Solicitation Amendment - N4215826Q00260001.pdf

PDF 2 MB Posted

Attached to
HPAC TECH ASSIST
Solicitation number
N4215826Q0026
Issued by

About this file

This is a Request for Quote (RFQ) for technical support services related to HPAC (Heating, Ventilation, Air Conditioning) repair at Norfolk Naval Shipyard. The solicitation number is N4215826Q00260001, issued on August 7, 2026, with quotes due by August 27, 2026 at 09:00 AM Eastern Time. The period of performance runs from August 17, 2026 through January 6, 2027, with an option for a 30-day extension.

The procurement encompasses three line items: (1) technical support services for HPAC #1-#3 (Firm Fixed Price); (2) unplanned material costs (Firm Fixed Price); and (3) an optional 30-day completion period (Firm Fixed Price). Work is being procured for the Waterfront Business Operations Division (Organization 1210) under a Women-Owned Small Business (WOSB) set-aside. The contract is unrestricted with a North American Industry Classification Standard (NAICS) code of 811310. All work will be performed at Norfolk Naval Shipyard, Building 276, Portsmouth, Virginia. Quotations must include technical descriptions demonstrating compliance with all specifications, confirmation of ability to meet delivery schedules, and certification that services meet or exceed all solicitation requirements. The Government will make award to the technically acceptable offer resulting in the lowest aggregate price. The Procuring Contracting Officer is Rebekah Riggins (757-967-4014), with contract specialist Theresa Clark (757-396-8345) as the primary point of contact.

View the file

Other files

File Type Posted
Security Statements.pdf PDF
STATEMENT OF WORK (SOW).pdf PDF
OPSEC ENCLOSURE 2.pdf PDF
PROVISIONS AND CLAUSES REFERENCES.pdf PDF
Solicitation Amendment N4215826Q00260001 SF 30.pdf PDF
OPSEC ENCLOSURE 3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

Solicitation/Contract Form Continuation

78J HPAC Repair -Technical Support Services HPAC #1 - 3

N4215826Q00260001

Continuation of Supplies or Services and Prices/Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price Amount

Provide technical support services in support of HPAC #1 - #3

Pricing Arrangement: Firm Fixed Price

1 Job

0002 Unplanned Material

Pricing Arrangement: Firm Fixed Price

1 Group

Option Line Item

Option Period for completion of HPACs.

Pricing Arrangement: Firm Fixed Price

30 Days

Continuation of Description

Requirements 78J HPAC Repair -Technical Support Services HPAC #1 - 3 for Organization 1210 - Waterfront Business Operations Division FY: 2026, AMS: N42158-26-SIMACQ-NNSY-1210-0091

