Amendment 000001 to the Solicitation SOL-114-13-000003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_1_to_Amendment_000002_.docx | DOCX document | |
| Attachment_2-_Answers_to_Additional_Questions_.docx | DOCX document | |
| Amendment_000002_SOL-114-13-000003.pdf | ||
| AMP_Final_Presentation_(24Apr).ppt | PPT presentation | |
| Answers_to_questions_(2).docx | DOCX document | |
| AMP_Summary_Evaluation.mht | MHT file | |
| SOL-114-13-000003_(4).doc | DOC document | |
| SOL-114-13-000003_(4).pdf | ||
| DCN_2013_GEO_010_REAP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENTIMODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
000001 04/25/2013
6. ISSUED BY
CODE
GEORGIA 7. ADMINISTERED BY (Ifotherthan Item 6)
CODE
Regional Contracting Office
11, George Balanchine Street
Tbilisi 0131 Georgia
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (x)
9A. AMENDMENT OF SOLICITATION NO
SOL-114-13-000003
9B. DATED (SEE ITEM 11)X
04/05/2013
10A. MODIFICATION OF CONTRACT/ORDER NO.
1 OB. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENT OF SOLICITATIONS
® The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers q is extended.
is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS /ORDERS . IT MODIFIES THE CONTRACTIORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43. 103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF
D. OTHER (Specify type of modification and authority)
E. IMPORTANT:
Contractor q is not.
q is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation /contract subject matter where feasible.)
The purpose of this amendment is to provide the following revisions to the RFTOP
SOL-114-13-000003, shown in the revised document with highlights:
1. P.76, L.6 INSTRUCTIONS FOR THE PREPARATION OF THE TECHNICAL PROPOSAL (1) Technical
Approach [See Section M.2, Section 1]
Revise the wording of paragraph 6 as follows:
"Methodologies and criteria that will be utilized to ensure that no less than 90% of grants are issued within 30 months of awarding this activity, including but not limited to grants promotion campaigns, regional and rural coverage, selection criteria and processes, provision of TA, and monitoring and evaluation of grantees' performance."
Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Sa h R.
Bueter
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16 . UNITED STATE
OF
ERICA 16C. DATE SIGNED
^^ I(Signature o/person authorized to sign) (Sign ontracting Officer) (( 13
NSN 7540-01-152-8070
STANDARD FORM 30 (REV. 10-83)
Previous edition unusable
Prescribed by GSA
FAR (48 CFR) 53.243
CHECK ONE
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
SOL-114-13-000003/000001
PAGE
OF
NAME OF OFFEROR OR CONTRACTOR
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
2.
P.75, L.6.(b) is corrected to show a 20-page limit for the technical proposal.
3.
P.
77, L.6 INSTRUCTIONS FOR THE PREPARATION
OF THE TECHNICAL PROPOSAL
(3)
Key Personnel
[See
Section M.2, Section 3]:
Revise the wording of paragraph 2 as follows:
"The offeror must identify the positions, which it considers to be key personnel for this activity, provide detailed position descriptions for each position, qualifications required for each position and propose individuals for these positions."
4.
P.86, M.2 TECHNICAL EVALUATION CRITERIA,
Section 3: Key Personnel: Revise the wording of paragraph 3 as follows:
"Qualifications and experience of proposed key personnel vis-a-vis the positions and qualifications for which the contractor is proposing them
(10 points, each proposed position weighted equally )."
5.
P.64, Section J, LIST OF ATTACHMENTS:
At the end of Section J add "Attachment 7 - Summary of
The Evaluation of the Access to Mechanization
Project
(AMP)".
Full text can be found in
Attachment 3 to this Amendment.
6. Answers to Questions from the prospective offerors can be found in Attachment 1 to this
Amendment.
7. The revised version of the RFTOP
SOL-114-13-000003 can be found in Attachment 2 to this Amendment;
-----End of the Amendment 000001---