This solicitation from the US Agency for International Development South Sudan seeks services to renovate and repaint prefabricated townhouses at the US Embassy Residential Compound in South Sudan. The solicitation number is 72066823Q00084 and offers are due by February 26, 2023. Services required include renovating up to 30 prefabricated townhouses to include repairs to walls, floors, windows and doors; repainting both interiors and exteriors; and repairing or replacing plumbing fixtures and electrical systems as needed. The period of performance is 120 days from the award date. The place of performance is the US Embassy Residential Compound in Juba, South Sudan.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

RESIDENTIAL COMPOUND

RUST REMEDIATION

(100% DESIGN SUBMISSION)

Submission Date: January 26, 2023

TASK ORDER AID-OAA-I-15-00051; AWARD NO: 72066820F00004

Submitted by: William Lyons, Program Manager Perez, APC 2525 Burgundy St.

New Orleans, LA 70117 Tel: +1 (504) 584-5100 wlyons@e-perez.com

This document was produced for review by the United States Agency for International Development South Sudan. It was prepared by Perez for the USAID South Sudan Vertical Structures Assessment, Task Order number AID-OAA-I-15-00051/72061119F00001 under the USAID Architectural and Engineering (A&E II IDIQ).

USAID South Sudan Engineering Support Program (ESP) Residential Compound Rust Remediation

THIS PAGE LEFT INTENTIONALLY BLANK

GE

NE

RA

TOR

P

AD

SEP

TIC

TA

NK

F O O T

C O N T A

IN

E R

GU

AR

D B

OO

TH

WAT

ER

TAN

KS

WA

SHR

OO

MS

B ri d g e

G R A S S

C R E T E

R O A D

D

Y H

D

Y H

0 24m16848

SOUTH SUDAN US EMBASSY JUBA RUST REMEDIATION

AWARD NO: 72066820F00003; TASK ORDER AID-OAA-I-15-0005I; JOB ORDER AID-0AA-TO-16-00028 ESP JO3

FIGURE 2 - RESIDENTIAL COMPOUND - REMEDIATION UNITS (labeled in red)

252627

12 14

13 21201918

23 22

3738 39

USAID South Sudan Engineering Support Program (ESP)

Residential Compound Rust Remediation

SCOPE OF WORK

The existing prefabricated residential units use metal panels of galvanized steel with an organic protective coating. See Trimo technical instructions for the use and maintenance of Trimo products after the Coating Restoration specifications for said units.

Follow Coating Restoration specifications for surface preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, and wall panel components.

Metal deterioration exceeding repair requirements must be replaced. If the damage exceeds 1/3 depth of the sheet metal and/or 1/4 depth of steel framing, remove damaged area and replace with new metal or hollow metal section, then follow coating specifications.

Metal repair must not damage the adjoining finish. Follow manufacturer's instructions for material limits, use of shears and protective layers. Machining is not advised to cause additional burrs or damage to adjacent material. See below for Trimo contact, Uros Murn, to obtain ordering information for full panel replacement.

TRIMO PANEL CONTACT

Uros Murn, Sales Trimo MSS d.o.o.

Prijateljeva cesta 12 | 8210 Trebnje | Slovenia T: +386 (0)7 34 83 502 | M: +386 51 360 044 uros.murn@trimo-group.com | www.trimo-mss.com

Notes:

1- The total number of housing units is 41 buildings. However, there are only 34 containerized building units which require rust remediation.

2 - The seven (7) building units that do not require rust remediation are concrete buildings which include unit #'s: 1 - 5, unit 36 and unit 41.

ASSESSMENT REPORT

USAID ENGINEERING SUPPORT PROJECT

Rust Remediation Works

06A & 06B

1-06A Kitchen area estimated to be 0.5m2 for wall panel.

2-06B Kitchen estimated area is 1m2 which includes minor rust on the panel, beams and the steel members used for supporting the connected prefabs.

3- 06A & 06B Toilet estimated area is 1m2

1-Thoroughly sand the rusted metallic surface and apply anti-rust treatment for the prefabs framings and the veranda ceiling.

2- For the panels, cut-off the damages part and replace with new one by joining or replacing the entire panel.

ADDITIONAL PHOTOS

1) Follow specifications for surface preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, and wall panel components.

2) Metal repair must not damage the adjoining finish. Follow manufacturer's instructions for material limits, use of shears and protective layers. Machining is not advised to cause additional burrs or damage to adjacent material.

ENLARGED PHOTOS 06A & 06B

07A & 07B

1-07A Toilet area estimated to be 0.5m2 2-07B Toilet an area estimated to be 0.4m2 3-07A Kitchen area estimated to be 0.9m2 for wall panel.

4-07B Kitchen bottom beam estimated area of 0.4m2.

1-Thoroughly sand the anti-rust treatment for the prefabs framings and the veranda ceiling.

2- For the panels, cut-off the damaged part and replace with new one by joining or replacing the entire panel

ADDITIONAL PHOTOS

1) Follow specifications for surface preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, and wall panel components.

2) Metal repair must not damage the adjoining finish. Follow manufacturer's instructions for material limits, use of shears and protective layers. Machining is not advised to cause additional burrs or damage to adjacent material.

08A & 08B

1-08A Kitchen area estimated to be 1 m2 for wall panel.

2-08B Kitchen estimated area is 0.9m2 which includes rust on the panel, beams and the steel members used for supporting the connected prefabs anti-rust treatment for the prefabs framings and the veranda ceiling.

2- For the panels, cut-off the damages part and replace

ENLARGED PHOTOS 07A & 07B

1) Follow specifications for surface preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, and wall panel components.

replacing the entire panel.

