Attached to
Marine Structures Replacement and Rehabilitation
Solicitation number
RFQ- 25 - 276
Issued by
Pinellas County, Florida

About this file

This is a Solicitation Development Form for a Request for Qualifications (RFQ) issued by the City of St. Petersburg, Florida for Marine Structures Replacement and Rehabilitation services. The City is seeking multiple qualified contractors to provide comprehensive marine infrastructure services across three primary work categories: Bridge Rehabilitation, Seawall Rehabilitation, and Structure Surface Protection. Services include concrete repairs, pile driving, sheet pile installation, crack sealing, surface treatments, and related marine structural work. The RFQ was released on August 15, 2025, with proposals due by September 16, 2025, at 3:00 pm. The contract is structured as a three-year agreement with one optional two-year renewal period. Proposals are limited to 30 pages and must demonstrate extensive experience through five reference projects valued over $75,000 completed within the past five years, along with detailed documentation of team qualifications and key personnel credentials.

The estimated annual expenditure is approximately $7,000,000, with a total budget of $7,000,000 charged to account 0001.130.1341.5320110. Funding sources include the City of St. Petersburg, Florida Department of Transportation (FDOT), Federal Highway Administration (FHWA), or a combination thereof. Projects will be issued as field orders on an as-needed basis with no guaranteed minimum work volume. The evaluation process uses a weighted scoring system: Team Background and Key Staff Availability (30 points), Experience and Relevant Project Examples (30 points), and References (20 points). Contractors must maintain specific insurance coverages including commercial general liability, automobile liability, and workers' compensation, with a Public Construction Bond initially set at $100,000 and supplemental bond riders for individual field orders. The City encourages participation from small businesses, minority-owned businesses, and disadvantaged business enterprises, including MBE, WBE, DBE, and SBE firms. Projects must comply with the latest Florida Department of Transportation Standard Specifications for Road and Bridge Construction and consider factors such as sea level rise, resiliency, and environmentally preferable purchasing. The acceptance period is 90 days after bids close.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev: 5/27/25

Solicitation Development Form – Construction CSA RFQ

OpenGov Followers: Evan Birk and Christy Carlton Routing Council Items and Related Questions:

Evan Birk, Sarah Johnson, Brejesh Prayman, Janice MacKinnon OpenGov Approvers: Evan Birk and Brejesh Prayman

Contract Type, if applicable

Multi-Year - New Agreement (RFQ)

Multi-Year - Renewal Agreement (RFQ) Contract Terms, if applicable 3-years with one 2-year renewal

Charge Account 0001.130.1341.5320110 Budget $ 7,000,000

Funding Source / Grant Info, if known CoSP Acceptance Period 90 Days, after bid closes

Background Checks Background check requirements are determined as the Project level, based on location.

Class Item Commodity Description

913.13 Construction, Bridge and Drawbridge (Includes Reconstruction/Rehabilitation)

959.90 Waterfront Construction Services including Piers, Docks, Decking, etc. (Includes Maintenance and Repair)

959.35 Construction Services, General (Marine)

913.66 Maintenance and Repair, Bridges

Insurance Requirements:

See Exhibit B - General Conditions for Field Order Contracts Article G-53 for Standard Limits.

Additional coverages or changes in limits will be determined at the Project between ECID and Risk Management.

ECID will provide the approved Certificate of Insurance to Procurement.

Committee Members Technical Advisors

1. Chair: Brejesh Prayman 1. Jacob Creamer

2. Evan Birk 2.

3. Thomas Rice

4. Michael Gebler

5. Daniel Singleton

Attachments

Exhibit A – Scope of Services Exhibit C - Statement of Qualifications

Exhibit B – General Conditions Other: Contractor Responses Chart

Scoring Criteria Weight (Points) Evaluation Criteria

0 - 10 30 Team Background and Key Staff Availability

0 - 10 30 Experience and Relevant Project Examples

Agreement Title Marine Structures Replacement and Rehabilitation

Type of Solicitation Construction Services Agreement (for Procurement’s purposes - Contract Purchase Agreement)

For ECID use only Yes No CCNA Yes No

Rev: 5/27/25

0 - 10 20 References

Pass/Fail (Total Sum

Weight of 20 Points)

-(XBE's)

Additional Firms To Notify:

1.

2.

3.

4.

5.

File details come from the government source that posted it. Updated .