This is a Request for Quotation (RFQ) for construction services to repair critical waterborne vessel barrier systems at Hoover Dam, issued by the U.S. Department of the Interior, Bureau of Reclamation, Lower Colorado Region.
The project involves two primary line items: (1) Lakeside (Upstream) Water Barrier/Boomline Repair and (2) Lakeside (Upstream) Vessel Gate Replacement Installation. The work is classified as a simplified acquisition for construction alteration estimated between $25,000 and $100,000. Contractor employees performing installation must be paid in accordance with Davis-Bacon wage rates. Quotes are due by May 14, 2026 at 1600 hours local time and must be submitted electronically to Jennalyn Kent at jennalyn_kent@ios.doi.gov. The contractor shall commence work within 14 calendar days of notice of award and complete all work within 60 calendar days. Performance bonds are required if the contract exceeds $150,000. Award will be made to the responsible offeror submitting the lowest price, with all proposals evaluated for price reasonableness and unbalanced pricing. The contracting officer is Luis Gallardo (Yuma Area Office), and the contract specialist is Jennalyn Kent (Boulder City Office). Contractor responses must include representations and certifications, completed SF-1442 pricing forms, and a technical narrative demonstrating a viable approach to completing the Statement of Work. The Statement of Work requires repair and certification of the existing boom line and installation of a Government-owned vessel exclusion barrier gate, with proof of ASTM Standard F2766-11 certification required for any vessel exclusion barrier proposed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140R3026Q0038_Amd_0001.pdf | ||
| Solicitation_140R3026Q0038_Amendment1_0001.pdf | ||
| Att2_WageDeterminations.pdf | ||
| Att1_SOW.pdf | ||
| Att3_DI-137_Release_of_Claims.pdf | ||
| Sol_140R3026Q0038.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 140R3026Q0038 Contract No. TBD Simplified Acquisition, Construction
Lakeside Vessel Barrier Gate Repair at Hoover Dam
U.S. Department of the Interior Bureau of Reclamation Interior Region 8: Lower Colorado Basin
This page intentionally left blank.
FOREWORD
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at Hoover Dam
Page i
The Bureau of Reclamation, Lower Colorado Basin, Lower Colorado Dams Office, Hoover Dam, has a requirement to repair critical waterborne vessel barrier systems on the lakeside (upstream) portion of Hoover Dam. The project includes installation of a Government‑owned lakeside vessel exclusion barrier gate, including repair and certification of the existing boom line.
ALTERATION OF REAL PROPERTY: The Department of Labor determines any contract that requires the alteration of real property over $2,000 shall include construction clauses. Therefore, the installation is considered construction and is subject to the construction clauses herein. The Contractor's employees performing installation shall be paid in accordance with Davis-Bacon wage rates.
MAGNITUDE OF CONSTRUCTION PROJECTS: This construction project is estimated to be between $25,000 and $100,000.
WRITTEN QUESTIONS: Reclamation will only accept written questions for this RFQ. Please submit all written questions pertaining to this RFQ to Jennalyn Kent (jennalyn_kent@ios.doi.gov) no later than Monday, April 20, 2026. The subject line shall clearly reference the RFQ Number associated with this RFQ. No questions will be entertained after this date.
For date and place of receipt of offerors, see “Solicitation, Offer, And Award,” Standard Form 1442 in Section A.
OTHER NOTES TO VENDORS:
(a) For information regarding Bureau of Reclamation’s publication “Reclamation Safety and Health Standards" (2009 Edition as revised, with revisions at http://www.usbr.gov/ssle/safety/RSHS/rshs.html ) which is applicable to work to be performed, see clause WBR 1452.223-81 Safety and Health.
(b) System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212- 3, Offeror Representations and Certifications-Commercial Products and Commercial Services.
Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
Project Title Lakeside Vessel Barrier Gate Repair at
Page ii
TABLE OF
CONTENTS
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page iii
TABLE OF CONTENTS
FOREWORD i-ii
TABLE OF CONTENTS iii-iv
PART I – THE SCHEDULE
SECTION A – Solicitation/Contract Form - Solicitation, Offer, and Award (Construction, Alteration or Repair) SF-1442
A-1
SECTION B - Supplies or Services and Prices/Costs B-1
SECTION C – Description/Specifications/Statement of Work C-1
SECTION D - Packaging and Marking - There are no clauses in this section D-1
SECTION E - Inspection and Acceptance E-1
SECTION F - Deliveries or Performance F-1
SECTION G - Contract Administration Data G-1
SECTION H - Special Contract Requirements - There are no clauses in this section H-1
PART II - CONTRACT CLAUSES
SECTION I - Contract Clauses I-1
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J - List of Attachments J-1
PART IV-REPRESENTATIONS AND INSTRUCTIONS
(This part will be removed after award.)
SECTION K - Representations, Certifications and Other Statements of Offerors K-1
SECTION L - Instructions, Conditions and Notices to Offerors L-1
SECTION M - Evaluation Factors for Award M-1
TABLE OF
CONTENTS
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page iv
This page intentionally left blank
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NO.
5. REQUISITION/PURCHASE REQUEST NO.
CODE
6. PROJECT NO.
8. ADDRESS OFFER TO
4. CONTRACT NO.
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
NEGOTIATED (RFP) REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF
SEALED BID (IFB) INVITATION FOR BID
9. FOR
INFORMATION CALL
PAGES
Lower Colorado Region Regional Office 500 Fir Street Boulder City NV 89005
See Schedule
R30
Jennalyn Kent 7022938030
04/15/2026
05/14/2026
14 60
Attachment 1 - Statement of Work
1 3
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Continued...
AMENDMENT
NUMBER
DATE.
Lower Colorado Region Regional Office 500 Fir Street Boulder City NV 89005
R30
Luis Gallardo
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
NAICS: 237990
PROJECT TITLE: Hoover Dam Vessel Barrier
Project
Delivery: 05/08/2026
Delivery Location Code: 0011285631
Bureau of Reclamation-LC-Hoover Dam
Hoover Dam Central Warehouse
State Route 172
S. US Hwy 93/NV Rte 172
Boulder City NV 89005-0400 US
Period of Performance: 05/25/2026 to
07/24/2026
00010 Riverside Water Barrier (Boomline)
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
Requisition No: 0044038147
All work shall be performed in accordance with the attached Statement of Work.
00020 Lakeside Vessel Barrier Gate Replacement
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
Requisition No: 0044036292
All work shall be performed in accordance with the attached Statement of Work.
Section A – Solicitation/ Contract Form
Project Title Lakeside Vessel Barrier Gate Repair at
Page A-4
Section B – Supplies or Services and Prices/Costs
Page B-1
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 THE REQUIREMENT
(a) The Contractor shall furnish the items identified in this Section, in accordance with the terms, conditions, and specifications contained in the contract.
(b) Vendors are cautioned to carefully review the quote submission requirements contained in Section L. Failure to comply with these requirements may result in a quote being determined unacceptable.
(c) Quotes will be considered for award on the schedule in Paragraph B.2, but no quote will be considered for award for only a part of the schedules or a part of any single schedule. Quotes for only a part of the schedules or parts of a single schedule may be determined unacceptable.
(d) Vendors shall complete the schedule(s) in Section B and Solicitation, Offer, and Award (Construction, Alteration or Repair) SF-1442
(e) IMPORTANT NOTE: The requirement for submission of performance and payment bonds is applicable for construction in excess of $150,000.00.
B.2 PRICE SCHEDULE
PRICE SCHEDULE
Line Item
Supplies/Services Quantity Unit Unit Price Total
10 Lakeside (Upstream) Water Barrier/Boomline Repair
Lump Sum $ $
20 Lakeside (Upstream) Vessel Gate Replacement Installation
Lump Sum $ $
Total for Schedule $
Section B – Supplies or Services and Prices/Costs
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page B-2
Section C – Description and Specifications
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page C-1
SECTION C – DESCRIPTION/SPECIFICATIONS/ STATEMENT OF WORK
C.1 DESCRIPTION/SPECIFICATIONS/ STATEMENT OF WORK
The Contractor shall furnish the necessary personnel, materials, equipment, services, and facilities (except as otherwise specified) to perform the requirement specified in the Statement of Work and Exhibits contained in Attachment 1 of this RFQ.