ENLARGED PHOTOS 08A & 08B

preparation, repair, and application of rust inhibitor for prefab building

09A & 09B

1-09A Kitchen area estimated to be 1m2 for wall panel and 0.3m2 on the bottom beam (frame).

2-09B Kitchen estimated area is 1.2m2 which includes rust on the panel, minor rust on the beams and the steel members used for supporting the connected prefabs

1-Thoroughly sand the minor rusted metallic surface and apply anti-rust treatment for the prefabs panel or cut-off the spoiled part and replace with new ones.

2- For the panels and the prefab beam, cut-off the

ENLARGED PHOTOS 08A & 08B

1) Follow specifications for surface preparation, repair, and application of rust inhibitor for prefab building

5-09A& B Toilets panels with estimated area of 0.4M2 damages part and replace it with a new one by joining or replacing the entire panel, also replace the bottom beam with new a one.

ENLARGED PHOTOS 09A & 09B

preparation, repair, and application of rust inhibitor for prefab building

10A & 10B

1-10A Kitchen area estimated to be 0.8 m2 for wall panel and the bottom beam.

2-10B Kitchen estimated area is 1.1 m2 which includes rust on the panel, beams and the steel members used for supporting the connected prefabs

5-10A& B Toilets panels, veranda ceiling with estimated area of 1.5M2 metallic surface and apply anti-rust treatment for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it with a new one by joining or replacing the entire panel, also replace the bottom beam with new a one.

3- Replace the entire veranda ceiling sheet.

ENLARGED PHOTOS 09A & 09B

preparation, repair, and application of rust inhibitor for prefab building

ENLARGED PHOTOS 10A & 10B

11A & 11B

1-11A Kitchen area estimated to be 0.8 m2 for wall panel.

2-11B Kitchen estimated area is 0.9m2 which includes rust on the panel, the beams and the steel

5-11A& B Toilets panels with estimated area of 0.3M2 rust treatment for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it

12A & 12B

1-12A Kitchen area estimated area to be 1m2 for wall panel and the entire beam.

2-12B Kitchen estimated area is 0.7m2 which includes rust on the panel, the beams and the steel members used for supporting the connected prefabs rust treatment for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it with a new one

1) Follow specifications for surface preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, and wall panel components.

1) Follow specifications for surface preparation, repair, and application of rust inhibitor for prefab building

3-12A ceiling panels with estimated area of 1.2M2 by joining or replacing the entire panel.

13A & 13B 1-13A Kitchen area estimated to be 0.7 m2 for wall panel.

2-13B Kitchen estimated area is 0.8m2 which includes rust on the panel, the beams and the steel members used for supporting the connected prefabs

3-13A& B Toilets panels with estimated area of 0.54M2 apply anti-rust treatment for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, and wall panel components.

1) Follow specifications for surface preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, and wall panel components.

14A & 14B 1-14A &B Kitchen area estimated to be 0.8 m2 for wall panel and the entire beam and connecting members.

3-14A& B Toilets panels with estimated area of 0.6M2 and estimated anti-rust treatment for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it of rust inhibitor for prefab building

ENLARGED PHOTOS 14A & 14B

15A & 15B 1-15A &B Kitchen area estimated to be 1 m2 for wall panel and the entire beam and connecting members.

3-15A& B Toilets panels with estimated area of 0.6M2 and estimated anti-rust treatment for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it

ENLARGED PHOTOS 14A & 14B

preparation, repair, and application of rust inhibitor for prefab building

ENLARGED PHOTOS 15A & 15B

ENLARGED PHOTOS 15A & 15B

16A & 16B

1-16A &B Kitchen area estimated to be 2 m2 for wall panel and the entire beam and connecting members.

3-16A& B Toilets panels with estimated area of 0.6M2 and estimated rust treatment for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it with a new one by joining or replacing the entire panel, also replace the bottom hollow section for the veranda preparation, repair, and application of rust inhibitor for prefab building

ENLARGED PHOTOS 16A & 16B

17A & 17B

1-17A &B Kitchen area estimated to be 1.6 m2 for wall panel and the entire beam and connecting members.

3-17A& B Toilets panels

0.6M2 and estimated rust treatment for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it with a new one by joining or replacing the entire panel, also replace the bottom hollow section for the veranda with new a one..

preparation, repair, and application of rust inhibitor for prefab building

ENLARGED PHOTOS 17A & 17B

18A & 16B

1-18A &B Kitchen area estimated to be 1 m2 for wall panel and the entire beam and connecting members.

3-18A& B Toilets panels

0.7M2 and estimated

1-Thoroughly sand the rusted metallic surface and apply anti-rust treatment for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it with a new one by joining or preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, 19A & 19B

1-19A &B Kitchen area estimated to be 1.5 m2 for wall panel and the entire beam and connecting members.

3-19A& B Toilets panels with estimated area of 1 M2 and estimated for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it with a new one by joining or replacing the entire panel.

ENLARGED PHOTOS 18A & 18B

preparation, repair, and application of rust

ENLARGED PHOTOS 19A & 19B

20A & 20B

1-20A &B Kitchen area estimated to be 1 m2 for wall panel and the entire beam and connecting members.

3-20 A& B Toilets panels

0.9M2 and estimated for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it with a new one by joining or replacing the entire panel, also replace the bottom beam with new a one.

ENLARGED PHOTOS 19A & 19B

1) Follow specifications for surface preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, and wall panel components.

ENLARGED PHOTOS 20A & 20B

21A & 21B

1-21A &B Kitchen area estimated to be 1.4 m2 for wall panel and the entire beam and connecting members.

