This document is a Sole Source (Including Brand Name) Justification for the acquisition of an upgraded Monaco D-21 fire alarm system and rack mount for D-21 computers at Hurlburt Field Air Force Base. The justification states that Monaco Inc. is the sole source provider as the existing D-21 system is proprietary, and no other products are compatible with the current system. Market research confirmed that Monaco's upgrades are the only ones that meet the requirements. The anticipated cost to the government is deemed fair and reasonable. The Air Force intends to award a sole source contract to Monaco Enterprises, Inc. under simplified acquisition procedures and other than full and open competition. Interested parties may submit product information in response to this notice by November 26, 2024, but the government retains sole discretion regarding whether to compete this proposed contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Statement of work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
Security Marking (select from the drop-down list)
March 2023 Security Marking (select from the drop-down list) Page 2 of 8March 2023 Security Marking (select from the drop-down list) Page 2 of 8
APPROVAL (AFFARS 5306.304(a) )
Date Chief of the Contracting Office (COCO) [ Official Signature Block ]
Signature
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
March 2023 Security Marking (select from the drop-down list) Page 4 of 8March 2023 Security Marking (select from the drop-down list) Page 4 of 8
V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).
The 1st Special Operations Civil Engineering Squadron (CES) Hurlburt Field AFB has a requirement for an upgraded Monaco D-21 and rack mount for D-21 computers. The requirement is to upgrade the system to provide drastic speed increases and system updates without the need to disconnect from the database providing continuous system up-time. Monaco Inc.'s unique products demonstrate why they are the only contractor who can perform for the reasons as follows:
a. The government uses the existing Monaco Fire Alarm D-21 system, and the additional equipment must be compatible with current equipment. Due to the electronic complexities of that system, the Monaco software, hardware and tone system are the only components that will interconnect and interface with the existing system.
Monaco, as the sole designer, developer and manufacturer of the existing D-21 system, owns the proprietary rights, hardware schematics and data rights. The Government does not own or have claim to the proprietary rights, hardware schematics and data rights of the Monaco D-21 system and cannot provide them to prospective contractors. In addition to proprietary data, Monaco has an in-depth understanding of the D-21 architecture.
This prevents any other company's equipment from interfacing with the existing system.
b. Market research showed that the Monaco required items with the software upgrades and accessories are the only upgrades that meets the requirements. These upgrades are compatible with the Hurlburt Field D-21 system. All required equipment is available on GSA contracts. Other fire alarm system is available in market research to having similar equipment; however none were compatible with the Hurlburt Field Monaco D-21 system.
c. The 1st SOCES believes that award to any other source would result in substantial duplication of cost to the Government that is not expected to be recovered through competition and unacceptable delays in fulfilling the Air Force's requirements. No other source can provide the upgrades to equipment that is compatible with the existing system. If award was made to another source, the entire base fire alarm system would need to be replaced. The to replace the system is more than $ Monaco Enterprises Inc. is the only firm capable of providing the products described in Section 3 above without the U.S. Air Force experiencing substantial duplication of cost that could not be expected to be recovered through competition.
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
Market research was accomplished to determine the extent of competition. Through Internet and local searches, it was determined; there were no other companies located to provide this requirement. And due to the reasons cited in Paragraph 5, no other firms were found to have the capability to satisfy the requirement other than Monaco Enterprises, Inc.
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
March 2023 Security Marking (select from the drop-down list) Page 5 of 8March 2023 Security Marking (select from the drop-down list) Page 5 of 8
VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.
VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.
IX. Any other facts supporting the use of Other Than Full and Open Competition.
X. List of any sources that expressed, in writing, an interest in the acquisition.
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.
XII. Certification by the Contracting Officer.
As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.
XIII. Certification by the technical/requirements personnel.
As evidenced by my (our) signature(s) above, I (we) certify that any supporting data contained herein, which is my (our) responsibility, is both accurate and complete.
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
March 2023 Security Marking (select from the drop-down list) Page 7 of 8March 2023 Security Marking (select from the drop-down list) Page 7 of 8
Contracting without providing for full and open competition shall not be justified on the basis of lack of advance planning by the requiring activity or concerns related to the amount of funds available (e.g., funds will expire) (10 U.S.C. 3204)
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
(FAR 6.303-2(b)(6))
Describe all efforts taken (or to be to be taken) to ensure that offers are solicited from as many potential sources as practicable under the circumstances. Although Market Research is covered in Section VIII, the information in Section VI should correlate with the Market Research described in Section VI. The following issues should be addressed in this paragraph:
Sources Sought Synopsis (used as part of market research). If a sources sought synopsis was issued, state the date the synopsis was issued and a brief description of its content. If any responses were received, describe in detail the results of the screening process and the rationale for determining the unacceptability of any synopsis respondents. Reference FAR 13.105, Synopsis and Posting Requirements.
