Solicitation - FA465921R0001.pdf
PDF 480 KB Posted
- Attached to
- Protective Coating Maintenance Federal contract opportunity
- Solicitation number
- FA465921R0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Sign-In.pdf | ||
| Protective Coating Maintenance Solicitation Q and A 17 May 2021.docx | DOCX document | |
| Protective Coating Maintenance Solicitation Q and A.docx | DOCX document | |
| Protective Coating Maintenance Solicitation Q and A.docx | DOCX document | |
| 3 May 21 Solicitation Amendment FA465921R00010001 SF 30.pdf | ||
| Att1_Material Submittal Schedule.pdf | ||
| Solicitation Cover Letter - FA465921R0001.pdf | ||
| Att2_Statement of Work.pdf | ||
| Att6_Past Performance Questionnaire.pdf | ||
| Att8_Highway Wage Determination ND20210054 .pdf | ||
| Att4_DAF Guidance on Use of Masks.pdf | ||
| Att3_Financial Institution Reference Sheet.pdf | ||
| Att5_Green Procurement Form.pdf | ||
| Att7_Building Wage Determination ND20210014 .pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION
CALL:
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
12b. CALENDAR DAYS
YES NO
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
AMOUNTS
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
FA465921R0001
Section A - Solicitation/Contract Form
Section B - Supplies or Services and Prices/Cost
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
EXTERIOR PAINTING Including, but not limited to, exterior siding, wall, ceiling and soffit building surfaces, and doors. In accordance with Statement of Work.
0001AA
Prime Coat, Spot Prime, including surface prep (Exterior), in accordance with Statement of Work.
Firm Fixed Price
300,000 Square Foot
0001AB
First Coat Including Surface Prep (Exterior), in accordance with Statement of Work.
Firm Fixed Price
400,000 Square Foot
0001AC
Coating, Other Than Prime/First Coat (Exterior), in accordance with Statement of Work.
Firm Fixed Price
200,000 Square Foot
INTERIOR PAINTING Interior, plain flat surfaces including, but not limited to, interior wall, ceiling, and soffit building surfaces, and doors. In accordance with Statement of Work.
0002AA
Prime Coat, Spot Prime, Including Surface Prep (Interior), in accordance with Statement of Work.
Firm Fixed Price
100,000 Square Foot
0002AB
First Coat Including Surface Prep (Interior), in accordance with Statement of Work.
Firm Fixed Price
250,000 Square Foot
0002AC
Coating, Other Than Prime/First coat (Exterior), in accordance with Statement of Work.
Firm Fixed Price
100,000 Square Foot
0002AD
Multi-Spec Coating (Interior), in accordance with Statement of Work.
Firm Fixed Price
2,500 Square Foot
EXTERIOR AND INTERIOR MISC.
Exterior and interior; unspecified miscellaneous refinishing, staining, varnishing, or painting including, but not limited to: miscellaneous wood, metal or masonry trim, plaques, boxes, containers, counters, stands, piping, heating covers, railing assemblies, installed equipment, building and room identification numbers, wood floors, wood sports floors, concrete street curbing, posts (including headbolt heater outlets, traffic barriers, utility indicator valve posts), and fire hydrants.
Related cosmetic touch-up and repair refinishing is included. In accordance with Statement of Work.
0003AA
Coating, Including Surface Preparation, in accordance with Statement of Work.
Firm Fixed Price
50,000 Square Foot
EXTERIOR AND INTERIOR
COSMETIC Touch-Up/Repair. In accordance with Statement of Work.
0004AA
EFIS/Stucco Repair (Does Not Include Paint), in accordance with Statement of Work.
Firm Fixed Price
1,500 Square Foot
0004AB
Repair Masonry, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
INTERIOR CONCRETE FLOOR
PAINTING. In accordance with Statement of Work.
0005AA
Interior Floor Painting With Grit, in accordance with Statement of Work.
Firm Fixed Price
1,000 Square Foot
0005AB
Interior Floor Painting Without Grit, in accordance with Statement of Work.
Firm Fixed Price
10,000 Square Foot
EXTERIOR AND INTERIOR;
PAVEMENT MARKINGS: In accordance with Statement of Work.
0006AA
Interior/Exterior Street Markings Interior /Exterior Street arrows, lettering, stop bars, crosswalk painting, in accordance with Statement of Work.
Firm Fixed Price
30,000 Square Foot
0006AB
Interior/Exterior Striping quantities under 2500 LF, in accordance with Statement of Work.
Firm Fixed Price
5,000 Linear Foot
0006AC
Interior/Exterior Striping Layout, in accordance with Statement of Work.
Firm Fixed Price
200,000 Linear Foot
0006AD
Interior/Exterior Striping quantities over 2500 LF, in accordance with Statement of
200,000 Linear Foot
Work.
Firm Fixed Price
0006AE
Airfield Striping with beads Type I. In accordance with Statement of Work.
Firm Fixed Price
300,000 Linear Foot
0006AF
Airfield Striping with beads Type III. In accordance with Statement of Work.
Firm Fixed Price
300,000 Linear Foot
0006AG
Airfield Striping without beads, in accordance with Statement of Work.
Firm Fixed Price
300,000 Linear Foot
REPAIR GYPSUM BOARD Gypsum board damage repair of walls, ceilings, soffit systems (includes exterior and interior corners)
0007AA
Gypsum Board repair, Removal of existing and install new tape, fill and Sand, in accordance with Statement of Work.
