IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

9. FOR INFORMATION

CALL:

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

12b. CALENDAR DAYS

YES NO

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

Created On: 10 Nov 2022, 01:29 PM Alaska Standard Time

AMOUNTS

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

Section A - Solicitation/Contract Form

Buckner Center Flooring

Purchase Requisition Number: A026021 Date: 09 Nov 2022 Proposal Identifier: FA500023R0002 Date: 09 Nov 2022

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Qty Unit Unit Price

Amount

Project is to remove and replace approximately twenty-thousand square feet (20,000 Sq. ft.) of flooring, twenty-five hundred linear feet (2500 LF) Cove Base, floor leveling, and mold remediation in building 690, Buckner Gym.

Please note: this is a NAF requirement.

All contactor invoices must be processed through 673 FSS/FSR and forwarded to AFSVC/VMXC Invoice Payments workflow (AFSVA.SVXF.InvoicePayments@us.af.

mil) for payment. Ensure all correspondence regarding this project references AFBCIF #229002. Please address questions or comments to our POCs, Mr. Andrew Bowles, AFSVC/VMXC, at DSN 969-7387 or andrew.bowles.2@us.af.mil or Mr. Scott Nunnelly, AFSVC/VMSF at DSN 969-8856 or michael.nunnelly@us.af.mil

Pricing Arrangement: Firm Fixed Price

1 Project

Section C - Description/Specifications/Statement of Work

Requirements Buckner Center Flooring on JBER, AK

Disclosure of magnitude: Between $500,000 and $1,000,000.

Please note there will be a site-visit on 22 November 2022 at 1000AM local time at Bldg. 690 JBER, AK.

Section D - Packaging and Marking

Section E - Inspection and Acceptance

Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: Provide inspection and acceptance.

DoDAAC: F1W3PA CountryCode: USA

673 FSS FSVS

AF BPN NO MILSBILLS PROCESSES

690 D ST

JBER, AK 99505-0000

UNITED STATES

John Limon Email: john.limon.1@us.af.mil Telephone: 9073841313

Section F - Deliveries or Performance

Overall Contract Delivery Period

From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt

From date of lead time event to completion of performance 180 Calendar Days Date of Notice to Proceed Receipt

Contractor Destination

Line Item Delivery Schedule QTY Address and POC

Delivery Schedule From date of lead time event to completion of performance 180 Calendar Days Date of Notice to Proceed Receipt

1 Project Place of Performance DoDAAC: F1W3PA CountryCode: USA

673 FSS FSVS

AF BPN NO MILSBILLS PROCESSES

690 D ST

JBER, AK 99505-0000

UNITED STATES

John Limon Email: john.limon.1@us.af.mil Telephone: 907#384#1313

Section G - Contract Administration Data

Section H - Special Contract Requirements

Section I - Contract Clauses

5352.242-9000 Contractor Access to Air Force Installations Oct 2019

(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver's license, current vehicle registration, and valid vehicle insurance certificate to obtain a vehicle pass.

(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101, Integrated Defense, and DODMAN5200.02_AFMAN 16-1405, Air Force Personnel Security Program. Contractors requiring access to any area on Joint Base Elmendorf-Richardson (JBER) shall comply with installation COVID-19 policies, mandates, and the current version of the Consolidated Department of Defense Coronavirus Disease 2019 Force Health Protection Guidance. Policies and mandates frequently change. COVID-19 policies and mandates are found at https://www.jber.jb.mil/Coronavirus/ for JBER COVID- 19 Policy Memo and https://www.defense.gov/Spotlights/Coronavirus-DoDResponse/Latest-DOD-Guidance /#fhpg-list for updates to the Consolidated Department of Defense Coronavirus Disease 2019 Force Health Protection Guidance. Failure to comply with the guidelines or restrictions may result in suspended access to JBER or debarment.

(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

(f) Failure to comply with these requirements may result in withholding of final payment.

(End of clause)

Section J - List of Attachments

Number Attachment Name

Attachment Description Reference Identifier

Date Line Item

Nonappropriated Fund Standard Clauses (3 November 2022)

Nonappropriated Fund Standard Clauses (3 November 2022)

09 Nov

02 Bldg 690 SOW Statement of Work 09 Nov

Attachment - General Specifications

Specification 09 Nov

Section K - Representations, Certification, & Other Statements

Section L - Instructions, Conditions, & Notices to Offerors or Quoters

Section L - Instructions, Conditions, and Notices to Offerors

PROPOSAL PREPARATION INSTRUCTIONS

A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The response shall consist of Three (3) separate parts; Part I - Summary and Miscellaneous Data, Part II - Price Proposal and, Part III - Technical Proposal.

B. The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer's opinion, adequate price competition exists within the parameters of FAR 13.106-2 no additional data will be requested. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists, offerors may be required to submit other than certified cost or pricing data IAW FAR 15.402(a)(2) to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price.