3-21A& B Toilets panels

0.8M2 and estimated rust treatment for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it with a new one by joining or replacing the entire panel, also replace the bottom beam with new a one.

3- Replace the entire ceiling panel for 21A.

ENLARGED PHOTOS 20A & 20B

preparation, repair, and application of rust inhibitor for prefab building

ENLARGED PHOTOS 21A & 21B

ENLARGED PHOTOS 21A & 21B

22A & 22B 1-22A &B Kitchen area estimated to be 2.5 m2 for wall panel and the entire beam and connecting members.

3-22A& B Toilets panels metallic surface and apply anti-rust treatment for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damaged part and replace it with a new one by joining or replacing the entire panel.

preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, and wall panel components.

ENLARGED PHOTOS 22A & 22B

23A & 23B

1-23A &B Kitchen area estimated to be 1 m2 for wall panel and the entire beam and connecting members.

3-23A& B Toilets panels for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it with a new one by joining or replacing the entire panel.

3-Replace the hollow section placed as bottom beam at the veranda.

preparation, repair, and application of rust

ENLARGED PHOTOS 23A & 23B

24A & 24B

1-24A &B Kitchen area estimated to be 2 m2 for wall panel and the entire beam and connecting members.

3-24A& B Toilets panels

1M2 and estimated for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it with a new one by joining or replacing the entire panel.

preparation, repair, and application of rust

ENLARGED PHOTOS 24A & 24B

Rust Remediation Works

33A &

33B 1-33A Kitchen area estimated to be 0.5m2 for wall panel.

2-33B Kitchen estimated area is 0.4m2 which includes minor rust on the panel, beams and the steel members used for

5-33A Veranda door frame 80x40x3 hollow section and estimated area of 1.5m2 rust at the veranda ceiling anti-rust treatment for the prefabs framings and the veranda ceiling.

2- For the panels, cut-off the damages part and replace with new one by joining or replacing the entire panel.

1) Follow specifications for surface preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, and wall panel components.

2) Metal repair must not damage the adjoining finish. Follow manufacturer's instructions for material limits, use of shears and protective layers. Machining is not advised to cause additional burrs or damage to adjacent material.

3) If the damage exceeds 1/3 depth of the sheet metal and/or 1/4 depth of steel framing, remove damaged area and replace with new metal or hollow metal section, then follow coating specifications.

ENLARGED PHOTOS 33A & 33B

ENLARGED PHOTOS 33A

32A & 32B

1-32A Toilet area estimated to be 0.44m2 2-32B Toilet area estimated to be 0.4m 2 3-32A Kitchen area estimated to be 1.32m2 for wall panel, bottom and top beams.

4-32B Kitchen bottom beam estimated area of 0.44m2 5-32A Veranda bottom beam (Rectangular hollow section 100x50x3mm) and minor rust on the veranda ceiling estimated to be 0.4m2 anti-rust treatment for the prefabs framings and the veranda ceiling.

2- For the panels, cut-off the damaged part and replace with new one by joining or replacing the entire panel 3- Replace the bottom beam (Rectangular hollow section 100x50x3mm) at the veranda.

1) Follow specifications for surface preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, and wall panel components.

2) Metal repair must not damage the adjoining finish. Follow manufacturer's instructions for material limits, use of shears and protective layers. Machining is not advised to cause additional burrs or damage to adjacent material.

3) If the damage exceeds 1/3 depth of the sheet metal and/or 1/4 depth of steel framing, remove damaged area and replace with new metal and apply 2 coats of rust inhibitor.

ENLARGED PHOTOS 32A & 32B

ENLARGED PHOTOS 32A & 32B

31A & 31B

1-31A Kitchen area estimated to be 0.9 m2 for wall panel.

2-31B Kitchen estimated area is 0.6m2 which includes minor rust on the panel, 5-31A Veranda wall bottom frame 60x60x2mm hollow section and estimated area of 0.1m2 rust at the veranda ceiling anti-rust treatment for the prefabs framings and the veranda ceiling.

2- For the panels, cut-off the damages part and replace with new one by joining or replacing the entire panel.

1) Follow specifications for surface preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, ENLARGED PHOTOS 31A

30A & 30B

1-30A Kitchen area estimated to be 0.4 m2 for wall panel and the entire beam to be replaced.

2-30B Kitchen estimated area is 0.7m2 which includes minor rust on the panel, serious rust on the beams and the steel anti-rust treatment for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it

1) Follow specifications for surface preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, and wall panel components.

2) Replace the rusted beams shown at full length.

ENLARGED PHOTOS 31A

5-30A& B Toilets panels with estimated area of 1M2 replacing the entire panel, also replace the bottom beam

ENLARGED PHOTOS 30A & 30B

1) Follow specifications for surface preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, and wall panel components.

2) Replace the rusted beams

29A & 29B

1-29A Kitchen area estimated to be 0.5 m2 for wall panel and the entire beam to be replaced.

2-29B Kitchen estimated area is 0.7m2 which includes minor rust on the panel, serious rust on the beams rust treatment for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it with a new one by joining or

1) Follow specifications for surface preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, and wall panel components.

2) Replace the rusted beams shown at full length.

ENLARGED PHOTOS 30A & 30B

5-29A& B Toilets panels with replacing the entire panel, also replace the bottom beam with new a one.

ENLARGED PHOTOS 29A & 29B

of rust inhibitor for prefab building framing, ceilings, and wall panel components.

28A & 28B

1-28A Kitchen area estimated to be 0.5 m2 for wall panel and the entire beam to be replaced.