Section C – Description and Specifications
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page C-2
Section D – Packaging and Marking
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page D-1
SECTION D – PACKAGING AND MARKING
(There is no additional information in this section)
Section D – Packaging and Marking
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page D-2
Section E – Inspection and Acceptance
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page E-1
SECTION E – INSPECTION AND ACCEPTANCE
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations (FAR) clauses: https://www.acquisition.gov/browse/index/far
In addition, clauses can be identified as follows:
FAR - by the number prefix 52, e.g. 52.252-01, etc.; and
The following referenced clauses are hereby incorporated into and made a part of this contract.
Clause Title Date 52.246-12 Inspection of Construction August 1996
Section E – Inspection and Acceptance
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page E-2
Section F – Deliveries or Performance
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page F-1
SECTION F – DELIVERIES OR PERFORMANCE
F.1 52.252-02 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations (FAR) clauses: https://www.acquisition.gov/browse/index/far
In addition, clauses can be identified as follows:
FAR - by the number prefix 52, e.g. 52.252-01, etc.; and
The following referenced clauses are hereby incorporated into and made a part of this contract.
Clause Title Date 52.242-14 Suspension of Work April 1984
F.2 52.211-10
COMMENCEMENT, PROSECUTION, AND
COMPLETION OF WORK
APRIL 1984
The Contractor shall be required to:
(a) Commence work under this contract within 14 calendar days after the date the Contractor receives the notice of award,
(b) Prosecute the work diligently, and
(c) Complete the entire work ready for use not later than 60 calendar days after receipt of Notice of Award. The time stated for completion shall include final cleanup of the premises.
Section F – Deliveries or Performance
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page F-2
This page left intentionally blank.
Section G – Contract Administration Data
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page G-1
SECTION G – CONTRACT ADMINSTRATION DATA
G.1 1452.201-70 AUTHORITIES AND DELEGATIONS SEPTEMBER 2011
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.
The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.
Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representatives(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph
(d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the risk of the Contractor.
Administration Data
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page G-2
G.2 WBR
1452.201-80
CONTRACTING OFFICER’S REPRESENTATIVE’S
AUTHORITIES AND LIMITATIONS -- BUREAU OF
RECLAMATION
MAY 2018
(a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer’s Representative (COR). The term “technical direction” is defined to include, without limitation:
(1) Inspecting and accepting or rejecting work performed under the contract.
(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.
(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.
(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR’s authority to act on behalf of the Contracting Officer.
(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract; therefore, the COR does not have the authority to, and may not, issue any technical direction that –
(1) Constitutes a direction of additional work outside the Contract requirements;
(2) Constitutes a change as defined in the contract clause entitled “Changes;”
(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;
(4) Changes any of the expressed terms, conditions or specifications of the contract; or
(5) Interferes with the Contractor’s right to perform the terms and conditions of the contract.
(d) All technical direction shall be issued in writing by the COR.
(c) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause.
If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must –
Administration Data
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page G-3
(1) Advise the Contractor in writing after receipt of the Contractor’s letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or
(2) Advise the Contractor that the Government will issue a written change order.
(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”
G.3 ELECTRONIC INVOICING AND PAYMENT
REQUIREMENTS – INTERNET PAYMENT
PLATFORM (IPP)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
None.
Concurrent to submitting an invoice in IPP, the contractor shall submit supporting documentation to the contract specialist via email at jennalyn_kent@ios.doi.gov. Contractors are cautioned that supporting documentation e-mailed to the contracting officer must not conflict with the IPP submission. Conflicts between the IPP submission and supporting documentation may result in a delay in approval and/or rejection of submitted invoices.
When e-mailing the invoice and supporting documentation to the contract specialist, the subject line of the email shall be formatted as follows: Contract Number, Invoice Number, Contract Specialist's last name (e.g., 140R3026P00000_Invoice No. 1_Smith). The invoice shall be attached to the email and named using the following format: Contract Number, Contractor Name, Invoice Number, Invoice Amount (e.g., 140R3026P00000_World Test, Inc. - Inv. No. 1 - $5,678).