C. Specific Instructions:

1. Only submit electronic copies of the proposal

2. Submit copies via email to the Government POC's in the posting.

D. Proposal Instructions:

1. PART I - SUMMARY AND MISCELLANEOUS DATA. Submit electronic copy only.

(a) The offeror shall provide a concise summary and master table of contents of the entire proposal.

(b) Complete blocks 14, 15, 16, 17 and 18 of the RFP Section A, SF1442 In doing so, the offeror accedes to the contract terms and conditions as written in the RFP Sections A through K. These sections constitute the model contract.

(c) Complete block 19, 20a, 20b, and 20c of the RFP Section A, SF 1442, if any solicitation amendment(s) to the original solicitation documents was/were issued. Amendments will not be counted against the page limits.

(d) Complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety. For Sections C through I, the offeror shall submit only those pages that require a fill-in.

(e) If applicable, provide a copy of the letter from the Small Business Administration (SBA) showing proof of Section 8(a) status.

2. PART II - PRICE PROPOSAL - Submit electronic copy only.

(a) This part shall contain a completed Section B (Supplies or Services and Prices/Costs).

(b) Insert proposed unit prices and extended amounts in Section B for each Contract Line Item Number (CLIN) or Sub CLIN (SCLIN). The extended amount must equal the unit price multiplied by the number of units. It is imperative that mathematical calculations are correct. The unit prices and extended amounts are limited to two decimal places.

(c) Extreme care should be exercised to ensure that no price data of any kind are included in any other Part of the proposal.

3. PART III - TECHNICAL PROPOSAL - Submit electronic copy only.

Please revise Seciton L Part III-TECHNICAL PROPOSAL to "Submit electronic copy only. Provide no more than a two page narrative demonstrating the offeror can identify and meet all the requirements stated in the attached Statement of Work. Please note that this is NOT a request for a capabilities statement or business competencies. The objective of this part is to submit a technical proposal that details the contractor's plan to accomplish the work and addresses the specifics of this project's requirements. A word-for-word copy of the Statement of Work also does NOT meet this factor.

4. Past Performance

The Government will obtain Past Performance information from established systems and other sources available to the Government. The evaluation of Past Performance is detailed in Section M. Offerors are not to submit Past Performance information. Any Past Performance information submitted will not be considered by the Government.

5. Format for proposal Parts I, II, and III, shall be as follows:

(a) Each written Part of the proposal shall contain a Table of Contents, Cross References, and the List of Tables and Drawings (if applicable).

(b) one electronic copy of each Part of the entire offer must be submitted. The electronic version of the proposal shall be submitted in a format readable by Microsoft Office 2010 which includes software programs such as WORD, EXCEL, or PowerPoint or Adobe Acrobat portable document files (.pdf) format. The electronic version shall be submitted via email to zachary.braum@us.af.mil. USB flash drives, floppy disks, and zip disks are not acceptable.

E. General Information:

1. Offerors are cautioned that JBER has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance. Late proposals will be processed in accordance with FAR 52.215-1(c)(3),"Submission, modification, revision, and withdrawal of proposals."

FEDERAL HOLIDAYS: The following Federal Legal Holidays are observed by this base:

New Year's Day Birthday of Martin Luther King Washington's Birthday Memorial Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day Juneteenth

2. A site visit will be held at Joint Base Elmendorf Richardson (JBER) on 22 November 2022 to start at 10:00 AM Alaska Time (AKT) at building 690. All costs associated with attending the site visit shall be borne by the offerors. Prospective offerors are urged to attend the site visit. If a contractor is unable to attend, there will be no future site visits scheduled. All questions are due by 10:00 AKT, 29 Nov 2022.

Section M - Evaluation Factors for Award

EVALUATION FACTORS FOR AWARD:

This solicitation is issued using FAR Part 15 Contracting by Negotiation. By submission of a proposal in accordance with the instructions provided in Section L, Instructions to Offerors, the Offeror accedes to the terms of this model contract. Failure to meet a requirement may result in a proposal being determined unacceptable.

Technical acceptability and past performance, when combined, are approximately equal to price. The contract award will be made to the Technically Acceptable, Lowest Priced with Acceptable Past Performance Offeror.

The evaluation criteria are as follows:

1. Technical Acceptability Factor. The government will evaluate proposals on a pass/fail basis and assign an Acceptable or Unacceptable rating as described below:

Rating Description:

-Acceptable - Presents a thorough understanding of, and ability to meet objectives outlined in the Statement of Work. Technical narrative, drawings, and all required submittals shall be submitted with proposal. Proposal and all submittals, drawing and technical narrative presents sufficient detail to allow the government to make an acceptability determination. Proposal meets all requirements of the solicitation.

-Unacceptable - This rating is met when the Offeror does not provide a proposal that presents a thorough understanding of, and ability to meet objectives outlined in the Statement of Work. Technical narrative, drawings and required submittals were not provided, or do not meet the specifications outlined in the solicitation. Or sufficient detail was not provided to allow the government to make an acceptability determination.

2. Price Evaluation Factor:

-The government will conduct quote/proposal evaluations IAW the procedures at FAR 15.404-1(b), however, upon examination of the initial offers and the determination that adequate price competition no longer exists, the Contracting Officer may use one or more, but not necessarily all of the evaluation techniques in FAR Part 15.404-1 to determine price reasonableness.

3. Past Performance: The Government will use past performance information from Contractor Performance Assessment Reporting System (CPARS) IAW FAR Part 42.1503(g), which mandates construction contracts will evaluate CPARS information within six (6) years of the completion of performance of the evaluated contract or order and information contained in Federal Awardee Performance and Integrity Information System (FAPIIS), e.

g., terminations for default or cause. Past Performance information may also be obtained from other established systems such as the Electronic Subcontract Reporting System (eSRS), or other databases; and may be obtained from other sources available to the Government, such as the Defense Contract Management Agency; and interviews with Program Managers, Contracting Officers or Fee Determining Officials.

In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall be determined to have unknown (or "neutral") past performance. In the context of acceptable /unacceptability, a neutral rating shall be considered "acceptable".

Rating Description:

- Acceptable- Based on the offeror's performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror's performance record is unknown.

- Unacceptable- Based on the offeror's performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.

Offerors are cautioned to submit sufficient information and in the format specified in Section L of this solicitation. Offerors may be asked to clarify certain aspects of their proposals. Exchanges conducted to resolve minor or clerical errors will not constitute discussions and the contracting officer reserves the right to award a contract without the opportunity for proposal revision. The government intends to award a contract without discussions with respective offerors. The government, however, reserves the right to conduct discussions if deemed in its best interest.

(End of Provision)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
OFFER (Must be fully completed by offeror)
18. The offeror agrees to furnish any required performance and payment bonds.

AWARD (To be completed by Government)

13cReferences:
1solicitationNumber: FA500023R0002
5reqOrPRNumber: A026021
6projectNumber: HJZH 21-1089
7issuedBy: FA5000 673 CONS LGC

10480 SIJAN AVE STE 242

CP 907 552 5614

JBER, AK 99506-2501

UNITED STATES

Zachary Braum, Email: zachary.braum@us.af.mil Telephone: 907-552-5895

7code: FA5000
8addressOfferTo:
numPages: 1 Of 18
9aname: Zachary Braum
9btelephoneNumber: 907-552-5895
11beginWithinDays: 10
11completeWithinDays: 180
11see: FAR 52.211-10
11eventNoticeToProceedCheckbox: Yes
2typeOfSolicitationIFBcheckbox: Off
2typeOfSolicitationRFPcheckbox: Yes
11periodMandatoryCheckbox: Yes
11periodNegotiableCheckbox: Off
12bCalendarDays: 7
13anumberOfCopies:
13adueHour: 10:00 AM
13adueDate: 12 Dec 2022
13bofferGuaranteeISrqdCheckbox: Yes
13bofferGuaranteeIsNOTrqdCheckbox: Off
13ddaysAfterDueDateAllowed: 3
14nameAndAddressOfOfferor:
15telephoneNumber:
16remittanceAddress:
14code:
14facilityCode:
17amounts:
19amendmentDateColA:
19amendmentNumberColA:
19amendmentNumberColB:
19amendmentDateColB:
19amendmentNumberColC:
19amendmentDateColC:
20aOfferSignerNameAndTitle:
20cofferDate:
21itemsAccepted:
22amount:
23accountingAndAppropriationData:
24item:
17acceptedWithinDays:
2510USC2304c:
2541USC3304a:
26administeredByCode:
26administeredBy:
27paymentMadeBy:
30cdate:
31cdate:
30acontractorNamdAndTitle:
31acontractingOfficerNameAndTitle:
29itemsListed:
29acceptedWithItemsListedCheckbox: Off
28copiesToReturn:
28negotiatedAgreementCheckbox: Off
3dateIssued:
2510USC2304cCheckbox: Off
2541USC3304aCheckbox: Off
10describingDocuments: Project is to remove and replace approximately twenty-thousand square feet (20,000 Sq. ft.) of flooring, twenty-five hundred linear feet (2500 LF) Cove Base, floor leveling, and mold remediation in building 690, Buckner Gym.

Disclosure of magnitude: Between $500,000 and $1,000,000.

10projectTitle: Project Title: Buckner Center Flooring
4contractNumber:
19amendmentNumberColD:
19amendmentDateColD:
19amendmentNumberColE:
19amendmentDateColE:
19amendmentNumberColF:
19amendmentDateColF:
19amendmentNumberColG:
19amendmentDateColG:
19amendmentNumberColH:
19amendmentDateColH:
19amendmentNumberColI:
19amendmentDateColI:
19amendmentNumberColJ:
19amendmentDateColJ:
contPageNum2: Page 2 Of 18
12apaymentBondsYesCheckbox: Yes
11eventAwardCheckbox: Off
12apaymentBondsNoeckbox: Off