2-28B Kitchen estimated area is 0.7m2 which includes minor rust on the panel, serious rust on the beams rust treatment for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it with a new one by joining or

ENLARGED PHOTOS 29A & 29B

1) Follow specifications for surface preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, and wall panel components.

2) Replace the bottom beams 28A and 28B.

5-28A& B Toilets panels with replacing the entire panel, also of rust inhibitor for prefab building framing, ceilings, and wall panel components.

27A & 27B

1-27A Kitchen area estimated to be 0.5 m2 for wall panel and the entire beam to be replaced.

2-27B Kitchen estimated area is 0.7m2 which includes minor rust on the panel, serious rust on the beams and the steel members used for supporting the

3-27A& B Toilets panels with rust treatment for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it with a new one by joining or replacing the entire panel, also replace the bottom beam with new a one.

preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, and wall panel components.

2) Metal repair must not damage the adjoining finish. Follow manufacturer's instructions for material limits, use of shears and protective layers.

Machining is not advised to cause additional burrs or damage to adjacent material.

3) If the damage exceeds 1/3 depth of the sheet metal and/or 1/4 depth of steel framing, remove damaged area and replace with new metal and apply 2 coats of rust inhibitor.

4) Replace the bottom beams 27A and 27B.

ENLARGED PHOTOS 27A & 27B

26A & 26B 1-26A Kitchen area estimated to be 0.5 m2 for wall panel and the entire beam to be replaced.

2-26B Kitchen estimated area is 0.7m2 which includes minor rust on the panel, serious rust on the beams and the steel members used for supporting the connected prefabs for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it with a new one by joining or replacing the entire panel, also

1) Follow specifications for surface preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, and wall panel components.

2) Metal repair must not damage the adjoining finish. Follow manufacturer's instructions for material limits, use of shears and protective layers. Machining is not advised to cause additional burrs or damage to adjacent material.

3) If the damage exceeds 1/3 depth of the sheet metal and/or 1/4 depth of steel framing, remove damaged area and replace with new metal and apply 2 coats of rust inhibitor.

4) Replace the bottom beams 26A and 26B.

ENLARGED PHOTOS 27A & 27B

3-26A& B Toilets panels with replace the bottom beam with new a one.

ENLARGED PHOTOS 26A & 26B

25A & 25B 1-25A Kitchen area estimated to be 0.8 m2 for wall panel and the entire beam to be replaced.

2-25B Kitchen estimated area is 0.2m2 which includes minor rust on the panel, serious rust on the beams and the steel members used for supporting the connected prefabs

3-25A& B Toilets panels with rust treatment for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it with a new one by joining or replacing the entire panel, also preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, and wall panel components.

2) Metal repair must not damage the adjoining finish. Follow manufacturer's instructions for material limits, use of shears and protective layers. Machining is not advised to cause additional burrs or damage to adjacent material.

3) If the damage exceeds 1/3 depth of the sheet metal and/or 1/4 depth of steel framing, remove damaged area and replace with new metal and apply 2 coats of rust inhibitor.

4) Replace the bottom beams 25A and 25B.

ENLARGED PHOTOS 25A & 25B

Rust Remediation Works

34A & 34B

1-34A Kitchen area estimated to be 0.5m2 for wall panel.

2-34B Kitchen estimated area is 1m2 which includes minor rust on the panel, anti-rust treatment for the prefabs framings and the veranda ceiling.

2- For the panels, cut-off the damages part and replace with new one by joining or replacing the entire panel.

ADDITIONAL PHOTOS

1) Follow specifications for surface preparation, repair, and application of rust inhibitor for prefab building

ENLARGED PHOTOS 34A & 34B

35A & 35B

1-35A Toilet area estimated to be 0.6m2 2-35B Toilet area estimated to be 0.7m 2 3-35A Kitchen area estimated to be 0.4m2 for wall panel 4-35B Kitchen panel estimated area to be 0.8m2 and bottom beam estimated area of 0.3m2.

anti-rust treatment for the prefabs framings and the veranda ceiling.

2- For the panels, cut-off the damaged part and replace replacing the entire panel of rust inhibitor for prefab building

37A & 37B

1-37A Kitchen area estimated to be 0.8 m2 for wall panel.

2-37B Kitchen estimated area is 0.9m2 which includes rust on the panel, beams and the steel members used for supporting the connected prefabs 3-37B Veranda door frame 60x40x82mm thick hollow section anti-rust treatment for the prefabs framings and the veranda ceiling.

2- For the panels, cut-off the damages part and replace.

With new one by joining or replacing the entire panel.

3- Replace the entire hollow section for the veranda door frame at unit 37B of rust inhibitor for prefab building framing, ceilings, and wall panel components.

2) For damaged panels, use shears to cut out the deteriorated area and join with new metal or replace entire panel.

3) Replace the entire hollow section for the veranda door frame at Unit 37B

38A & 38B

1-38A Kitchen area estimated to be 0.8m2 for wall panel and bottom beam.

2-38B Kitchen estimated area is 0.6m2 which includes rust on the beam, the panel and the steel members used for

5-38A& B Toilets panels with estimated area of 0.5M2

1-Thoroughly sand the minor apply anti-rust treatment for the prefabs panel or cut-off the spoiled part and the replace and replace with new ones.

2- For the panels and the prefab beam, cut-off the damages part and replace it

39A &

39B 1-39A Kitchen area estimated to be 0.3 m2 for wall panel and the beam.

2-39B Kitchen estimated area is 0.4m2 which includes rust on the panel, beams and the steel

5-39A& B Toilets panels and ceiling panels with estimated area of 0.6M2 rust treatment for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it of rust inhibitor for prefab building framing, ceilings, and wall panel components.

