SOL 72066823Q00084 - RUST REMEDIATION PROJECTlp.pdf

PDF 577 KB Posted

Attached to
Procure services to renovate and repaint prefabricated townhouses at the US Embassy Residential Compound (RC)
Solicitation number
72066823Q00084
Issued by

About this file

This document is a request for quotation (RFQ) from the US Agency for International Development South Sudan for renovation and repainting services at a US Embassy residential compound. The contractor will repair gutters, downpipes, fascia boards, and exterior wall panels; repaint external surfaces; and repair hollow balcony sections at 34 prefabricated townhouses. The work must be completed within 365 days of the notice to proceed. The RFQ uses a lowest price technically acceptable process, with proposals due by August 14, 2023. The contract will be a firm-fixed-price purchase order for mobilization and completion of each townhouse. The contractor must be registered in SAM and have experience with similar projects, scaffolding, and handling paint emissions. The mandatory site visit will be on July 31, and questions are due by August 2.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

RFQ IFB RFP

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NAICS:

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8 (A)

EDWOSB

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

REQ-668-23-000175 29

72066823Q00084

See page 25 See page 25 720668

Kololo Street, 2nd Block Next to European Union US Embassy, Juba South Sudan

USAID/SOUTH SUDAN/EXO

1 Procure services to renovate and repaint prefabricated townhouses at the US Embassy Residential Compound

(RC).

LESLIE PETERSEN

07/18/2023

08/14/2023

2300 CAT

720668

USAID/South Sudan 4420 Juba Place Washington DC 20251-4420 00000

Leslie C Petersen (affiliate)

Digitally signed by Leslie C Petersen (affiliate) Date: 2023.07.19 08:18:52 +02'00'

Issue Date: July 18, 2023

Deadline for Questions: August 02, 2023, C.O.B 5p.m. (CAT) South Sudan Time

Site Visit: July 31, 2023, at 10a.m. (CAT) South Sudan Time

Closing Date and Time: August 14, 2023, at 2300 (CAT) South Sudan Time. Late submissions WILL NOT be considered.

REQUEST FOR QUOTATION NO.:72066823Q00084 – RUST REMEDIATION PROJECT

Dear Offerors, USAID/South Sudan – Construction Office is seeking quotations from reputable construction firms to renovate and repaint prefabricated townhouses at the US Embassy Residential Compound (RC).

Award will be based on the Lowest Price Technically Acceptable (LPTA) process.

(i) This posting serves as a Combined Synopsis/Solicitation for Commercial Items prepared in accordance with the Federal Acquisition Regulation (FAR) 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice.

(ii) This announcement constitutes the only solicitation.

(iii) This is a Request for Quotations only. Issuance of this RFQ does not in any way obligate USAID to make an award or pay for costs incurred by potential offerors in the preparation and submission of an offer.

(iv) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2021-06 (06/10/2021). It is the responsibility of the Offeror to be familiar with the applicable clauses and provisions. The full text of the referenced FAR Clauses may be accessed electronically at https://www.acquistion.gov/far/.

(v) The associated North American Industrial Classification Code (NAICS) for this procurement is 423390 - Other Construction Material Merchant Wholesalers 100.

(vi) The US Mission in South Sudan is exempt from all Government taxes.

(vii) The Government will award a contract resulting from this solicitation to the responsible offeror under the LPTA process.

(viii) For the Site Visit: Please provide names/ID for technical Co. representatives to attend by July 26, 2023, 5p.m. (CAT) South Sudan Time.

(ix) Quotations in response to this RFQ must be priced on a Firm-Fixed-Price basis. Offers must remain valid for no less than thirty (30) calendar days after the offer submission date.

Offerors are requested to provide quotations on their official quotation format or letterhead. The quotation proposal must not be more than 15 pages and must be on A-4 paper size.

(x) USAID/South Sudan anticipates awarding a Firm Fixed Price Purchase Order as a result of this RFQ.

(xi) Submission method: Electronically - email your offer or questions to jolando@usaid.gov, npoggo@usaid.gov with copy to jubaprocurements@usaid.gov

IMPORTANT NOTE: All vendors dealing with the United States Government MUST be registered in the SAM (System for Award Management) Database https://www.sam.gov prior to contract award pursuant to FAR provision 52.204-7. Therefore, prospective offerors are encouraged to register prior to the submission of quotations/proposals. Only vendors who have fully complied with this requirement are eligible for award.

Regards, USAID/South Sudan/Procurement Office

STATEMENT OF WORK

EXTERNAL REPAIRS AND EXTERNAL REPAINTING OF PREFABRICATED TOWNHOUSES

B.1 PURPOSE

The purpose of this contract is to renovate and repaint townhouses as described in detail in Section C, Statement of Work, Design Drawings, Appendices and Schedules.

B.2 TYPE OF CONTRACT & PAYMENT SCHEDULE

This is a Firm Fixed Price (FFP) contract with two (2) contract line-item numbers (CLINs) and payable entirely in U.S. dollars. The contractor must complete all work (including furnishing all labor, material, equipment, management, and services) required under this contract.

CLIN 1: Mobilization to Site Payment schedule: Mobilization to site is 10% of the total contract value payable upon 100% mobilization to site.

CLIN 2: Renovation of a Single Townhouse Payment Schedule: The remaining 90% cost of renovation is payable upon 100% completion of a single townhouse as described in the scope of work. This payment will be subject to 10% retainage for any latent defects identified during the 3-month defects liability period.