Continuation of Packaging and Marking

Continuation of Inspection and Acceptance

Overall Contract Inspection/Acceptance Locations

Acceptance Location

Acceptance Destination Instructions: IAWSOW

DoDAAC: N42158

N42158

1 NORFOLK NAVAL SHIPYARD BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

Nancy Wilson, COR Email: nancy.h.wilson.civ@navy.mil Telephone: (757) 810-4936

Inspection Location

Inspection Destination Instructions: IAWSOW

DoDAAC: N42158 CountryCode: USA

NORFOLK NAVAL SHIPYARD GF

1 NORFOLK NAVAL SHIPYARD, BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

Nancy Wilson, COR Email: nancy.h.wilson.civ@navy.mil Telephone: (757) 810-4936

Acceptance Location

Acceptance Destination Instructions: IAWSOW

DoDAAC: N42158

N42158

1 NORFOLK NAVAL SHIPYARD BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

Nancy Wilson, COR Email: nancy.h.wilson.civ@navy.mil Telephone: (757) 810-4936

Inspection Location

Inspection Destination Instructions: IAWSOW

DoDAAC: N42158 CountryCode: USA

NORFOLK NAVAL SHIPYARD GF

1 NORFOLK NAVAL SHIPYARD, BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

Nancy Wilson, COR Email: nancy.h.wilson.civ@navy.mil Telephone: (757) 810-4936

Option Line Item

Acceptance Location

Acceptance Destination Instructions: IAWSOW

DoDAAC: N42158

N42158

1 NORFOLK NAVAL SHIPYARD BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

Nancy Wilson, COR Email: nancy.h.wilson.civ@navy.mil Telephone: (757) 810-4936

Inspection Location

Inspection Destination Instructions: IAWSOW

DoDAAC: N42158 CountryCode: USA

NORFOLK NAVAL SHIPYARD GF

1 NORFOLK NAVAL SHIPYARD, BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

Nancy Wilson, COR Email: nancy.h.wilson.civ@navy.mil Telephone: (757) 810-4936

Continuation of Deliveries or Performance

Line Item Delivery Schedule Quantity Address and POC

Delivery Period From 17 Aug 2026 to 06 Jan 2027

Period of Performance From 17 Aug 2026 To 06 Jan 2027

1 Job Place of Performance DoDAAC: N42158 CountryCode: USA

NORFOLK NAVAL SHIPYARD GF

1 NORFOLK NAVAL SHIPYARD, BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

TBD, TBD

Email: TBD Telephone: TBD

Delivery Period From 17 Aug 2026 to 06 Jan 2027

Period of Performance From 17 Aug 2026 To 06 Jan 2027

1 Group Place of Performance DoDAAC: N42158 CountryCode: USA

NORFOLK NAVAL SHIPYARD GF

1 NORFOLK NAVAL SHIPYARD, BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

TBD, TBD

Email: TBD Telephone: TBD

Option Line Item

Delivery Period From 17 Aug 2026 to 06 Jan 2027

Period of Performance From 17 Aug 2026 To 06 Jan 2027

30 Days Service Performance Site DoDAAC: N42158 CountryCode: USA

NORFOLK NAVAL SHIPYARD GF

1 NORFOLK NAVAL SHIPYARD, BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

TBD, TBD

Email: TBD Telephone: TBD

Continuation of Accounting and Appropriation Data

Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (Deviation 2026- O0038)

Feb 2026

52.204-13 System for Award Management-Maintenance. (Deviation 2026-O0038) Feb 2026 52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026-O0038) Feb 2026 52.222-41 Service Contract Labor Standards. (Deviation 2026-O0038) Feb 2026 52.222-54 Employment Eligibility Verification. (Deviation 2026-O0038) Feb 2026 52.222-62 Paid Sick Leave Under Executive Order 13706. (Deviation 2026-O0038) Feb 2026 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023 52.233-3 Protest after Award. (Deviation 2026-O0038) Feb 2026 52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026-O0038) Feb 2026

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7004 Antiterrorism Awareness Training for Contractors. Jan 2023 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. May 2024

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

Jan 2023

252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region. Jun 2023 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.232-7010 Levies on Contract Payments. Dec 2006 252.247-7023 Transportation of Supplies by Sea. Oct 2024 252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011

FAR Clauses Incorporated by Full Text

52.222-42 Statement of Equivalent Rates for Federal Hires. (May 2014)

STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)

In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor ( ), this clause 29 CFR Part 4 identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.5341 or 5332.

This Statement is for Information Only: It is not a Wage Determination

Employee Class Monetary Wage-Fringe Benefits

23530 - Machinery Maintenance Mechanic 30.32

15090 - Technical Instructor 28.53

15095 - Technical Instructor/Course Developer 34.90

(End of clause)

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.

authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.

Protocol.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports WAWF payment instructions.

in WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s): Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

NOT APPLICABLE

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

2in1

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in Document routing.

WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC N50082

Issue By DoDAAC N42158

Admin DoDAAC N42158

Inspect By DoDAAC N42158

Ship To Code ____

Ship From Code ____

Mark For Code TBD

Service Approver (DoDAAC) N42158

Service Acceptor (DoDAAC) N42158

Accept at Other DoDAAC N42158

LPO DoDAAC N42158

DCAA Auditor DoDAAC ____

Other DoDAAC(s) 050120

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.

accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

TBD

(Contracting Officer: Insert applicable information or "Not applicable.")

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Additional Regulation or Supplemental Clauses Incorporated by Full Text

G-242-H001 - GOVERNMENT CONTRACTADMINISTRATION POINTS-OF-CONTACT AND

RESPONSIBILITIES (NAVSEA) (OCT 2023)

(Oct 2023)

(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.

(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel - that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.

(c) The points of contact are as follows:

(i) The Procuring Contracting Officer (PCO) is:

Name: Rebekah Riggins Phone: 757- 967-4014 E-mail: rebekah.r.riggins.civ@us.navy.mil

(ii) The Contract Specialist is:

Name: Theresa Clark Phone: (757) 396-8345 E-mail: Theresa.m.clark36.civ@us.navy.mil

(d) The Contracting Officer's Representative (COR) is the contracting officer's appointed representative for technical matters. The COR is not a contracting officer and does not have the authority to direct the accomplishment of effort which is beyond the scope of the contract or to otherwise change any contract requirements. An informational copy of the COR appointment letter, which provides a delineation of COR authority and responsibilities, will be provided upon award of this contract.

The Contracting Officer's Representative (COR) is:

Name: TBD Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(e) The Alternate Contracting Officer's Representative (ACOR) is responsible for COR responsibilities and functions in the event that the COR is unavailable due to leave, illness, or other official business. The ACOR is appointed by the contracting officer; a copy of the ACOR appointment will be provided upon award of this contract.

The Alternate Contracting Officer's Representative (ACOR) is:

Name: TBD Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(f) The Technical Point of Contact (TPOC) is the contracting officer's representative for technical matters when a COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government Furnished Material (GFM) and Government Furnished Equipment (GFE) if specified in the contract as well as the inspection and acceptance of all contract deliverables.

The Technical Point of Contact (TPOC) is:

Name: TBD Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(g) The Alternate Technical Point of Contact (ATPOC) is responsible for TPOC responsibilities and functions in the event that the TPOC is unavailable due to leave, illness, or other official business.

The Alternate Technical Point of Contact (ATPOC) is:

Name: TBD Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(j) The Contractor's point of contact for performance under this contract is:

Name: TBD Address:

[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(End of Text)

Addendum to 52.212-4, Contract Terms and Conditions - Commercial Products and Commercial Services

Contract Terms and Conditions Required To Implement Statutes or Executive Orders — Commercial Products and Commercial Services

Addendum to Contract Clauses

Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.204-9 Personal Identity Verification of Contractor Personnel. Jan 2011

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation 2026- O0038)

Feb 2026

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026-O0038)

Feb 2026

52.222-3 Convict Labor. (Deviation 2026-O0038) Feb 2026

52.222-90 Addressing DEI Discrimination by Federal Contractors. (Deviation 2026-O0040, Revision 1)

Apr 2026

52.240-91 Security Prohibitions and Exclusions. (Deviation 2026-O0038) Feb 2026

52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026- O0038)

Apr 2026

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. Jan 2023 252.201-7000 Contracting Officer's Representative. Dec 1991

FAR Clauses Incorporated by Full Text

52.252-2 Clauses Incorporated by Reference. (Feb 1998)

CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

FAR Clauses: https://www.acquisition.gov/far-overhaul/far-part-deviation-guide DFARS Clauses: https://www.acq.osd.mil/dpap/dars [Insert one or more Internet/dfars_far_overhaul_class_deviations.html NMCARS: https://www.secnav.navy.mil/rda/DASN-P/Pages/NMCARS.aspx addresses]

(End of clause)

52.252-6 Authorized Deviations in Clauses. (Nov 2020)

AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any [insert regulation name] (48 Defense Acquisition Regulations System, Department of Defense CFR ) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.2

(End of clause)

52.217-9 Option to Extend the Term of the Contract. (Mar 2000)

OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within [insert the period of time within which the 30 Contracting Officer may exercise the option]; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least days[ ] before the contract expires. The preliminary notice does not commit the 30 60days unless a different number of days is inserted Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed (months) (years).1 month

(End of clause)

52.217-8 Option to Extend Services. (Nov 1999)

OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within [insert the period of time within which the Contracting Officer may exercise the option].30

(End of clause)

Additional Regulation or Supplemental Clauses Incorporated by Full Text

C-223-W002 ON-SITE SAFETY REQUIREMENTS (NAVSEA) (OCT 2018) (Oct 2018)

(a) The contractor shall ensure that each contractor employee reads any necessary safety documents within 30 days of commencing performance at any Government facility. Required safety documents can be obtained from the respective safety office. Contractors shall notify the Safety office points of contact below to report completion of the required training via email. The email shall include the contractor employee's name, work site, and contract number.

