Solicitation_ERK_W9128F23Q0106.pdf

PDF 1 MB Posted

Attached to
POL Tank Inspection ERK Eareckson Air Station
Solicitation number
W9128F23Q0106
Issued by

About this file

This is a solicitation from the Department of the Army Corps of Engineers Engineering District Omaha seeking proposals for aboveground storage tank inspection services at Eareckson Air Station in Shemya, Alaska. The contractor will be required to perform an API 653 internal inspection of one tank, including removal and disposal of remaining fuel, tank cleaning, non-destructive testing, and drafting inspection reports. The period of performance is 300 calendar days from award. The solicitation identifies response and award dates, pricing terms, and relevant federal agencies and locations. Qualified offerors must have API 653 certified inspectors and submit proposals by the specified due date to be considered for this firm fixed price contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W9128F23Q0106

b. TELEPHONE NUMBER

402-995-2233

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 13 Oct 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

22-Sep-2023

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W9128F9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

STEVEN D ENGEN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 966752 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

COE PROGRAMS MANAGEMENT BRANCH

LAURA STEPHENS

USA, OMAHA CENWO-PM-P

1616 CAPITOL AVE

OMAHA NE 68102-4901

TEL: 402-995-2802 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

X 8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$19,500,000

NAICS:

541990

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF67

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W9128F23Q0106

Section SF 1449 - CONTINUATION SHEET

PERFORMANCE WORK STATEMENT

SP-POL-CMP-INSPECT-PWS-ERK

Eareckson AS, (Shemya) AK

Part 1

General Information

1. GENERAL:

1.1. Scope: This is a non-personnel services contract to perform inspections on

Department of Defense fuel tanks. This service entails disposal of remaining fuel, tank cleaning, and providing an above-ground storage tank (AST) Inspection on tank(s) listed in Attachment B. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.

1.2. Background: See attachment J for previous inspection report(s).

1.3. Objectives: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to execute the fuel disposal of remaining fuel, clean the tank and perform an AST internal inspection on the tank(s) as applicable at the location and tanks specified in attachment B as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.4. Period of Performance: The period of performance shall be for 300 calendar days starting at the date of contract award. Earlier completion of required services is encouraged and acceptable.

1.5. General Information

1.5.1. Quality Assurance: The government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.5.2. Recognized Holidays:

New Year’s Day Martin Luther King Birthday President’s Day Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veteran’s Day Thanksgiving Christmas

1.5.3. Hours of Operation: The contractor is responsible for conducting business, between the hours of 0730-1630 Monday through Friday, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Other than normal duty hours must be coordinated with the KO or his/her designated representative. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall maintain stability and continuity of the workforce.

1.5.4. Place of Performance: The work to be performed under this contract will be performed at the installation and facilities identified in Attachment B.

1.5.5. Type of Contract: The government will award a Firm Fixed Price Contract

1.5.6. Security Requirements: Reference Attachment A – General Installation Security Requirements

1.5.7. Site Access: Contractor shall coordinate with Installation personnel for access to the site. Points of contact for the installation will be provided upon award.

Site Authorization Request (SAR) is required to be completed and approved before travel can begin. This is typically submitted 30 days prior to travel.

A Letter of Authorization (LoA) is required to be signed by the COR for the awarded contract to authorize the flight and billeting/food.

Travelers flying on the rotator are limited to two (2) 50 lbs suitcases. This is strictly enforced.

1.5.8. Equipment: Equipment sent to Eareckson Air Station, Shemya island requires significant coordination. Anything larger than hand carry items need to be sent out on a dedicated military (contracted) cargo flight or sent out on a barge prior to being needed. All equipment initially needs to be shipped to JB Elmendorf-Richardson TMO a minimum 90 days prior to allow ample time for transport. Equipment shipped needs to have DD Form 1149 completed. For bidding purposes estimate approximately $3 a pound/one way trip.

1.5.9. Meetings/Kick-Off Meetings: The Contractor shall coordinate with USACE

PM and conduct a kickoff meeting prior to field activities. This can be accomplished either prior to mobilization and inspection activities or onsite prior to commencement of inspection activities. The Work Plan shall be discussed, and further coordination and scheduling accomplished at this meeting. These meetings shall be at no additional cost to the government.

1.5.9.1. The Contractor shall call the installation 72 hours prior to mobilization to verify tank fuel quantities are at the quoted/verified amount as stated in Attachment B as the contractor is not authorized to remove/transfer or dispose of more fuel than what is stated in the contract per Attachment B.

1.5.9.2. The Contractor shall be responsible to establish a report of findings and coordinate a teleconference after the inspection is complete and at least 24 hours prior to placing tank back into service. This teleconference will review deficiencies found during the inspection with the Government making the final decision on whether or not to place this tank back into service. The Contractor can use Attachment E - API INTERNAL INSPECTION TELECON BRIEFING TEMPLATE or their own format however this document shall include the next recommended inspection intervals for both External and Internal Inspection, and State regulated inspection intervals, if applicable. Also, when listing the findings, they shall be categorized as either “Mandatory”, “Recommended”. Coordinate with POC’s from Service Control Point (SCP), DLA, and USACE. Individuals to be identified after project award.

1.5.10. Contracting Officer Representative (COR): The (COR) will be identified by separate letter.

1.5.10.1. The COR is authorized to perform the following functions:

assure that the Contractor performs the technical requirements of the contract perform inspections necessary in connection with contract performance maintain written and oral communications with the Contractor concerning technical aspects of the contract issue written interpretations of technical requirements, including Government drawings, designs, specification monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies assist in coordinating availability of government furnished property

A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regards to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.5.11. Key Personnel: Certified API 653 Inspector and Project Manager.

1.5.12. Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI.

The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as they deem necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.5.13. Suitability For Service: Evaluate inspection data to determine suitability for continued use. Identify conditions which pose a risk to integrity. Determine a metal loss threshold for mandatory repairs. In the determination of mandatory repairs:

Use a "first, do no harm" approach to classifying tank repairs.

Use Desired Service Interval as the time to next inspection unless notified otherwise by the Contracting Officer.

Use minimum remaining thickness (MRT) no less than 100 mils at the next inspection.

Do not classify as mandatory repair of conditions which are noncompliant with current standards but are un-related to structural or hydraulic integrity (e.g., gouge, improper weld spacing, weld profile).

Apply repair determination to individual indications. Do not average across an entire plate or course.

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. MANDATORY REPAIR. Action necessary to preserve or restore the structural and hydraulic integrity of the tank or piping, or to mitigate a safety hazard.

Includes any condition which has or may breach the hydraulic or structural integrity of the tank prior to the next integrity inspection.

2.1.8. PHYSICAL SECURITY. Actions that prevent the loss or damage of

Government property.

2.1.9. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.10. QUALITY ASSURANCE SURVEILANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.11. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.12. RECOMMENDED REPAIR. Action intended to extend the service life of the tank or piping and to address conditions that currently, or within the next service interval, will not have an adverse effect on tank operability or integrity.

Applicability is limited to exclude soft or elastomeric parts for any pressure containing system. Categorize in either Long Term or Short Term repairs.

2.1.13. SUBCONTRACTOR. One that enters into a contract with a prime contractor.

The Government does not have privity of contract with the subcontractor.

2.1.14. TANK INSPECTION. A multi-disciplinary engineering assessment of al petroleum, oil, and lubricant storage tank systems within or connected to the tank hydraulic boundary. Systems include nozzles, appurtenances, and conveyance systems such as piping, stilling well, valve, flow control, cathodic protection, overfill protection, spill prevention, containment, leak detection, fire suppression, gauging, ventilation, lighting, and other electrical systems.

Inspection includes a review of cathodic protection reports and relevant as-built records when available. Unless stated otherwise, the limits are the boundary of secondary containment.

2.1.15. TANK INSPECTOR. An individual certified as a fuel storage tank inspector.

The recognized certification is API Std 653.

2.1.16. WORKDAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.17. WORK WEEK. Monday through Friday, unless specified otherwise.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement ANG Army National Guard AR Army Regulation AST Aboveground Storage Tank API American Petroleum Institute ATG Automatic Tank Gauging AWWA American Water Works Association CCE Contracting Center of Excellence

CCS Coating Condition Survey CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DAF Department of the Air Force DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense EPA Environmental Protection Agency FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 IAP International Airport KO Contracting Officer MOGAS Motor Gasoline NFPA National Fire Protection Association OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RTO Returned to Operator STI Steel Tank Institute SCP Service Control Point TE Technical Exhibit UFC Unified Facilities Criteria UFGS Unified Facilities Guide Specification

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND

SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: No Government furnished items or services are required.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1. General: The Contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2. Equipment: The Contractor shall provide all tools and inspection equipment needed to perform the inspection and other services to be performed under the PWS.

4.2.1. Precision Equipment: Contractor is responsible to ensure all equipment to be used is certified and calibrated to the parameters and tolerances of the required equipment.

4.2.2. Gaskets: Composition ring, one piece factory cut, compliant with ASME

B16.21, Buna-N. Gaskets must be composed of either graphite or synthetic fibers in a nitrile binder and must be resistant to the effects of aviation hydrocarbon fuels and manufactured of fire-resistant materials. Use full-faced gaskets for flat-face flanged joints. Buna-N material must conform to SAE

AMS3275.

4.2.3. Flange Bolts, Nuts, and Washers: Bolts for manway covers must conform to

ASME B18.2.1. Bolts must be of sufficient length to obtain full bearing on the nuts and must project no more than three full threads beyond the nuts with the bolts tightened to the required torque. Bolts must be regular hexagonal bolts conforming to ASME B18.2.1 with material conforming to ASTM A193/A193M, Class 2, Grade B8. Bolts must be threaded in accordance with ASME B1.1, Class 2A fit, Coarse Thread Series, for sizes one inch and smaller and Eight-Pitch Thread Series for sizes larger than one inch. Use stainless steel washers dimensioned in accordance with ASTM F436 flat circular and fabricated from the same grade of stainless steel as the bolt.

4.3. Project Inspection Management Plan (PMP): As part of the initial PMP, the

Contractor shall prepare and include a brief (< 10 pages) Work Plan, as an attachment, which will include proposed schedule, inspection activities, personnel performing inspection, required training certificates, and additional data or support requests.

4.4. Health and Safety Plan (HSP) and Accident Prevention Plan (APP): The

Contractor will prepare a Health and Safety Plan (HSP) to comply with 29 Code of Federal Regulations (CFR) 1910 and 1926 as well as applicable Military Service (Army, Air Force, or Navy), OSHA, state, host nation, and local and installation health and safety regulations regarding the proposed work effort. Qualifications for individuals who will be on-site for safety shall be submitted in the HSP.

4.4.1. The Accident Prevention Plan (APP) is required by FAR clause 52.236-13.

The APP describes the methods by which the contractor or USACE personnel will meet the safety and health requirements listed in EM 385-1-1. Entry into Confined Spaces shall comply with the requirements of 29 CFR 1910.146.

Provide additional monitoring for toxic (petroleum) vapors in addition to normal air monitoring requirements.

4.4.2. Abbreviated Accident Prevention Plans may be developed and submitted per

Form A-01 Abbreviated Accident Prevention Plan Checklist page A-13 of the EM 385-1-1. This may be submitted in order to develop a plan more specific to the work performed under this PWS but shall still comply as indicated above.

PART 5

SPECIFIC TASKS

5. Specific Tasks: Per each tank as identified in attachment B

5.1. Basic Services.

5.1.1. Perform a Tel-con kick-off meeting either prior to mobilization or the morning of the commencement of work on-site.

5.1.2. Dispose of remaining fuel quantities as stated in Attachment B. The contractor will be responsible to coordinate with environmental and safety authorities having jurisdiction to obtain and execute required permits, manifests, etc. Tank cleaning shall be done in accordance with UFGS 33 01 50.55.

5.1.3. The tank Inspection shall be in conformance with applicable industry standards API 653, API RP 575, NFPA 30, NFPA 326, UFGS 33 01 50.65, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local and service requirements. Scan 100 percent of the tank bottom, as interior appurtenances allow, for indications such as metal loss, pits, cracks, gouges, and general corrosion. Distinguish between product and backside indications. Measure metal thickness with an ultrasonic method. Procedures must be compliant with ASME BPVC SEC V.

Record measurements, exclusive of coating, for all tank bottom plates.

Provide UT thickness measurement on no less than five locations per bottom plate and at indications from the screening technologies determined to be relevant. Mark relevant indications on tank surfaces in a neat and professional manner adjacent to the indication. Collect data to be used in the assessment of corrosion growth, structural integrity, brittle fracture, and hydraulic integrity. Complete the API Std 653 checklist and provide them with the DRAFT and FINAL reports. Utilize UFC 3-460-01 Table 8-1 and indicate appurtenances that are not present. The attached Inspection Report template should be utilized in submitting both the DRAFT and FINAL inspection reports. Contractor shall leave a clean and orderly site upon the completion of the inspection.

5.1.4. The contractor must complete a Coating Condition Survey (CCS) on all the interior and exterior tank coating systems. The CCS should be accomplished by personnel from a business that routinely performs coating evaluations, and the individual investigator should be Certified by SSPC as a Protective Coatings Specialist. The CCS should be sufficiently detailed to provide all technical information about the coatings. At a minimum, the CCS should provide a detailed report of: 1. Existing coating conditions, including condition of coating film, and the existence of potentially hazardous substances that may impact coating management (i.e. lead, cadmium, chromium); 2. Analysis of remaining coating life, suitability of overcoating, and technical requirements for overcoating; 3. Technical recommendations for the most cost effective management of existing coating systems, including any hazardous materials present in paint film; and 4. Any other information of interest to the coating system management that should be identifiable by an individual trained and experienced in the field of coating analysis, coating failure analysis, and coating design. The findings from the CCS must be included on the DRAFT and FINAL inspection reports.

5.1.5. The contractor shall visually inspect containment for ability to contain the entire contents of the tank in the event of catastrophic failure including required freeboard, assessing for cracks, settlement, and deterioration.

Record dimensions of cracks and provide photographic evidence of each deficiency. Visually assess the liner integrity and impermeability where applicable. Containment drain system shall be tested as follows.

5.1.6. Drain Line and Release Valve. The Contractor shall perform a hydrostatic test to ensure the drainpipe and release valve do not leak. Test in accordance with applicable requirements of AWWA C600 for hydrostatic testing. Ensure the release valve is closed and pressurize the end of the pipe within the containment basin sump. Test for leakage by filling the pipe with water and pressurizing to 10 psi using a suitable pump connected to the pipeline. The test pressure shall not vary by more than ±1 psi for the duration of the test. Hold this pressure for not less than 2 hours. If the system does not hold pressure, check the outfall point to see if water is bypassing the valve. Test pressure shall be maintained during the test by adding makeup water through the pressure test pump into the pipeline. Accurately note the amount of makeup water required to maintain pressure during the test.

5.1.7. Containment Drain Inlet. The Contractor shall perform a hydrostatic test to ensure the integrity of the inlet sump. Test for leakage by filling the inlet with water to a level at least 1-2 inches above the top of the inlet structure. The inlet shall hold this water for not less than 2 hours with no measurable change in the water level.

5.1.8. Coverage of the UT scan shall include 5 points per shell plate on the first shell course. Spot UT scans shall be made once every foot along the circumference of the tank shell within the critical zone and along the tank chime as accessible. 5 points per shell plate shall also be taken along the spiral staircase for each shell course as accessible. Provide UT scans of tank shell nozzles on the first shell course and their respective reinforcement plates as applicable. Include all findings in the inspection report.

5.1.9. Upon completion of the Internal inspection the contractor shall provide a legible tank stencil or decal, consisting of black letters at least 1” in height, stating the date cleaned and inspected, the contractor’s name and the name of the contractor’s personnel supervising the work. Remove any existing stencils displaying previous inspection information. New information shall be provided in the following format:

Date Cleaned and Inspected: Day-Month-Year ABC Contracting Supervisor: John Doe

5.1.10. Provide Tel-con out briefing prior to closing up the tank.

5.1.11. When the tank is ready to be closed and RTO, the Contractor is responsible to provide new stainless-steel bolts and all manway gaskets on the first shell course and ensure there are no leaks at the manways by filling the tank to at least the first shell course.

5.1.12. Provide photographic documentation of the following: PLC make and model, Input/Output Alarm Modules including directories, Level Alarm Panel, Annunciator Panel, and any As-Builts that are in the alarm panel. Coordinate with the installation as needed to obtain this information.

5.1.13. Provide DRAFT and FINAL inspection reports per the attached templates.

The report(s) must include a record of NDE findings with drawings depicting plate layout and thickness measurement locations. Incorporate engineering analysis, suitability for service analysis, corrosion rate determinations, and remaining service life calculations. Provide separate report for each tank inspected. Specify the due date for the next inspection. Include the API Std 653 inspector of record certificate number and signature.

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.

Steel Tank Institute (STI) SP001 Standard for the Inspection of Aboveground Storage Tanks

American Petroleum Institute (API) 653 Standard for the Tank Inspection, Repair, Alteration, and

Reconstruction 650 Welded Tanks for Oil Storage RP 575 Inspection Practices for Atmospheric and Low-pressure Storage

Tanks Std 2015 Requirements for Safe Entry and Cleaning of Petroleum Storage

Tanks

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 30 Flammable and Combustible Liquids Code NFPA 70 National Electrical Code (NEC) NFPA 326 Standard for Safeguarding of Tanks and Containers for Entry, Cleaning, or Repairs

UNIFIED FACILITIES CRITERIA (UFC)

UFC 3-460-01 Design: Petroleum Fuel Facilities UFC 3-460-03 Petroleum Fuel Systems Maintenance

UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS)

UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks UFGS 33 01 50.65 Inspection of Field Fabricated Fuel Storage Tanks UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 112 EPA: Oil Pollution Prevention

PART 7

ATTACHMENT

7. Attachment/Technical Exhibit List:

7.1. Attachment A – General Installation Security Requirements

7.2. Attachment B – Fuel Storage Tank List

7.3. Attachment C – Fuel Storage Tank Data Sheet

7.4. Attachment D – Monthly Contractors Progress, Management and Status Report

7.5. Attachment E – API Internal Inspection Telecon Briefing Template

7.6. Attachment F – API Internal Inspection Report Template

7.7. Attachment G – Return to Service Letter

7.8. Attachment H – Not Applicable

7.9. Attachment I – Not Applicable

7.10. Attachment J.1 – Tank 123 Internal Report 2014

7.11. Attachment J.2 – Tank 123 External Report 2019

TECHNICAL EXHIBIT 1

Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

Standard Performance Threshold

Method of Surveillance

PRS # 1.

Kick-Off Meeting with USACE and Stakeholders

Para. 1.5.8.

State, local, and federal requirements regulating fuel storage tanks

100% The contractor will schedule this Meeting either on-site prior to commencement of work or via tel-con prior to being onsite. Submit agenda and meeting minutes to stakeholders

PRS # 2.

Clean and provide API 653 Internal Inspection, complete Coating Condition Survey (CCS),and visual inspection of the containment area

Para. 5.1.3, 5.1.4 & 5.1.5.

State, local, and federal requirements regulating fuel storage tanks

100% Random Inspection

PRS # 3.

Provide API 653 Internal Inspection reports

State, local, and federal requirements regulating fuel storage tanks

100% Random Inspection.

The contractor is to provide a DRAFT and FINAL report

DELIVERABLES SCHEDULE

DELIVERABLE SCOPE OF

WORK

PARAGRAPH

DUE DATE

Project Inspection Management Plan/Work Plan, Accident Prevention Plan & Health and Safety Plan (Draft)

4.3 & 4.4. 15 days after award

Project Inspection Management Plan/Work Plan, Accident Prevention Plan & Health and Safety Plan (Final)

4.3 & 4.4. 5 days after receipt of comments

Inspection and Evaluation Report – (Draft) 5.1.13.

28 days after Field Inspection

Inspection and Evaluation Report – to include populated Attachment C Excel Sheet for each base (Final)

5.1.13.

7 days after receipt of comments

SCA WAGE DETERMINATION

"REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary of Labor | WAGE AND HOUR DIVISION

| WASHINGTON D.C. 20210

| Wage Determination No.: 2015-5687

Daniel W. Simms Division of | Revision No.: 20

Director Wage Determinations| Date Of Last Revision: 07/27/2023

Note: Contracts subject to the Service Contract Act are generally required to pay at least the applicable minimum wage rate required under Executive Order

14026 or Executive Order 13658.

Para 5.1.13 for MCX review and comment

PRS # 5.

Out-Brief Meeting with USACE and Stakeholders

Para 5.1.10.

State, local, and federal requirements regulating fuel storage tanks

100% Contractor will coordinate a Tel-con and distribute the report of findings 24 hrs prior to the scheduled conference

PRS #6

Fuel disposal Para. 5.1.2.

State, local, and federal requirements regulating fuel storage tanks

100% Random Inspection

|If the contract is entered into on or |Executive Order 14026 generally applies to |

|after January 30, 2022, or the |the contract. |

|contract is renewed or extended (e.g., |The contractor must pay all covered workers |

|an option is exercised) on or after |at least $16.20 per hour (or the applicable |

|January 30, 2022: |wage rate listed on this wage determination,|

| |if it is higher) for all hours spent |

| |performing on the contract in 2023. |

|If the contract was awarded on or |Executive Order 13658 generally applies to |

|between January 1, 2015 and January 29,|the contract. |

|2022, and the contract is not renewed |The contractor must pay all covered workers |

|or extended on or after January 30, |at least $12.15 per hour (or the applicable |

|2022: |wage rate listed on this wage determination,|

| |if it is higher) for all hours spent |

| |performing on the contract in 2023. |

The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the Executive Orders is available at www.dol.gov/whd/govcontracts.

State: Alaska

Area: Alaska Boroughs of Aleutian Island, Bethel, Bristol Bay, Dillingham, Kenai Peninsula, Kodiak Island, Nome, North Slope, Southeast Fairb, Valdez-

Cordova, Wade Hampton, Yukon-Koyukuk

**Fringe Benefits Required Follow the Occupational Listing**

OCCUPATION CODE - TITLE FOOTNOTE RATE

01000 - Administrative Support And Clerical Occupations

01011 - Accounting Clerk I 18.78

01012 - Accounting Clerk II 21.09

01013 - Accounting Clerk III 23.59

01020 - Administrative Assistant 31.06

01035 - Court Reporter 21.59

01041 - Customer Service Representative I 16.83

01042 - Customer Service Representative II 18.63

01043 - Customer Service Representative III 20.62

01051 - Data Entry Operator I 18.99

01052 - Data Entry Operator II 20.71

01060 - Dispatcher, Motor Vehicle 31.63

01070 - Document Preparation Clerk 19.38

01090 - Duplicating Machine Operator 19.38

01111 - General Clerk I 18.84

01112 - General Clerk II 20.56

01113 - General Clerk III 23.09

01120 - Housing Referral Assistant 24.07

01141 - Messenger Courier 15.77***

01191 - Order Clerk I 18.70

01192 - Order Clerk II 20.41

01261 - Personnel Assistant (Employment) I 20.34

01262 - Personnel Assistant (Employment) II 22.75

01263 - Personnel Assistant (Employment) III 25.36

01270 - Production Control Clerk 27.66

01290 - Rental Clerk 18.04

01300 - Scheduler, Maintenance 19.31

01311 - Secretary I 19.31

01312 - Secretary II 21.59

01313 - Secretary III 24.07

01320 - Service Order Dispatcher 28.26

01410 - Supply Technician 31.06

01420 - Survey Worker 21.59

01460 - Switchboard Operator/Receptionist 18.87

01531 - Travel Clerk I 17.35

01532 - Travel Clerk II 19.15

01533 - Travel Clerk III 21.15

01611 - Word Processor I 17.19

01612 - Word Processor II 19.31

01613 - Word Processor III 21.59

05000 - Automotive Service Occupations

05005 - Automobile Body Repairer, Fiberglass 28.80

05010 - Automotive Electrician 27.40

05040 - Automotive Glass Installer 25.74

05070 - Automotive Worker 25.74

05110 - Mobile Equipment Servicer 22.36

05130 - Motor Equipment Metal Mechanic 29.09

05160 - Motor Equipment Metal Worker 25.74

05190 - Motor Vehicle Mechanic 29.09

05220 - Motor Vehicle Mechanic Helper 20.69

05250 - Motor Vehicle Upholstery Worker 24.04

05280 - Motor Vehicle Wrecker 25.74

05310 - Painter, Automotive 27.40

05340 - Radiator Repair Specialist 25.74

05370 - Tire Repairer 17.78

05400 - Transmission Repair Specialist 29.09

07000 - Food Preparation And Service Occupations

07010 - Baker 16.84

07041 - Cook I 21.22

07042 - Cook II 24.42

07070 - Dishwasher 13.13***

07130 - Food Service Worker 16.60

07210 - Meat Cutter 25.12

07260 - Waiter/Waitress 12.31***

09000 - Furniture Maintenance And Repair Occupations

09010 - Electrostatic Spray Painter 32.47

09040 - Furniture Handler 20.55

09080 - Furniture Refinisher 32.47

09090 - Furniture Refinisher Helper 24.52

09110 - Furniture Repairer, Minor 28.49

09130 - Upholsterer 32.47

11000 - General Services And Support Occupations

11030 - Cleaner, Vehicles 17.11

11060 - Elevator Operator 17.86

11090 - Gardener 24.81

11122 - Housekeeping Aide 17.86

11150 - Janitor 17.86

11210 - Laborer, Grounds Maintenance 19.22

11240 - Maid or Houseman 16.17***

11260 - Pruner 17.36

11270 - Tractor Operator 22.95

11330 - Trail Maintenance Worker 19.22

11360 - Window Cleaner 19.77

12000 - Health Occupations

12010 - Ambulance Driver 28.25

12011 - Breath Alcohol Technician 30.96

12012 - Certified Occupational Therapist Assistant 42.48

12015 - Certified Physical Therapist Assistant 38.81

12020 - Dental Assistant 25.59

12025 - Dental Hygienist 61.27

12030 - EKG Technician 46.91

12035 - Electroneurodiagnostic Technologist 46.91

12040 - Emergency Medical Technician 28.25

12071 - Licensed Practical Nurse I 27.68

12072 - Licensed Practical Nurse II 30.96

12073 - Licensed Practical Nurse III 34.51

12100 - Medical Assistant 23.60

12130 - Medical Laboratory Technician 28.87

12160 - Medical Record Clerk 23.47

12190 - Medical Record Technician 32.95

12195 - Medical Transcriptionist 27.68

12210 - Nuclear Medicine Technologist 68.04

12221 - Nursing Assistant I 16.53

12222 - Nursing Assistant II 18.58

12223 - Nursing Assistant III 20.27

12224 - Nursing Assistant IV 22.75

12235 - Optical Dispenser 30.96

12236 - Optical Technician 27.68

12250 - Pharmacy Technician 23.89

12280 - Phlebotomist 24.32

12305 - Radiologic Technologist 43.69

12311 - Registered Nurse I 28.98

12312 - Registered Nurse II 35.45

12313 - Registered Nurse II, Specialist 35.45

12314 - Registered Nurse III 42.88

12315 - Registered Nurse III, Anesthetist 42.88

12316 - Registered Nurse IV 51.40

12317 - Scheduler (Drug and Alcohol Testing) 38.36

12320 - Substance Abuse Treatment Counselor 32.23

13000 - Information And Arts Occupations

13011 - Exhibits Specialist I 21.09

13012 - Exhibits Specialist II 25.32

13013 - Exhibits Specialist III 30.96

13041 - Illustrator I 21.09

13042 - Illustrator II 25.32

13043 - Illustrator III 30.96

13047 - Librarian 28.03

13050 - Library Aide/Clerk 18.41

13054 - Library Information Technology Systems 25.32

Administrator

13058 - Library Technician 23.59

13061 - Media Specialist I 18.26

13062 - Media Specialist II 20.43

13063 - Media Specialist III 22.77

13071 - Photographer I 19.50

13072 - Photographer II 23.82

13073 - Photographer III 27.01

13074 - Photographer IV 33.05

13075 - Photographer V 37.45

13090 - Technical Order Library Clerk 23.12

13110 - Video Teleconference Technician 18.43

14000 - Information Technology Occupations

14041 - Computer Operator I 22.75

14042 - Computer Operator II 25.44

14043 - Computer Operator III 29.41

14044 - Computer Operator IV 32.69

14045 - Computer Operator V 36.20

14071 - Computer Programmer I (see 1)

14072 - Computer Programmer II (see 1)

14073 - Computer Programmer III (see 1)

14074 - Computer Programmer IV (see 1)

14101 - Computer Systems Analyst I (see 1)

14102 - Computer Systems Analyst II (see 1)

14103 - Computer Systems Analyst III (see 1)

14150 - Peripheral Equipment Operator 23.59

14160 - Personal Computer Support Technician 32.69

14170 - System Support Specialist 36.20

15000 - Instructional Occupations

15010 - Aircrew Training Devices Instructor (Non-Rated) 36.81

15020 - Aircrew Training Devices Instructor (Rated) 44.54

15030 - Air Crew Training Devices Instructor (Pilot) 53.39

15050 - Computer Based Training Specialist / Instructor 36.81

15060 - Educational Technologist 32.56

15070 - Flight Instructor (Pilot) 53.39

15080 - Graphic Artist 33.62

15085 - Maintenance Test Pilot, Fixed, Jet/Prop 51.74

15086 - Maintenance Test Pilot, Rotary Wing 51.74

15088 - Non-Maintenance Test/Co-Pilot 51.74

15090 - Technical Instructor 28.51

15095 - Technical Instructor/Course Developer 34.88

15110 - Test Proctor 23.13

15120 - Tutor 23.13

16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations

16010 - Assembler 13.49***

16030 - Counter Attendant 13.49***

16040 - Dry Cleaner 17.18

16070 - Finisher, Flatwork, Machine 13.49***

16090 - Presser, Hand 13.49***

16110 - Presser, Machine, Drycleaning 13.49***

16130 - Presser, Machine, Shirts 13.49***

16160 - Presser, Machine, Wearing Apparel, Laundry 13.49***

16190 - Sewing Machine Operator 18.39

16220 - Tailor 19.64

16250 - Washer, Machine 14.74***

19000 - Machine Tool Operation And Repair Occupations

19010 - Machine-Tool Operator (Tool Room) 35.56

19040 - Tool And Die Maker 44.32

21000 - Materials Handling And Packing Occupations

21020 - Forklift Operator 30.88

21030 - Material Coordinator 27.66

21040 - Material Expediter 27.66

21050 - Material Handling Laborer 22.41

21071 - Order Filler 17.74

21080 - Production Line Worker (Food Processing) 30.88

21110 - Shipping Packer 21.54

21130 - Shipping/Receiving Clerk 21.54

21140 - Store Worker I 17.59

21150 - Stock Clerk 23.98

21210 - Tools And Parts Attendant 30.88

21410 - Warehouse Specialist 30.88

23000 - Mechanics And Maintenance And Repair Occupations

23010 - Aerospace Structural Welder 39.41

23019 - Aircraft Logs and Records Technician 30.81

23021 - Aircraft Mechanic I 37.28

23022 - Aircraft Mechanic II 39.41

23023 - Aircraft Mechanic III 41.59

23040 - Aircraft Mechanic Helper 26.52

23050 - Aircraft, Painter 35.12

23060 - Aircraft Servicer 30.81

23070 - Aircraft Survival Flight Equipment Technician 35.12

23080 - Aircraft Worker 32.98

23091 - Aircrew Life Support Equipment (ALSE) Mechanic 32.98

I

23092 - Aircrew Life Support Equipment (ALSE) Mechanic 37.28

II

23110 - Appliance Mechanic 35.56

23120 - Bicycle Repairer 29.03

23125 - Cable Splicer 46.25

23130 - Carpenter, Maintenance 33.02

23140 - Carpet Layer 33.40

23160 - Electrician, Maintenance 40.24

23181 - Electronics Technician Maintenance I 39.64

23182 - Electronics Technician Maintenance II 42.21

23183 - Electronics Technician Maintenance III 44.81

23260 - Fabric Worker 31.20

23290 - Fire Alarm System Mechanic 37.76

23310 - Fire Extinguisher Repairer 29.03

23311 - Fuel Distribution System Mechanic 38.48

23312 - Fuel Distribution System Operator 29.58

23370 - General Maintenance Worker 25.83

23380 - Ground Support Equipment Mechanic 37.28

23381 - Ground Support Equipment Servicer 30.81

23382 - Ground Support Equipment Worker 32.98

23391 - Gunsmith I 29.03

23392 - Gunsmith II 33.40

23393 - Gunsmith III 37.76

23410 - Heating, Ventilation And Air-Conditioning 36.53

Mechanic

23411 - Heating, Ventilation And Air Contidioning 38.62

Mechanic (Research Facility)

23430 - Heavy Equipment Mechanic 37.93

23440 - Heavy Equipment Operator 32.31

23460 - Instrument Mechanic 37.76

23465 - Laboratory/Shelter Mechanic 35.56

23470 - Laborer 22.41

23510 - Locksmith 35.56

23530 - Machinery Maintenance Mechanic 36.52

23550 - Machinist, Maintenance 36.88

23580 - Maintenance Trades Helper 25.35

23591 - Metrology Technician I 37.76

23592 - Metrology Technician II 39.92

23593 - Metrology Technician III 42.12

23640 - Millwright 37.76

23710 - Office Appliance Repairer 35.56

23760 - Painter, Maintenance 30.30

23790 - Pipefitter, Maintenance 39.77

23810 - Plumber, Maintenance 37.46

23820 - Pneudraulic Systems Mechanic 37.76

23850 - Rigger 37.05

23870 - Scale Mechanic 33.40

23890 - Sheet-Metal Worker, Maintenance 37.76

23910 - Small Engine Mechanic 30.50

23931 - Telecommunications Mechanic I 36.38

23932 - Telecommunications Mechanic II 38.46

23950 - Telephone Lineman 43.59

23960 - Welder, Combination, Maintenance 35.29

23965 - Well Driller 35.92

23970 - Woodcraft Worker 37.76

23980 - Woodworker 29.03

24000 - Personal Needs Occupations

24550 - Case Manager 22.47

24570 - Child Care Attendant 14.46***

24580 - Child Care Center Clerk 18.03

24610 - Chore Aide 17.90

24620 - Family Readiness And Support Services 22.47

Coordinator

24630 - Homemaker 22.47

25000 - Plant And System Operations Occupations

25010 - Boiler Tender 38.95

25040 - Sewage Plant Operator 30.87

25070 - Stationary Engineer 38.95

25190 - Ventilation Equipment Tender 28.83

25210 - Water Treatment Plant Operator 30.87

27000 - Protective Service Occupations

27004 - Alarm Monitor 24.67

27007 - Baggage Inspector 20.35

27008 - Corrections Officer 33.49

27010 - Court Security Officer 31.22

27030 - Detection Dog Handler 22.77

27040 - Detention Officer 33.49

27070 - Firefighter 30.67

27101 - Guard I 20.35

27102 - Guard II 22.77

27131 - Police Officer I 35.19

27132 - Police Officer II 39.09

28000 - Recreation Occupations

28041 - Carnival Equipment Operator 19.03

28042 - Carnival Equipment Repairer 20.57

28043 - Carnival Worker 14.51***

28210 - Gate Attendant/Gate Tender 24.45

28310 - Lifeguard 18.68

28350 - Park Attendant (Aide) 27.34

28510 - Recreation Aide/Health Facility Attendant 19.95

28515 - Recreation Specialist 33.89

28630 - Sports Official 21.77

28690 - Swimming Pool Operator 26.50

29000 - Stevedoring/Longshoremen Occupational Services

29010 - Blocker And Bracer 34.02

29020 - Hatch Tender 34.02

29030 - Line Handler 34.02

29041 - Stevedore I 31.77

29042 - Stevedore II 36.22

30000 - Technical Occupations

30010 - Air Traffic Control Specialist, Center (HFO) (see 2) 48.54

30011 - Air Traffic Control Specialist, Station (HFO) (see 2) 33.47

30012 - Air Traffic Control Specialist, Terminal (HFO) (see 2) 36.86

30021 - Archeological Technician I 23.41

30022 - Archeological Technician II 27.28

30023 - Archeological Technician III 29.85

30030 - Cartographic Technician 31.78

30040 - Civil Engineering Technician 34.02

30051 - Cryogenic Technician I 30.77

30052 - Cryogenic Technician II 33.98

30061 - Drafter/CAD Operator I 23.41

30062 - Drafter/CAD Operator II 27.28

30063 - Drafter/CAD Operator III 29.19

30064 - Drafter/CAD Operator IV 34.79

30081 - Engineering Technician I 22.72

30082 - Engineering Technician II 26.56

30083 - Engineering Technician III 29.74

30084 - Engineering Technician IV 33.02

30085 - Engineering Technician V 38.08

30086 - Engineering Technician VI 45.77

30090 - Environmental Technician 27.62

30095 - Evidence Control Specialist 27.79

30210 - Laboratory Technician 37.27

30221 - Latent Fingerprint Technician I 30.77

30222 - Latent Fingerprint Technician II 33.98

30240 - Mathematical Technician 35.75

30361 - Paralegal/Legal Assistant I 24.04

30362 - Paralegal/Legal Assistant II 29.79

30363 - Paralegal/Legal Assistant III 36.43

30364 - Paralegal/Legal Assistant IV 44.07

30375 - Petroleum Supply Specialist 33.98

30390 - Photo-Optics Technician 32.95

30395 - Radiation Control Technician 33.98

30461 - Technical Writer I 25.87

30462 - Technical Writer II 31.64

30463 - Technical Writer III 38.28

30491 - Unexploded Ordnance (UXO) Technician I 30.85

30492 - Unexploded Ordnance (UXO) Technician II 37.33

30493 - Unexploded Ordnance (UXO) Technician III 44.74

30494 - Unexploded (UXO) Safety Escort 30.85

30495 - Unexploded (UXO) Sweep Personnel 30.85

30501 - Weather Forecaster I 34.79

30502 - Weather Forecaster II 42.32

30620 - Weather Observer, Combined Upper Air Or (see 2) 29.19

Surface Programs

30621 - Weather Observer, Senior (see 2) 32.42

31000 - Transportation/Mobile Equipment Operation Occupations

31010 - Airplane Pilot 37.33

31020 - Bus Aide 20.47

31030 - Bus Driver 29.52

31043 - Driver Courier 21.39

31260 - Parking and Lot Attendant 16.30

31290 - Shuttle Bus Driver 23.12

31310 - Taxi Driver 21.60

31361 - Truckdriver, Light 23.12

31362 - Truckdriver, Medium 24.85

31363 - Truckdriver, Heavy 29.02

31364 - Truckdriver, Tractor-Trailer 29.02

99000 - Miscellaneous Occupations

99020 - Cabin Safety Specialist 18.20

99030 - Cashier 14.38***

99050 - Desk Clerk 16.06***

99095 - Embalmer 30.85

99130 - Flight Follower 30.85

99251 - Laboratory Animal Caretaker I 17.98

99252 - Laboratory Animal Caretaker II 25.20

99260 - Marketing Analyst 29.04

99310 - Mortician 30.85

99410 - Pest Controller 30.31

99510 - Photofinishing Worker 16.21

99710 - Recycling Laborer 25.38

99711 - Recycling Specialist 30.29

99730 - Refuse Collector 22.92

99810 - Sales Clerk 15.99***

99820 - School Crossing Guard 19.73

99830 - Survey Party Chief 31.98

99831 - Surveying Aide 21.29

99832 - Surveying Technician 29.08

99840 - Vending Machine Attendant 26.09

99841 - Vending Machine Repairer 32.45

99842 - Vending Machine Repairer Helper 26.09

***Workers in this classification may be entitled to a higher minimum wage under

Executive Order 14026 ($16.20 per hour) or 13658 ($12.15 per hour). Please see the

Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 and 13658 are not currently being enforced as to contracts or contract-like instruments entered into with the federal government in connection with seasonal recreational services or seasonal recreational equipment rental for the general public on federal lands.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal

Contractors,…