SOLICITATION ADDENDUM ONE- QUESTIONS AND ANSWER.docx

DOCX document 27 KB Posted

Attached to
Television Broadcast Antenna and Transmission Line Removal and Installation at KUON-TV Transmission Tower
Solicitation number
123947 O5
Issued by
Blaine County, Nebraska

About this file

This is a Solicitation Addendum One containing Questions and Answers for Solicitation Number 123947 O5, issued by the State of Nebraska, Department of Administrative Services, Materiel Division, State Purchasing Bureau, on behalf of the Nebraska Educational Telecommunications Commission (NETC). The solicitation addresses television broadcast antenna and transmission line removal and installation services at KUON-TV's transmission tower in Ithaca (Mead), Nebraska. The project encompasses three phases: Phase 1 involves installation of a new UHF-27 auxiliary antenna and transmission line on the west side of the 234.7-meter tower at approximately 550 feet above ground level; Phase 2 requires removal and disposal of the existing VHF-12 main antenna and its transmission line; and Phase 3 involves installation of a new UHF-27 main antenna and associated transmission line at the tower top. The addendum, effective February 26, 2026, addresses clarifications submitted by prospective bidders, with the proposal opening scheduled for March 10, 2026, at 2:00 p.m. Central Time. The contract term is one year from execution with potential extension by mutual agreement.

Key clarifications provided in the addendum confirm that Dielectric antenna and transmission line materials have already been purchased and are required; no additional building permits are required; no adapter is needed for the 1 5/8" coax connection to the auxiliary antenna system; an auxiliary sweep test must be performed by the contractor prior to energizing the new installation; no bid bond or performance bond is required; and prevailing wage requirements do not apply to this state contract. All submissions must comply with OSHA safety requirements, and contractors must maintain comprehensive insurance coverage, obtain climber certification, and provide detailed site safety and rigging plans. Payment will be made in compliance with Nebraska's Prompt Payment Act within forty-five calendar days of invoice receipt, with no advance payments permitted. The specific contract award value is not disclosed in the solicitation documents.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION ADDENDUM ONE

QUESTIONS AND ANSWERS

SOLICITATION NUMBER: 123947 O5

Television broadcast antenna and transmission line removal and installation at KUON-TV transmission tower Opening Date: March 10, 2026 2:00 p.m. Central Time Addendum Effective Date: February 26, 2026

Questions and Answers

Following are the questions submitted and answers provided for the above-mentioned solicitation. The questions and answers are to be considered as part of the solicitation. It is the responsibility of bidders to check the State Purchasing Bureau website for all addenda or amendments.

Question Number
RFP

Section Reference

RFP

Page Number

Question
State Response

1.

After reviewing RFP 123947 O5 Section V (beginning on page 22), it appears that the antenna and rigid line manufacture has been decided. Per your documents, Dielectric Antenna and Dielectric Line is a requirement. Electronics Research, Inc. (ERI) would like to offer our products for the Aux Antenna, Main Antenna and Rigid Transmission Line; the Air Dielectric cable would be the same as listed). Please indicate if this contract will allow ERI products for us to bid.
No. These materials have already been purchased.

2.

With no mention of removing the aux antenna system and appears to be a new permanent installation on the tower, is there additional building permits required to be provided by the contractor?
No additional building permits required.

3.

With the 1 5/8” coax for the aux antenna, no line items showed and adapter for the connection to the existing system. Is there an adapter to connect to the existing 6” line or switch panel to accommodate the smaller connector?
No adaptor needed. No connection to existing 6” line required.

4.

With the new aux appearing to be a permanent installation, is a sweep test to be performed prior to energizing? If so, is that required to be performed by the contractor?
Yes, an aux sweep test is needed and is to be performed by the contractor.

5.

No mention of a Bond requirement. Can you confirm there is NO bid bond or performance bond requirements?
Confirmed, no bid bond or performance bond required.

6.

No mention of prevailing wage requirements. Can you confirm there is no prevailing wage requirements?
The State does not have specific prevailing wage requirements.

This addendum will be incorporated into the solicitation.

SPB Form 26 Last Revised 4-17-2025