Philippe Guerrier Scope of Work
Scope items for the work described below are included here for informational purposes. All work elements should be coordinated with and as indicated on the drawings provided as an attachment hereto. The Contractor is responsible to notify USAID immediately of any discrepancies found between the work elements described here, the provided drawings, and the existing field conditions.
1. Demolish existing stair and walkway and prepare ground for new ramp as shown on design drawings.
2. Remove existing railings between columns to provide access to the second floor handicap ramp.
3. Demolish existing basketball court as required. Remove and salvage existing equipment and seating.
4. Patch basketball court paving after ramp construction is completed.
5. Construct new access ramp with railings for access from ground level to the second floor of Building 1.
6. Construct new pedestrian bridge with railings to provide access between building 1 and Building 2.
7. All new ramps to have painted galvanized steel handrails.
8. Provide and install 203mm diameter drainage piping sleeved through new ramp wall to permit water to flow for site drainage from courtyard side to existing site drainage provisions at existing north perimeter wall. Inlet and outlet to match grade.
9. Provide and install new expansion joint cover floor to floor, and floor to wall as indicated.
10. Provide complete finished project in area of work. All transitions to existing construction should be complete.