A. Gutters, downpipes, and fascia boards.

B. Repair all corroded exterior wall panels.

C. Repaint external surfaces of townhouse walls and corrugated galvanized iron (CGI) roofing.

D. Repair of Rusted Hollow Section (60x40x3mm) and Ceiling in Porches.

[END OF SECTION B]

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK (SOW)

C.1 TITLE

USAID/South Sudan External Repairs and External Repainting of 34 Prefabricated Townhouses.

C.2 PURPOSE

The objective of this FFP contract is to ensure all townhouses are fully repaired and repainted as described in the scope of work.

C. 3 BACKGROUND

Juba is a challenging environment. The Mission has gone on two ordered departures since December 2013 due to civil unrest. Flexibility and an understanding of how to operate safely and efficiently in South Sudan is essential for success. The Contractor must understand and have established international supply chains for procuring goods. This must include but is not limited to approved paints, solvents for paints, high density polyvinyl chloride (PVC) gutters and pipes, metal sheets and prefabricated wall panels (if applicable) and other general building materials. The availability of local supplies is inconsistent and the quality of many of these supplies is poor, therefore, the contractor must have the ability to import good quality supplies when they are unavailable locally. The Contractor must also understand the challenging labor market and have expertise in recruiting and managing skilled staff in Juba.

A Rust Remediation Assessment Report has been prepared identifying recommended replacement and repairs. This document is provided for background only. The contractor must follow all requirements of the Statement of Work and determine the scope of the work to be performed prior to submitting a proposal to the Government. The contractor bears the responsibility of understanding the Statement of Work before submitting a quotation. The contractor must make all required inquiries into the existing conditions and the required work in advance of submitting a quotation. The Rust Remediation Assessment Report includes a description of the manufacturers’ (Trimo and ICS group) products.

C.4 EXISTING CONDITIONS OF PREFABRICATED TOWNHOUSES

The existing conditions are established as a guideline and do not fully represent 100% condition of structures, grounds, infrastructure, and services. The Contractor must become familiar with the townhouses and the general layout of the US Embassy Residential Compound (RC) during the mandatory site visit. The prefabricated townhouses are scattered over a 5.5 acre footprint and are among several vertical structures ranging from other living quarters to service buildings that include kitchen, medical unit, restaurant etc. These townhouse units are more than 10 years old with 3 of the units having undergone expansion (in 2019) from 1-bedroom to 2-bedroom units; these expanded units are #14, #21 and #22.

The description of the 30 townhouses are as follows:

i. There are twenty-four (24) one-bedroom, 2-level townhouses (TWH) in 4 different locations within the RC. The units are numbered #6 to #13; #15 to #20; #23 to #32. Each unit is constructed of a concrete foundation hosting 3 modular prefabricated cells per level. Each cell is 6m x 2.4m x 2.8m high; refer to the drawings showing the building layout and material specification. Each TWH is serviced with power, water, sewerage management, AC units, IT, cable television and telephone service. The floor plans indicate the layout for both levels including the terrace and roof pitch approximately 2.2m high.

ii. There are six (6) two-bedroom, 2-level townhouses (TWH) in 3 different locations within the RC.

The units are numbered #14, #21, #22, #33, #34, and #35. Each unit is constructed of a concrete foundation hosting 4 modular prefabricated cells per level. Each cell is 6m x 2.4m x 2.8m high;

refer to the drawings showing the building layout and material specification. Each TWH is serviced with power, water, sewerage management, AC units, IT, cable television, and telephone service. The floor plans indicate the layout for both levels including the terrace and roof pitch approximately 2.2m high.

iii. Estimated dimensions for townhouses (subject to site measurement) are as follows:

a. Typical 1-bedroom townhouse aggregate for 2 levels: External surface area less terraces approximately 120m2, each terrace approximately 1.8m x 6m x 2.8m high.

b. Typical 2-bedroom townhouse aggregate for 2 levels: External surface area less terraces approximately 145m2, each terrace approximately 1.8m x 6m x 2.8m high.

c. Townhouses #14, #21 and #22 carry a different geometry to the typical units. External surface area less terraces approximately 142m2, each terrace approximately 1.8m x 7.2m x 2.8m high.

C.5 SCOPE OF WORK

The Contractor is responsible for providing all labor, equipment, materials, and services as described below and must consistently monitor quality of work and materials to ensure they meet internationally acceptable standards, such as, but not limited to, the International Building Codes and its equivalent. The following describe each CLIN’s elements of work:

CLIN 1: Initial mobilization 100% mobilization for the execution of the work. The initial mobilization must allow for the provision of a work schedule to be approved by the Contracting Officer’s Representative (COR); all safety equipment deemed necessary for safe operations; all scaffolding to cover the façade of these townhouses, and site measurement of all elements of the work as assessed by the Contractor and agreed to by the COR.

CLIN 2: Renovation of a Single Townhouse: Activities under this CLINs includes but are not limited to:

A. Gutters, downpipes, and fascia boards:

1. Supply and replace all existing gutters and downpipes with new gutters and downpipes;

the material must match the existing gutters and downpipes, in type and dimensions. The color must match the existing gutters and downpipes, in pre-painted sections. The paint used must be a lead free, all weather exterior, oil based, UV resistant paint. Coatings should be applied consistent with Specification Number 09 01 90.92.

2. Remove and replace the existing fascia boards with similar type timber; timber must be kiln dried, all-weather type. All fascia boards must be fastened with exterior grade screws; the use of nails is not allowed. An alternative method of fastening the fascia boards may be proposed at no additional cost, provided such an alternative is provided in writing prior to the commencement of the work and subject to the COR’s approval.

Coatings should be applied consistent with Specification Number 09 01 90.92.