Other Actions. In this paragraph, discuss any other actions taken or planned to facilitate competition for this acquisition. The discussion should include actions tried or considered even if the actions were unsuccessful. If the efforts were unsuccessful, so state and describe why.
Qualifying Country Sources. If qualifying country sources have expressed interest, but are to be excluded, provide supporting rationale.
VII. Determination by the Contracting Officer that the anticipated cost to the government will be fair and reasonable. (FAR 6.303-2(b)(7))
Include a statement by the contracting officer that the anticipated cost will be considered fair and reasonable and provide the basis for this determination. The steps that will be taken to ensure the final contract price will be fair and reasonable are also described here. Describe the extent of cost or price analysis anticipated including the requirements for certified cost or pricing data, technical evaluations, and audits.
VIII. Description of the market research conducted and the results, or explain why market research was not conducted. (FAR 6.303-2(b)(8))
Generally, some form of market research should be conducted. Discuss any market research conducted pursuant to FAR Part 10 and describe results of that research. Market research is any effort undertaken to determine if sources capable of satisfying the agency's requirements exist and to determine if commercial items or non-developmental items are either available or can be modified so that they will satisfy the agency's needs. Market research should be focused not only on identifying alternate sources, but also on alternate equipment or substitutes that might fulfill the Government needs with only minor modification.
Regardless of the approach used, the results should provide a high level of confidence that no other qualified sources exist.
When other exceptions from the requirement to obtain full and open competition are relied upon, the market research might be limited to an examination of the acquisition history and experience with the marketplace under previous acquisitions for the same or similar items.
If no market research was conducted, so state and provide the rationale.
IX. Any other facts supporting the use of Other Than Full and Open Competition. (FAR 6.303-2(b)(9)(i))
Provide any other facts supporting the use of other than full and open competition, including an explanation of why technical data packages, specifications, engineering descriptions, statements of work, statements of objectives, or purchase descriptions suitable for full and open competition have not been developed, are not being developed, are not being used, or are not available.
X. List of sources, if any, that expressed interest in the acquisition. (FAR 6.303-2(b)(10))
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
March 2023 Security Marking (select from the drop-down list) Page 8 of 8
If a sources sought synopsis was done and all interested sources are included in Section VI, it is acceptable to state, “See Section VI above.”
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required. (FAR 6.303-2(b)(11))
Describe any actions taken or to be taken to foster competition for future acquisitions of the supplies or services being acquired.
Describe potential actions that could be taken to remove the barriers to competition that have been identified in the justification and include a milestone schedule, where available, for accomplishing these actions. For example, if a follow-on competitive acquisition is planned, so state and provide the planned award date, or state that the Government will attempt to acquire rights in technical data and computer software sufficient to compete follow-on acquisitions as a priced option in the contract action that is the subject of this Justification, or (if applicable) state how the Government intends to challenge nonconforming markings on technical data and computer software delivered to it under previous contracts so those markings can be removed in order that the technical data and computer software may be used in support of a follow-on competitive acquisition, or describe plans to qualify additional sources.
Address efforts to ensure competition for future spare parts and maintenance in support of systems or equipment covered by the justification, even when these acquisitions will be accomplished by other organizations. Include a discussion on available breakout data.
If no actions are planned, so state and provide reasons. If approval is sought for more than one year, explain why a sole source effort is required for the planned time duration.
For a non-competitive follow-on acquisition to a previous award for the same supply or service supported by a Justification citing the same authority, include a discussion of the actions planned to overcome barriers to competition established in the previous justification, the status of those actions, and the results of those actions. The approval authority shall determine whether the planned actions were completed. If the planned actions were not completed, the justification for the follow-on acquisition shall be approved by the approval authority one-level above the approval authority for the previous justification (see FAR 13.501(a)(2)). If the previous justification was approved by the Senior Procurement Executive (SPE), the approval remains at the SPE level.
[DFARS 213.501(a) and DFARS PGI 206.304(a)(S-70)(ii)]
XII. Certification by the Contracting Officer. (FAR 6.303-2(b)(12))
As evidenced by his/her signature, the contracting officer has determined this document to be both accurate and complete to the best of his/her knowledge and belief.
XIII. Certification by the technical/requirements personnel. (FAR 6.303-2(c))
As evidenced by their signatures, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete.