SOLE SOURCE CNC 3 Axis milling center.pdf
PDF 222 KB Posted
- Solicitation number
- FA441926Q0020
About this file
This is a Single Source Justification form for a Simplified Acquisition submitted by the 97th Contracting Squadron at Altus Air Force Base for the procurement of a Haas VF-4SS Super Speed Vertical Machining Center.
The contracting activity is requesting a Haas VF-4SS CNC 3-axis vertical milling center with dimensions of 50" x 20" x 25" at an estimated contract cost of $159,768.00. The equipment must include a Value Option Package containing chip auger, high-intensity lighting, programmable coolant nozzle, high-speed machining, wireless probing, 4th-axis drive, auto door, coolant maintenance package, coolant sanitizer, WiFi camera, auxiliary coolant filter, automatic air gun, minimum quantity lubrication, through-tool air blast, and through-spindle coolant capabilities. The machine requires 480V, 3-phase power input and includes a 1-year warranty. The single-source justification is based on standardization strategy per Department of Air Force Instruction 63-140 and AFMC Supplement. Current Altus AFB operators are formally trained in Haas processes, programming, and software language; switching to a different manufacturer would result in aircraft part manufacture delays, potential machine damage, and significant retraining costs. The contracting officer has determined under FAR 13.106-1(b)(1) that only a single source is reasonably available. Section E commits to conducting extensive market research and seeking competitive bids/estimates to preclude future single-source awards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOLE SOURCE SMCO Haas UMC 750SS_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Security Marking (select from the drop-down list)
Single Source Justification (Simplified Acquisition)
Security Marking (select from the drop-down list) April 2021 Page 1 of 2
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No
Contracting Activity: 97 CONF
Project/Program Name: SMCO, Haas CNC 3 Axis vertical milling center VF 4SS
Purchase Request / Local ID Number:
Estimated Contract Cost (including Options): $159,768.00
Haas, VF-4SS, Super Speed Vertical Machining Center; X 50" x Y 20" x Z 25"
Must have a Value Option Package- includes chip auger, high-intensity lighting, programmable coolant nozzle, high-speed machining, wireless probing, 4th-axis drive, auto door, coolant maintenance package, coolant sanitizer, WiFi camera, auxiliary coolant filter, automatic air gun, minimum quantity lubrication, through-tool air blast, through-spindle coolant.
1 Year Warranty Power input- 480V,3phz
STANDARDIZATION STRATEGY: per the department of the air force instruction (DAFI) 63-140 and air force materiel command (AFMC) SUPPLEMENT (DAFI63-140_AFMCSUP), The air force metal fabrication and technologies office (MFTO) serves as the operational safety, suitability, and effectiveness (OSS&E) equipment authority for the AMT and ASM career fields. Standardization supports the air force mission by promoting proficiency, qualification, and continued readiness across installations upon deployment or permanent change of station (PCS). The MFTO has written and published multiple commercial item descriptions (CIDS) that dictate the minimum performance requirements of various equipment, such as computer numerical control (CNC) mills and lathes, water jets, and other industrial plant equipment (IPE) items. The MFTO is also working to standardize computer aided design (CAD) and computer aided manufacturing (CAM) software. standardization of this equipment and software ensures continued familiarization with the human machine interface (HMI) of equipment and software, and therefore, learning new systems and programs is not required. Current (Altus AFB) operators are formally trained in Haas processes/programming and software language, changing to a different manufacturer or software language would allow for aircraft part manufacture delays and possible machine damage. Cost of retraining operators is another factor to consider.
Section A: General Contract Information
Section B: Description of the Supplies/Services Required
Section C: Justification for Soliciting from a Single Source or Brand Name
Section D: Efforts to Obtain Competition
Security Marking (select from the drop-down list)
Single Source Justification (Simplified Acquisition)
Security Marking (select from the drop-down list) April 2021 Page 2 of 2
Extensive market research will always be conducted and competitive bid/estimate sought.
I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.
Date Typed Name and Rank/Grade of Contracting Officer Signature of Contracting Officer
Section E: Steps to Preclude Future Single Source or Brand Name Awards
Section F: Contracting Officer's Determination
| 2026-06-04T17:21:30-0500 | |
| CLINTON.LORI.ANN.1054815421 |
File details come from the government source that posted it. Updated .