B. Repair all corroded exterior wall panels:

1. Remove rust and repair all prefabricated, exterior wall panels that exhibit corrosion or rust. The work will include de-rusting, repair of the wall panels and removal and reinstallation of all service lines passing through the prefabricated walls. The wall panels shall be repaired using the specification of the original manufacturer.

C. Repaint external surfaces of townhouses:

1. Supply and apply surface coatings pursuant to the attached Specification Number 09 01

90.92 to the external surfaces of the townhouses, including CGI roofing sheets. The scope of work includes the careful sanding and cleaning of the rusted external prefabricated beams, columns and panels surfaces, filling of damaged parts, painting, and all other finishing works according to the technical instructions for the use and maintenance of Trimo and ICS group products.

2. The Contractor must provide a description of the work to be performed, including controls for paint handling and disposal, as well as erection of scaffolding. The contractor must be diligent in efforts to reduce paint fume emissions. All existing services (AC; IT electrical, plumbing) but not limited to, hardware and lines must always be protected from fumes and paint droplets during the execution of the work. All paint spills must be cleaned, and the utility lines must be free of any paint. All scaffolding must be placed as per Occupational Safety and Health Administration (OSHA) and/or Army Corp of Engineers (ACE) approved method of installation.

D. Repair of Rusted Hollow Section (60x40x3mm) and Ceiling in Porches:

1. The work must include but is not limited to repairing all corroded balcony floor hollow sections and ceiling panels. The hollow section members are welded to support the 2nd floor porch area that requires repair in accordance with the A&E assessment report attached here to. All repair materials must be all weather types and must be of the same materials as those presently installed. Paint coatings should be applied consistent with Specification Number 09 01 90.92.

MINIMUM STANDARDS FOR APPLICATION DURING THE PERFORMANCE OF THE MAINTENANCE

ACTIVITIES

At a minimum, the Contractor must apply the following or more stringent standards and methods to the different elements of this CLIN. When a conflict between two standards exists, the Contractor must utilize the stricter standard. The version of referenced standards in effect at the time of contract award applies.

Painting Codes; Standards and Specifications

● JOTASHIELD EXTERIOR or approved equal.

● Paint specifications: 576 High performance JOTUN Color #5041 NCS 54030-810G sRGB

(84,136,149)

Health and Safety Standards

● 29 Code of Federal Regulations (CFR) 1910, OSHA Safety and Health Standard for General Industry.

● 29 CFR 1904, OSHA Recording and Reporting Occupational Injuries and Illnesses.

● 29 CFR 1926, OSHA Safety and Health Standards for the Construction Industry.

Environmental Mitigation and Monitoring Plan

● The Contractor will be required to provide an Environmental Mitigation and Monitoring Plan to ensure adherence to the 22 CFR 216 regulations. The Contractor shall ensure to remove and dispose off-site all unwanted materials, including but not limited to empty paint containers, rollers, plastic sheets, etc., to approved locations by the host country and/or state government.

C.6 MANAGEMENT SERVICES/GENERAL CONTRACT REQUIREMENT

The Contractor is responsible for the overall management of this contract including human resources management, financial management, procurement and logistics, and contract management.

HUMAN RESOURCES MANAGEMENT

The Contractor must recruit, supervise, direct, discipline, and if necessary, discharge all personnel in each specialized area. The Contractor must supply USAID with personnel properly trained for their respective job assignments. All personnel furnished by the Contractor must always and for all purposes be employees of the Contractor and be subject to the conditions of employment.

The Contractor will assume full responsibility for the actions of such personnel while performing services pursuant to the contract, its modifications, or additional service agreements issued hereunder, and must be solely responsible for their supervision, daily direction and control, payment of salary (including any withholdings that may be required under local law or other applicable laws such as that of income taxes and social security), worker’s compensation, disability benefits, etc.

All Contractor’s staff must obtain access to the site from the Regional Security Officer (RSO) through an access request done by the COR. For seeking access, the Contractor at minimum must provide each employee’s correct name, proper form of ID e.g., passport, national ID card, country of origin and a telephone number (if available) for contact tracing.

The Contractor must abide by and must require employees to comply with all instructions, regulations, and codes of conduct as specified by USAID. Each employee of the Contractor must be legally authorized to work in South Sudan.

Uniforms and Personal Equipment: The Contractor's employees must wear clean, neat, and complete uniforms when on duty. Uniforms must be distinctive. All employees’ uniforms must be approved by the COR, and the cost of the uniforms should be included in the fixed price of the contract. The Contractor must provide all its employees with personal protective equipment (PPE) as guided by the Health & Safety codes and standards for PPE.

Neglect of duties must not be condoned: The Contractor must enforce a policy requiring no sleeping while on duty, unreasonable delays, or failures to carry out assigned tasks, conducting personal affairs during duty hours, and refusing to render assistance or cooperate in upholding the integrity of the worksite security.

Disorderly conduct, use of abusive or offensive language, quarreling, intimidation, and/or fighting is not allowed, nor is participation in disruptive activities, which interfere with normal and efficient US Government or host nation operations.

Contractor employees are not allowed to possess, sell, consume, or be under the influence of intoxicants, drugs or substances that produce similar effects while on duty. Contractor employees are not allowed to possess, sell, consume, or be under the influence of any illegal drug on or off duty.

Contractor employees may be subject to criminal actions as allowed by law in certain circumstances.

These include but are not limited to falsification or unlawful concealment, removal, mutilation, or destruction of any official documents or records or concealment of material facts by willful omission from official documents or records; unauthorized use of Government property, theft, vandalism, or improper conduct, unethical or improper use of official authority or credentials, security violations, organizing and/or participating in gambling in any form.

