R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
Created On: 17 Nov 2022, 02:01 PM Alaska Standard Time
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this amendment is to:Block 14 (Description of Amendment/Modification):
1. Include attachments below:
Attachment 1 - Statement of Work Attachment 2 - Drawings Attachment 3 - HAZMAT Report Attachment 4 - Section 01500 Environmental Protection Attachment 5 - Preconstruction Checklist Attachment 6 - Contractor Safety Guide Attachment 7 - Drawing As-Built Standard Attachment 8 - AF66 Attachment 9 - Open Market General Specifications_10 Feb 2021 Attachment 10 - DBA Wage Determination_Revised 14 Oct 2022 Attachment 11 - Nonappropriated Fund Standard Clauses
2. Change Minimum Acceptance Days After Offer Due from three (3) calendar days to 45 (forty-five) calendar days
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Accept Within Days 3 45
Section J - List of Attachments
The following attachments were deleted:
Bldg 690 SOW Nonappropriated Fund Standard Clauses (3 November 2022) Attachment - General Specifications
Miscellaneous text in this section has been modified to:
Attachment 1 - Statement of Work Attachment 2 - Drawings Attachment 3 - HAZMAT Report Attachment 4 - Section 01500 Environmental Protection Attachment 5 - Preconstruction Checklist Attachment 6 - Contractor Safety Guide Attachment 7 - Drawing As-Built Standard Attachment 8 - AF66 Attachment 9 - Open Market General Specifications_10 Feb 2021 Attachment 10 - DBA Wage Determination_Revised 14 Oct 2022 Attachment 11 - Nonappropriated Fund Standard Clauses
FA500023R00020001
| IDCode: |
| Page: 1 |
| Pages: 2 |
| AmendNo: 0001 |
| EffDate: 17 Nov 2022 |
| ReqNo: |
| ProjNo: HJZH 21-1089 |
| IssCode: FA5000 |
| AdmCode: |
| IssuedBy: FA5000 673 CONS LGC |
10480 SIJAN AVE STE 242
CP 907 552 5614
JBER, AK 99506-2501
UNITED STATES
Charmaine Cadua, Email: charmaine.cadua@us.af.mil Telephone: 907-552-5744
| AdminBy: |
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA500023R0002 |
| SolDate: 10 Nov 2022 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: |
| ContDate: |
| CODate: |
File details come from the government source that posted it. Updated .