1) Follow specifications for surface preparation, repair, and application of rust inhibitor for prefab building

40A & 40B

1-40A Kitchen area estimated to be 1m2 for wall panel and the entire beam to be replaced.

2-40B Kitchen estimated area is 0.7m2 which includes rust on the wall panel, the beams and the steel members used for supporting the connected prefabs.

3- 40A Ceiling estimated area as 7.2m2 4-40A& B Toilets panels with estimated area of 1.2M2 rust treatment for the prefabs panel or cut-off the spoiled part and the veranda.

2- For the panels and the prefab beam, cut-off the damages part and replace it with a new one by joining or replacing the entire panel.

3- Replace the ceiling panel.

preparation, repair, and application of rust inhibitor for prefab building framing, ceilings, and wall panel components.

2) Replace the rusted beams shown at full length.

3) Replace entire ceiling panel.

ENLARGED PHOTOS 40A & 40B

USAID South Sudan Engineering Support Program (ESP)

Residential Compound Rust Remediation

09 01 90.92 Coating Restoration - Page 1 of 8

SECTION 09 01 90.92

COATING RESTORATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Paints and coatings including the following:

1. Surface preparation cleaners.

2. Interior paint and coatings systems including surface preparation.

3. Exterior paint and coatings systems including surface preparation.

4. Trimo Technical Instructions for the use and maintenance of Trimo products.

B. Related Requirements:

1. Section 01 33 00 – Submittal Procedures: For additional general requirements for submittals.

2. Section 01 60 00 – Product Requirements: Materials and Equipment for requirements for submitting comparable product submittals for products by listed manufacturers.

3. Divisions 02 through 16 Sections for specific requirements and limitations for substitutions.

1.3 REFERENCES

A. ASTM International (ASTM):

1. ASTM D522 - Standard Test Methods for Mandrel Bend Test of Attached Organic Coatings.

2. ASTM D659 - Method of Evaluating Degree of Chalking of Exterior Paints.

3. ASTM D660 - Standard Test Method for Evaluating Degree of Checking of

Exterior Paints.

4. ASTM D661 - Standard Test Method for Evaluating Degree of Cracking of

Exterior Paints.

5. ASTM D714 - Standard Test Method for Evaluating Degree of Blistering of Paints.

6. ASTM D1640 - Standard Test Methods for Drying, Curing, or Film Formation of Organic Coatings.

USAID South Sudan Engineering Support Program (ESP)

Residential Compound Rust Remediation

09 01 90.92 Coating Restoration - Page 2 of 8

B. Steel Structures Painting Council (SSPC):

1. SSPC-SP 1 - Solvent Cleaning.

2. SSPC-SP 2 - Hand Tool Cleaning.

3. SSPC-SP 3 - Power Tool Cleaning.

4. SSPC-SP7/NACE No. 4, Brush-Off Blast Cleaning.

5. SSPC-SP11, Power Tool Cleaning to Bare Metal.

C. United States Environmental Protection Agency (USEPA).

D. United States Green Building Council (USGBC): LEED-09 NC/CI/CS.

1.4 ACTION SUBMITTALS

A. Submit under provisions of Division 01.

B. Product Data: For each paint system indicated, including.

1. Product characteristics.

2. Surface preparation instructions and recommendations.

3. Primer requirements and finish specification.

4. Storage and handling requirements and recommendations.

5. Application methods.

6. Cautions for storage, handling and installation.

C. Verification Samples: For each finish product specified, submit samples that represent actual product, color, and sheen.

D. Only submit complying products based on project requirements (i.e. LEED). One must also comply with the regulations regarding VOCs (CARB, OTC, SCAQMD, LADCO). To ensure compliance with district regulations and other rules, businesses that perform coating activities should contact the local district in each area where the coating will be used.

1.5 QUALITY ASSURANCE

A. Installer Qualifications: A firm or individual experienced in applying paints and coatings similar in material, design, and extent to those indicated for this Project, whose work has resulted in applications with a record of successful in-service performance.

B. Paint exposed surfaces. If a color of finish, or a surface is not specifically mentioned, Architect will select from standard products, colors and sheens available.

C. Do not paint prefinished items, concealed surfaces, finished metal surfaces, operating parts, and labels unless indicated.

D. Only scissors and saws that do not heat the cutting spot to a high temperature are allowed for additional cutting of panels or elements. High temperature causes destruction of anti-corrosion protection in the immediate vicinity of the cut. Therefore, the use of angle grinders is strictly prohibited for this purpose.

E. A protective element (e.g. cardboard) is to be inserted between a drilling machine and a façade panel during drilling and riveting of the edges and flashing in order to prevent any

USAID South Sudan Engineering Support Program (ESP)

Residential Compound Rust Remediation

09 01 90.92 Coating Restoration - Page 3 of 8 additional mechanical damage to a panel and falling of chips on a pre-painted thin sheet metal.

F. Marking or scratching by wire nails or similar sharp objects is prohibited since it may damage the protective layer.

G. Small metal particles that appear as a result of cutting and drilling corrode very quickly and cause mechanical and visible damage to the organic coating. They have to be completely removed from panel surfaces immediately or latest when the daily work has been finished.

Soft brooms or suction are used for removal viz. cleaning. The use of tools with integrated power nozzles for suction of waste particles is recommended.

H. Mock-Up: Provide a mock-up for evaluation of surface preparation techniques and application workmanship.

1. Finish surfaces for verification of products, colors, and sheens.

2. Finish area designated by COR.

3. Provide samples that designate primer and finish coats.

4. Do not proceed with remaining work until the COR approves the mock-up.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Delivery: Deliver manufacturer's unopened containers to the work site. Packaging shall bear the manufacturer's name, label, and the following list of information.