(b) It is expected that contractor employees will have received training from their employer on hazards associated with the areas in which they will be working and know what to do in order to protect themselves. Contractors are required to adhere to the requirements of 29 CFR 1910, 29 CFR 1926 and applicable state and local requirements while in Government spaces. The contractor shall ensure that all on-site contractor work at the Government facility is in accordance with any local safety instructions as provided via the COR. The contractor shall report all work-related injuries/illnesses that occurred while working at the Government site to the COR.

(c) Contractors whose employees perform work within Government spaces in excess of 1000 hours per calendar quarter during a calendar year shall submit the data elements on OSHA Form 300A, Summary of Work Related Injuries and Illnesses, for those employees to the safety office via the COR by 15 January for the previous calendar year, even if no work related injuries or , illnesses occurred. If a contractor's injury/illness rates are above the Bureau of Labor Statistics industry standards, a safety assessment may be performed by the Safety Office to determine if any administrative or engineering controls can be utilized to prevent further injuries/illnesses, or if any additional Personal Protective Equipment or training will be required.

(d) Any contractor employee exhibiting unsafe behavior may be removed from the Government site. Such removal shall not relieve the contractor from meeting its contractual obligations and shall not be considered an excusable delay as defined in FAR 52.249-14.

(e) The Safety Office points of contacts are as follows:

TBD

(End of Text)

E-246-H008 PRELIMINARY ACCEPTANCE (NAVSEA) (OCT 2018) (Oct 2018)

Upon satisfactory completion of the applicable trial requirements and upon delivery as provided in Section F of this contract, each vessel shall be preliminarily accepted.

(End of Text)

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (Oct 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as "protected information". File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

(End of Text)

C-215-H001 PRICE ADJUSTMENT FOR CHANGES IN FEDERAL LAW (NAVSEA) (OCT 2018) (Oct 2018)

(a) Definitions

(1) For the purpose of this requirement:

(i) The term "Currently Applicable Federal Laws" is defined to mean and include only the statutes listed below and regulations thereunder, promulgated by Federal authorities as in effect on the date of contract award.

(A) Contract Work Hours and Safety Standards Act

(B) Occupational Safety and Health Act

(C) Atomic Energy Act

(D) National Environmental Policy Act

(E) Clean Air Act

(F) Clean Water Act

(G) Refuse Act

(H) Noise Control Act

(I) Toxic Substances Control Act

(J) Solid Waste Disposal Act

(K) Marine Protection, Research and Sanctuaries Act

(L) Comprehensive Environmental Response, Compensation, and Liability Act

(M) Act to Prevent Pollution from Ships

(N) Hazardous Materials Transportation Act

(ii) The term "New Federal Law" is defined to mean a new Federal Statute enacted subsequent to the contract award date pertaining to (1) workplace conditions affecting employees or the public, or (2) environmental standards and requirements, and regulations thereunder promulgated by Federal authorities.

(iii) The term "change" shall be deemed to mean the amendment or repeal of any Currently Applicable Federal Law or New Federal Law or regulations promulgated thereunder by Federal authorities.

(b) If, at any time after the effective date of this contract, a New Federal Law is enacted or a change is made to a Currently Applicable Federal Law or a New Federal Law or regulations thereunder promulgated by Federal authorities, and compliance with such new law or change directly results in an increase or decrease in the Contractor's cost of performance of this contract, the contract price(s) shall be adjusted as provided in paragraph (c) below. No such adjustment shall be made for contract costs incurred or projected to be incurred during the two (2) year period after the effective date of this contract.

(c) The price adjustment provided for in paragraph (b) above shall be made, in the same amount, in each of the Target Cost(s), the Target Price(s), and the Ceiling Price(s) or Fixed Price(s) of this contract, as appropriate, and shall include only the properly allowable and allocable direct and indirect costs of additional labor and materials directly resulting from compliance with the new law or with the change, but shall not include:

(1) Costs of delay, disruption, or acceleration of performance;

(2) Increases or decreases in prices charged by subcontractors or suppliers; or

(3) Costs of additional facilities or of any portion thereof constructed or acquired after the contract award date unless such additional facilities or the portion thereof have been constructed or acquired by the Contractor solely in order to comply with a New Federal law or a change in Currently Applicable Federal Laws or New Federal Laws, or regulations thereunder promulgated by Federal authorities.

The price adjustment shall consider and exclude any tax, depreciation, or other special allowances provided to the Contractor in the New Federal Law or change for compliance therewith. No adjustment shall be made in the Profit or Delivery Schedule of the contract, provided, however, that the Contractor's right, if any, to extension of the delivery schedule under any other requirement of this contract shall not be prejudiced thereby. No adjustment shall be made unless a New Federal Law or a change directly causes an increase or decrease in the Contractor's cost of performance of this contract in excess of $250,000 per ship.

(d) The Contractor shall promptly notify the Contracting Officer, in writing, of the enactment of New Federal Laws or of a change that reasonably may be expected to result in an adjustment under the provisions of this requirement.

(e) Requests for price adjustments hereunder shall be made in accordance with the procedures of the contract requirement entitled "Documentation of Requests for Equitable Adjustment".

(End of Text)

E-246-W007 NOTIFICATION OF INSPECTION OR TEST (NAVSEA) (OCT 2018) (Oct 2018)

The Contractor agrees to notify _______________________________ , in writing, when the material will be inspected and/or tested. A minimum of _____ working days is required to arrange such a visit.

(End of Text)

C-222-H001 ACCESS TO THE VESSELS BY NON-U.S. CITIZENS (NAVSEA) (APR 2019) (Apr 2019)

(a) No person not known to be a U.S. citizen shall be eligible for access to naval vessels, work sites and adjacent areas when said vessels are under construction, conversion, overhaul, or repair, except upon a finding by COMNAVSEA or his designated representative that such access should be permitted in the best interest of the United States. The Contractor shall establish procedures to comply with this requirement and NAVSEAINST 5510.2D.

(b) If the Contractor desires to employ non-U.S. citizens in the performance of work under this contract or agreement that requires access as specified in paragraph (a) of this requirement, approval must be obtained prior to access for each contract or agreement where such access is required. To request such approval for non-U.S. citizens of friendly countries, the Contractor shall submit to the cognizant Contract Administration Office (CAO), an Access Control Plan (ACP) which shall contain as a minimum, the following information:

(1) Badge or Pass oriented identification, access, and movement control system for non-U.S. citizen employees with the badge or pass to be worn or displayed on outer garments at all times while on the Contractor's facilities and when performing work aboard ship.

(i) Badges must be of such design and appearance that permits easy recognition to facilitate quick and positive identification.

(ii) Access authorization and limitations for the bearer must be clearly established and in accordance with applicable security regulations and instructions.

(iii) A control system, which provides rigid accountability procedures for handling lost, damaged, forgotten or no longer required badges, must be established.

(iv) A badge or pass check must be performed at all points of entry to the Contractor's facilities or by a site supervisor for work performed on vessels outside the Contractor's plant.

(2) Contractor's plan for ascertaining citizenship and for screening employees for security risk.

(3) Data reflecting the number, nationality, and positions held by nonU.S. citizen employees, including procedures to update data as nonU.S. citizen employee data changes, and pass to cognizant CAO

(4) Contractor's plan for ensuring subcontractor compliance with the provisions of the Contractor's ACP.

(5) These conditions and controls are intended to serve as guidelines representing the minimum requirements of an acceptable ACP. They are not meant to restrict the Contractor in any way from imposing additional controls necessary to tailor these requirements to a specific facility.

(c) To request approval for non-U.S. citizens of hostile and/or communist-controlled countries (listed in Department of Defense Industrial Security Manual, DOD 5220.22-M or available from cognizant CAO), Contractor shall include in the ACP the following employee data: name, place of birth, citizenship (if different from place of birth), date of entry to U.S., extenuating circumstances (if any) concerning immigration to U.S., number of years employed by Contractor, position, and stated intent concerning U.S. citizenship. COMNAVSEA or his designated representative will make individual determinations for desirability of access for the above group. Approval of ACP's for access of non-U.S. citizens of friendly countries will not be delayed for approval of non-U.S. citizens of hostile communist-controlled countries. Until approval is received, Contractor must deny access to vessels for employees who are non-U.S. citizens of hostile and/or communist-controlled countries.

(d) The Contractor shall fully comply with approved ACPs. Noncompliance by the Contractor or subcontractor serves to cancel any authorization previously granted, in which case the Contractor shall be precluded from the continued use of non-U.S.

citizens on this contract or agreement until such time as the compliance with an approved ACP is demonstrated and upon a determination by the CAO that the Government's interests are protected. Further, the Government reserves the right to cancel previously granted authority when such cancellation is determined to be in the Government's best interest. Use of non-U.S.

citizens, without an approved ACP or when a previous authorization has been canceled, will be considered a violation of security regulations. Upon confirmation by the CAO of such violation, this contract, agreement or any job order issued under this agreement may be terminated for default in accordance with the clause entitled "Default (Fixed-Price Supply And Service)" (FAR 52.249-8), "Default (Fixed-Price Research And Development)" (FAR 52.249-9) or "Termination (Cost Reimbursement)" (FAR 52.249-6), as applicable.

(e) Prime Contractors have full responsibility for the proper administration of the approved ACP for all work performed under this contract or agreement, regardless of the location of the vessel, and must ensure compliance by all subcontractors, technical representatives and other persons granted access to U.S. Navy vessels, adjacent areas, and work sites.

(f) In the event the Contractor does not intend to employ non-U.S. citizens in the performance of the work under this contract, but has non-U.S. citizen employees, such employees must be precluded from access to the vessel and its work site and those shops where work on the vessel's equipment is being performed. The ACP must spell out how non-U.S. citizens are excluded from access to contract work areas.

(g) The same restriction as in paragraph (f) above applies to other non-U.S. citizens who have access to the Contractor's facilities (e.g., for accomplishing facility improvements, from foreign crewed vessels within its facility, etc.) except that, with respect to access to the vessel and worksite, the restrictions shall not apply to uniformed U.S. Navy personnel who are non-U.S.

citizens and who are either assigned to the ship or require access to the ship to perform their duties.

(End of Text)

C-217-H005 GROWTH AND NEW WORK (NAVSEA) (JAN 2019) (Jan 2019)

(a) The Contractor is required to notify the Contracting Officer via email regarding growth and new work within 30 days of discovery:

(1) of any apparent errors or omissions in the contract (SF 33, specifications, drawings, etc.); and,

(2) of any/all conflicts between the contract package and actual conditions observed during ship check(s) and/or contract execution.

(b) Growth work is synonymous with over and above work, which is described in DFARS 252.217-7028, Over and Above Work and it provides the process for adjudication.

(c) New work is distinguished from over and above work and is outside the scope of the competitively procured requirement. New work will be approved in accordance with FAR Part 6 and associated policies and procedures.

(d) The Government will NOT negotiate modifications to increase the contract price to address errors or omissions to the contract package which were reasonably apparent to the contractor prior to proposal submission.

(End of Text)

C-211-H001 ACCESS TO THE VESSEL(S) (Oct 2018)

Officers, employees and associates of other prime Contractors with the Government and their subcontractors, shall, as authorized by the Supervisor, have, at all reasonable times, admission to the plant, access to the vessel(s) where and as required, and be permitted, within the plant and on the vessel(s) required, to perform and fulfill their respective obligations to the Government. The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Supervisor to be given admission to the plant and access to the vessel(s) for office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of the respective responsibilities involved, and reasonable to their performance.

(End of Text)

G-232-H002 H002 PAYMENT INSTRUCTIONS (NAVSEA) (FEB 2024) (Feb 2024)

Payment office allocation methods can be found in the table at DFARS PGI 204.7108(b)(2) (https://www.acq.osd.mil/dpap /dars/pgi/pgi_htm/current/PGI204_71.htm#payment_instructions).

(End of text)

G-242-H002 HOURS OF OPERATION AND HOLIDAY SCHEDULE (NAVSEA) (JUL 2021) (Jul 2021)

(a) The policy of this activity is to schedule periods of reduced operations or shutdown during holiday periods. Deliveries will not be accepted on Saturdays, Sundays or Holidays except as specifically requested by the [insert activity name]. All goods or services attempted to be delivered on a Saturday, Sunday or Holiday without specific instructions from the Contracting Officer or his duly appointed representative will be returned to the contractor at the contractor's expense with no cost or liability to the U.

S. Government.

(b) The federal Government observes public Holidays that have been established under 5 U.S.C. 6103. The actual date of observance for each of the holidays, for a specific calendar year, may be obtained from the OPM website at OPM.GOV or by using the following direct link: https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/.

(c) Delayed Opening, Early Dismissal and Closure of Government Facilities. When a Government facility has a delayed opening, is closed or Federal employees are dismissed early (due to severe weather, security threat, security exercise, or a

N4215826Q00260001 https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/ https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays facility related problem) that prevents personnel from working, onsite contractor personnel regularly assigned to work at that facility shall follow the same reporting and/or departure directions given to Government personnel. The contractor shall not direct charge to the contract for such time off, but shall follow parent company policies regarding taking leave (administrative or other). Non-essential contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal, delayed opening, or during periods of inclement weather, onsite contractors should monitor the OPM website as well as radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.

(d) When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site contractors shall continue working established work hours or take leave in accordance with parent company policy. Those contractor employees who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, or closings in accordance with the FAR, applicable cost accounting standards, and the company's established policy and procedures. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The Contracting Officer will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy and procedures.

(e) If you intend to visit the Contracts Office, it is advised that you call for an appointment at least 24 hours in advance.

(f) The hours of operation are as follows:

AREA FROM TO

Norfolk Naval Shipyard Receiving Office, Bldg. 276 0720 1550

(g) All deliveries to the Receiving Officer, Norfolk Naval Shipyard Receiving Office, Bldg. 276 ,shall be made Monday through Friday from to , local time. Deliveries will not be accepted after . No deliveries will be accepted on federal government holidays.0720 1550 1550

(End of Text)

C-222-H002 DEPARTMENT OF LABOR SAFETY AND HEALTH STANDARDS FOR

SHIPBUILDING (NAVSEA) (OCT 2018)

(Oct 2018)

Attention of the Contractor is directed to Public Law 91596, approved December 29, 1970 (84 Stat. 1590, 29 USC 655) known as the "Occupational Safety and Health Act of 1970" and to the "Occupational Safety and Health Standards for Shipyard Employment" promulgated thereunder by the Secretary of Labor (29 CFR. 1910 and 1915). These regulations apply to all shipbuilding and related work, as defined in the regulations. Nothing contained in this contract shall be construed as relieving the Contractor from any obligations which it may have for compliance with the aforesaid regulations.

(End of Text)

B-232-H001 PAYMENTS--BASIC (NAVSEA) (JAN 2019) (Jan 2019)

(a) Computation of Payments

(1) Until such time as physical progress in the performance of work on a vessel is fifty percent (50%) complete, the Government, upon submission by the Contractor of invoices certified by the Contractor as hereinafter provided, will promptly make payments, on account of the total contract price(s), at ninety percent (90%) of the amount determined by multiplying the allocated total contract price of such vessel by the percentage of physical progress in the performance of work on such vessel as certified by the Contractor subject to the approval of the Supervisor; , that provided no such payment shall be made in an amount which when added to the total of all payments previously made with respect to such vessel under paragraph (a) of this requirement exceeds one hundred percent (100%) of the allowable costs certified by the Contractor on the related invoice to have been incurred in the performance of work on such vessel.

(2) After the percentage of physical progress in the performance of work on a vessel has reached fifty percent (50%), the Government, upon submission by the Contractor of invoices certified by the Contractor as hereinafter provided, will promptly make payments, on account of the total contract price(s), of one hundred percent (100%) of the amount determined by: (i) multiplying the allocated total contract price of such vessel by the percentage of physical progress in the performance of work on such vessel as certified by the Contractor subject to the approval of the Supervisor, and (ii) subtracting from that product five percent (5%) of the allocated total contract price of such vessel; , that no such provided payment shall be made in an amount which when added to the total of all payments made previously with respect to such vessel under paragraph

(a) of this requirement exceeds one hundred five percent (105%) of the allowable costs certified by the Contractor on the related invoice to have been incurred in the performance of work on such vessel; , , that the Contractor furnishes data on actual cumulative costs and provided further estimated future costs acceptable to the Supervisor which demonstrates to the satisfaction of the Supervisor that the Contractor will make a profit of at least five percent (5%) on completion of the contract, and the Contractor provides updated information on a quarterly basis. If updated data indicate the Contractor will not make a profit of at least five percent (5%) on completion of the contract, the progress payments shall be adjusted retroactively so that the total of all payments made with respect to the vessel under paragraph (a) of this requirement shall not exceed one hundred percent (100%) of the allowable costs certified by the Contractor on the related invoice to have been incurred in the performance of work on such vessel.

(b) Billing Price

(1) For the purpose of this requirement, until the establishment of the total final price(s) in accordance with paragraph (d) of the clause of this contract entitled "Incentive Price Revision--Firm Target (FAR 52.216-16)", the term "total contract price" means the billing price; initially the billing price shall be the initial total contract target price(s), and there after the billing price shall be revised as provided in paragraph (b)(2) below. After establishment of the total final price(s) in accordance with paragraph (d) of the "Incentive Price Revision--Firm Target (FAR52.216- 16)" clause, the billing price shall be the total final price(s) so established.

(2) Within fifteen (15) days after each calendar quarter the Contractor shall submit in writing a proposed revised billing price which shall be established as follows:

(i) The Contractor shall certify to the Contracting Officer the percentage of physical progress in the performance of the contract as a whole as of the end of the calendar quarter. Such percentage of physical progress shall be expressed as a decimal carried to four decimal places and shall be subject to the approval of the Supervisor.

(ii) The revised billing price shall be the sum of a projected final cost(s), and a projected profit, and the Total EPA Amount (positive or negative), as determined in the contract requirement entitled "Economic Price Adjustment", computed as follows:

(A) A projected final cost shall be computed by (i) determining the cumulative sum of the costs as of the end of the calendar quarter, and (ii) dividing this amount by the percentage of physical progress certified and approved as set forth in subparagraph (i) above. From this amount, the Total EPA Amount (positive or negative) incurred through the end of the applicable billing period, as determined in the contract requirement entitled "Economic Price Adjustment" will be subtracted.

(B) A projected profit shall be determined by applying to the projected final cost(s) as calculated in paragraph 2(ii)(A), the incentive formula set forth in paragraph(d)(2) of the "Incentive Price Revision--Firm Target (FAR 52.216-16)" clause.

(C) The sum of the projected final cost, as calculated in paragraph (A), and the projected profit, as calculated in paragraph (B), shall not exceed the total Ceiling Price set forth in Section B.

(D) The sum of (C) above and the EPA Adjustment amount (positive or negative) shall be the revised billing price; provided that in no event shall the revised billing price exceed the sum of (i) the product of four point zero (4.0) percentage points applied to the Section B Target Cost plus (ii) the Section B Ceiling Price.

(iii) The revised billing price determined as stated above shall be set forth separately in a supplemental agreement to this contract, which also shall set forth the computations upon which the revision of the billing price is based.

(iv) Any revision of the billing prices shall not affect the determination of the total final price(s) under paragraph (d) of the "Incentive Price Revision--Firm Target (FAR 52.216-16)" clause. After execution of the contract modification referred to in subparagraph (d)(3) of said clause, the total amount paid or to be paid on all invoices or vouchers shall be adjusted to reflect the total final price(s), and any additional payments, refunds, or credits resulting therefrom shall be promptly made.

(c)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .