About this file

This document is an Attachment 2: Waste Diversion Plan that provides instructions for tracking and reporting on the disposal and recovery of various construction materials for a government contract. The plan requires the contractor to categorize and track the weight and recovery method for materials such as carpet, architectural elements, metals, aggregates, plumbing fixtures, furniture, ceiling/wall materials, and roofing. It also requires the contractor to identify the landfill hauler and document the total landfill waste. The plan is to be submitted either pre-construction or at the final stage of the project. This Waste Diversion Plan is associated with Solicitation Number 47PH0524R0069 for the William M. Steger Fire Alarm & Fire Sprinkler System Upgrade, a construction project issued by the General Services Administration for the Greater Southwest Region with an estimated value between $1,000,000 and $5,000,000.

View the file

Other files for this federal contract opportunity

Other files attached to William M Steger - Fire Alarm & Fire Sprinkler System Upgrade, newest first.
File Type Posted
Solicitation Amendment 47PH0524R0069_0004.pdf PDF
Amend 0003 SOW - Fire Alarm Fire Sprinkler System Upgrade 3JUN2024.pdf PDF
Solicitation Amendment 47PH0524R0069_0003.pdf PDF
Amend 0003 RFIs Fire Alarm and Fire Sprinkler System Upgrade 3JUN2024.xlsx XLSX spreadsheet
Amend 0003 TX0262 Tyler Asbestos Reinspection-2014.pdf PDF
Amend 0003 TX0182 Tyler Asbestos Reinspection 2014-REV 12.22.14.pdf PDF
Amend 0003 Site Visit Sign In Sheet.pdf PDF
Solicitation Amendment 47PH0524R0069_0002.pdf PDF
Solicitation Amendment 47PH0524R0069_0001.pdf PDF
SOW - William M Steger Fire Alarm and Fire Sprinkler System Upgrade.pdf PDF
Solicitation Attach 5 - Fire Sprinkler Bid Dwg set 2-6-24.pdf PDF
Solicitation Attach 6 - 283111 Fire Alarm Spec 3-15.pdf PDF
47PH0524R0069 William M Steger Fire Alarm and Fire Sprinkler System Upgrade.pdf PDF
Solicitation Attach 1 - Green Purchasing Requirements.pdf PDF
SBSA_GC_Solicitation_December_2023.docx DOCX document
Solicitation Attach 4 - 211313 Sprinkler Spec 3-15-24.pdf PDF
Solicitation Attach 9 - WD TX20240269 dated 5JAN2024.pdf PDF
Solicitation Attach 10 - Bid Schedule Example.xlsx XLSX spreadsheet
Solicitation Attach 12 - Past Performance Questionaire.docx DOCX document
Solicitation Attach 8 - GSA527-21.pdf PDF
SBSA_GC_Agreement_December 2023.docx DOCX document
Solicitation Attach 3 - Building Information.pdf PDF
Solicitation Attach 7 - Fire Alarm Bid Dwg Set 2-6-24.pdf PDF
Solicitation Attach 11 - GC Reps and Certs 47PH0524R0069.docx DOCX document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. General Services Administration

Public Buildings Service Greater Southwest Region

Page 6 of 8 Tyler Fire Protection Upgrades Kahua # 18492 1-19-24

Attachment 2: Waste Diversion Plan

1. Submital Type: Pre-Construction or Final (Circle Appropriate Type)

2. ePM Number: ___________________ (Should receive from GSA PM)

3. Field Office: Circle Appropriate Field Office: (Oklahoma City, Tulsa, New Mexico, Little Rock, Shreveport, Tyler, New Orleans, Baton Rouge, Dallas, Fort Worth, Lubbock, Houston, Austin, San Antonio, McAllen, El Paso)

4. GSA Project Manager: _________________

5. Contract Number:______________________

6. Categories to Track:

6.1 Carpet: (rolled or tiled) Weight(lbs):_____ Recover Method:___________

6.2 Architectural:(doors,windows,frames,millwork) Weight(lbs):_____ Recover Method:___________

6.3 Ferrous Metals: (structural steel, studs, rebar) Weight(lbs):_____ Recover Method:___________

6.4 Non-Ferrous: (wire, piping, duct) Weight(lbs):_____ Recover Method:___________

6.5 Aggregate: (concrete,brick,blocks) Weight(lbs):_____ Recover Method:___________

6.6 Plumbing Fixtures: (sinks,toilets,urinals) Weight(lbs):_____ Recover Method:___________

6.7 Furniture: (Systems, casual, equip.) Weight(lbs):_____ Recover Method:___________

6.8 Ceiling/Wall: (gypsum, tiles) Weight(lbs):_____ Recover Method:___________

6.9 Roofing: (Shingles, Paper, membrane) Weight(lbs):_____ Recover Method:___________

6.10 Other: (any other material, packaging, etc) Weight(lbs):_____ Recover

Method:___________

7. Landfill Hauler:___________________

8. Landfill Waste:____________________

Recover Method: Reuse, Recycle, Donation