1. Product name, and type (description).

2. Application and use instructions.

3. Surface preparation.

4. VOC content.

5. Environmental handling.

6. Batch date.

7. Color number.

B. Storage: Store and dispose of solvent-based materials, and materials used with solvent-based materials, in accordance with requirements of local authorities having jurisdiction.

C. Store materials in an area that is within the acceptable temperature range, per manufacturer's instructions. Protect from freezing.

D. Handling: Maintain a clean, dry storage area, to prevent contamination or damage to the coatings.

1.7 PROJECT CONDITIONS

A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.

USAID South Sudan Engineering Support Program (ESP)

Residential Compound Rust Remediation

09 01 90.92 Coating Restoration - Page 4 of 8

1.8 EXTRA MATERIALS

A. Furnish extra paint materials from the same production run as the materials applied and, in the quantities, described below. Package with protective covering for storage and identify with labels describing contents. Deliver extra materials to COR.

B. Furnish COR with an additional one percent of each material and color, but not less than 1 gal (3.8 L) or 1 case, as appropriate.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Acceptable Manufacturer: Rust-Oleum(R), Web: www.rustoleum.com

B. Acceptable Manufacturer: Modern Masters, Web: www.modernmasters.com

2.2 APPLICATIONS/SCOPE

A. Interior Paints and Coatings:

1. Metal: galvanized steel.

2. Metal: Structural steel beams, partitions, and similar items.

B. Exterior Paints and Coatings:

1. Metal: galvanized steel.

2. Metal: Structural steel beams, partitions and similar items.

2.3 PAINT MATERlALS - GENERAL

A. Paints and Coatings.

1. Unless otherwise indicated, provide factory-mixed coatings. When required, mix coatings to correct consistency in accordance with manufacturer's instructions before application. Do not reduce, thin, or dilute coatings or add materials to coatings unless such procedure is specifically described in manufacturer's product instructions.

2. For opaque finishes, tint each coat including primer coat and intermediate coats, one-half shade lighter than succeeding coat, with final finish coat as base color. Or follow manufactures product instructions for optimal color conformance.

B. Primers: Where the manufacturer offers options on primers for a particular substrate, use primer categorized as "best" by the manufacturer.

C. Coating Application Accessories: Provide all primers, sealers, cleaning agents, cleaning cloths, sanding materials, and clean-up materials required, per manufacturer's specifications.

2.4 SURFACE PREPARATION CLEANERS

A. Interior Cleaners:

1. Krud Kutter Original.

2. Krud Kutter Pre Paint Cleaner.

USAID South Sudan Engineering Support Program (ESP)

Residential Compound Rust Remediation

09 01 90.92 Coating Restoration - Page 5 of 8

3. Krud Kutter Must for Rust.

4. Krud Kutter Rustex.

B. Exterior Cleaners:

1. Krud Kutter Original.

2. Krud Kutter Multi Purpose Wash.

3. Krud Kutter Must for Rust.

4. Krud Kutter Rustex.

5. Krud Kutter Pre Paint Cleaner.

2.5 INTERIOR PAINT SYSTEMS

A. Metal: Galvanized.

1. Latex Systems:

a. Satin Finish:

1) 1st Coat: R-O Aluminum Primer (2 mils dry).

2) 2nd Coat: R-O Zinsser Perma White Interior Satin Acrylic.

3) 3rd Coat: R-O Zinsser Perma White Interior Satin Acrylic (1-3 mils dry per coat).

B. Metal: Structural Steel.

1. Latex Systems:

a. Satin Finish:

1) 1st Coat: R-O Aluminum Primer (2 mils dry).

2) 2nd Coat: R-O Zinsser Perma White Interior Satin Acrylic.

3) 3rd Coat: R-O Zinsser Perma White Interior Satin Acrylic (1-3 mils dry per coat).

2.6 EXTERIOR PAINT SYSTEMS

A. Metal: Galvanized.

1. Latex Systems:

a. Satin Finish:

1) 1st Coat: R-O Aluminum Primer (1.8 mils dry).

2) 2nd Coat: R-O Zinsser Perma White Exterior Satin Acrylic.

3) 3rd Coat: R-O Zinsser Perma White Exterior Satin Acrylic (1-

3 mils dry per coat).

B. Metal: Structural Steel.

1. Latex Systems:

a. Satin Finish:

1) 1st Coat: R-O Aluminum Primer (1.8 mils dry).

2) 2nd Coat: R-O Zinsser Perma White Exterior Satin Acrylic.

3) 3rd Coat: R-O Zinsser Perma White Exterior Satin Acrylic (1-

3 mils dry per coat).

USAID South Sudan Engineering Support Program (ESP)

Residential Compound Rust Remediation

09 01 90.92 Coating Restoration - Page 6 of 8

PART 3 – EXECUTION

3.1 EXAMINATION

A. Do not begin installation until substrates have been properly prepared; notify COR of unsatisfactory conditions before proceeding. If substrate preparation is the responsibility of another installer, notify COR of unsatisfactory preparation before proceeding.

B. Proceed with work only after conditions have been corrected and approved by all parties, otherwise application of coatings will be considered as an acceptance of surface conditions.

C. Previously Painted Surfaces: Verify that existing painted surfaces do not contain lead based paints, notify COR immediately if lead based paints are encountered.

3.2 SURFACE PREPARATION

A. General: Surfaces shall be dry and in sound condition. Remove oil, dust, dirt, loose rust, peeling paint or other contamination to ensure good adhesion.

1. Remove mildew before painting by washing with a solution of 1 part liquid household bleach and 3 parts of warm water. Apply the solution and scrub the mildewed area. Allow the solution to remain on the surface for 10 minutes. Rinse thoroughly with clean water and allow the surface to dry a minimum of 48 hours before painting. Wear protective glasses or goggles, waterproof gloves, and protective clothing. Quickly wash off any of the mixture that comes in contact with your skin. Do not add detergents or ammonia to the bleach/water solution.

2. Remove items including but not limited to thermostats, electrical outlets, switch covers and similar items prior to painting. After completing painting operations in each space or area, reinstall items removed using workers skilled in the trades involved.

3. No exterior painting should be done immediately after a rain, during foggy weather, when rain is predicted, or when the temperature is below 10 degrees C (50 degrees F), unless products are designed specifically for these conditions. On large expanses of metal siding, the air, surface and material temperatures must be 10 degrees C (50 degrees F), or higher to use low temperature products.

B. Galvanized Metal: Clean per SSPC-SP1 using detergent and water or a degreasing cleaner to remove greases and oils. Apply a test area, priming as required. Allow the coating to dry at least one week before testing. If adhesion is poor, Brush Blast per SSPC- SP7 is necessary to remove these treatments.

C. Steel: Structural, Plate, And Similar Items: Should be cleaned by one or more of the surface preparations described below. These methods are used throughout the world for describing methods for cleaning structural steel. Visual standards are available through the Society of Protective Coatings. A brief description of these standards together with numbers by which they can be specified follow.

USAID South Sudan Engineering Support Program (ESP)

Residential Compound Rust Remediation

09 01 90.92 Coating Restoration - Page 7 of 8

1. Solvent Cleaning, SSPC-SP1: Solvent cleaning is a method for removing all visible oil, grease, soil, drawing and cutting compounds, and other soluble contaminants.

Solvent cleaning does not remove rust or mill scale. Change rags and cleaning solution frequently so that deposits of oil and grease are not spread over additional areas in the cleaning process. Be sure to allow adequate ventilation.

2. Hand Tool Cleaning, SSPC-SP2: Hand Tool Cleaning removes all loose mill scale, loose rust, and other detrimental foreign matter. It is not intended that adherent mill scale, rust, and paint be removed by this process. Before hand tool cleaning, remove visible oil, grease, soluble welding residues, and salts by the methods outlined in SSPC-SP1.

3. Brush-Off Blast Cleaning, SSPC-SP7 or NACE 4: A Brush-Off Blast Cleaned surface, when viewed without magnification, shall be free of all visible oil, grease, dirt, dust, loose mill scale, loose rust, and loose paint. Tightly adherent mill scale, rust, and paint may remain on the surface. Before blast cleaning, visible deposits of oil or grease shall be removed by any of the methods specified in SSPC-SP 1 or other agreed upon methods.

4. Power Tool Cleaning to Bare Metal, SSPC-SP11: Metallic surfaces that are prepared according to this specification, when viewed without magnification, shall be free of all visible oil, grease, dirt, dust, mill scale, rust, paint, oxide corrosion products, and other foreign matter. Slight residues of rust and paint may be left in the lower portions of pits if the original surface is pitted. Prior to power tool surface preparation, remove visible deposits of oil or grease by any of the methods specified in SSPC-SP1, Solvent Cleaning, or other agreed upon methods.

3.3 INSTALLATION

A. Apply all coatings and materials with the manufacturer’s specifications in mind. Mix and thin coatings according to manufacturer’s recommendations.

B. Do not apply to wet or damp surfaces.

C. Apply coatings using methods recommended by manufacturer.

D. Uniformly apply coatings without runs, drips, or sags, without brush marks, and with consistent sheen.

E. Apply coatings at spreading rate required to achieve the manufacturers recommended dry film thickness.

F. Regardless of number of coats specified, apply as many coats as necessary for complete hide, and uniform appearance.

G. Inspection: The coated surface must be inspected and approved by the COR just prior to the application of each coat.

USAID South Sudan Engineering Support Program (ESP)

Residential Compound Rust Remediation

09 01 90.92 Coating Restoration - Page 8 of 8

3.4 PROTECTION

A. Protect finished coatings from damage until completion of project.

B. Touch-up damaged coatings after substantial completion, following manufacturer’s recommendation for touch up or repair of damaged coatings. Repair any defects that will hinder the performance of the coatings.

END OF SECTION 09 01 90.92

TECHNICAL INSTRUCTIONS FOR THE USE

AND MAINTENANCE OF TRIMO PRODUCTS

TABLE OF CONTENTS

1 Introduction 1

2 Protection of Trimo elements 1

2.1 Instructions for prevention of damage to products 2

3 Regular annual inspection 2

4 Control of tightening of all structural elements 2

5 Control of all seals 3

6 Cleaning 3

6.1 Removal of small metal particles 3

7 Washing [3]

7.1 Special recommendations 4

7.2 Warnings 4

8 Rehabilitation of mecahnical damage to organic coating 4

8.1 Repairs of mechancial damage (touch up) 5

8.2 Mechanical damage to corroded surfaces 6

Annex 1: Tables of activities of regular annual inspection of the Trimoterm SNV system 7 Annex 2: Tables of activities of regular annual inspection of the FTV Trimoterm 8 Annex 3 : Tables of activities of regular annual inspection of the Trimoval system 9 Annex 4 : Tables of activities of regular annual inspection of the Qbiss element system 10 Annex 5 : Tables of activities of regular annual inspection of the CONTAINER system 11 Annex 6 : Tables of activities of regular annual inspection of the CLEAN ROOM system 11

Descriptions of details, and other information in this document, are only provided to illustrate the system(s) of Trimoterm cladding products and applications.

Each user of such information is fully responsible for the incorporation of this advisory information in its design.

Trimo assumes no liability whatsoever for any damages incurred by you resulting from errors in or omissions from the information included herein.

Care has been taken to ensure that information contained in the document are accurate, but Trimo, including its subsidiaries, does not accept responsibility or liability for errors in information.

Technical instructions for the use and maintenance of Trimo products | EN | May 2021 1

TYPE OF CORROSION PROTECTION SP SP PVDF PVDF+ PUR

PUR/PA PVC(P) PVC+F

Corrosion classification [EN ISO 12944-2] II III III III III III III

Total organic thickness (my) [EN 13523-1] 15 25 25 35 35-50 175-200 120-200

Temperture resistance (°C) 70 80 110 110 110 70 70

UV resistance category [EN 10169 / Table 8] — Ruv3 Ruv4 Ruv4 Ruv4 Ruv2 —

Flexibility •• •• ••• •••• •••• •••• ••••

Stain resistance •• ••• •••• •••• •••• •• ••••

1 Introduction

The instructions are intended for the inspection and maintenance of Trimo products and flashing elements made of galvanised pre-painted sheet metal, protected with the coil coating organic protective coatings. These coatings provide long-term resistance and stability and aesthetic appearance of individual elements and the final facility.

On a regular basis a caretaker or user of facilities and persons with adequate professional qualifications shall inspect, maintain and organise cleaning of all structural elements of the facility in scope of regular maintenance works. An inspection carried out minimally once a year is obligatory; it may be carried out even several times if the environment is less favourable. Conclusion of a maintenance contract with the contractor is recommended.

The table at the end of this document presents a list of required procedures and measures that are to be implemented during the annual inspection of the facility, instructions for damage repairs, washing of roof and façade panels and other aspects of maintenance.

In case of questions about the inspection and maintenance of hot galvanised pre-painted sheet metal, Trimo cladding, roof and façade products, you are kindly requested to contact the Trimo service and repair department.

2 Protection of Trimo elements

Trimo elements viz. panels consist of a filling (mineral wool, honeycomb) and cladding made of galvanised pre-painted thin sheet metal.

Steel sheet metal is preliminary hot-dip galvanised in compliance with EN 10346, and additionally protected by organic coating in accordance with the »coil-coating« process (EN 10169).

The following basic types of organic coatings viz. protection are applied to steel sheet metal:

• based on SP polyester

• based on PVDF polyvinylidene fluoride

• based on PUR polyurethane

• based on PUR/PA polyamide modified polyurethane

• based on PVC polyvinyl chloride, coating or film

Individual types of organic protection with the basic characteristics are presented in Table 1.

Table 1: Basic characteristics of an individual type of organic coating or protection

Legend:

•••• suitable without reservations ••• very suitable •• suitable • conditionally useful /contact Trimo - not useful

Note: There should be no sudden cooling to the dew point during cleaning. Otherwise condensate can appear. See Table: Presentation of dew point at a certain temperature of the room and relative humidity. In case of cooling the working temperature should be min. 3°C above the dew point.

Technical instructions for the use and maintenance of Trimo products | EN | May 20212

The condition of screws can be easily established by unscrewing some randomly selected screws on various parts of the facility. The condition of seals, joints between seals and fixing elements and possibly rust at screws is to be inspected thoroughly. A seal has to be pressed well against sheet metal so that tightness of a joint is provided. Insulation in panels can eventually get slightly compressed which results in a slot between a seal and a panel, and therefore screws have to be regularly inspected. Loose screws are to be tightened, and rusted screws or worn seals replaced.

2.1 Instructions for prevention of damage to products

The instructions for handling of panels and elements are to be followed in order to be able to prevent mechanical damage.

Only scissors and saws that do not heat the cutting spot to a high temperature are allowed for additional cutting of panels or elements. High temperature causes destruction of anti-corrosion protection in the immediate vicinity of the cut. Therefore the use of angle grinders is strictly prohibited for this purpose!

A protective element (e.g. cardboard) is to be inserted between a drilling machine and a façade panel during drilling and riveting of the edges and flashing in order to prevent any additional mechanical damage to a panel and falling of chips on a pre-painted thin sheet metal.

Work producing hot filings (i.e. welding, cutting) is strictly forbidden in the vicinity of panels. Panels have to be adequately temporarily protected if any additional works are carried out in the immediate vicinity (i.e. concreting, plastering, asphalting etc.).

Marking or scratching by wire nails or similar sharp objects is prohibited since it may damage the protective layer.

3 Regular annual inspection

The purpose of the inspection is elimination of any possible shortcomings / deficiencies during the use of the facility.

The facility consisting of façade and roof elements and other end / closing pieces can be exposed to various weather and temperature changes.

Regular maintenance is therefore of vital importance for long service life of a facility.

In accordance with good practice it is necessary to carry out inspection of panels and other structural elements of the facility minimally once a year.

In scope of maintenance special attention is to be paid to the following:

• sections where dirt, smoke soot, condensate and water may accumulate

• cleaning of inflow pipes, roof valleys and gutters

• tightening of all structural elements on the structure

• control of all seals on the facility

Activities relating to the regular annual inspection are stated in Annexes 1-6 at the end of the document:

ANNEX 1: Table of activities of regular annual inspection of the Trimoterm SNV system, ANNEX 2: Table of activities of regular annual inspection of the Trimoterm FTV system, ANNEX 3: Table of activities of regular annual inspection of the Trimoval system, ANNEX 4: Table of activities of regular annual inspection of the Qbiss element system, ANNEX 5: Table of activities of regular…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .