) Means any item of supply (including construction material) that is-
(i) A commercial product (as defined in paragraph (1) of the definition of "commercial product" at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work.
The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph
(1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.
Domestic construction material means-
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if-
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
None
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable.
(A) .For domestic construction material that is not a critical item or does not contain critical components
(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A) of this clause.(1)
(3) The procedures in paragraph (b)(3)(i)(A) of this clause will no longer apply as of January 1, 2030.(2)
(B) .For domestic construction material that is a critical item or contains critical components
(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.
(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B) of this clause.(1)
(3) The procedures in paragraph (b)(3)(i)(B) of this clause will no longer apply as of January 1, 2030.(2)
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute or Balance of Payments Program.
(d) . To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any Data applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price
(dollars)*
Item 1:
Foreign construction material. ____ ____ ____
Domestic construction material. ____ ____ ____
Item 2:
Foreign construction material. ____ ____
Domestic construction material. ____ ____ ____
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate ].is issued)
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach ]summary.
[ ]Include other applicable supporting information.
(End of clause)
52.232-5 Payments under Fixed-Price Construction Contracts. (May 2014)
Payments under Fixed-Price Construction Contracts (May 2014)
(a) Payment of price. The Government shall pay the Contractor the contract price as provided in this contract.
(b) Progress payments. The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.
(1) The Contractor's request for progress payments shall include the following substantiation:
(i) An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment requested.
(ii) A listing of the amount included for work performed by each subcontractor under the contract.
(iii) A listing of the total amount of each subcontract under the contract.
(iv) A listing of the amounts previously paid to each such subcontractor under the contract.
(v) Additional supporting data in a form and detail required by the Contracting Officer.
(2) In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be taken into consideration. Material delivered to the Contractor at locations other than the site also may be taken into consideration if-
(i) Consideration is specifically authorized by this contract; and
(ii) The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform this contract.
(c) Contractor certification. Along with each request for progress payments, the Contractor shall furnish the following certification, or payment shall not be made: (However, if the Contractor elects to delete paragraph (c)(4) from the certification, the certification is still acceptable.)
I hereby certify, to the best of my knowledge and belief, that-
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor's performance.
____ (Name)
____ (Title)
____ (Date)
(d) Refund of unearned amounts. If the Contractor, after making a certified request for progress payments, discovers that a portion or all of such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the "unearned amount"), the Contractor shall-
(1) Notify the Contracting Officer of such performance deficiency; and
(2) Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph (j) of this clause) equal to interest on the unearned amount from the 8 thday after the date of receipt of the unearned amount until-
(i) The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or
(ii) The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the unearned amount.
(e) Retainage. If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future progress payments that amount the Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage.
(f) Title, liability, and reservation of rights. All material and work covered by progress payments made shall, at the time of payment, become the sole property of the Government, but this shall not be construed as-
(1) Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work; or
(2) Waiving the right of the Government to require the fulfillment of all of the terms of the contract.
(g) Reimbursement for bond premiums. In making these progress payments, the Government shall, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (e) of this clause shall not apply to that portion of progress payments attributable to bond premiums.
(h) Final payment. The Government shall pay the…
This is the start of the file's text. The full file is on GovTribe.