Solicitation_Development_Form_-_INTERNAL_USE_ONLY.pdf
PDF 129 KB Posted
- Attached to
- Marine Structures Replacement and Rehabilitation
- Solicitation number
- RFQ- 25 - 276
- Issued by
- Pinellas County, Florida
About this file
The document is a Solicitation Development Form for a Construction Services Agreement (CSA) Request for Qualifications (RFQ) issued by ECID (likely a local government or public works entity) for Marine Structures Replacement and Rehabilitation. The solicitation seeks a contractor to perform marine construction services including bridge, drawbridge, waterfront, and pier construction, reconstruction, rehabilitation, maintenance, and repair. The contract is for a 3-year term with one potential 2-year renewal, and has a total budget of $7,000,000. The solicitation uses a qualifications-based selection process with scoring criteria focused on team background (30 points), experience and project examples (30 points), and references (20 points).
The project will be funded through a CoSP (Cooperative Service Provider) source, with an acceptance period of 90 days after bid closure. Insurance requirements will be determined at the project level between ECID and Risk Management. Background checks will also be project-specific based on location. The evaluation committee includes five members led by Brejesh Prayman, with Jacob Creamer listed as a technical advisor. Attachments include a Scope of Services, General Conditions, Statement of Qualifications, and a Contractor Responses Chart. The solicitation indicates this is a Consultants' Competitive Negotiation Act (CCNA) procurement, suggesting it follows specific state guidelines for professional services selection.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev: 5/27/25
Solicitation Development Form – Construction CSA RFQ
OpenGov Followers: Evan Birk and Christy Carlton Routing Council Items and Related Questions:
Evan Birk, Sarah Johnson, Brejesh Prayman, Janice MacKinnon OpenGov Approvers: Evan Birk and Brejesh Prayman
Contract Type, if applicable
Multi-Year - New Agreement (RFQ)
Multi-Year - Renewal Agreement (RFQ) Contract Terms, if applicable 3-years with one 2-year renewal
Charge Account 0001.130.1341.5320110 Budget $ 7,000,000
Funding Source / Grant Info, if known CoSP Acceptance Period 90 Days, after bid closes
Background Checks Background check requirements are determined as the Project level, based on location.
Class Item Commodity Description
913.13 Construction, Bridge and Drawbridge (Includes Reconstruction/Rehabilitation)
959.90 Waterfront Construction Services including Piers, Docks, Decking, etc. (Includes Maintenance and Repair)
959.35 Construction Services, General (Marine)
913.66 Maintenance and Repair, Bridges
Insurance Requirements:
See Exhibit B - General Conditions for Field Order Contracts Article G-53 for Standard Limits.
Additional coverages or changes in limits will be determined at the Project between ECID and Risk Management.
ECID will provide the approved Certificate of Insurance to Procurement.
Committee Members Technical Advisors
1. Chair: Brejesh Prayman 1. Jacob Creamer
2. Evan Birk 2.
3. Thomas Rice
4. Michael Gebler
5. Daniel Singleton
Attachments
Exhibit A – Scope of Services Exhibit C - Statement of Qualifications
Exhibit B – General Conditions Other: Contractor Responses Chart
Scoring Criteria Weight (Points) Evaluation Criteria
0 - 10 30 Team Background and Key Staff Availability
0 - 10 30 Experience and Relevant Project Examples
Agreement Title Marine Structures Replacement and Rehabilitation
Type of Solicitation Construction Services Agreement (for Procurement’s purposes - Contract Purchase Agreement)
For ECID use only Yes No CCNA Yes No
Rev: 5/27/25
0 - 10 20 References
Pass/Fail (Total Sum
Weight of 20 Points)
-(XBE's)
Additional Firms To Notify:
1.
2.
3.
4.
5.
File details come from the government source that posted it. Updated .