Firm Fixed Price
Linear Foot
0007AB
Gypsum Board Repair. Tape Joints, fill nail holes and sand (no prime or paint), in accordance with Statement of Work.
Firm Fixed Price
75,000 Square Foot
0007AC
Gypsum Board Repair. Remove existing /install new gypsum board, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
0007AD
Gypsum Board Repair. Install new Gypsum Board, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
0007AE
Gypsum Board Repair. Provide and Install corner bead/edge trim, in accordance with Statement of Work.
Firm Fixed Price
Linear Foot
REPAIR/FINISH/SURFACE
PREPARATION Exterior and Interior, repair / finish / surface preparation of existing surfaces: In accordance with Statement of Work.
0008AA
Install sprayed textural finish to existing plaster/gypsum wall/ceiling surfaces, in accordance with Statement of Work.
Firm Fixed Price
10,000 Square Foot
0008AB
Skim Coat Walls, in accordance with Statement of Work.
Firm Fixed Price
15,000 Square
0008AC
Application of surface sizing to facilitate removal of wall coverings w/o damage, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
0008AD
Strip existing paper or vinyl sheet wall coverings from existing wall/ceilings, in accordance with Statement of Work.
Firm Fixed Price
7,500 Square Foot
0008AE
Repair existing paper, vinyl, or acoustical wall coverings, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
0008AF
Remove wall carpet and glue, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
0008AG
Sandblasting, in accordance with Statement of Work.
Firm Fixed Price
100,000 Square Foot
0008AH
Water blasting, in accordance with Statement of Work.
Firm Fixed Price
200,000 Square Foot
0008AJ
Remove existing sealant and backer rod from building control joints, in accordance with Statement of Work.
Firm Fixed Price
Linear Foot
0008AK
Install new backer rod and sealant to building control joints, in accordance with Statement of Work.
Firm Fixed Price
Linear Foot
INTERIOR, PROVIDE AND INSTALL
COVERINGS new flexible sheet, paper, vinyl, or acoustical wall coverings to existing wall and ceiling surfaces in accordance with Statement of Work.
0009AA
Provide and install moderate cost wall coverings (Type II), in accordance with Statement of Work.
Firm Fixed Price
Square Yard
0009AB
Provide and install high cost wall coverings (Type III), in accordance with Statement of Work.
Firm Fixed Price
Square Yard
0009AC
Install Government High cost wall coverings, in accordance with Statement of Work.
Firm Fixed Price
Square Yard
SIGNAGE Signage: Exterior and Interior;
Manufacture and installation of decals, 0010 letters, and numbers (self-adhesive or heat activated) (price includes sign blank, painting or applying vinyl to metal, both sides):
0010AA
Security Delays, in accordance with Statement of Work.
Firm Fixed Price
Quarter Hours
0010AB
Paint Entry Control Point signs, in accordance with Statement of Work.
Firm Fixed Price
20 Each
0010AC
Paint Restricted area/Deadly Force Signs, in accordance with Statement of Work.
Firm Fixed Price
200 Each
EXTERIOR PAINTING Including, but not limited to, exterior siding, wall, ceiling and soffit building surfaces, and doors. In accordance with Statement of Work.
1001AA
Prime Coat, Spot Prime, including surface prep (Exterior), in accordance with Statement of Work.
Firm Fixed Price
300,000 Square Foot
1001AB
First Coat Including Surface Prep (Exterior), in accordance with Statement of Work.
Firm Fixed Price
400,000 Square Foot
1001AC
Coating, Other Than Prime/First Coat (Exterior), in accordance with Statement of Work.
Firm Fixed Price
200,000 Square Foot
INTERIOR PAINTING Interior, plain flat surfaces including, but not limited to, interior wall, ceiling, and soffit building surfaces, and doors. In accordance with Statement of Work.
1002AA
Prime Coat, Spot Prime, Including Surface Prep (Interior), in accordance with Statement of Work.
Firm Fixed Price
100,000 Square Foot
1002AB
First Coat Including Surface Prep (Interior), in accordance with Statement of Work.
Firm Fixed Price
250,000 Square Foot
1002AC
Coating, Other Than Prime/First coat (Exterior), in accordance with Statement of Work.
Firm Fixed Price
100,000 Square Foot
1002AD
Multi-Spec Coating (Interior), in accordance with Statement of Work. 2,500
Square
Firm Fixed Price
EXTERIOR AND INTERIOR MISC.
Exterior and interior; unspecified miscellaneous refinishing, staining, varnishing, or painting including, but not limited to: miscellaneous wood, metal or masonry trim, plaques, boxes, containers, counters, stands, piping, heating covers, railing assemblies, installed equipment, building and room identification numbers, wood floors, wood sports floors, concrete street curbing, posts (including headbolt heater outlets, traffic barriers, utility indicator valve posts), and fire hydrants.
Related cosmetic touch-up and repair refinishing is included. In accordance with Statement of Work.
1003AA
Coating, Including Surface Preparation, in accordance with Statement of Work.
Firm Fixed Price
50,000 Square Foot
EXTERIOR AND INTERIOR
COSMETIC Touch-Up/Repair. In accordance with Statement of Work.
1004AA
EFIS/Stucco Repair (Does Not Include Paint), in accordance with Statement of Work.
Firm Fixed Price
1,500 Square Foot
1004AB
Repair Masonry, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
INTERIOR CONCRETE FLOOR
PAINTING. In accordance with Statement of Work.
1005AA
Interior Floor Painting With Grit, in accordance with Statement of Work.
Firm Fixed Price
1,000 Square Foot
1005AB
Interior Floor Painting Without Grit, in accordance with Statement of Work.
Firm Fixed Price
10,000 Square Foot
EXTERIOR AND INTERIOR;
PAVEMENT MARKINGS: In accordance with Statement of Work.
1006AA
Interior/Exterior Street Markings Interior /Exterior Street arrows, lettering, stop bars, crosswalk painting, in accordance with Statement of Work.
Firm Fixed Price
30,000 Square Foot
1006AB
Interior/Exterior Striping quantities under 2500 LF, in accordance with Statement of
5,000 Linear
Firm Fixed Price
1006AC
Interior/Exterior Striping Layout, in accordance with Statement of Work.
Firm Fixed Price
200,000 Linear Foot
1006AD
Interior/Exterior Striping quantities over 2500 LF, in accordance with Statement of Work.
Firm Fixed Price
200,000 Linear Foot
1006AE
Airfield Striping with beads Type I. In accordance with Statement of Work.
Firm Fixed Price
300,000 Linear Foot
1006AF
Airfield Striping with beads Type III. In accordance with Statement of Work.
Firm Fixed Price
300,000 Linear Foot
1006AG
Airfield Striping without beads, in accordance with Statement of Work.
Firm Fixed Price
300,000 Linear Foot
REPAIR GYPSUM BOARD Gypsum board damage repair of walls, ceilings, soffit systems (includes exterior and interior corners)
1007AA
Gypsum Board repair, Removal of existing and install new tape, fill and Sand, in accordance with Statement of Work.
Firm Fixed Price
Linear Foot
1007AB
Gypsum Board Repair. Tape Joints, fill nail holes and sand (no prime or paint), in accordance with Statement of Work.
Firm Fixed Price
75,000 Square Foot
1007AC
Gypsum Board Repair. Remove existing /install new gypsum board, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
1007AD
Gypsum Board Repair. Install new Gypsum Board, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
1007AE
Gypsum Board Repair. Provide and Install corner bead/edge trim, in accordance with Statement of Work.
Firm Fixed Price
Linear Foot
REPAIR/FINISH/SURFACE
PREPARATION Exterior and Interior, repair / finish / surface preparation of existing surfaces: In accordance with Statement of Work.
1008AA
Install sprayed textural finish to existing plaster/gypsum wall/ceiling surfaces, in accordance with Statement of Work.
Firm Fixed Price
10,000 Square Foot
1008AB
Skim Coat Walls, in accordance with Statement of Work.
Firm Fixed Price
15,000 Square Foot
1008AC
Application of surface sizing to facilitate removal of wall coverings w/o damage, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
1008AD
Strip existing paper or vinyl sheet wall coverings from existing wall/ceilings, in accordance with Statement of Work.
Firm Fixed Price
7,500 Square Foot
1008AE
Repair existing paper, vinyl, or acoustical wall coverings, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
1008AF
Remove wall carpet and glue, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
1008AG
Sandblasting, in accordance with Statement of Work.
Firm Fixed Price
100,000 Square Foot
1008AH
Water blasting, in accordance with Statement of Work.
Firm Fixed Price
200,000 Square Foot
1008AJ
Remove existing sealant and backer rod from building control joints, in accordance with Statement of Work.
Firm Fixed Price
Linear Foot
1008AK
Install new backer rod and sealant to building control joints, in accordance with Statement of Work.
Firm Fixed Price
Linear Foot
INTERIOR, PROVIDE AND INSTALL
COVERINGS new flexible sheet, paper, vinyl, or acoustical wall coverings to existing wall and ceiling surfaces in accordance with Statement of Work.
1009AA
Provide and install moderate cost wall coverings (Type II), in accordance with Statement of Work.
Firm Fixed Price
Square Yard
1009AB
Provide and install high cost wall coverings (Type III), in accordance with Statement of
Square Yard
Firm Fixed Price
1009AC
Install Government High cost wall coverings, in accordance with Statement of Work.
Firm Fixed Price
Square Yard
SIGNAGE Signage: Exterior and Interior;
Manufacture and installation of decals, letters, and numbers (self-adhesive or heat activated) (price includes sign blank, painting or applying vinyl to metal, both sides):
1010AA
Security Delays, in accordance with Statement of Work.
Firm Fixed Price
Quarter Hours
1010AB
Paint Entry Control Point signs, in accordance with Statement of Work.
Firm Fixed Price
20 Each
1010AC
Paint Restricted area/Deadly Force Signs, in accordance with Statement of Work.
Firm Fixed Price
200 Each
EXTERIOR PAINTING Including, but not limited to, exterior siding, wall, ceiling and soffit building surfaces, and doors. In accordance with Statement of Work.
2001AA
Prime Coat, Spot Prime, including surface prep (Exterior), in accordance with Statement of Work.
Firm Fixed Price
300,000 Square Foot
2001AB
First Coat Including Surface Prep (Exterior), in accordance with Statement of Work.
Firm Fixed Price
400,000 Square Foot
2001AC
Coating, Other Than Prime/First Coat (Exterior), in accordance with Statement of Work.
Firm Fixed Price
200,000 Square Foot
INTERIOR PAINTING Interior, plain flat surfaces including, but not limited to, interior wall, ceiling, and soffit building surfaces, and doors. In accordance with Statement of Work.
2002AA
Prime Coat, Spot Prime, Including Surface Prep (Interior), in accordance with Statement of Work.
Firm Fixed Price
100,000 Square Foot
2002AB
First Coat Including Surface Prep (Interior), in accordance with Statement of 250,000
Square
Firm Fixed Price
2002AC
Coating, Other Than Prime/First coat (Exterior), in accordance with Statement of Work.
Firm Fixed Price
100,000 Square Foot
2002AD
Multi-Spec Coating (Interior), in accordance with Statement of Work.
Firm Fixed Price
2,500 Square Foot
EXTERIOR AND INTERIOR MISC.
Exterior and interior; unspecified miscellaneous refinishing, staining, varnishing, or painting including, but not limited to: miscellaneous wood, metal or masonry trim, plaques, boxes, containers, counters, stands, piping, heating covers, railing assemblies, installed equipment, building and room identification numbers, wood floors, wood sports floors, concrete street curbing, posts (including headbolt heater outlets, traffic barriers, utility indicator valve posts), and fire hydrants.
Related cosmetic touch-up and repair refinishing is included. In accordance with Statement of Work.
2003AA
Coating, Including Surface Preparation, in accordance with Statement of Work.
Firm Fixed Price
50,000 Square Foot
EXTERIOR AND INTERIOR
COSMETIC Touch-Up/Repair. In accordance with Statement of Work.
2004AA
EFIS/Stucco Repair (Does Not Include Paint), in accordance with Statement of Work.
Firm Fixed Price
1,500 Square Foot
2004AB
Repair Masonry, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
INTERIOR CONCRETE FLOOR
PAINTING. In accordance with Statement of Work.
2005AA
Interior Floor Painting With Grit, in accordance with Statement of Work.
Firm Fixed Price
1,000 Square Foot
2005AB
Interior Floor Painting Without Grit, in accordance with Statement of Work.
Firm Fixed Price
10,000 Square Foot
EXTERIOR AND INTERIOR;
PAVEMENT MARKINGS: In accordance with Statement of Work.
2006AA
Interior/Exterior Street Markings Interior /Exterior Street arrows, lettering, stop bars, crosswalk painting, in accordance with Statement of Work.
Firm Fixed Price
30,000 Square Foot
2006AB
Interior/Exterior Striping quantities under 2500 LF, in accordance with Statement of Work.
Firm Fixed Price
5,000 Linear Foot
2006AC
Interior/Exterior Striping Layout, in accordance with Statement of Work.
Firm Fixed Price
200,000 Linear Foot
2006AD
Interior/Exterior Striping quantities over 2500 LF, in accordance with Statement of Work.
Firm Fixed Price
200,000 Linear Foot
2006AE
Airfield Striping with beads Type I. In accordance with Statement of Work.
Firm Fixed Price
300,000 Linear Foot
2006AF
Airfield Striping with beads Type III. In accordance with Statement of Work.
Firm Fixed Price
300,000 Linear Foot
2006AG
Airfield Striping without beads, in accordance with Statement of Work.
Firm Fixed Price
300,000 Linear Foot
REPAIR GYPSUM BOARD Gypsum board damage repair of walls, ceilings, soffit systems (includes exterior and interior corners)
2007AA
Gypsum Board repair, Removal of existing and install new tape, fill and Sand, in accordance with Statement of Work.
Firm Fixed Price
Linear Foot
2007AB
Gypsum Board Repair. Tape Joints, fill nail holes and sand (no prime or paint), in accordance with Statement of Work.
Firm Fixed Price
75,000 Square Foot
2007AC
Gypsum Board Repair. Remove existing /install new gypsum board, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
2007AD
Gypsum Board Repair. Install new Gypsum Board, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
2007AE
Gypsum Board Repair. Provide and Install corner bead/edge trim, in accordance with 500
Linear
Firm Fixed Price
REPAIR/FINISH/SURFACE
PREPARATION Exterior and Interior, repair / finish / surface preparation of existing surfaces: In accordance with Statement of Work.
2008AA
Install sprayed textural finish to existing plaster/gypsum wall/ceiling surfaces, in accordance with Statement of Work.
Firm Fixed Price
10,000 Square Foot
2008AB
Skim Coat Walls, in accordance with Statement of Work.
Firm Fixed Price
15,000 Square Foot
2008AC
Application of surface sizing to facilitate removal of wall coverings w/o damage, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
2008AD
Strip existing paper or vinyl sheet wall coverings from existing wall/ceilings, in accordance with Statement of Work.
Firm Fixed Price
7,500 Square Foot
2008AE
Repair existing paper, vinyl, or acoustical wall coverings, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
2008AF
Remove wall carpet and glue, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
2008AG
Sandblasting, in accordance with Statement of Work.
Firm Fixed Price
100,000 Square Foot
2008AH
Water blasting, in accordance with Statement of Work.
Firm Fixed Price
200,000 Square Foot
2008AJ
Remove existing sealant and backer rod from building control joints, in accordance with Statement of Work.
Firm Fixed Price
Linear Foot
2008AK
Install new backer rod and sealant to building control joints, in accordance with Statement of Work.
Firm Fixed Price
Linear Foot
INTERIOR, PROVIDE AND INSTALL
COVERINGS new flexible sheet, paper, vinyl, or acoustical wall coverings to existing wall and ceiling surfaces in accordance with Statement of Work.
2009AA
Provide and install moderate cost wall coverings (Type II), in accordance with Statement of Work.
Firm Fixed Price
Square Yard
2009AB
Provide and install high cost wall coverings (Type III), in accordance with Statement of Work.
Firm Fixed Price
Square Yard
2009AC
Install Government High cost wall coverings, in accordance with Statement of Work.
Firm Fixed Price
Square Yard
SIGNAGE Signage: Exterior and Interior;
Manufacture and installation of decals, letters, and numbers (self-adhesive or heat activated) (price includes sign blank, painting or applying vinyl to metal, both sides):
2010AA
Security Delays, in accordance with Statement of Work.
Firm Fixed Price
Quarter Hours
2010AB
Paint Entry Control Point signs, in accordance with Statement of Work.
Firm Fixed Price
20 Each
2010AC
Paint Restricted area/Deadly Force Signs, in accordance with Statement of Work.
Firm Fixed Price
200 Each
EXTERIOR PAINTING Including, but not limited to, exterior siding, wall, ceiling and soffit building surfaces, and doors. In accordance with Statement of Work.
3001AA
Prime Coat, Spot Prime, including surface prep (Exterior), in accordance with Statement of Work.
Firm Fixed Price
300,000 Square Foot
3001AB
First Coat Including Surface Prep (Exterior), in accordance with Statement of Work.
Firm Fixed Price
400,000 Square Foot
3001AC
Coating, Other Than Prime/First Coat (Exterior), in accordance with Statement of Work.
Firm Fixed Price
200,000 Square Foot
INTERIOR PAINTING Interior, plain flat surfaces including, but not limited to, interior wall, ceiling, and soffit building surfaces, and doors. In accordance with
3002AA
Prime Coat, Spot Prime, Including Surface Prep (Interior), in accordance with Statement of Work.
Firm Fixed Price
100,000 Square Foot
3002AB
First Coat Including Surface Prep (Interior), in accordance with Statement of Work.
Firm Fixed Price
250,000 Square Foot
3002AC
Coating, Other Than Prime/First coat (Exterior), in accordance with Statement of Work.
Firm Fixed Price
100,000 Square Foot
3002AD
Multi-Spec Coating (Interior), in accordance with Statement of Work.
Firm Fixed Price
2,500 Square Foot
EXTERIOR AND INTERIOR MISC.
Exterior and interior; unspecified miscellaneous refinishing, staining, varnishing, or painting including, but not limited to: miscellaneous wood, metal or masonry trim, plaques, boxes, containers, counters, stands, piping, heating covers, railing assemblies, installed equipment, building and room identification numbers, wood floors, wood sports floors, concrete street curbing, posts (including headbolt heater outlets, traffic barriers, utility indicator valve posts), and fire hydrants.
Related cosmetic touch-up and repair refinishing is included. In accordance with Statement of Work.
3003AA
Coating, Including Surface Preparation, in accordance with Statement of Work.
Firm Fixed Price
50,000 Square Foot
EXTERIOR AND INTERIOR
COSMETIC Touch-Up/Repair. In accordance with Statement of Work.
3004AA
EFIS/Stucco Repair (Does Not Include Paint), in accordance with Statement of Work.
Firm Fixed Price
1,500 Square Foot
3004AB
Repair Masonry, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
INTERIOR CONCRETE FLOOR
PAINTING. In accordance with Statement of Work.
3005AA
Interior Floor Painting With Grit, in accordance with Statement of Work.
Firm Fixed Price
1,000 Square
3005AB Interior Floor Painting Without Grit, in accordance with Statement of Work.
Firm Fixed Price
10,000 Square Foot
EXTERIOR AND INTERIOR;
PAVEMENT MARKINGS: In accordance with Statement of Work.
3006AA
Interior/Exterior Street Markings Interior /Exterior Street arrows, lettering, stop bars, crosswalk painting, in accordance with Statement of Work.
Firm Fixed Price
30,000 Square Foot
3006AB
Interior/Exterior Striping quantities under 2500 LF, in accordance with Statement of Work.
Firm Fixed Price
5,000 Linear Foot
3006AC
Interior/Exterior Striping Layout, in accordance with Statement of Work.
Firm Fixed Price
200,000 Linear Foot
3006AD
Interior/Exterior Striping quantities over 2500 LF, in accordance with Statement of Work.
Firm Fixed Price
200,000 Linear Foot
3006AE
Airfield Striping with beads Type I. In accordance with Statement of Work.
Firm Fixed Price
300,000 Linear Foot
3006AF
Airfield Striping with beads Type III. In accordance with Statement of Work.
Firm Fixed Price
300,000 Linear Foot
3006AG
Airfield Striping without beads, in accordance with Statement of Work.
Firm Fixed Price
300,000 Linear Foot
REPAIR GYPSUM BOARD Gypsum board damage repair of walls, ceilings, soffit systems (includes exterior and interior corners)
3007AA
Gypsum Board repair, Removal of existing and install new tape, fill and Sand, in accordance with Statement of Work.
Firm Fixed Price
Linear Foot
3007AB
Gypsum Board Repair. Tape Joints, fill nail holes and sand (no prime or paint), in accordance with Statement of Work.
Firm Fixed Price
75,000 Square Foot
3007AC
Gypsum Board Repair. Remove existing /install new gypsum board, in accordance with Statement of Work.
