Attachment J.4 HUJ Contractor Pricing Table
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN Table Definitions
| RFP No. SOL-521-15-000049 / Construction of Justinien Pediatric Ward | Offeror Name: | [ENTER OFFEROR NAME HERE] | |||||
| Attachment J.4 - HUJ CLIN Table Definitions | |||||||
| CLIN | Description | Unit of Measure | Quantity* | Unit Cost* | Element Total Cost | Line Item Total Cost | |
| 0.00 | Administrative Requirements | $ - 0 | |||||
| 0.1 | Insurance | Insert cost of obtaining insurance as specified in the solicitation. | LS | 1.00 | $ - 0 | $ - 0 | 0.00% |
| 0.2 | General Requirements | Include G&A, Overhead, etc. | LS | 1.00 | $ - 0 | $ - 0 | 0.00% |
| 0.3 | Profit | Contractors expected profit on this project | LS | 1.00 | $ - 0 | $ - 0 | 0.00% |
| 0.4 | (De)Mobilization | Contractors mobilization and demobilization costs | LS | 1.00 | $ - 0 | $ - 0 | 0.00% |
| 1.00 | Building 1: Pediatric Ward | Definition of Items Included In Each Category | $ - 0 | ||||
| 1.01A | Foundations and Slabs | ||||||
| Special Foundations | (Helical Anchors) | CM | |||||
| Foundations | (Column Footings, Wall Footings, Pile Caps, Retaining Walls) | CM | |||||
| Slab on Grade | (Concrete Slab on Grade, Capillary Water Barrier) | CM | |||||
| 1.01B | Super Structure | ||||||
| Floor Structure | (Elevated Concrete Slab & Beams, Concrete Columns, Concrete Walls) | CM | |||||
| Roof Structure | (Elevated Concrete Slab & Beams, Concrete Columns, Concrete Walls, Metal Deck, Structural Steel Framing) | CM | |||||
| Exterior Walls & Tie Beams | (Concrete, CMU, Precast Cornice, Precast Window Sill, Trellis Structure) | SM | |||||
| Interior Stairs | (Concrete, Handrail) | CM | |||||
| Interior Ramp | (Concrete Slab on Deck, Metal Railings, Structural Steel Framing) | CM | |||||
| 1.01C | Roofing | ||||||
| Roof Covering | (Elastomeric Roof Coating) | SM | |||||
| Roof Specialties | (Roof Hatch, Coping, Scuppers, Downspouts) | LS | |||||
| 1.01D | Exterior Enclosures | ||||||
| Exterior Finishes | (Stucco, Stucco Cornice) | SM | |||||
| Exterior Doors | (HM Door & Frames, Aluminum Doors & Frames, Door Glazing) | EA | |||||
| Exterior Windows | (Aluminum Window Frame & Glazing | EA | |||||
| 1.01E | Interior Construction | ||||||
| Interior Walls | (Concrete Walls, CMU) | SM | |||||
| Interior Windows | (HM Frames, Glazing) | EA | |||||
| Doors and Hardware | (HM Doors, HM Frames, Wood Doors, Hardware) | EA | |||||
| 1.01F | Finishes | ||||||
| Floor Finishes | (Sealed Concrete, Porcelain Tile, Porcelain Tile Base) | SM | |||||
| Wall Finishes | (Painting) | SM | |||||
| Ceiling Finishes | (Acoustical Ceiling, Gypsum Board Ceiling, Painting) | SM | |||||
| 1.01G | Specialties | ||||||
| Toilet Accessories | (Grab Bars, Toilet Paper Holders, Mirrors, Paper Towel Dispensers, Soap Dispensers, Robe Hooks) | EA | |||||
| Fire Specialties | (Fire Extinguisher Cabinets, Fire Extinguishers) | EA | |||||
| Casework | (Base Cabinets, Wall Cabinets, Countertops) | LM | |||||
| 1.01H | Services | ||||||
| Plumbing | (Water Pump, Water Heater, Expansion Tank, Thermostatic Mixing Valve, Hydro-neumatic Tank, Plumbing Fixtures, Sanitary Waste Piping, Sanitary Vent Piping, Domestic Water Piping, Medical Gas Piping) | ||||||
| HVAC | (Air Handling Unit, Exhaust Fans, Roof Ventilators, Registers, Diffusers, Grilles, Fire Dampers, Fire/Smoke Dampers, Ductwork) | SM | |||||
| Electrical | (Distribution Panel, Panel Board, Receptacles, Lights, Wiring, Conduit, Motor Starter with Disconnect Switch) | SM |
| 1.00A | Pediatric Ward Bid Option 1 - Solar Panels | ||||||
| Photovoltaic Panels Addition | PV and associated work specified on Bid Option 1 drawings, related drawings, notes and specifications | ||||||
| 2.00 | Site Preparation, Site Work, Exterior Improvements & Infrastructure | $ - 0 | |||||
| 2.01 | Site Demolition | ||||||
| Site Demolition | (Demolish Building, Demolish Concrete Pavement, Demolish Concrete Steps & Wall, Remove Tree, Demolish Concrete Wash Sink, Haul Rubbish from Site to Dump) | LS | |||||
| 2.02 | Earthwork | ||||||
| Site Grading | (Mass Grading, Fine Grading) | LS | |||||
| Import Fill | (Import Borrow Fill Material from Offsite) | CM | |||||
| 2.03 | Exterior Improvements | ||||||
| Concrete Paving | (Concrete Pavement, Concrete Sidewalk, Capillary Water Barrier) | SM | |||||
| Exterior Ramp | (Concrete Slab on Grade, Capillary Water Barrier, Metal Railings) | CM | |||||
| Concrete Steps | (Concrete, Metal Railings) | LM | |||||
| Site Improvements | (Bollards, Seeding) | LS | |||||
| 2.04 | Utilities | ||||||
| Water Service | (Water Storage Tanks, Domestic Water line with Valves & Fittings) | LM | |||||
| Water Cistern Structure | (Concrete Structure, Water Filters, Transfer Pumps, Control Panel, Access Hatches) | CM | |||||
| Storm Drainage | (Sanitary Sewer Piping & Fittings, Trench Drain) | LM | |||||
| Septic Tank Structure | (Concrete Structure, Access Hatches) | CM | |||||
| 3.00 | Inspection Services | $ - 0 | |||||
| Cost to conduct adequate Quality Control as indicated in the solicitation | LS | 1.00 | $ - 0 | $ - 0 | 0.00% | ||
| 4.00 | Commissioning Services | $ - 0 | |||||
| Cost to provide commissioning services | LS | 1.00 | $ - 0 | - 0 | 0.00% | ||
| 5.00 | Import Taxes and Duties | ERROR:#REF! | |||||
| Duties and taxes only | LS | 1.00 | - 0 | - 0 | waived | ||
| 6.00 | Staging, Shipping, Transport & Phasing | ERROR:#REF! | |||||
| Includes all shipping, transport, customs broker and associated costs | |||||||
| 7.00 | Differing / Unforseen Conditions | ||||||
| Unit costs for removal and disposal of unsuitable soil, rock, subsurface concrete and hazardous materials |
Table B-1 CLIN for HUJ Base Bid
| RFP No. SOL-521-15-000049 / Construction of Justinien Pediatric Ward | Offeror Name: | [ENTER OFFEROR NAME HERE] | ||||
| Attachment J.4 - Table B-1 CLIN for HUJ (Base Bid) | ||||||
| CLIN | Description | Unit of Measure | Quantity* | Unit Cost* | Element Total Cost | Line Item Total Cost |
| 0.00 | Administrative Requirements | $ - 0 | ||||
| 0.1 | Insurance | LS | 1.00 | $ - 0 | $ - 0 | |
| 0.2 | General Requirements | LS | 1.00 | $ - 0 | $ - 0 | |
| 0.3 | Profit | LS | 1.00 | $ - 0 | $ - 0 | |
| 0.4 | (De)Mobilization | LS | 1.00 | $ - 0 | $ - 0 | |
| 1.00 | Building: Pediatric Ward | $ - 0 | ||||
| 1.01A | Foundations and Slabs | |||||
| Special Foundations | EA | $ - 0 | $ - 0 | |||
| Foundations | CM | $ - 0 | $ - 0 | |||
| Slab on Grade | CM | $ - 0 | $ - 0 | |||
| 1.01B | Super Structure | |||||
| Floor Structure | CM | $ - 0 | $ - 0 | |||
| Roof Structure | CM | $ - 0 | $ - 0 | |||
| Exterior Walls & Tie Beams | SM | $ - 0 | $ - 0 | |||
| Interior Stairs | CM | $ - 0 | $ - 0 | |||
| Interior Ramp | CM | $ - 0 | $ - 0 | |||
| 1.01C | Roofing | |||||
| Roof Covering | SM | $ - 0 | $ - 0 | |||
| Roof Specialties | LS | $ - 0 | $ - 0 | |||
| 1.01D | Exterior Enclosures | |||||
| Exterior Finishes | SM | $ - 0 | $ - 0 | |||
| Exterior Doors | EA | $ - 0 | $ - 0 | |||
| Exterior Windows | EA | $ - 0 | $ - 0 | |||
| 1.01E | Interior Construction | |||||
| Interior Walls | SM | $ - 0 | $ - 0 | |||
| Interior Windows | EA | $ - 0 | $ - 0 | |||
| Doors and Hardware | EA | $ - 0 | $ - 0 | |||
| 1.01F | Finishes | |||||
| Floor Finishes | SM | $ - 0 | $ - 0 | |||
| Wall Finishes | SM | $ - 0 | $ - 0 | |||
| Ceiling Finishes | SM | $ - 0 | $ - 0 | |||
| 1.01G | Specialties | |||||
| Toilet Accessories | EA | $ - 0 | $ - 0 | |||
| Fire Specialties | EA | $ - 0 | $ - 0 | |||
| Casework | LM | $ - 0 | $ - 0 | |||
| 1.01H | Services | |||||
| Plumbing | SM | $ - 0 | $ - 0 | |||
| HVAC | SM | $ - 0 | $ - 0 | |||
| Electrical | SM | $ - 0 | $ - 0 | |||
| 2.00 | Site Preparation, Site Work, Exterior Improvements & Infrastructure | $ - 0 | ||||
| 2.01 | Site Demolition | |||||
| Site Demolition | LS | $ - 0 | $ - 0 | |||
| 2.02 | Earthwork | |||||
| Site Grading | LS | $ - 0 | $ - 0 | |||
| Import Fill | CM | $ - 0 | $ - 0 | |||
| 2.03 | Exterior Improvements | |||||
| Concrete Paving | SM | $ - 0 | $ - 0 | |||
| Exterior Ramp | CM | $ - 0 | $ - 0 | |||
| Concrete Steps | LM | $ - 0 | $ - 0 | |||
| Site Improvements | LS | $ - 0 | $ - 0 | |||
| 2.04 | Utilities | |||||
| Water Service | LM | $ - 0 | $ - 0 | |||
| Water Cistern Structure | CM | $ - 0 | $ - 0 | |||
| Storm Drainage | LM | $ - 0 | $ - 0 | |||
| Septic Tank Structure | CM | $ - 0 | $ - 0 | |||
| 3.00 | Inspection Services | $ - 0 | ||||
| LS | 1.00 | $ - 0 | $ - 0 | |||
| 4.00 | Commissioning Services | $ - 0 | ||||
| LS | 1.00 | $ - 0 | $ - 0 | |||
| 5.00 | Import Taxes and Duties | $ - 0 | ||||
| LS | 1.00 | $ - 0 | $ - 0 | |||
| 6.00 | Staging, Shipping, Transport & Phasing | $ - 0 | ||||
| LS | 1.00 | $ - 0 | $ - 0 | |||
| Grand Total (CLIN 0.00 - 6.00) | $ - 0 |
Table B-1A CLIN for HUJ Opt. 1
| RFP No. SOL-521-15-000049 / Construction of Justinien Pediatric Ward Bid Option 1 | Offeror Name: | [ENTER OFFEROR NAME HERE] | ||||
| Attachment J.4 - Table B-1A CLIN for HUJ (Bid Option 1) | ||||||
| CLIN | Description | Unit of Measure | Quantity* | Unit Cost* | Element Total Cost | Line Item Total Cost |
| 0.00A | Administrative Requirements | $ - 0 | ||||
| 0.1A | Insurance | LS | 1.00 | $ - 0 | $ - 0 | |
| 0.2A | General Requirements | LS | 1.00 | $ - 0 | $ - 0 | |
| 0.3A | Profit | LS | 1.00 | $ - 0 | $ - 0 | |
| 0.4A | (De)Mobilization | LS | 1.00 | $ - 0 | $ - 0 | |
| 1.00A | Pediatric Ward Bid Option 1 - Solar Panels | $ - 0 | ||||
| Photovoltaic Panels Addition | EA | - 0 | $ - 0 | $ - 0 | ||
| 3.00A | Inspection Services | $ - 0 | ||||
| LS | 1.00 | $ - 0 | $ - 0 | |||
| 4.00A | Commissioning Services | $ - 0 | ||||
| LS | 1.00 | $ - 0 | $ - 0 | |||
| 5.00A | Import Taxes and Duties | $ - 0 | ||||
| LS | 1.00 | $ - 0 | $ - 0 | |||
| 6.00A | Staging, Shipping, Transport & Phasing | $ - 0 | ||||
| LS | 1.00 | $ - 0 | $ - 0 | |||
| Grand Total (CLIN 0.00A - 6.00A) | $ - 0 |
Table B-2 Differing Conditions
| RFP No. SOL-521-15-000049 / Construction of Justinien Pediatric Ward | Offeror Name: | [ENTER OFFEROR NAME HERE] | ||
| Attachment J.4 - Table B-2 CLIN for HUJ (Differing/Unforseen Site Conditions) | ||||
| CLIN | Description | Unit of Measure | Quantity* | Unit Cost* |
| 7.0 | Cost Reimbursable Unit Rate for Differing / Unforeseen Site Conditions | |||
| 7.1 | Removal and disposal of unsuitable soils | LS | 1.00 | $ - 0 |
| 7.2 | Removal and disposal of rock | LS | 1.00 | $ - 0 |
| 7.3 | Removal and disposal of subsurface concrete | LS | 1.00 | $ - 0 |
| 7.4 | Removal and disposal of hazardous materials | LS | 1.00 | $ - 0 |
Table B-1 CLIN for Justinie (2
| RFP No. SOL-521-15-0000XXX / Construction of Justinien Pediatric Ward | Offeror Name: | [ENTER OFFEROR NAME HERE] | ||||
| CLIN | Description | Unit of Measure | Quantity* | Unit Cost* | Element Total Cost | Line Item Total Cost |
| 0.0 | Administrative Requirements - Justinien | $ - 0 | ||||
| 0.1 | Insurance | LS | 1.00 | $ - 0 | $ - 0 | 0.00% |
| 0.2 | General Requirements | LS | 1.00 | $ - 0 | $ - 0 | 0.00% |
| 0.3 | Profit | LS | 1.00 | $ - 0 | $ - 0 | 0.00% |
| 0.4 | (De)Mobilization | LS | 1.00 | $ - 0 | $ - 0 | 0.00% |
| 1 | Building 1: Pediatric Ward | $ - 0 | ||||
| 1.01A | Foundations and Slabs | |||||
| Special Foundations | CM | |||||
| (Helical Anchors) | ||||||
| Foundations | CM | |||||
| (Column Footings, Wall Footings, Pile Caps, Retaining Walls) | ||||||
| Slab on Grade | CM | |||||
| (Concrete Slab on Grade, Capillary Water Barrier) | ||||||
| 1.01B | Super Structure | |||||
| Floor Structure | CM | |||||
| (Elevated Concrete Slab & Beams, Concrete Slab on Metal Deck, Concrete Columns, Concrete Walls) | ||||||
| Roof Structure | CM | |||||
| (Elevated Concrete Slab & Beams, Concrete Columns, Concrete Walls, Metal Deck) | ||||||
| Exterior Walls & Tie Beams | SM | |||||
| (Concrete, CMU, Precast Cornice, Precast Window Sill) | ||||||
| Interior Stairs | CM | |||||
| (Concrete, Handrail) | ||||||
| Interior Ramp | CM | |||||
| (Concrete, Handrail) | ||||||
| 1.01C | Roofing | |||||
| Roof Covering | SM | |||||
| (Elastomeric Roof Coating) | ||||||
| Roof Specialties | LS | |||||
| (Roof Hatch, Coping, Scuppers, Downspouts) | ||||||
| 1.01D | Exterior Enclosures | |||||
| Exterior Finishes | SM | |||||
| (Stucco, Stucco Cornice)) | ||||||
| Exterior Doors | EA | |||||
| (HM Door & Frames, Aluminum Doors & Frames, Door Glazing) | ||||||
| Exterior Windows | EA | |||||
| (Aluminum Window Frame & Glazing | ||||||
| 1.01E | Interior Construction | |||||
| Interior Walls | SM | |||||
| (Concrete Walls, CMU) | ||||||
| Interior Windows | EA | |||||
| (HM Frames, Glzing) | ||||||
| Doors and Hardware | EA | |||||
| (HM Doors, HM Frames, Wood Doors, Hardware) | ||||||
| 1.01F | Finishes | |||||
| Floor Finishes | SM | |||||
| (Sealed Concrete, Porcelain Tile, Porcelain Tile Base) | ||||||
| Wall Finishes | SM | |||||
| (Painting) | ||||||
| Ceiling Finishes | SM | |||||
| (Acoustical Ceiling, Gypsum Board Ceiling, Painting) | ||||||
| 1.01G | Specialties | |||||
| Toilet Accessories | EA | |||||
| (Grab Bars, Toilet Paper Holders, Mirrors, Paper Towel Dispensers, Soap Dispensers, Robe Hooks) | ||||||
| Fire Specialties | EA | |||||
| (Fire Extingusher Cabinets, Fire Extingusihers) | ||||||
| Casework | LM | |||||
| (Base Cabinets, Wall Cabinets, Countertops) | ||||||
| 1.01H | Services | |||||
| Plumbing | SM | |||||
| (Water Pump, Water Heater, Expansion Tank, Thermostatic Mixing Valve, Hydroneumatic Tank, Plumbing Fixtures, Sanitary Waste Piping, Sanitary Vent Piping, Domestic Water Piping, Medical Gas Piping) | ||||||
| HVAC | SM | |||||
| (Air Handling Unit, Exhaust Fans, Roof Ventilators, Registers, Diffusers, Grilles, Fire Dampers, Fire/Smoke Dampers, Ductwork) | ||||||
| Electrical | SM | |||||
| (Distribution Panel, Panelbaord, Receptacles, Lights, Wiring, Conduit, Motor Starter with Disconnect Switch) | ||||||
| 2 | Site Preparation, Site Work, Exterior Improvements & Infrastructure-Justinien | $ - 0 | ||||
| 2.01 | Site Demolition | |||||
| Site Demolition | LS | |||||
| (Demolish Building, Demolish Concrete Pavement, Demolish Concrete Steps & Wall, Remove Tree, Demolish Concrete Wash Sink, Haul Rubbish from Site to Dump) | ||||||
| 2.02 | Earthwork | |||||
| Site Grading | LS | |||||
| (Mass Grading, Fine Grading) | ||||||
| Import Fill | CM | |||||
| (Import Borrow Fill Material from Offsite) | ||||||
| 2.03 | Exterior Improvements | |||||
| Concrete Paving | SM | |||||
| (Concrete Pavement, Concrete Sidewalk, Capillary Water Barrier) | ||||||
| Exterior Ramp | CM | |||||
| (Concrete Slab on Grade, Capillary Water Barrier) | ||||||
| Concrete Steps | LM | |||||
| (Concrete, Metal Railings) | ||||||
| Site Improvements | LS | |||||
| (Bollards, Seeding) | ||||||
| 2.04 | Utilities | |||||
| Water Service | LM | |||||
| (Water Storage Tanks, Domestic Water line with Valves & Fittings) | ||||||
| Water Cistern Structure | CM | |||||
| (Concrete Structure, Water Filters, Transfer Pumps, Control Panel, Access Hatches) | ||||||
| Storm Drainage | LM | |||||
| (Sanitary Sewer Piping & Fittings, Trench Drain) | ||||||
| Septic Tank Structure | CM | |||||
| (Concrete Structure, Access Hatches) | ||||||
| 3 | Inspection Services-Justinien | $ - 0 | ||||
| LS | 1.00 | $ - 0 | $ - 0 | 0.00% | ||
| 4 | Commissioning Services-Justinien | $ - 0 | ||||
| LS | 1.00 | $ - 0 | - 0 | 0.00% | ||
| 5 | Import Taxes and Duties-Justinien | $ - 0 | ||||
| LS | 1.00 | - 0 | - 0 | waived | ||
| Grand Total (CLIN 0 - 5) | $ - 0 |
Table B-3 CLIN for Diff Cond
| RFP No. SOL-521-14-000058 / Construction of SMA and Platana | Offeror Name: | [ENTER OFFEROR NAME HERE] | ||
| CLIN | Description | Unit of Measure | Quantity | Unit Cost |
| 7.00 | Cost Reimbursable Unit Rate for Differing / Unforeseen Site Conditions | |||
| 7.1 | Removal and disposal of unsuitable soils | CM | 1.00 | $ 31.58 |
| 7.2 | Removal and disposal of rock | CM | 1.00 | $ 21.45 |
| 7.3 | Removal and disposal of subsurface concrete | CM | 1.00 | $ 44.87 |
| 7.4 | Removal and disposal of hazardous materials | CM | 1.00 | $ 25.19 |