This document contains a waste diversion plan template and related federal contract opportunity for elevator modernization services. The General Services Administration Public Buildings Service intends to issue a request for proposal for modernizing four existing elevators at the Mickey Leland Federal Building in Houston, Texas, with an estimated construction cost between $1 million to $5 million. The applicable NAICS code is 238290 for other building equipment. The solicitation number is 47PH0523R0017. Interested small businesses are encouraged to attend an on-site visit scheduled for February 2, 2023 and submit proposals by the closing date of March 2, 2023. The source selection process will use a best value tradeoff methodology. The waste diversion plan template provides sections for contractors to estimate and report on diversion of various construction and demolition materials like asphalt, drywall, metals, and wood.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Waste Diversion Plan
: +christopher.clever@gsa.gov +walter.tersch@gsa.gov
(For consideration as an alternate). Anticipated sections match Actual to the right for 1:1 comparison.
-Jake Begnaud - WPIDBB Fine with either, will defer to +walter.tersch@gsa.gov Seems like it only boils down to estimating method or not.
-Christopher Clever - PCBL That's correct.
| -Jake Begnaud - WPIDBB | Project Waste Management Plan | Submittal Type: | Waste Diversion Plan (Anticipated): | Waste Diversion Report (Final) : | |||
| The general info in these gray cells replicates onto the Report tabs. | |||||||
| Project Name: | 8547 Mickey Leland Elevator Modernization | ECC (estimated construction cost): | n/a | Project Manager: | Kristina Le | Kahua Project # : | 8547 |
| Project Short Description: | Replace existing 4 passenger elevators with new modernized passenger elevators | PM email or phone: | kristina.le@gsa.gov | gBUILD Project # : | |||
| Building Number: | TX0298ZZ | Service Center / Field Office: | Budget Activity: | (list all applicable) | RWA # : |
Anticipated Waste Diversion Plan To be filled out and submitted Pre-Construction, with final Construction Documents (PM or contractor populates this pink section) Actual Waste Diversion Report To be submitted during Project Close-Out (Reports tab figures auto-populate this green section)
| Material* | |||||
| (see weight conversion factors below) | Diversion Method | Target Diversion Rate for each material, by weight | |||
| (Change to actual target(s) as needed) | Diverted (lbs) | Landfilled (lbs) | Total C&D material weight (Diverted + Landfilled) (lbs) | Diversion |
Rate
| Reuse* | Recycle or Compost | Donation | ||||||
| Asphalt | 50% | 0 | 0 | 0 | n/a | |||
| Brick, Masonry, and Tile | 50% | 0 | 0 | 0 | n/a | |||
| Cardboard | 50% | 0 | 0 | 0 | n/a | |||
| Carpet, including Padding | 50% | 0 | 0 | 0 | n/a | |||
| Ceiling tile | 50% | 0 | 0 | 0 | n/a | |||
| Concrete | 50% | 0 | 0 | 0 | n/a | |||
| Drywall/ sheetrock (unpainted) | 50% | 0 | 0 | 0 | n/a | |||
| Metals | 50% | 0 | 0 | 0 | n/a | |||
| Painted wood, drywall, or plywood | 50% | 0 | 0 | 0 | n/a | |||
| Reusable items | 50% | 0 | 0 | 0 | n/a | |||
| Roofing | 50% | 0 | 0 | 0 | n/a | |||
| Soil, Rock, Land Clearing Debris | 50% | 0 | 0 | 0 | n/a | |||
| Wood (unpainted) | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Total**: | 0 | 0 | 0 | n/a |
| Reuse is encouraged. Please list any items such as cabinets, doors, shelves, bricks, framing lumber, siding, fill material, misc. millwork, etc. planned for reuse. | |||
| Item | Reuse Onsite | Reuse Offsite | Off-Site Recipient or Salvage/ Deconstruction Company |
| Volume-to-Weight Conversion Factor Reference Table |
| If a hauler reports materials by volume, this table enables conversion to weight, for reporting actual diversion and disposal. |
| Asphalt paving: 1 cubic yard = 773 lbs | Dirt or sand: 1 cubic yard = 929 lbs |
| Asphalt or composite roof shingles: 1 cubic yard = 731 lbs | Fiberglass insulation, loose: 1 cubic yard = 17 lbs |
| Brick, laid flat: 1 flat square foot = 20 lbs | Mixed (composite) C&D material: 1 cubic yard = 417 lbs |
| Brick, loose: 1 cubic yard = 3,200 lbs. (1 cubic foot = 120 lbs) | Sheetrock (drywall), loose: 1 cubic yard = 393.5 lbs |
| Ceramic tile, scrap, loose: 1 cubic yard = 1,214 lbs | Rock, crushed: 1 cubic yard = 2,570 lbs |
| Concrete: 1 cubic yard = 860 lbs | Wood: 1 cubic yard = 169 lbs |
| *Only non-hazardous materials need to be included in this document. C&D mandates governing GSA exclude hazardous materials such as asbestos or lead-containing paint. |
| **At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics. |