FINANCIAL MANAGEMENT

The Contractor is responsible for the financial management of this contract. The Contractor is responsible for submitting timely and accurate invoices. The Contractor is responsible for maintaining a sufficient level of cash on hand to be able to support the contract.

CONTRACT MANAGEMENT

General: The Contractor is responsible for providing full time administrative staff to meet the terms of the contract. Key personnel must have strong interpersonal skills and the ability to effectively liaise with individuals, institutions, and personnel from the U.S. Embassy/USAID.

USG supplied resources: The Contractor must use Government property, either furnished or acquired under this contract, only for performing this contract, unless otherwise provided for in this contract or approved by the Contracting Officer.

USAID will provide duty free entry of only paints and paint-based products which undergo importation into South Sudan.

USAID will provide limited space for the Contractor’s staging operations, electrical power, water (non-potable), sanitary facilities and the RC Annex for the Contractor’s storage and fabrication shop when required. The RC Annex is immediately opposite to the RC compound and is considered a controlled US Embassy occupied property. Any bulky storage, fabrication and processing of materials shall be done from the vendor’s yard.

The Contractor must promptly notify the COR of failure or anticipated failure of all USG furnished resources such as equipment and/or material. The Contractor will be responsible for fixing/replacing equipment if such equipment is damaged due to the negligence by the Contractor’s actions.

USAID will make the townhouses accessible to the external facades, stairs and within each terrace. The USAID/COR will be the liaison between the Contractor and the occupant(s). If during any standard working time (as described below) an occupant has complaints and/or requests a stoppage of the work, the Contractor shall cease all operations of the affected area, immediately inform the COR of this event, and both the Contractor and COR must agree on a way forward including a written record of any delays/causes from this event. Due to the occupancy of these units, the Contractor will have access to these areas as follows:

● Mondays to Fridays (standard workdays) from 8:00 am to 5:00 pm.

● No work is allowed outside of the standard workdays/period unless approved by the COR in advance. Work periods outside of standard workdays/periods include weekends and US/Local holidays.

● For work to be performed outside of these periods, the Contractor must provide a written request to the COR no later than 48 hours prior to the start of any work subject to approval of the request.

Contractor responsibilities: The Contractor is responsible for the proper use, storage, inventory, maintenance, transportation, and security of all Government Furnished Items (GFI) when applicable in the Contractor’s care. Any GFI that is lost or damaged due to the Contractor’s negligence must be replaced or repaired by the Contractor. All GFI is furnished in an “as is” condition and must be inspected and accepted by the Contractor prior to its use. The Contractor assumes all liability for claims arising from use or misuse of GFI while in the Contractor’s possession and must hold the Government harmless from any claims by the Contractor’s employees or others.

The Contractor must sign for all GFI on the forms provided by the Government.

Laws and Regulations: Without additional expense to the Government, the Contractor must comply with all local laws, codes, ordinances, and regulations required to perform work under this contract. In the event of a conflict among the contract and requirements of local law, the Contractor must promptly advise the COR of the conflict and of the Contractor's proposed course of action for resolution by the Contracting Officer (CO).

The Contractor is required to comply with all local labor laws, regulations, customs, and practices pertaining to labor, safety, and similar matters, to the extent that such compliance is not inconsistent with the requirements of this contract.

Changes to local labor laws that cause an increase to the cost of labor included in the fixed price portion of this contract, excluding company initiated pay raises, must be considered a basis for renegotiating the firm fixed price portion of the contract in accordance with the FAR clauses of this contract.

Personnel and Supervision: The Contractor must provide experienced and qualified administrative staff to oversee the management and logistics functions in this contract. The minimum key personnel for this contract are:

1. Superintendent of Work (SW)/Quality Control Officer (QCO)/Health & Safety Officer (HSO) - Full time on Site: The Contractor must designate a SW/QCO/HSO as the primary point of contact whom USAID may contact for procedural and substantive matters. The SW/QCO bears primary responsibility for all technical aspects of contract performance as well as management related requirements of the contract. The individual must have strong writing and oral presentation skills, and be knowledgeable about the overall technical, administrative, and logistical responsibility for the effective, efficient, and timely implementation of all activities undertaken by the Contractor. The individual must possess at least 5 years' experience of which 3 years’ in working on vertical structures and construction management and quality control of building construction and health and safety experience. The individual must be knowledgeable in the use and practice of scaffolding erection and use, must be familiar with control of painting emissions and disposal of paint and paint solvents. The individual must be familiar with the guidelines of the US Army Corps of Engineers Safety and Health Requirements Manual and/or OSHA for the construction industry.

[END OF SECTION C]

CONTRACT CLAUSES:

52.202-1 Definitions 52.203-3 Gratuities 52.203-5 Covenant Against Contingent Fees 52.203-6 Restrictions on Subcontractor Sales to the Government 52.203-6 Alternate I 52.203-7 Anti-Kickback Procedures 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity 52.203-12 Limitation on Payments to Influence Certain Federal Transactions 52.203-13 Contractor Code of Business Ethics and Conduct 52.203-14 Display of Hotline Poster(s) 52.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 52.203-16 Preventing Personal Conflicts of Interest 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of

Whistleblower Rights 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements 52.204-1 Approval of Contract 52.204-2 Security Requirements 52.204-2 Alternate I 52.204-2 Alternate II

52.204-9 Personal Identity Verification of Contractor Personnel 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards 52.204-12 Unique Entity Identifier Maintenance 52.204-13 System for Award Management Maintenance 52.204-14 Service Contract Reporting Requirements 52.204-18 Commercial and Government Entity Code Maintenance 52.204-19 Incorporation by Reference of Representations and Certifications 52.204-21 Basic Safeguarding of Covered Contractor Information Systems 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance

Services or Equipment 52.204-26 Covered Telecommunications Equipment or Services-Representation 52.207-3 Right of First Refusal of Employment 52.207-5 Option to Purchase Equipment 52.208-4 Vehicle Lease Payments 52.208-5 Condition of Leased Vehicles 52.208-6 Marking of Leased Vehicles 52.208-7 Tagging of Leased Vehicles 52.208-8 Required Sources for Helium and Helium Usage Data 52.208-9 Contractor Use of Mandatory Sources of Supply or Services 52.209-1 Qualification Requirements 52.209-3 First Article Approval-Contractor Testing

52.209-3 Alternate I 52.209-3 Alternate II 52.209-4 First Article Approval-Government Testing 52.209-4 Alternate I 52.209-4 Alternate II 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations 52.210-1 Market Research 52.211-5 Material Requirements 52.211-8 Time of Delivery 52.211-8 Alternate I 52.211-8 Alternate II 52.211-8 Alternate III 52.211-9 Desired and Required Time of Delivery.

52.211-9 Alternate I 52.211-9 Alternate II 52.211-9 Alternate III 52.211-10 Commencement, Prosecution, and Completion of Work 52.211-10 Alternate I 52.211-11 Liquidated Damages-Supplies, Services, or Research and Development 52.211-12 Liquidated Damages-Construction 52.211-13 Time Extensions 52.211-15 Defense Priority and Allocation Requirements 52.211-16 Variation in Quantity 52.211-17 Delivery of Excess Quantities 52.211-18 Variation in Estimated Quantity 52.212-4 Contract Terms and Conditions-Commercial Items 52.212-4 Alternate I 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders-

Commercial Items 52.212-5 Alternate I 52.212-5 Alternate II 52.213-1 Fast Payment Procedure 52.213-2 Invoices 52.213-3 Notice to Supplier 52.213-4 Terms and Conditions-Simplified Acquisitions (Other Than Commercial Items) 2.214-26 Audit and Records-Sealed Bidding 52.214-26 Alternate I 52.214-27 Price Reduction for Defective Certified Cost or Pricing Data-Modifications-Sealed Bidding 52.214-28 Subcontractor Certified Cost or Pricing Data-Modifications-Sealed Bidding 52.214-29 Order of Precedence-Sealed Bidding 52.214-31 Facsimile Bids 52.215-2 Audit and Records-Negotiation 52.215-2 Alternate I

52.215-2 Alternate II 52.215-2 Alternate III 52.215-8 Order of Precedence-Uniform Contract Format 52.215-9 Changes or Additions to Make-or-Buy Program 52.215-9 Alternate I 52.215-9 Alternate II 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data-Modifications 52.215-12 Subcontractor Certified Cost or Pricing Data 52.215-13 Subcontractor Certified Cost or Pricing Data-Modifications 52.215-14 Integrity of Unit Prices 52.215-14 Alternate I 52.215-15 Pension Adjustments and Asset Reversions 52.215-17 Waiver of Facilities Capital Cost of Money 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits (PRB) Other Than Pensions 52.215-19 Notification of Ownership Changes 52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or

Pricing Data-Modifications 52.215-21 Alternate I 52.215-21 Alternate II 52.215-21 Alternate III 52.215-21 Alternate IV 52.215-23 Limitations on Pass-Through Charges 52.215-23 Alternate I 52.216-2 Economic Price Adjustment-Standard Supplies 52.216-3 Economic Price Adjustment-Semistandard Supplies 52.216-4 Economic Price Adjustment-Labor and Material 52.216-5 Price Redetermination-Prospective 52.216-6 Price Redetermination-Retroactive 52.216-7 Allowable Cost and Payment 52.216-7 Alternate I 52.216-7 Alternate II 52.216-7 Alternate III 52.216-7 Alternate IV 52.216-8 Fixed Fee 52.216-9 Fixed Fee-Construction 52.216-10 Incentive Fee 52.216-11 Cost Contract-No Fee 52.216-11 Alternate I 52.216-12 Cost-Sharing Contract-No Fee 52.216-12 Alternate I 52.216-15 Predetermined Indirect Cost Rates 52.216-16 Incentive Price Revision-Firm Target 52.216-16 Alternate I 52.216-17 Incentive Price Revision-Successive Targets 52.216-17 Alternate I

52.216-18 Ordering 52.216-19 Order Limitations 52.216-20 Definite Quantity 52.216-26 Payments of Allowable Costs Before Definitization 52.216-27 Single or Multiple Awards 52.216-28 Multiple Awards for Advisory and Assistance Services 52.216-29 Time-and-Materials/Labor-Hour Proposal Requirements-Non-Commercial Item

Acquisition with Adequate Price Competition 52.216-30 Time-and-Materials/Labor-Hour Proposal Requirements-Non-Commercial Item

Acquisition Without Adequate Price Competition 52.216-31 Time-and-Materials/Labor-Hour Proposal Requirements-Commercial Item Acquisition 52.216-32 Task-Order and Delivery-Order Ombudsman 52.216-32 Alternate I 52.217-2 Cancellation Under Multi-Year Contracts 52.217-3 Evaluation Exclusive of Options 52.217-4 Evaluation of Options Exercised at Time of Contract Award 52.217-5 Evaluation of Options 52.217-6 Option for Increased Quantity 52.217-7 Option for Increased Quantity-Separately Priced Line Item 52.217-8 Option to Extend Services 52.219-3 Notice of HUBZone Set-Aside or Sole Source Award 52.219-3 Alternate I 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns 52.219-4 Alternate I 52.219-6 Notice of Total Small Business Set-Aside 52.219-6 Alternate I 52.219-6 Alternate II 52.219-7 Notice of Partial Small Business Set-Aside 52.219-7 Alternate I 52.219-7 Alternate II 52.219-8 Utilization of Small Business Concerns 52.219-9 Small Business Subcontracting Plan 52.219-9 Alternate I 52.219-9 Alternate II 52.219-9 Alternate III 52.219-9 Alternate IV 52.219-10 Incentive Subcontracting Program 52.219-11 Special 8(a) Contract Conditions 52.219-14 Limitations on Subcontracting 52.219-16 Liquidated Damages-Subcontracting Plan 52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-Aside 52.219-28 Post-Award Small Business Program Representation 52.219-28 Alternate I 52.219-29 Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-