Firm Fixed Price
Square
3007AD
Gypsum Board Repair. Install new Gypsum Board, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
3007AE
Gypsum Board Repair. Provide and Install corner bead/edge trim, in accordance with Statement of Work.
Firm Fixed Price
Linear Foot
REPAIR/FINISH/SURFACE
PREPARATION Exterior and Interior, repair / finish / surface preparation of existing surfaces: In accordance with Statement of Work.
3008AA
Install sprayed textural finish to existing plaster/gypsum wall/ceiling surfaces, in accordance with Statement of Work.
Firm Fixed Price
10,000 Square Foot
3008AB
Skim Coat Walls, in accordance with Statement of Work.
Firm Fixed Price
15,000 Square Foot
3008AC
Application of surface sizing to facilitate removal of wall coverings w/o damage, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
3008AD
Strip existing paper or vinyl sheet wall coverings from existing wall/ceilings, in accordance with Statement of Work.
Firm Fixed Price
7,500 Square Foot
3008AE
Repair existing paper, vinyl, or acoustical wall coverings, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
3008AF
Remove wall carpet and glue, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
3008AG
Sandblasting, in accordance with Statement of Work.
Firm Fixed Price
100,000 Square Foot
3008AH
Water blasting, in accordance with Statement of Work.
Firm Fixed Price
200,000 Square Foot
3008AJ
Remove existing sealant and backer rod from building control joints, in accordance with Statement of Work.
Firm Fixed Price
Linear Foot
3008AK
Install new backer rod and sealant to building control joints, in accordance with
Linear
Firm Fixed Price
INTERIOR, PROVIDE AND INSTALL
COVERINGS new flexible sheet, paper, vinyl, or acoustical wall coverings to existing wall and ceiling surfaces in accordance with Statement of Work.
3009AA
Provide and install moderate cost wall coverings (Type II), in accordance with Statement of Work.
Firm Fixed Price
Square Yard
3009AB
Provide and install high cost wall coverings (Type III), in accordance with Statement of Work.
Firm Fixed Price
Square Yard
3009AC
Install Government High cost wall coverings, in accordance with Statement of Work.
Firm Fixed Price
Square Yard
SIGNAGE Signage: Exterior and Interior;
Manufacture and installation of decals, letters, and numbers (self-adhesive or heat activated) (price includes sign blank, painting or applying vinyl to metal, both sides):
3010AA
Security Delays, in accordance with Statement of Work.
Firm Fixed Price
Quarter Hours
3010AB
Paint Entry Control Point signs, in accordance with Statement of Work.
Firm Fixed Price
20 Each
3010AC
Paint Restricted area/Deadly Force Signs, in accordance with Statement of Work.
Firm Fixed Price
200 Each
EXTERIOR PAINTING Including, but not limited to, exterior siding, wall, ceiling and soffit building surfaces, and doors. In accordance with Statement of Work.
4001AA
Prime Coat, Spot Prime, including surface prep (Exterior), in accordance with Statement of Work.
Firm Fixed Price
300,000 Square Foot
4001AB
First Coat Including Surface Prep (Exterior), in accordance with Statement of Work.
Firm Fixed Price
400,000 Square Foot
4001AC
Coating, Other Than Prime/First Coat (Exterior), in accordance with Statement of 200,000
Square
Firm Fixed Price
INTERIOR PAINTING Interior, plain flat surfaces including, but not limited to, interior wall, ceiling, and soffit building surfaces, and doors. In accordance with Statement of Work.
4002AA
Prime Coat, Spot Prime, Including Surface Prep (Interior), in accordance with Statement of Work.
Firm Fixed Price
100,000 Square Foot
4002AB
First Coat Including Surface Prep (Interior), in accordance with Statement of Work.
Firm Fixed Price
250,000 Square Foot
4002AC
Coating, Other Than Prime/First coat (Exterior), in accordance with Statement of Work.
Firm Fixed Price
100,000 Square Foot
4002AD
Multi-Spec Coating (Interior), in accordance with Statement of Work.
Firm Fixed Price
2,500 Square Foot
EXTERIOR AND INTERIOR MISC.
Exterior and interior; unspecified miscellaneous refinishing, staining, varnishing, or painting including, but not limited to: miscellaneous wood, metal or masonry trim, plaques, boxes, containers, counters, stands, piping, heating covers, railing assemblies, installed equipment, building and room identification numbers, wood floors, wood sports floors, concrete street curbing, posts (including headbolt heater outlets, traffic barriers, utility indicator valve posts), and fire hydrants.
Related cosmetic touch-up and repair refinishing is included. In accordance with Statement of Work.
4003AA
Coating, Including Surface Preparation, in accordance with Statement of Work.
Firm Fixed Price
50,000 Square Foot
EXTERIOR AND INTERIOR
COSMETIC Touch-Up/Repair. In accordance with Statement of Work.
4004AA
EFIS/Stucco Repair (Does Not Include Paint), in accordance with Statement of Work.
Firm Fixed Price
1,500 Square Foot
4004AB
Repair Masonry, in accordance with Statement of Work.
Firm Fixed Price
Square
INTERIOR CONCRETE FLOOR
PAINTING. In accordance with Statement of Work.
4005AA
Interior Floor Painting With Grit, in accordance with Statement of Work.
Firm Fixed Price
1,000 Square Foot
4005AB
Interior Floor Painting Without Grit, in accordance with Statement of Work.
Firm Fixed Price
10,000 Square Foot
EXTERIOR AND INTERIOR;
PAVEMENT MARKINGS: In accordance with Statement of Work.
4006AA
Interior/Exterior Street Markings Interior /Exterior Street arrows, lettering, stop bars, crosswalk painting, in accordance with Statement of Work.
Firm Fixed Price
30,000 Square Foot
4006AB
Interior/Exterior Striping quantities under 2500 LF, in accordance with Statement of Work.
Firm Fixed Price
5,000 Linear Foot
4006AC
Interior/Exterior Striping Layout, in accordance with Statement of Work.
Firm Fixed Price
200,000 Linear Foot
4006AD
Interior/Exterior Striping quantities over 2500 LF, in accordance with Statement of Work.
Firm Fixed Price
200,000 Linear Foot
4006AE
Airfield Striping with beads Type I. In accordance with Statement of Work.
Firm Fixed Price
300,000 Linear Foot
4006AF
Airfield Striping with beads Type III. In accordance with Statement of Work.
Firm Fixed Price
300,000 Linear Foot
4006AG
Airfield Striping without beads, in accordance with Statement of Work.
Firm Fixed Price
300,000 Linear Foot
REPAIR GYPSUM BOARD Gypsum board damage repair of walls, ceilings, soffit systems (includes exterior and interior corners)
4007AA
Gypsum Board repair, Removal of existing and install new tape, fill and Sand, in accordance with Statement of Work.
Firm Fixed Price
Linear Foot
Gypsum Board Repair. Tape Joints, fill nail Square
4007AB holes and sand (no prime or paint), in accordance with Statement of Work.
Firm Fixed Price
75,000 Foot
4007AC
Gypsum Board Repair. Remove existing /install new gypsum board, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
4007AD
Gypsum Board Repair. Install new Gypsum Board, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
4007AE
Gypsum Board Repair. Provide and Install corner bead/edge trim, in accordance with Statement of Work.
Firm Fixed Price
Linear Foot
REPAIR/FINISH/SURFACE
PREPARATION Exterior and Interior, repair / finish / surface preparation of existing surfaces: In accordance with Statement of Work.
4008AA
Install sprayed textural finish to existing plaster/gypsum wall/ceiling surfaces, in accordance with Statement of Work.
Firm Fixed Price
10,000 Square Foot
4008AB
Skim Coat Walls, in accordance with Statement of Work.
Firm Fixed Price
15,000 Square Foot
4008AC
Application of surface sizing to facilitate removal of wall coverings w/o damage, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
4008AD
Strip existing paper or vinyl sheet wall coverings from existing wall/ceilings, in accordance with Statement of Work.
Firm Fixed Price
7,500 Square Foot
4008AE
Repair existing paper, vinyl, or acoustical wall coverings, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
4008AF
Remove wall carpet and glue, in accordance with Statement of Work.
Firm Fixed Price
Square Foot
4008AG
Sandblasting, in accordance with Statement of Work.
Firm Fixed Price
100,000 Square Foot
4008AH
Water blasting, in accordance with Statement of Work.
Firm Fixed Price
200,000 Square
4008AJ
Remove existing sealant and backer rod from building control joints, in accordance with Statement of Work.
Firm Fixed Price
Linear Foot
4008AK
Install new backer rod and sealant to building control joints, in accordance with Statement of Work.
Firm Fixed Price
Linear Foot
INTERIOR, PROVIDE AND INSTALL
COVERINGS new flexible sheet, paper, vinyl, or acoustical wall coverings to existing wall and ceiling surfaces in accordance with Statement of Work.
4009AA
Provide and install moderate cost wall coverings (Type II), in accordance with Statement of Work.
Firm Fixed Price
Square Yard
4009AB
Provide and install high cost wall coverings (Type III), in accordance with Statement of Work.
Firm Fixed Price
Square Yard
4009AC
Install Government High cost wall coverings, in accordance with Statement of Work.
Firm Fixed Price
Square Yard
SIGNAGE Signage: Exterior and Interior;
Manufacture and installation of decals, letters, and numbers (self-adhesive or heat activated) (price includes sign blank, painting or applying vinyl to metal, both sides):
4010AA
Security Delays, in accordance with Statement of Work.
Firm Fixed Price
Quarter Hours
4010AB
Paint Entry Control Point signs, in accordance with Statement of Work.
Firm Fixed Price
20 Each
4010AC
Paint Restricted area/Deadly Force Signs, in accordance with Statement of Work.
Firm Fixed Price
200 Each
Section C - Description/Specifications/Statement of Work
Requirements -Protective Coatings-Grand Forks AFB, ND. Contractor shall furnish all labor, transportation, tools, equipment, uniforms/protective clothing, materials, supplies, supervision, and administration to provide protective coating for various Grand Forks AFB facilities in accordance with the terms of the contract. -There is a No Work Period for external work only from 15 October through 15 April. -Contractor must be registered in the System for Award Management (SAM) database. -In accordance with FAR 36.204(g), the magnitude of this project is between $5,000,000.00 and $10,000,000.00. -This will be a Requirements Type Contract with a five-year ordering period. -Reference Section 3 of the Statement of Work (SOW) for Government Furnished Space /Contractor Bldg. -THIS ACQUISITION IS SET ASIDE FOR SERVICE DISABLED VETERAN OWNED SMALL BUSINESS. -Block 13b of this RFP states no bid guarantee required, however; see Section H in regards to bid guarantee.
Section D - Packaging and Marking
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.246-12 Inspection of Construction. 1996-08
Section F - Deliveries or Performance
0001AA
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0001AB
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0001AC
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0002AA
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0002AB
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0002AC
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0002AD
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0003AA
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0004AA
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0004AB
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0005AA
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0005AB
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0006AA
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0006AB
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0006AC
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0006AD
Delivery Schedule FoB Details
Period of Performance From
29 SEP 2021
To
28 SEP 2022
Contractor Destination
0006AE
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0006AF
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0006AG
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0007AA
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0007AB
Delivery Schedule
Period of Performance From
29 SEP 2021
FoB Details
Contractor
To
28 SEP 2022
0007AC
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0007AD
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0007AE
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0008AA
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0008AB
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor
0008AC
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0008AD
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0008AE
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0008AF
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0008AG
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor
0008AH
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0008AJ
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0008AK
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0009AA
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0009AB
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0009AC
From
29 SEP 2021
To
28 SEP 2022
Contractor Destination
0010AA
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0010AB
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
0010AC
Delivery Schedule
Period of Performance From
29 SEP 2021
To
28 SEP 2022
FoB Details
Contractor Destination
1001AA
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1001AB
Delivery Schedule
Period of Performance From
FoB Details
Contractor
29 SEP 2022
To
28 SEP 2023
Destination
1001AC
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1002AA
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1002AB
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1002AC
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1002AD
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor
1003AA
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1004AA
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1004AB
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1005AA
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1005AB
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor
1006AA
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1006AB
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1006AC
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1006AD
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1006AE
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1006AF
From
29 SEP 2022
To
28 SEP 2023
Contractor Destination
1006AG
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1007AA
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1007AB
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1007AC
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1007AD
Delivery Schedule
Period of Performance
FoB Details
From
29 SEP 2022
To
28 SEP 2023
Contractor Destination
1007AE
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1008AA
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1008AB
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1008AC
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1008AD
Delivery Schedule
Period of Performance From
29 SEP 2022
FoB Details
Contractor
28 SEP 2023
1008AE
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1008AF
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1008AG
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1008AH
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1008AJ
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor
1008AK
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1009AA
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1009AB
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1009AC
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1010AA
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor
1010AB
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
1010AC
Delivery Schedule
Period of Performance From
29 SEP 2022
To
28 SEP 2023
FoB Details
Contractor Destination
2001AA
Delivery Schedule
Period of Performance From
29 SEP 2023
To
28 SEP 2024
FoB Details
Contractor Destination
2001AB
Delivery Schedule
Period of Performance From
29 SEP 2023
To
28 SEP 2024
FoB Details
Contractor Destination
2001AC
Delivery Schedule
Period of Performance From
29 SEP 2023
To
28 SEP 2024
FoB Details
Contractor Destination
2002AA
From
29 SEP 2023
To
28 SEP 2024
Contractor Destination
2002AB
Delivery Schedule
Period of Performance From
29 SEP 2023
To
28 SEP 2024
FoB Details
Contractor Destination
2002AC
Delivery Schedule
Period of Performance From
29 SEP 2023
To
28 SEP 2024
FoB Details
Contractor Destination
2002AD
Delivery Schedule
Period of Performance From
29 SEP 2023
To
28 SEP 2024
FoB Details
Contractor Destination
2003AA
Delivery Schedule
Period of Performance From
29 SEP 2023
To
28 SEP 2024
FoB Details
Contractor Destination
2004AA
Delivery Schedule
Period of Performance From
FoB Details
29 SEP 2023
To
28 SEP 2024
Destination
2004AB
Delivery Schedule
Period of Performance From
29 SEP 2023
To
28 SEP 2024
FoB Details
Contractor Destination
2005AA
Delivery Schedule
Period of Performance From
29 SEP 2023
To
28 SEP 2024
FoB Details
Contractor Destination
2005AB
Delivery Schedule
Period of Performance From
29 SEP 2023
To
28 SEP 2024
FoB Details
Contractor Destination
2006AA
Delivery Schedule
Period of Performance From
29 SEP 2023
To
28 SEP 2024
FoB Details
Contractor Destination
2006AB
Delivery Schedule
Period of Performance From
29 SEP 2023
To
28 SEP 2024
FoB Details
Contractor
2006AC
Delivery Schedule
Period of Performance From
29 SEP 2023
To
28 SEP 2024
FoB Details
Contractor Destination
2006AD
Delivery Schedule
Period of Performance From
29 SEP 2023
To
28 SEP 2024
FoB Details
Contractor Destination
2006AE
Delivery Schedule
Period of Performance From
29 SEP 2023
To
28 SEP 2024
FoB Details
Contractor Destination
2006AF
Delivery Schedule
Period of Performance From
29 SEP 2023
To
28 SEP 2024
FoB Details
Contractor Destination
2006AG
Delivery Schedule
Period of Performance From
29 SEP 2023
To
28 SEP 2024
FoB Details
Contractor
2007AA
Delivery Schedule
Period of Performance From
29 SEP 2023
To
28 SEP 2024
FoB Details
Contractor Destination
2007AB
Delivery Schedule
Period of Performance From
29 SEP 2023
To
28 SEP 2024
FoB Details
Contractor Destination
2007AC
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .