Attachment A Schedule of Repairs and Replacements.xlsx.pdf
PDF 195 KB Posted
- Solicitation number
- 72066823Q00084
About this file
This document contains an attachment schedule outlining repairs and replacements needed for 68 prefabricated townhouse units at a US Embassy Residential Compound. The schedule lists each unit and building, describes external wall rust areas, and specifies the quantities of repairs and replacements required, including replacing wall panels, repairing structural beams, replacing rusted balcony floors, gutters and downpipes, painting exterior walls and roofing sheets, installing porch mosquito mesh and fascia boards. The total estimated quantities of materials and services are provided at the bottom.
The related federal contract opportunity is a solicitation by the US Agency for International Development South Sudan to procure services to renovate and repaint the prefabricated townhouses, as detailed in the attachment schedule. The solicitation number and opportunity type are provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 230126_USAID South Sudan ESP RC_Rust Remediation.pdf | ||
| SOL 72066823Q00084 - RUST REMEDIATION PROJECTlp.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Number of Replaced Wall
Panels
Structural Beams (m)
Replace (Yes=1, No=0)
Repair (Yes=1, No=0)
1 6A Unit 6A external wall rusted area is about 1 square meter
2 5 0 1 5 N/A 73.92 N/A 28 N/A
2 6B Unit 6B external wall rusted area is about 1.5 square meters
2 6 0 1 0 95.64 73.92 30.4 28 32.4
3 7A Unit 7A external wall rusted area is about 1.1 square meters
2 6 0 1 4 N/A 73.92 N/A 28 N/A
4 7B Unit 7B external wall rusted area is about 1m square meter
2 4 0 1 0 95.64 73.92 30.4 28 32.4
5 8A Unit 8A external wall rusted area is about 0.8m square meter
2 4 0 1 4 N/A 73.92 N/A 28 N/A
6 8B Unit 8B external wall rusted area is about 1.2 square meters
2 5 0 1 0 95.64 73.92 30.4 28 32.4
7 9A Unit 9A external wall rusted area is about 2 square meters
2 6 0 1 0 N/A 73.92 N/A 28 N/A
8 9B Unit 9B external wall rusted area is about 1 square meter
2 5 0 1 0 95.64 73.92 30.4 28 32.4
9 10A Unit 10A external wall rusted area is about 1 square meter
2 4 1 0 5 N/A 73.92 N/A 28 N/A
10 10B Unit 10B external wall rusted area is about 1.5 square meters
2 6 0 1 0 95.64 73.92 30.4 28 32.4
11 11A Unit 11A external wall rusted area is about 0.7 square meter
2 2 0 1 0 N/A 73.92 N/A 28 N/A
12 11B Unit 11B external wall rusted area is about 0.9 square meter
2 4 0 1 0 95.64 73.92 30.4 28 32.4
13 12A Unit 12A external wall rusted area is about 1 square meter
2 5 1 0 20 N/A 73.92 N/A 28 N/A
14 12B Unit 12B external wall rusted area is about 1.1 square meters
2 4 0 1 0 95.64 73.92 30.4 28 32.4
15 13A Unit 13A external wall rusted area is about 1.6 square meters
3 7 0 1 0 N/A 73.92 N/A 28 N/A
16 13B Unit 13B external wall rusted area is about 1 square meter
2 3 0 0 0 95.64 73.92 30.4 28 32.4
17 14A Unit 14A external wall rusted area is about 0.8 square meter
1 4 0 1 0 N/A 87.36 N/A 28 N/A
18 14B Unit 14B external wall rusted area is about 0.5 square meter
0 2 0 1 0 120.12 87.36 35.2 28 37.2
19 15A Unit 15A external wall rusted area is about 2.7 square meters
3 9 0 1 8 N/A 73.92 N/A 28 N/A
20 15B Unit 15B external wall rusted area is about 1.4 square meter
3 7 0 1 0 95.64 73.92 30.4 28 32.4
21 16A Unit 16A external wall rusted area is about 1.2 square meter
2 6 0 1 0 N/A 73.92 N/A 28 N/A
22 16B Unit 16B external wall rusted area is about 1 square meter
2 5 0 1 0 95.64 73.92 30.4 28 32.4
23 17A Unit 17A external wall rusted area is about 1 square meter
2 5 0 1 10 N/A 73.92 N/A 28 N/A
24 17B Unit 17B external wall rusted area is about 0.5 square meter
2 5 0 1 0 95.64 73.92 30.4 28 32.4
25 18A Unit 18A external wall rusted area is about 1.2 square meters
2 6 0 1 4 N/A 73.92 N/A 28 N/A
26 18B Unit 18B external wall rusted area is about 1 square meter
1 5 0 1 0 95.64 73.92 30.4 28 32.4
Schedule of Repairs and Replacments
Replacement of Rusted Balcony Floor Hollow
Section 60x40x3mm (m)
Replacement of Gutters and
Downpipes (m)
Painting of the exterior wall surfaces (m2)
Porch Mosquito mesh and its brandering (m2)
Replacement of fascia boards
(m)
Painting of the roofing sheets (m2) S/No
Building Units
Description (See Note 1)
Prefab Members Balcony Roof
Panels
Structural Beams (m)
Replace (Yes=1, No=0)
Repair (Yes=1, No=0)
Replacement of Rusted Balcony Floor Hollow
Section 60x40x3mm (m)
Replacement of Gutters and
Downpipes (m)
Painting of the exterior wall surfaces (m2)
Porch Mosquito mesh and its brandering (m2)
Replacement of fascia boards
(m)
Painting of the roofing sheets (m2) S/No
Building Units
Description (See Note 1)
Prefab Members Balcony Roof
27 19A Unit 19A external wall rusted area is about 0.8 square meter
5 10 0 1 10 N/A 73.92 N/A 28 N/A
28 19B Unit 19B external wall rusted area is about 0.5 square meter
2 5 0 1 0 95.64 73.92 30.4 28 32.4
29 20A Unit 20A external wall rusted area is about 2 square meters
2 10 0 1 0 N/A 73.92 N/A 28 N/A
30 20B Unit 20B external wall rusted area is about 1.5 square meters
1 5 0 1 0 95.64 73.92 30.4 28 32.4
31 21A Unit 21A external wall rusted area is about 1.5 square meters
1 5 1 0 3 N/A 87.36 N/A 28 N/A
32 21B Unit 21B external wall rusted area is about 1 square meter
0 5 0 1 0 120.12 87.36 35.2 28 37.2
33 22A Unit 22A external wall rusted area is about 1.5 square meters
2 8 0 1 3 N/A 87.36 N/A 28 N/A
34 22B Unit 22B external wall rusted area is about 2.1 square meters
2 7.5 0 1 0 120.12 87.36 35.2 28 37.2
35 23A Unit 23A external wall rusted area is about 1.8 square meters
2 6 0 1 10 N/A 73.92 N/A 28 N/A
36 23B Unit 23B external wall rusted area is about 1.5 square meters
2 5 0 1 0 95.64 73.92 30.4 28 32.4
37 24A Unit 24A external wall rusted area is about 2.2 square meters
2 7.2 0 1 8 N/A 73.92 N/A 28 N/A
38 24B Unit 24B external wall rusted area is about 2 square meters
1 6 0 1 0 95.64 73.92 30.4 28 32.4
39 25A Unit 25A external wall rusted area is about 5 square meters
3 14 0 1 6 N/A 73.92 N/A 28 N/A
40 25B Unit 25B external wall rusted area is about 1.5 square meters
1 5 0 1 0 95.64 73.92 30.4 28 32.4
41 26A Unit 26A external wall rusted area is about 1.8 square meters
3 9 0 1 10 N/A 73.92 N/A 28 N/A
42 26B Unit 26B external wall rusted area is about 1.2 square meters
2 6 0 0 0 95.64 73.92 30.4 28 32.4
43 27A Unit 27A external wall rusted area is about 2.6 square meters
3 9 0 1 12 N/A 73.92 N/A 28 N/A
44 27B Unit 27B external wall rusted area is about 1.7 square meters
2 6 0 0 0 95.64 73.92 30.4 28 32.4
45 28A Unit 28A external wall rusted area is about 1.8 square meters
0 9 0 1 8 N/A 73.92 N/A 28 N/A
46 28B Unit 28B external wall rusted area is about 2.7 square meters
2 10 0 0 0 95.64 73.92 30.4 28 32.4
47 29A Unit 29A external wall rusted area is about 1.4 square meters
2 5 0 1 15 N/A 73.92 N/A 28 N/A
48 29B Unit 29B external wall rusted area is about 2.2 square meters
2 7 0 0 0 95.64 73.92 30.4 28 32.4
49 30A Unit 30A external wall rusted area is about 1.5 square meters
2 5 0 1 8 N/A 73.92 N/A 28 N/A
50 30B Unit 30B external wall rusted area is about 2.1 square meters
2 8 0 0 0 95.64 73.92 30.4 28 32.4
51 31A Unit 31A external wall rusted area is about 1.8 square meters
3 7.2 0 1 12 N/A 73.92 N/A 28 N/A
52 31B Unit 31B external wall rusted area is about 1.5 square meters
2 6 0 0 0 95.64 73.92 30.4 28 32.4
53 32A Unit 32A external wall rusted area is about 1.5 square meters
3 7.2 0 1 8 N/A 73.92 N/A 28 N/A
Panels
Structural Beams (m)
Replace (Yes=1, No=0)
Repair (Yes=1, No=0)
Replacement of Rusted Balcony Floor Hollow
Section 60x40x3mm (m)
Replacement of Gutters and
Downpipes (m)
Painting of the exterior wall surfaces (m2)
Porch Mosquito mesh and its brandering (m2)
Replacement of fascia boards
(m)
Painting of the roofing sheets (m2) S/No
Building Units
Description (See Note 1)
Prefab Members Balcony Roof
54 32B Unit 32B external wall rusted area is about 1 square meter
2 3 0 0 0 95.64 73.92 30.4 28 32.4
55 33A Unit 33A external wall rusted area is about 1.5 square meters
2 6 1 0 8 N/A 87.36 N/A 28 N/A
56 33B Unit 33B external wall rusted area is about 1 square meter
1 4 0 0 0 120.12 87.36 35.2 28 37.2
57 34A Unit 34A external wall rusted area is about 1.5 square meters
2 6 1 0 8 N/A 87.36 N/A 28 N/A
58 34B Unit 34B external wall rusted area is about 1 square meter
2 4 0 0 0 120.12 87.36 35.2 28 37.2
59 35A Unit 35A external wall rusted area is about 2.5 square meters
3 8 1 0 14 N/A 87.36 N/A 28 N/A
60 35B Unit 35B external wall rusted area is about 1.8 square meters
2 5 0 0 0 120.12 87.36 35.2 28 37.2
61 37A Unit 37A external wall rusted area is about 0.6 square meter
2 3 0 1 0 N/A 73.92 N/A 28 N/A
62 37B Unit 37B external wall rusted area is about 1.2 square meters
0 6 0 0 0 95.64 73.92 30.4 28 32.4
63 38A Unit 38A external wall rusted area is about 0.7 square meter
2 3 0 1 18 N/A 73.92 N/A 28 N/A
64 38B Unit 38B external wall rusted area is about 0.8 square meter
0 2 0 0 0 95.64 73.92 30.4 28 32.4
65 39A Unit 39A external wall rusted area is about 0.6 square meter
1 3 0 1 10 N/A 73.92 N/A 28 N/A
66 39B Unit 39B external wall rusted area is about 0.5 square meter
1 2 0 0 0 95.64 73.92 30.4 28 32.4
67 40A Unit 40A external wall rusted area is about 1.7 square meters
3 9 1 0 15 N/A 87.36 N/A 28 N/A
68 40B Unit 40B external wall rusted area is about 1.2 square meters
0 5 0 0 0 95.64 87.36 35.2 28 32.4
Total Estimated Quantity 128 392.1 7 46 246 3399 5215 1067 1904 1130.4