Owned Small Business Concerns

52.219-30 Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program

52.219-32 Orders Issued Directly Under Small Business Reserves 52.219-33 Nonmanufacturer Rule 52.222-1 Notice to the Government of Labor Disputes 52.222-2 Payment for Overtime Premiums 52.222-3 Convict Labor 52.222-4 Contract Work Hours and Safety Standards -Overtime Compensation 52.222-7 Withholding of Funds 52.222-8 Payrolls and Basic Records 52.222-9 Apprentices and Trainees 52.222-10 Compliance with Copeland Act Requirements 52.222-11 Subcontracts (Labor Standards) 52.222-12 Contract Termination-Debarment 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations 52.222-14 Disputes Concerning Labor Standards 52.222-15 Certification of Eligibility 52.222-16 Approval of Wage Rates 52.222-17 [Reserved] 52.222-19 Child Labor-Cooperation with Authorities and Remedies 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment 52.222-21 Prohibition of Segregated Facilities 52.222-26 Equal Opportunity 52.222-26 Alternate I 52.222-27 Affirmative Action Compliance Requirements for Construction 52.222-29 Notification of Visa Denial 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified

Method) 52.222-31 Construction Wage Rate Requirements-Price Adjustment (Percentage Method) 52.222-32 Construction Wage Rate Requirements-Price Adjustment (Actual Method) 52.222-34 Project Labor Agreement 52.222-34 Alternate I 52.222-37 Employment Reports on Veterans 52.222-40 Notification of Employee Rights Under the National Labor Relations Act 52.222-41 Service Contract Labor Standards 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment

(Multiple Year and Option Contracts) 52.222-44 Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment 52.222-46 Evaluation of Compensation for Professional Employees 52.222-49 Service Contract Labor Standards-Place of Performance Unknown 52.222-50 Combating Trafficking in Persons 52.222-51 Exemption from Application of the Service Contract Labor Standards to Contracts for

Maintenance, Calibration, or Repair of Certain Equipment Requirements 52.222-53 Exemption from Application of the Service Contract Labor Standards to Contracts for

Certain Services-Requirements 52.222-54 Employment Eligibility Verification

52.222-55 Minimum Wages Under Executive Order 13658 52.222-62 Paid Sick Leave Under Executive Order 13706 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts 52.223-3 Hazardous Material Identification and Material Safety Data 52.223-3 Alternate I 52.223-5 Pollution Prevention and Right-to-Know Information 52.223-5 Alternate I 52.223-5 Alternate II 52.223-6 Drug-Free Workplace 52.223-7 Notice of Radioactive Materials 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items 52.223-9 Alternate I 52.223-10 Waste Reduction Program 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioner 52.223-13 Acquisition of EPEAT®–Registered Imaging Equipment 52.223-13 Alternate I 52.223-14 Acquisition of EPEAT®-Registered Televisions 52.223-14 Alternate I 52.223-15 Energy Efficiency in Energy-Consuming Products 52.223-16 Acquisition of EPEAT®-Registered Personal Computer Products 52.223-16 Alternate I 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving 52.223-19 Compliance with Environmental Management Systems 52.223-20 Aerosols 52.223-21 Foams 52.224-1 Privacy Act Notification 52.224-2 Privacy Act 52.224-3 Privacy Training 52.224-3 Alternate I 52.225-1 Buy American-Supplies 52.225-2 Buy American Certificate 52.225-3 Buy American-Free Trade Agreements-Israeli Trade Act 52.225-3 Alternate I 52.225-3 Alternate II 52.225-3 Alternate III 52.225-4 Buy American-Free Trade Agreements-Israeli Trade Act Certificate 52.225-5 Trade Agreements 52.225-13 Restrictions on Certain Foreign Purchases 52.225-14 Inconsistency between English Version and Translation of Contract 52.225-19 Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or

Consular Mission Outside the United States 52.225-26 Contractors Performing Private Security Functions Outside the United States 52.222-35 Equal Opportunity for Veterans 52.222-36 Equal Opportunity for Workers with Disabilities

52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises 52.227-1 Authorization and Consent 52.227-1 Alternate I 52.227-1 Alternate II 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement 52.227-3 Patent Indemnity 52.227-3 Alternate I 52.227-3 Alternate II 52.227-3 Alternate III 52.227-4 Patent Indemnity-Construction Contracts 52.227-4 Alternate I 52.227-5 Waiver of Indemnity 52.227-6 Royalty Information 52.227-9 Refund of Royalties 52.227-10 Filing of Patent Applications-Classified Subject Matter 52.227-11 Patent Rights-Ownership by the Contractor 52.227-11 Alternate I 52.227-11 Alternate II 52.227-11 Alternate III 52.227-11 Alternate IV 52.227-11 Alternate 52.227-13 Patent Rights-Ownership by the Government 52.227-13 Alternate I 52.227-13 Alternate II 52.227-14 Rights in Data-General 52.227-14 Alternate I 52.227-14 Alternate II 52.227-14 Alternate III 52.227-14 Alternate IV 52.227-14 Alternate 52.227-16 Additional Data Requirements 52.227-17 Rights in Data-Special Works 52.227-18 Rights in Data-Existing Works 52.227-19 Commercial Computer Software License 52.227-20 Rights in Data-SBIR Program 52.227-21 Technical Data Declaration, Revision, and Withholding of Payment-Major Systems 52.227-22 Major System-Minimum Rights 52.227-23 Rights to Proposal Data (Technical) 52.228-2 Additional Bond Security 52.228-3 Workers’ Compensation Insurance (Defense Base Act) 52.228-4 Workers’ Compensation and War-Hazard Insurance Overseas 52.228-5 Insurance-Work on a Government Installation 52.228-7 Insurance-Liability to Third Persons 52.228-8 Liability and Insurance-Leased Motor Vehicles 52.228-9 Cargo Insurance 52.228-10 Vehicular and General Public Liability Insurance

52.228-11 Pledges of Assets 52.228-12 Prospective Subcontractor Requests for Bonds 52.228-13 Alternative Payment Protections 52.228-14 Irrevocable Letter of Credit 52.228-15 Performance and Payment Bonds-Construction 52.229-1 State and Local Taxes 52.229-2 North Carolina State and Local Sales and Use Tax 52.229-2_ Alternate I 52.229-3 Federal, State, and Local Taxes 52.229-4 Federal, State, and Local Taxes (State and Local Adjustments) 52.229-6 Taxes-Foreign Fixed-Price Contracts 52.229-7 Taxes-Fixed-Price Contracts with Foreign Governments 52.229-8 Taxes-Foreign Cost-Reimbursement Contracts 52.229-9 Taxes-Cost-Reimbursement Contracts with Foreign Governments 52.229-11 Tax on Certain Foreign Procurements 52.229-12 Tax on Certain Foreign Procurements 52.230-2 Cost Accounting Standards 52.230-3 Disclosure and Consistency of Cost Accounting Practices 52.230-4 Disclosure and Consistency of Cost Accounting Practices-Foreign Concerns 52.230-5 Cost Accounting Standards-Educational Institution 52.230-6 Administration of Cost Accounting Standards 52.232-1 Payments 52.232-2 Payments under Fixed-Price Research and Development Contracts 52.232-3 Payments under Personal Services Contracts 52.232-4 Payments under Transportation Contracts and Transportation-Related Services Contracts 52.232-5 Payments under Fixed-Price Construction Contracts 52.232-6 Payment under Communication Service Contracts with Common Carriers 52.232-7 Payments under Time-and-Materials and Labor-Hour Contracts 52.232-8 Discounts for Prompt Payment 52.232-9 Limitation on Withholding of Payments 52.232-10 Payments under Fixed-Price Architect-Engineer Contracts 52.232-11 Extras 52.232-16 Progress Payments 52.232-16 Alternate I 52.232-16 Alternate II 52.232-16 Alternate III 52.232-17 Interest 52.232-18 Availability of Funds 52.232-20 Limitation of Cost 52.232-22 Limitation of Funds 52.232-23 Assignment of Claims 52.232-23 Alternate I 52.232-24 Prohibition of Assignment of Claims 52.232-25 Prompt Payment 52.232-25 Alternate I 52.232-26 Prompt Payment for Fixed-Price Architect-Engineer Contracts

52.232-27 Prompt Payment for Construction Contracts 52.232-30 Installment Payments for Commercial Items 52.232-33 Payment by Electronic Funds Transfer-System for Award Management 52.232-34 Payment by Electronic Funds Transfer-Other than System for Award Management 52.232-35 Designation of Office for Government Receipt of Electronic Funds Transfer Information 52.232-36 Payment by Third Party 52.232-37 Multiple Payment Arrangements 52.232-39 Unenforceability of Unauthorized Obligations 52.232-40 Providing Accelerated Payments to Small Business Subcontractors 52.233-1 Disputes 52.233-1 Alternate I 52.233-3 Protest after Award 52.233-3 Alternate I 52.233-4 Applicable Law for Breach of Contract Claim 52.234-4 Earned Value Management System 52.236-1 Performance of Work by the Contractor 52.236-2 Differing Site Conditions 52.236-3 Site Investigation and Conditions Affecting the Work 52.236-5 Material and Workmanship 52.236-6 Superintendence by the Contractor 52.236-7 Permits and Responsibilities 52.236-8 Other Contracts 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements 52.236-10 Operations and Storage Areas 52.236-11 Use and Possession Prior to Completion 52.236-12 Cleaning Up 52.236-13 Accident Prevention 52.236-13 Alternate I 52.236-14 Availability and Use of Utility Services 52.236-15 Schedules for Construction Contracts 52.236-16 Quantity Surveys 52.236-16_ Alternate I 52.236-17 Layout of Work 52.236-18 Work Oversight in Cost-Reimbursement Construction Contracts 52.236-19 Organization and Direction of the Work 52.236-21 Specifications and Drawings for Construction 52.236-21 Alternate I 52.236-21 Alternate II 52.236-22 Design Within Funding Limitations 52.236-23 Responsibility of the Architect-Engineer Contractor 52.236-24 Work Oversight in Architect-Engineer Contracts 52.236-25 Requirements for Registration of Designers 52.236-26 Preconstruction Conference 52.237-2 Protection of Government Buildings, Equipment, and Vegetation 52.237-3 Continuity of Services 52.237-4 Payment by Government to Contractor

52.237-4 Alternate I 52.237-5 Payment by Contractor to Government 52.237-6 Incremental Payment by Contractor to Government 52.237-7 Indemnification and Medical Liability Insurance 52.237-9 Waiver of Limitation on Severance Payments to Foreign Nationals 52.239-1 Privacy or Security Safeguards 52.241-2 Order of Precedence-Utilities 52.241-4 Change in Class of Service 52.241-5 Contractor’s Facilities 52.242-1 Notice of Intent to Disallow Costs 52.242-2 Production Progress Reports 52.242-3 Penalties for Unallowable Costs 52.242-4 Certification of Final Indirect Costs 52.242-5 Payments to Small Business Subcontractors 52.242-13 Bankruptcy 52.242-14 Suspension of Work 52.242-15 Stop-Work Order 52.242-15 Alternate I 52.242-17 Government Delay of Work 52.243-1 Changes-Fixed-Price 52.243-1 Alternate I 52.243-1 Alternate II 52.243-1 Alternate III 52.243-1 Alternate IV 52.243-1 Alternate 52.243-2 Changes-Cost-Reimbursement 52.243-2 Alternate I 52.243-2 Alternate II 52.243-2 Alternate III 52.243-2 Alternate IV 52.243-2 Alternate 52.243-3 Changes-Time-and-Materials or Labor-Hours 52.243-4 Changes 52.243-5 Changes and Changed Conditions 52.243-6 Change Order Accounting 52.243-7 Notification of Changes 52.244-2 Subcontracts 52.244-2 Alternate I 52.244-4 Subcontractors and Outside Associates and Consultants (Architect-Engineer Services) 52.244-5 Competition in Subcontracting 52.244-6 Subcontracts for Commercial Items 52.245-1 Government Property 52.245-1 Alternate I 52.245-1 Alternate II 52.245-9 Use and Charges 52.246-1 Contractor Inspection Requirements

52.246-2 Inspection of Supplies-Fixed-Price 52.246-2 Alternate I 52.246-2 Alternate II 52.246-3 Inspection of Supplies-Cost-Reimbursement 52.246-4 Inspection of Services-Fixed-Price 52.246-5 Inspection of Services-Cost-Reimbursement 52.246-6 Inspection-Time-and-Material and Labor-Hour 52.246-6 Alternate I 52.246-7 Inspection of Research and Development-Fixed-Price 52.246-8 Inspection of Research and Development-Cost-Reimbursement 52.246-8 Alternate I 52.246-9 Inspection of Research and Development (Short Form) 52.246-11 Higher-Level Contract Quality Requirement 52.246-12 Inspection of Construction 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements 52.246-14 Inspection of Transportation 52.246-15 Certificate of Conformance 52.246-16 Responsibility for Supplies 52.246-17 Warranty of Supplies of a Noncomplex Nature 52.246-17 Alternate I 52.246-17 Alternate II 52.246-17 Alternate III 52.246-17 Alternate IV 52.246-17 Alternate 52.246-18 Warranty of Supplies of a Complex Nature 52.246-18 Alternate I 52.246-18 Alternate II 52.246-18 Alternate III 52.246-18 Alternate IV 52.246-19 Warranty of Systems and Equipment under Performance Specifications or Design Criteria 52.246-19 Alternate I 52.246-19 Alternate II 52.246-19 Alternate III 52.246-20 Warranty of Services 52.246-21 Warranty of Construction 52.246-21 Alternate I 52.246-23 Limitation of Liability 52.246-24 Limitation of Liability-High-Value Items 52.246-24 Alternate I 52.246-25 Limitation of Liability-Services 52.246-26 Reporting Nonconforming Items 52.247-1 Commercial Bill of Lading Notations 52.247-3 Capability to Perform a Contract for the Relocation of a Federal Office 52.247-3 Alternate I 52.247-8 Estimated Weights or Quantities Not Guaranteed 52.247-9 Agreed Weight-General Freight

52.247-10 Net Weight-General Freight 52.247-11 Net Weight-Household Goods or Office Furniture 52.247-12 Supervision, Labor, or Materials 52.247-13 Accessorial Services-Moving Contracts 52.247-14 Contractor Responsibility for Receipt of Shipment 52.247-15 Contractor Responsibility for Loading and Unloading 52.247-16 Contractor Responsibility for Returning Undelivered Freight 52.247-17 Charges 52.247-18 Multiple Shipments 52.247-22 Contractor Liability for Loss of and/or Damage to Freight other than Household Goods 52.247-23 Contractor Liability for Loss of and/or Damage to Household Goods 52.247-24 Advance Notification by the Government 52.247-25 Government-Furnished Equipment with or Without Operators 52.247-26 Government Direction and Marking 52.247-27 Contract Not Affected by Oral Agreement 52.247-28 Contractor’s Invoices 52.247-29 F.o.b. Origin 52.247-30 F.o.b. Origin, Contractor’s Facility 52.247-31 F.o.b. Origin, Freight Allowed) 52.247-32 F.o.b. Origin, Freight Prepaid 52.247-34 F.o.b. Destination 52.247-35 F.o.b. Destination, Within Consignee’s Premises 52.247-36 F.a.s. Vessel, Port of Shipment 52.247-37 F.o.b. Vessel, Port of Shipment 52.247-38 F.o.b. Inland Carrier, Point of Exportation 52.247-39 F.o.b. Inland Point, Country of Importation 52.247-40 Ex Dock, Pier, or Warehouse, Port of Importation 52.247-41 C.& f. Destination 52.247-42 C.i.f. Destination 52.247-43 F.o.b. Designated Air Carrier’s Terminal, Point of Exportation 52.247-44 F.o.b. Designated Air Carrier’s Terminal, Point of Importation 52.247-48 F.o.b.