Invoices shall not include information that would compromise Personally Identifiable Information, such as full social security numbers, dates of birth, etc. The final invoice shall be submitted and will be approved in accordance with payment terms and conditions contained in the contract, after all, if any, settlement actions are complete. The contractor must clearly identify the last payment request as the ‘Final Invoice’.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5
Administration Data
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page G-4 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone
(866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
G.4 GOVERNMENT ADMINISTRATION PERSONNEL
The Contracting Officer responsible for this contract is:
Luis Gallardo, Contracting Officer (LC-10300) Bureau of Reclamation
Yuma Area Office 7301 Calle Agua Salada Yuma, AZ 85364 Phone No.: 928-343-8129 Facsimile No.: 928-343-8568 E-mail: luis_gallardo@ios.doi.gov
The Contract Specialist who is responsible for overall administration of this contract is:
Jennalyn Kent, Contract Specialist (LC-10303) Bureau of Reclamation P.O. Box 61470
Boulder City, NV 89006-1470 Phone No.: 702-293-8030 Facsimile No.: 702-293-8499 E-Mail: jennalyn_kent@ios.doi.gov
G.5 CONTRACTOR'S ADMINISTRATION PERSONNEL
The designated contractor official who will be in charge of overall administration of this contract
Name: ________________________________________________ Title: _________________________________________________ Address: ______________________________________________
City/State/Zip: _________________________________________ Telephone No: _________________________________________ Facsimile No.: __________________________________________ (Complete and submit with Quote.)
Section H – Special
Requirements
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page H-1
SECTION H – SPECIAL CONTRACT REQUIREMENTS
(There is no additional information in this section.)
Section H – Special
Requirements
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page H-2
Section I – Contract Clauses
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page I-1
SECTION I – CONTRACT CLAUSES
I.1 52.252-02 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations (FAR) clauses: https://www.acquisition.gov/browse/index/far and Revolutionary FAR Overhaul (RFO) clauses: https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
In addition, clauses can be identified as follows:
FAR - by the number prefix 52, e.g. 52.252-01, etc.
RFO - by the “RFO” text in front of the clause number
The following referenced clauses are hereby incorporated into and made a part of this contract.
Clause Title Date 52.203-17 Contractor Employee Whistleblower Rights November 2023 52.203-19 Prohibition on Requiring Certain Internal Confidentiality
Agreements or Statements January 2017
RFO 52.204-13 System for Award Management – Maintenance (DEVIATION 03/31/2026)
October 2018
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations
November 2026
RFO 52.213-04 Terms and Conditions--Simplified Acquisitions (Noncommercial) (DEVIATION 03/31/2026)
March 2026
52.222-03 Convict Labor June 2003 52.222-06 Construction Wage Rate Requirements August 2026 52.222-07 Withholding of Funds May 2026 52.222-08 Payrolls and Basic Records July 2026 52.222-10 Compliance with Copeland Act Requirements February 1988 52.222-11 Subcontracts (Labor Standards) May 2026 52.222-12 Contract Termination-Debarment May 2026 52.222-13 Compliance with Construction Wage Rate Requirements and
Related Regulations May 2026
52.222-14 Disputes Concerning Labor Standards February 1988 52.222-15 Certification of Eligibility May 2026 52.222-19 Child Labor-Cooperation with Authorities and Remedies March 2026 52.222-35 Equal Opportunity for Veterans June 2020 52.222-36 Equal Opportunity for Workers with Disabilities June 2020 52.222-37 Employment Reports on Veterans June 2020 52.222-50 Combating Trafficking in Persons October 2025 52.222-55 Minimum Wages for Contractor Workers Under Executive
Order 14026 January 2022
52.222-62 Paid Sick Leave Under Executive Order 13706 January 2022 52.223-05 Pollution Prevention and Right-to-Know Information May 2024 52.223-11 Ozone-Depleting Substances and High Global Warming May 2024
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page I-2
Potential Hydrofluorocarbons
52.222-20 Aerosols May 2024 52.222-21 Foams May 2024 52.225-09 Buy American-Construction Materials October 2026 52.225-13 Restrictions on Certain Foreign Purchases February 2021 RFO 52.226-07 Drug Free Workplace (DEVIATION 03/31/2026) May 2024 RFO 52.226-08 Encouraging Contractor Policies to Ban Text Messaging While
Driving (DEVIATION 03/31/2026) May 2024
52.228-02 Additional Bond Security October 1997 52.228-11 Individual Surety-Pledge of Assets February 2026 52.228-14 Irrevocable Letter of Credit November 2026 52.232-23 Assignment of Claims May 2026 52.232-25 Prompt Payment January 2017 52.232-33 Payment by Electronic Funds Transfer-System for Award
Management October 2018
52.232-39 Unenforceability of Unauthorized Obligations June 2013 52.233-01 Disputes May 2014 52.233-03 Protest After Award August 1996 52.233-04 Applicable Law for Breach of Contract Claim October 2004 RFO 52.236-02 Differing Site Conditions (DEVIATION 01/30/2026) April 1984 RFO 52.236-03 Site Investigation and Conditions Affecting the Work
(DEVIATION 01/30/2026)
April 1984
RFO 52.236-05 Material and Workmanship (DEVIATION 01/30/2026) April 1984 RFO 52.236-06 Superintendence by the Contractor (DEVIATION 01/30/2026) April 1984 RFO 52.236-07 Permits and Responsibilities (DEVIATION 01/30/2026) November 1991 RFO 52.236-08 Other Contracts (DEVIATION 01/30/2026) April 1984 RFO 52.236-09 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (DEVIATION 01/30/2026) April 1984
RFO 52.236-10 Operations and Storage Areas (DEVIATION 01/30/2026) April 1984 RFO 52.236-11 Use and Possession Prior to Completion (DEVIATION
01/30/2026) April 1984
RFO 52.236-12 Cleaning Up (DEVIATION 01/30/2026) April 1984 RFO 52.236-13 Accident Prevention (DEVIATION 01/30/2026) November 1991 RFO 52.236-14 Availability and Use of Utility Services (DEVIATION
01/30/2026) April 1984
RFO 52.236-21 Specifications and Drawings for Construction (DEVIATION 01/30/2026)
February 1997
RFO 52.243-05 Changes and Changed Conditions (DEVATION 10/01/2025) April 1984 52.245-01 A1 Government Property - Alternate I (April 2012) September 2021 52.246-21 A1 Warranty of Construction - Alternate I (April 1984) March 1994 52.249-10 Default (Fixed-Price Construction) April 1984 52.253-01 Computer Generated Forms January 1991
I.2 52.222-09 APPRENTICES AND TRAINEES (DEVIATION FEB
2025)
JUL 2005
(a) Apprentices.(1) An apprentice will be permitted to work at less than the predetermined rate for the
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page I-3 work performed when employed-
(i) Pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer, and Labor Services (OATELS) or with a State Apprenticeship Agency recognized by the OATELS; or
(ii) In the first 90 days of probationary employment as an apprentice in such an apprenticeship program, even though not individually registered in the program, if certified by the OATELS or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice.
(2) The allowable ratio of apprentices to journeymen on the job site in any craft classification shall not be greater than the ratio permitted to the Contractor as to the entire work force under the registered program.
(3) Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated in paragraph (a)(1) of this clause, shall be paid not less than the applicable wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed.
(4) Where a Contractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman’s hourly rate) specified in the Contractor’s or subcontractor’s registered program shall be observed. Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice’s level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination.
(5) Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination.
(6) In the event OATELS, or a State Apprenticeship Agency recognized by OATELS, withdraws approval of an apprenticeship program, the Contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved.
(b) Trainees.(1) Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and individually registered in a program which has received prior approval, evidenced by formal certification by the U.S.
Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer, and Labor Services (OATELS). The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by OATELS.
(2) Every trainee must be paid at not less than the rate specified in the approved program for the trainee’s level of progress, expressed as a percentage of the journeyman hourly rate specified in the
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page I-4 applicable wage determination. Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed in the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate in the wage determination which provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate who is not registered and participating in a training plan approved by the OATELS shall be paid not less than the applicable wage rate in the wage determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate in the wage determination for the work actually performed.
(3) In the event OATELS withdraws approval of a training program, the Contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved.
I.3 52.223-02 REPORTING OF BIOBASED PRODUCTS UNDER
SERVICE AND CONSTRUCTION CONTRACTS
(DEVIATION FEB 2025)
MAY 2024
(a) Definitions. As used in this clause—
Biobased product means a product determined by the U.S. Department of Agriculture (USDA) to be a commercial product or industrial product (other than food or feed) that is composed, in whole or in significant part, of biological products, including renewable domestic agricultural materials and forestry materials, or that is an intermediate ingredient or feedstock. The term includes, with respect to forestry materials, forest products that meet biobased content requirements, notwithstanding the market share the product holds, the age of the product, or whether the market for the product is new or emerging. ( 7
U.S.C. 8101) ( 7 CFR 4270.2).
USDA-designated product category means a generic grouping of products that are or can be made with biobased materials—
(1) That are listed by USDA in a procurement guideline available at https://www.biopreferred.gov/resources/categories.html; and
(2) For which USDA has provided purchasing recommendations (available at https://www.biopreferred.gov or 7 CFR part 4270).
(b) The Contractor shall report to https://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any biobased products in USDA-designated product categories purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(c)Submit this report no later than—
(1) October 31 of each year during contract performance; and
(2) At the end of contract performance.
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page I-5
I.4 52.223-23 SUSTAINABLE PRODUCTS AND SERVICES
(DEVIATION FEB 2025)
MAY 2024
Biobased product means a product determined by the U.S. Department of Agriculture (USDA) to be a commercial product or industrial product (other than food or feed) that is composed, in whole or in significant part, of biological products, including renewable domestic agricultural materials and forestry materials, or that is an intermediate ingredient or feedstock. The term includes, with respect to forestry materials, forest products that meet biobased content requirements, notwithstanding the market share the product holds, the age of the product, or whether the market for the product is new or emerging. (7 U.S.C.
8101) (7 CFR part 4720.2).
Recovered material means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process. ( 42 U.S.C. 6903).
Sustainable products and services means:
(1) Products containing recovered material designated by the U.S. Environmental Protection Agency (EPA) under the Comprehensive Procurement Guidelines ( 42 U.S.C. 6962) ( 40 CFR part 247) (https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products).
(2) Energy- and water-efficient products that are ENERGY STAR® certified or Federal Energy Management Program (FEMP)-designated products ( 42 U.S.C. 8259b) ( 10 CFR part 436, subpart C) ( https://www.energy.gov/eere/femp/search-energy-efficient-products and https://www.energystar.gov/ products?s=mega).
(3) Biobased products meeting the content requirement of the USDA under the BioPreferred® program ( 7 U.S.C. 8102) ( 7 CFR part 4270) ( https://www.biopreferred.gov)
(4) Acceptable chemicals, products, and manufacturing processes listed under EPA's Significant New Alternatives Policy (SNAP) program, which ensures a safe and smooth transition away from substances that contribute to the depletion of stratospheric ozone ( 42 U.S.C. 7671l) ( 40 CFR part 82, subpart G) ( https://www.epa.gov/snap).
(b) Requirements.
(1) The sustainable products and services, including the purchasing program and type of product or service, that are applicable to this contract, and any products or services that are not subject to this clause, will be set forth in the statement of work or elsewhere in the contract.
(2) The Contractor shall ensure that the sustainable products and services required by this contract are—
(i) Delivered to the Government;
(ii) Furnished for use by the Government;
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page I-6
(iii) Incorporated into the construction of a public building or public work; and
(iv) Furnished for use in performing services under this contract, where the cost of the products is a direct cost to this contract (versus costs which are normally applied to the Contractor's general and administrative expenses or indirect costs). This includes services performed by contractors performing management and operation of Government-owned facilities to the same extent that, at the time of award, an agency would be required to comply if an agency operated or supported the facility.
(c) Resource. The Green Procurement Compilation (GPC) available at https://sftool.gov/greenprocurement a comprehensive list of sustainable products and services and sustainable acquisition guidance. The Contractor should review the GPC when determining which statutory purchasing programs apply to a specific product or service.
I.5 52-244-06 SUBCONTRACTS FOR COMMERCIAL PRODUCTS
AND COMMERCIAL SERVICES (DEVIATION FEB
2025)
JANUARY 2025
Commercial product, commercial service and commercially available off-the-shelf item have the meanings contained in Federal Acquisition Regulation (FAR) 2.101.
Subcontract includes a transfer of commercial items between divisions, subsidiaries, or affiliates of the Contractor or subcontractor at any tier.
(b) To the maximum extent practicable, the Contractor shall incorporate, and require its subcontractors at all tiers to incorporate, commercial products, commercial services, or non-developmental items as components of items to be supplied under this contract.
(c) (1) The Contractor shall insert the following clauses in subcontracts for commercial products or commercial services:
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C.
3509), if the subcontract exceeds the threshold specified in FAR 3.1004(a) on the date of subcontract award, and has a performance period of more than 120 days. In altering this clause to identify the appropriate parties, all disclosures of violation of the civil False Claims Act or of Federal criminal law shall be directed to the agency Office of the Inspector General, with a copy to the Contracting Officer.
(ii) 52.203-15, Whistleblower Protections Under the American Recovery and
Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5), if the subcontract is funded under the Recovery Act.
(iii) 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) (41 U.S.C.
4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page I-7
(iv) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (JAN 2017).
(v) 52.204-21, Basic Safeguarding of Covered Contractor Information Systems (NOV 2021) , other than subcontracts for commercially available off-the-shelf items, if flow down is required in accordance with paragraph (c) of FAR clause 52.204-21.
(vi) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services
Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).
(vii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(viii) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L.117-328).
(ix) (A) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition.
(DEC 2023) (Pub. L. 115–390, title II).
(x) 52.219-8, Utilization of Small Business Concerns (FEB 2024) (15 U.S.C.637(d)(2) and (3)), if the subcontract offers further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(xi) [Reserved]
(xii) [Reserved]
(xiii) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C.4212(a));
(xiv) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29
U.S.C.793).
(xv) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C.4212).
(xvi) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496), if flow down is required in accordance with paragraph (f) of FAR clause 52.222-40.
(xvii) (A) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter
78 and E.O. 13627).
(B) Alternate I (MAR 2015) of 52.222-50(22 U.S.C. chapter 78 and E.O. 13627).
(xviii) 52.222-55, Minimum Wages under Executive Order 13658 (NOV 2020), if flow down is required in accordance with paragraph (k) of FAR clause 52.222-55.
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page I-8
(xix) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O.
13706), if flow down is required in accordance with paragraph (m) of FAR clause 52.222-62.
(xx) (A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a) if flow down is required in accordance with 52.224-3(f).
(B) Alternate I (JAN 2017) of 52.224-3, if flow down is required in accordance with 52.224-3(f) and the agency specifies that only its agency-provided training is acceptable).
(xxi) 52.225-26, Contractors Performing Private Security Functions Outside the United
States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
(xxii) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors
(MAR 2023), if flow down is required in accordance with paragraph (c) of FAR clause 52.232- 40.
(xxiii) 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (NOV 2024) (Sections 1821-1826, Pub. L. 118-31, 41 U.S.C. 3901 note prec.).
(xxiv) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV
2021) (46 U.S.C. 55305 and 10 U.S.C.2631), if flow down is required in accordance with paragraph (d) of FAR clause 52.247-64).
(2) While not required, the Contractor may flow down to subcontracts for commercial products or commercial services a minimal number of additional clauses necessary to satisfy its contractual obligations.
(d) The Contractor shall include the terms of this clause, including this paragraph (d), in subcontracts awarded under this contract.
I.6 52.252-6 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES NOV 2020
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.
(b) The use in this solicitation or contract of any Department of the Interior Acquisition Regulation (48 CFR 14) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
I.7 1452.203-70 RESTRICTIONS ON ENDORSEMENTS –
DEPARTMENT OF THE INTERIOR
JUL 1996
The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in FAR 31.205-1, in a manner which states or implies that the product or service provided is approved or endorsed by the Government, or is considered by the Government to be superior
Solicitation No.
140R3026Q0038
Project Title Lakeside Vessel Barrier Gate Repair at
Page I-9 to other products or services. This restriction is intended to avoid the appearance of preference by the Government toward any product or service. The Contractor may request the Contracting Officer to make a determination as to the propriety of promotional material.
I.8 1452.204-70 RELEASE OF CLAIMS – DEPARTMENT OF THE
INTERIOR
After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.
I.9 1452.228-70 LIABILITY INSURANCE – DEPARTMENT OF THE
INTERIOR
(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
WORKERS' COMPENSATION AND EMPLOYER'S LIABILITY
$100,000
GENERAL LIABILITY
$500,000 per occurrence
AUTOMOBILE LIABILITY
$200,000 each person $500,000 each occurrence $ 20,000 property damage
(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The Contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
I.10 1452.237-70 INFORMATION COLLECTION – DEPARTMENT OF
THE INTERIOR
If performance of this contract requires the contractor to collect information on identical items from ten or more public respondents, no action shall be taken or funds expended in the solicitation or collection of such information until the contractor has received from the Contracting Officer written notification that approval has been obtained from the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1980.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .