Solicitation.Section 11_Supplemental Pricing Schedule.pdf

PDF 95 KB Posted

Attached to
Boeing 737-400 Aircraft Heavy Maintenance C-Check
Solicitation number
15M30025QA3700005
Issued by

About this file

This document is a detailed Heavy Maintenance Check Requirements list for a specific aircraft (N279AD/PW261), outlining 38 distinct maintenance tasks and inspections to be performed. The tasks include various comprehensive maintenance checks such as Service Check, Monthly Safety Inspection, multiple aircraft checks (1A, 2A, 1C, 2C, 3C, 6C), a complete aircraft wash, and multiple specialized inspections covering areas like passenger seat break-over features, engine components, fuel systems, and structural elements.

The maintenance requirements involve executing multiple Airworthiness Directives (ADs) and Service Bulletins with specific instructions for different aircraft groups and configurations. Notable tasks include engine gas path cleaning, fan blade lubrication, GPS antenna structural inspection, and detailed examinations of pressure bulkheads and fastener attachments. The document indicates that some tasks have specific timing restrictions, such as the Monthly Safety Inspection which must not be performed earlier than seven days prior to departure, and AD 2020-16-51 which must not be performed earlier than two days before departure. While the firm fixed prices are listed as columns, the actual monetary values are not visible in the provided document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. Heavy Maintenance Check Requirements

Task Sub- Maintenance Requirements

Firm Fixed Number Task Price

1 Perform Service Check

2 Perform Monthly Safety Inspection (MSI) Note: The Monthly Safety Inspection (MSI) must not be performed earlier than seven days prior to departure

3 Perform 1A Check

4 Perform 2A Check

5 Perform 1 C Check

6 Perform 2C Check

7 Perform 3C Check

8 Perform 6C Check

9 Perform Complete Aircraft Wash

10 Perform Task 25-010-01 Operationally Check the Passenger Seat Break-Over Feature on all Seats Adjacent (Forward and Aft) to all of the Emergency Exits

11 Perform Task 28-AWL-01 Detailed Inspection External Wires Over Center Fuel Tank using Boeing Task Card 28-011-00-01

12 Perform Task 28-AWL-27 Review AC Fuel Boost Pump Installation

13 Perform Task 32-040-01 Operationally Check the Brake Accumulator Isolation Valve

14 Perform Task 72-001-17 #1 and #2 Engine Gas Path Cleaning with Detergent IAW AMM Task 72-00-00-117-coo

15 Perform Task 72-018-01 Lubricate the Left Engine Fan Blade Dovetail Per Manufacturer's Instructions

16 Perform Task 72-018-02 Lubricate the Right Engine Fan Blade Dovetail Per Manufacturer's Instructions

17 Perform Task EMTQ-012-CAW Structural Inspection of the Dual GPS Antenna Installation

18 Perform AD 1999-10-12 Paragraph (b)(c)

18 a Perform SB 737-32A1314, dated April 15, 1999, N/A

Accomplishment Instructions

19 Perform AD 2004-06-18 Paraaraph (a)(1)(i)

20 Perform AD 2006-12-23 Paraaraph (i)

20 a Perform Service Bulletin 737-55A 1070 Revision 2, N/A

Accomplishment Instructions 3.8. Part 10, Followed by:

N279AD (PW261) is a Group 10 Aircraft

20 b Perform Service Bulletin 737-55A 1070 Revision 2 N/A

Accomplishment Instructions 3.8. Part 1

20 C Perform Service Bulletin 737-55A 1070 Revision 2 N/A

Accomplishment Instructions 3.8. Part 2

Maintenance Requirements

Firm Fixed Number Task Price

21 Perform AD 2012-18-13 R1 Paragraph (g)(1)(h)(i)

21 a Perform a LFEC inspection from the aft side of the aft N/A pressure bulkhead to detect discrepancies (including cracking, misdrilled fastener holes, and corrosion) of the web of the upper section of the aft pressure bulkhead at BS 1016 at the aft fastener row attachment to the "Y" chord, from S-15L to S-15R IAW NDT Manual D6- 37239, Part 6 Section 53-10-54

22 Perform AD 2012-18-13 R1 Paragraph (k) 22 a Perform Service Bulletin 737-53A1214 Revision 4 N/A

Accomplishment Instructions 3.8. Part 1 Step 1 N279AD (PW261) is a Group 1 Aircraft

23 Perform AD 2014-18-02 Paragraph (k)(I) 23 a Perform Service Bulletin 737-53A1075 Revision 3, N/A

Accomplishment Instructions 3. Work Instructions Step C N279AD (PW261) is a Group 1 Aircraft

24 Perform AD 2016-11-04 Paragraph (m) 24 a Perform Service Bulletin 737-53A 1279 Revision 2, N/A

Accomplishment Instructions 3.8. Part 4 N279AD (PW261) is a Group 2 Configuration 3 Aircraft

25 Perform AD 2016-23-08 Paragraph la) 25 a Perform Service Bulletin 737-53A1347, dated December N/A

09, 2015, Accomplishment Instructions 3.8. Work Instructions Part 2 N279AD (PW261) is a Group 1 Aircraft

26 Perform AD 2017-02-05 Paragraph (h)

26 a Perform Service Bulletin 737-53A1350, dated May 06, N/A

2016, Accomplishment Instructions 3.8. Group 3-8 Part 2 Step 3.a and Group 3-8 Part 6 step 2.a N279AD (PW261) is a Group 5 Aircraft

27 Perform AD 2017-02-12 Paragraph (a)(1) 27 a Perform Service Bulletin 737-55A1092, dated August 07, N/A

2015, Accomplishment Instructions 3.8. Work Instructions Part 1 N279AD (PW261) is a Group 1 Aircraft

28 Perform AD 2017-02-12 Paragraph (q)(2) 28 a Perform Service Bulletin 737-55A1092, dated August 07, N/A

2015, Accomplishment Instructions 3.8. Work Instructions Part 2 N279AD (PW261) is a Group 1 Aircraft

29 Perform AD 2017-25-10 Paragraph (h)(5) 29 a Perform Service Bulletin 737-55A 1099 Revision 1, N/A

Accomplishment Instructions 3.8. Work Package 3 N279AD (PW261) is a Group 3 Aircraft

30 Perform AD 2017-25-10 Paragraph (h)(6) 30 a Perform Service Bulletin 737-55A 1099 Revision 1, N/A

Accomplishment Instructions 3.8. Work Package 4 N279AD (PW261) is a Group 3 Aircraft

Maintenance Requirements

Firm Fixed Number Task Price

31 Perform AD 2017-25-1 0 Paragraph (h )(7)

31 a Perform Service Bulletin 737-55A 1099 Revision 1, N/A

Accomplishment Instructions 3.8. Work Package 5 N279AD (PW261) is a Group 3 Aircraft

32 Perform AD 2018-18-13 Paragraph (h)

32 a Perform Service Bulletin 737-57 A 1338, dated N/A

September 25, 2017, Accomplishment Instructions 3.8.

Table 1 Inspection 1 N279AD (PW261) is a Group 3 Configuration 1 Aircraft

32 b Perform Service Bulletin 737-57 A 1338, dated N/A

September 25, 2017, Accomplishment Instructions 3.8.

Table 3 Inspection 5 and Inspection 6 N279AD (PW261) is a Group 3 Configuration 1 Aircraft

33 Perform AD 2019-10-03 Paragraph (h)

33 a Perform Service Bulletin 737-53-1246 Revision 1, N/A

Accomplishment Instructions 3.8. Group 4-5 Part 17 N279AD (PW261) is a Group 5 Aircraft

33 b Perform Service Bulletin 737-53-1246 Revision 1, N/A

Accomplishment Instructions 3.8 Group 4-5 Part 18 N279AD (PW261) is a Group 5 Aircraft

34 Perform AD 2020-16-51 Paragraph (h) Note: AD 2020-16-51 Paragraph (h) must not be performed earlier than two davs prior to departure

35 Perform AD 2024-18-08 Paragraph (g)(1)

35 a Perform Service Bulletin 737-25A 1873, dated August 25, N/A

2023, Accomplishment Instructions 3.8. Table 2 Condition 3.1 Part 1 JPATS will provide Top Kits P/N's:

• SB560101069-11

• SB560101018-11

• SB560101095-11

N279AD (PW261) is a Group 2 Aircraft

36 Perform AD 2024-23-03 Paragraph (g)

36 a Perform Service Bulletin 737-22A1399, dated April 13, N/A

2023, Accomplishment Instructions 3.8. Group 4 Table 1 Action 1, Action 2, Action 3, Action 4, and Condition 1 JPATS will provide Top Kit P/N: 65C37849-60 N279AD (PW261) is a Group 4 Aircraft

37 Non-routine work cards for discrepancies identified in accomplishing above checks and inspections. Hourly Labor Rate:

38 Administrative fee for the procurement of aircraft parts and materials:

File details come from the government source that posted it. Updated .