Sol_68HERF26R0054.pdf

PDF 472 KB Posted

Attached to
RFQ Design, Installation and Testing of a New Fire Sprinkler/Suppression System
Solicitation number
68HERF26R0054
Issued by
Middlesex County, New Jersey

About this file

This is a Request for Proposal (RFP) issued by the U.S. Environmental Protection Agency for the design, installation, and testing of a new fire sprinkler/suppression system in Building 10 at the EPA's Edison Environmental Center located at 2890 Woodbridge Avenue, Edison, New Jersey 08837. The solicitation number is 68HERF26R0054, and it encompasses NAICS code 238220 (Plumbing, Heating, and Air-Conditioning Contractors). An organized site visit will be conducted on Thursday, July 30, 2026, at 1:00 p.m. EDT, with registration required by 10:00 a.m. EDT on Wednesday, July 29, 2026. All attendees must provide a government-issued photo ID upon arrival. Proposals must be submitted by 12:00 p.m. EDT on Friday, August 14, 2026, through the FedConnect Portal, with vendor questions accepted until 12:00 p.m. EDT on Tuesday, August 4, 2026. The period of performance extends from October 1, 2026, through April 9, 2027, for a total of 180 days from issuance of the Notice to Proceed. The contract will be awarded on a stand-alone basis with no renewal options mentioned.

This acquisition is set aside exclusively for small businesses with Service-Disabled Veteran-Owned Business (SDVOSB) certifications, making it a total small business set-aside. Only concerns designated in the System for Award Management (SAM) as SDVOSB-certified by the Small Business Administration are eligible to submit offers. The solicitation is prepared in accordance with FAR Part 12 for commercial products or commercial services. Offerors must submit both technical and price proposals, with the technical proposal to detail the contractor's methods for satisfying Statement of Work requirements. Pricing shall constitute complete compensation for all plant, labor, materials, equipment, services, and bonds necessary for contract completion. The contractor must procure and maintain specific insurance coverage, including workers' compensation, employer's liability of at least $100,000, general liability of at least $500,000 per occurrence, and automobile liability of at least $200,000 per person and $500,000 per occurrence. Key personnel requirements include assignment of a project superintendent to roster and sign-in personnel daily. Davis Bacon wage requirements apply, with wage determination #NJ20260036 Mod 1 dated May 18, 2026, incorporated by reference. The Contracting Officer is Amber Hawkins at (513) 487-2126 or hawkins.amber@epa.gov, and the Contract Specialist is Paul Buechlein at (513) 487-2046 or buechlein.paul@epa.gov.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation 68HERF26R0054 Cover Memorandum

U.S. Environmental Protection Agency Construction, Finance, Admin & IA Division

Cincinnati, Ohio 45268

July 24, 2026

MEMORANDUM

From: Amber Hawkins, Contracting Officer

To: Prospective Offerors

Subject: Combined Synopsis/Solicitation: Request for Proposal (RFP) 68HERF26R0054, Fire Sprinkler System Design & Installation for Building 10 at the US Environmental Protection Agency, Edison Environmental Center, located at 2890 Woodbridge Avenue, Edison, New Jersey 08837.

This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with RFO Part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. It is the Agency’s intent to award a stand-alone contract as a result of this solicitation for NAICS 238220 – Plumbing Heating and Air Conditioning Contractors.

This acquisition is set-aside for small businesses with Service Disabled Veteran Owned Business (SDVOSB) certifications. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.

This RFP consists of the following documents:

- RFP Cover Memorandum

- RFP 68HERF26R0054

- Attachment 1 – Statement of Work - Fire Sprinkler Design and Install – EPA Edison NJ

- Appendix A – Previous Evaluation of Building 10 for Fire Sprinkler System (Building & Life &

Safety Review) for informational purposes only

- Attachment 2 – Davis Bacon Wage Determination # NJ20260036 Mod 1, dated May 18, 2026

- Attachment 3 - Past Performance Questionnaire

- Attachment 4 – Project Experience Sheet

1. Technical Proposal Instructions: In addition to the instructions provided within this solicitation, proposals shall be specific and sufficiently detailed to allow a complete evaluation of the offeror’s methods for satisfying the requirements set forth in accordance with the attached Statement of Work.

2. Price Proposal Instructions: A complete price proposal which accurately reflects the Offeror’s price proposal shall be submitted in accordance with the instructions provided in this solicitation under RFO 52.212-1 Instructions to Offerors - Commercial Products and Commercial Services

(DEV APRIL 2026).

http://www.acquisition.gov/

Solicitation 68HERF26R0054 Cover Memorandum

3. Online Representations/Certifications: In addition to including the Section K representations certifications in your price proposal, make sure your company’s annual representations and certifications is current and complete via the System for Award Management (SAM) website at https://www.sam.gov (see Section I clause System for Award Management (RFO 52.204-7) and Section K provision Annual Representations and Certifications (RFO 52.212-3 (OCT 2025)) of the RFP for additional information).

Ensure your proposal acknowledges receipt of all amendments issued to the RFP by annotating and returning the SF1442 with your proposal.

4. Performance Period: The anticipated period of performance for this potential contract is 180 days from the issuance of the Notice to Proceed.

5. Site Visit: An organized site visit will be conducted for the EPA Edison Environmental Center Sprinkler design and installation project. Visitors should meet at the Security Guard House as you enter the campus, located at 2890 Woodbridge Ave, Bldg. 209, Edison, NJ 0883. The tour will begin at 1:00 pm ED time on Thursday, July 30, 2026.

Attendance at the site visit is crucial to fully understanding the scope of the requirements set forth herein. Registrations to attend the site visit will be accepted until 10:00 am ED on Wednesday, July 29, 2026. You must register in writing via email through the Contract Specialist identified in this cover letter by providing your company name and Full Name and Title of personnel attending the site visit. Since this site visit will be conducted at Federal Facilities all attendees are required to provide a government issued photo ID upon arrival to attend. If attendees are not US Citizens, a valid passport shall be provided.

6. Proposal Due Date: Proposals must be submitted by 12:00 pm Eastern Daylight Time on Friday, August 14, 2026, via the FedConnect Portal. In addition, please note that vendor questions will not be accepted after 12:00 pm Eastern Daylight Time on Tuesday, August 4, 2026. All questions and proposals shall be submitted through the FedConnect Portal. Proposals received via email, or through any method other than FedConnect, will not be accepted or considered for award.

7. Points of Contact: Please direct all communication regarding this RFP to both of the following:

o Amber Hawkins (513) 487-2126 or email at hawkins.amber@epa.gov o Paul Buechlein (513) 487-2046 or email at buechlein.paul@epa.gov

Sincerely, Contracting Officer, Amber Hawkins https://www.sam.gov/ file://anf-4460.aa.ad.epa.gov/OAS-CAD-CIN/CAD/FSS%20Branch/Active%20Solicitations/Regions%201-4%20Facilities%20Support%20Team/68HERF26R0054%20-%20PR-OFA-26-00648%20-%20R2%20Fire%20Suppression%20System/Section%20III%20-%20Solicitation/hawkins.amber@epa.gov mailto:buechlein.paul@epa.gov

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION CALL

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

PR-OFA-26-00648

CFAIAD

US Environmental Protection Agency

109 T.W. Alexander Drive Mail Code: AA005

CFAIAD

P.O. Box 12055

Research Triangle Park NC 27709

Paul Buechlein (513) 487-2046

1x 07/24/2026

68HERF26R0054

INVITATION FOR BID

REQUEST FOR PROPOSAL

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with RFO Part 12. This announcement constitutes the only solicitation for Fire Sprinkler System Design & Installation for Building 10 at the US Environmental Protection Agency, Edison Environmental Center, located at 2890

Woodbridge Avenue, Edison, New Jersey 08837 . Offers are being requested and a separate written solicitation will not be issued. It is the Agency’s intent to award a stand-alone contract as a result of this solicitation for NAICS 238220 – Plumbing

Heating and Air Conditioning Contractors. This acquisition is set-aside for small businesses with Service Disabled Veteran Owned Business (SDVOSB) certifications.

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

0 180 calendar days and complete it within ________________ ________________ calendar days after receiving

08/14/2026

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 12/2022)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

CFAIAD

US Environmental Protection Agency

109 T.W. Alexander Drive Mail Code: AA005

CFAIAD

P.O. Box 12055

Research Triangle Park NC 27709

Amber Hawkins

28. NEGOTIATED AGREEMENT 29. AWARD

and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

10 U.S.C. 3204(a) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 12/2022) BACK

Continued...

and return

(Contractor is not required to sign this document.) Your offer on this

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 97

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

68HERF26R0054

Delivery Location Code: R2 NJ

R2 NJ

US Environmental Protection Agency

Shipping and Receiving

2890 Woodbridge Ave, Building 209

Edison NJ 08837-3679 USA

0001 Design, installation and testing of a new fire sprinkler/suppression system in building 10 at the US Environmental Protection Agency, Edison

Environmental Center, located at 2890 Woodbridge

Avenue, Edison, New Jersey 08837.

Period of Performance: 180 days after Notice to

Proceed

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

SECTION A - Solicitation/Contract Form

SECTION B - Supplies or Services/Prices

B-1 IDENTIFICATION OF SERVICES AND PRICES

SECTION C - Description/Specifications

C-1 EPAAR 1552.211-79 COMPLIANCE WITH EPA POLICIES FOR INFORMATION RESOURCES

MANAGEMENT. (JUL 2016)

C-2 Local Clauses EPA-C-10-101 STATEMENT OF WORK/PERFORMANCE WORK

STATEMENT/SPECIFICATIONS

SECTION D - Packaging and Marking

SECTION E - Inspection and Acceptance

E-1 RFO 52.246-4 INSPECTION OF SERVICES - FIXED-PRICE. (AUG 1996)

E-2 RFO 52.246-12 INSPECTION OF CONSTRUCTION. (AUG 1996)

E-3 RFO 52.246-13 INSPECTION - DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS.

(AUG 1996)

SECTION F - Deliveries or Performance

F-1 RFO 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS. (APR 1984) (RFO-DEV JUL 2025) .12

F-2 RFO 52.242-14 SUSPENSION OF WORK. (APR 1984)

F-3 RFO 52.242-15 STOP-WORK ORDER. (AUG 1989)

F-4 Local Clauses EPA-F-12-101 PERIOD OF PERFORMANCE…………………………………………………………….12 SECTION G - Contract Administration Data

G-1 EPAAR 1552.232-70 SUBMISSION OF INVOICES. (MAY 2019)…………………………………………………

G-2 Local Clauses EPA-G-36-101 GOVERNMENT CONTRACT-LEVEL COR (CONSTRUCTION)

G-3 Local Clauses EPA-G-42-101 CONTRACT ADMINISTRATION REPRESENTATIVES

SECTION H - Special Contract Requirements

H-1 EPAAR 1552.203-71 DISPLAY OF EPA OFFICE OF INSPECTOR GENERAL HOTLINE POSTER. (JUL 2016)

H-2 EPAAR 1552.209-71 ORGANIZATIONAL CONFLICTS OF INTEREST. (MAY 1994)

H-3 EPAAR 1552.235-79 RELEASE OF CONTRACTOR CONFIDENTIAL BUSINESS INFORMATION. (DEC 2018)

H-4 EPAAR 1552.236-70 SAMPLES AND CERTIFICATES. (APR 1984)

H-5 EPAAR 1552.237-72 KEY PERSONNEL. (APR 1984)

H-6 Local Clauses EPA-H-07-102 IDENTIFICATION OF ON-SITE CONTRACTOR EMPLOYEES

H-7 Local Clauses EPA-H-07-103 NOTICE REGARDING PROHIBITED CONTRACTOR ACTIVITIES ON

ENVIRONMENTAL PROTECTION AGENCY (EPA CONTRACTS)

H-8 Local Clauses EPA-H-09-101 CONTRACTOR DISCLOSURE REQUIREMENTS FOR CONFLICT OF

INTEREST

H-9 Local Clauses EPA-H-15-101 RELEASE OF COST OR PRICING PROPOSALS OUTSIDE THE

GOVERNMENT FOR AUDIT

H-10 Local Clauses EPA-H-28-106 INSURANCE-WORK ON A GOVERNMENT INSTALLATION

H-11 Local Clauses EPA-H-42-102 UTILIZATION OF FEDCONNECT FOR CONTRACT ADMINISTRATION28

H-12 Local Clauses EPA-H-42-103 TEMPORARY CLOSURE OF EPA FACILITIES

SECTION I - Contract Clauses

I-1 RFO 52.202-1 DEFINITIONS. (JUN 2020)

I-2 RFO 52.203-3 GRATUITIES. (APR 1984)

I-3 RFO 52.203-5 COVENANT AGAINST CONTINGENT FEES. (MAY 2014)

I-4 RFO 52.203-7 ANTI-KICKBACK PROCEDURES. (JUN 2020)

I-5 RFO 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS.

(JUN 2020)

I-6 RFO 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS. (NOV 2023)

I-7 RFO 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS

OR STATEMENTS. (JAN 2017)

I-8 RFO 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL. (JAN 2011)

I-9 RFO 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS.

(JUN 2020) (RFO-DEV AUG 2025)

I-10 RFO 52.204-13 SYSTEM FOR AWARD MANAGEMENT-MAINTENANCE. (OCT 2018) (RFO-DEV AUG 2025)

I-11 RFO 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS.

(DEC 2014)

I-12 RFO 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, OR VOLUNTARILY EXCLUDED.

(JAN 2025) (RFO-DEV AUG 2025)

I-13 RFO 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY

MATTERS. (OCT 2018) (RFO-DEV AUG 2025)

I-14 RFO 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS.

(NOV 2015) (RFO-DEV AUG 2025)

I-15 RFO 52.215-2 AUDIT AND RECORDS-NEGOTIATION. (JUN 2020) (RFO-DEV SEP 2025)

I-16 RFO 52.215-8 ORDER OF PRECEDENCE-UNIFORM CONTRACT FORMAT. (OCT 1997) (RFO-DEV SEP 2025)

I-17 RFO 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES. (OCT 1997) (RFO-DEV SEP 2025)

I-18 RFO 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE. (NOV 2020) (RFO-DEV SEP 2025)30

I-19 RFO 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS. (JAN 2025) (RFO-DEV SEP 2025)...30

I-20 RFO 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN. (JAN 2025) (DEVIATION EFFECTIVE

DATE)

I-21 RFO 52.219-14 LIMITATIONS ON SUBCONTRACTING. (OCT 2022) (RFO-DEV SEP 2025)

I-22 RFO 52.219-27 NOTICE OF SET-ASIDE FOR, OR SOLE-SOURCE AWARD TO, SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) CONCERNS ELIGIBLE UNDER THE SDVOSB PROGRAM……33

I-23 RFO 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION. (JAN 2025)

(DEVIATION EFFECTIVE DATE)

I-24 RFO 52.222-3 CONVICT LABOR. (JUN 2003) (MAR 2026)

I-25 RFO 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS. (AUG 2018) (RFO-DEV SEP 2025) .36

I-26 RFO 52.222-7 WITHHOLDING OF FUNDS. (MAY 2014) (MAR 2026)

I-27 RFO 52.222-8 PAYROLLS AND BASIC RECORDS. (JUL 2021) (MAR 2026)

I-28 RFO 52.222-9 APPRENTICES AND TRAINEES. (JUL 2005) (MAR 2026)

I-29 RFO 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS. (FEB 1988) (MAR 2026)...38

I-30 RFO 52.222-11 SUBCONTRACTS (LABOR STANDARDS). (MAY 2014) (RFO-DEV SEP 2025)

I-31 RFO 52.222-12 CONTRACT TERMINATION - DEBARMENT. (MAY 2014)

I-32 RFO 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED

REGULATIONS. (MAY 2014)

I-33 RFO 52.222-14 DISPUTES CONCERNING LABOR STANDARDS. (FEB 1988) (MAR 2026)

I-34 RFO 52.222-15 CERTIFICATION OF ELIGIBILITY. (MAY 2014)

I-35 RFO 52.222-35 EQUAL OPPORTUNITY FOR VETERANS. (JUN 2020) (RFO-DEV SEP 2025)

I-36 RFO 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES. (JUN 2020) (RFO-DEV

SEP 2025)

I-37 RFO 52.222-37 EMPLOYMENT REPORTS ON VETERANS. (JUN 2020) (RFO-DEV SEP 2025)

I-38 RFO 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS

ACT. (DEC 2010) (MAR 2026)

I-39 RFO 52.222-41 SERVICE CONTRACT LABOR STANDARDS. (AUG 2018) (DEVIATION EFFECTIVE

DATE)

I-40 RFO 52.222-50 COMBATING TRAFFICKING IN PERSONS. (OCT 2025) (DEVIATION EFFECTIVE

DATE)

I-41 RFO 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION. (JAN 2025) (RFO-DEV SEP 2025)

I-42 RFO 52.222-55 MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE ORDER

14026. (JAN 2022)

I-43 RFO 52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706. (JAN 2022) (MAR 2026)

I-44 RFO 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (DEVIATION

EFFECTIVE DATE)………………………………………………………………………………………………………………………

I-45 RFO 52.223-2 REPORTING OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION

CONTRACTS. (MAY 2024) (RFO-DEV SEP 2025)

I-46 RFO 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND SAFETY DATA. (FEB 2021) (RFO-DEV

SEP 2025)

I-47 RFO 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION. (MAY 2024)

I-48 RFO 52.223-11 OZONE-DEPLETING SUBSTANCES. (MAY 2024) (RFO-DEV SEP 2025)

I-49 RFO 52.223-23 SUSTAINABLE PRODUCTS. (MAY 2024) (DEVIATION EFFECTIVE DATE)

I-50 RFO 52.225-9 BUY AMERICAN - CONSTRUCTION MATERIALS. (OCT 2022) (RFO-DEV SEP 2025) .41

I-51 RFO 52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE

DRIVING. (MAY 2024)

I-52 RFO 52.227-1 AUTHORIZATION AND CONSENT. (JUN 2020)

I-53 RFO 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT.

(JUN 2020)

I-54 RFO 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS. (DEC 2007)

I-55 RFO 52.228-2 ADDITIONAL BOND SECURITY. (OCT 1997)

I-56 RFO 52.228-5 INSURANCE - WORK ON A GOVERNMENT INSTALLATION. (JAN 1997)

I-57 RFO 52.228-11 INDIVIDUAL SURETY-PLEDGE OF ASSETS. (FEB 2021)

I-58 RFO 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS. (DEC 2022)

I-59 RFO 52.228-14 IRREVOCABLE LETTER OF CREDIT. (NOV 2014)

I-60 RFO 52.228-15 PERFORMANCE AND PAYMENT BONDS - CONSTRUCTION. (JUN 2020)

I-61 RFO 52.229-3 FEDERAL, STATE, AND LOCAL TAXES. (FEB 2013)

I-62 RFO 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS. (MAY 2014)

I-63 RFO 52.232-23 ASSIGNMENT OF CLAIMS. (MAY 2014)

I-64 RFO 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS. (JAN 2017)

I-65 RFO 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR AWARD

MANAGEMENT. (OCT 2018)

I-66 RFO 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS. (JUN 2013)

I-67 RFO 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS.

(MAR 2023)

I-68 RFO 52.233-1 DISPUTES. (MAY 2014) (DEVIATION EFFECTIVE DATE)

I-69 RFO 52.233-3 PROTEST AFTER AWARD. (AUG 1996) (RFO-DEV AUG 2025)

I-70 RFO 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM. (OCT 2004) (RFO-DEV AUG 2025)

I-71 RFO 52.236-2 DIFFERING SITE CONDITIONS. (APR 1984) (RFO-DEV JUL 2025)

I-72 RFO 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK. (APR 1984) (RFO-

DEV JUL 2025)

I-73 RFO 52.236-5 MATERIAL AND WORKMANSHIP. (APR 1984) (RFO-DEV JUL 2025)

I-74 RFO 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR. (APR 1984) (RFO-DEV JUL 2025)

I-75 RFO 52.236-7 PERMITS AND RESPONSIBILITIES. (NOV 1991) (RFO-DEV JUL 2025)

I-76 RFO 52.236-8 OTHER CONTRACTS. (APR 1984) (RFO-DEV JUL 2025)

I-77 RFO 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS. (APR 1984) (RFO-DEV JUL 2025)

I-78 RFO 52.236-10 OPERATIONS AND STORAGE AREAS. (APR 1984) (RFO-DEV JUL 2025)

I-79 RFO 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION. (APR 1984) (RFO-DEV JUL 2025)

I-80 RFO 52.236-12 CLEANING UP. (APR 1984) (RFO-DEV JUL 2025)

I-81 RFO 52.236-13 ACCIDENT PREVENTION. (NOV 1991) (RFO-DEV JUL 2025)

I-82 RFO 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES. (APR 1984) (RFO-DEV JUL 2025)...44

I-83 RFO 52.236-17 LAYOUT OF WORK. (APR 1984) (RFO-DEV JUL 2025)

I-84 RFO 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION. (FEB 1997) (RFO-DEV JUL 2025)

I-85 RFO 52.242-13 BANKRUPTCY. (JUL 1995)

I-86 RFO 52.243-1 CHANGES-FIXED-PRICE. (AUG 1987) (RFO-DEV SEP 2025) - ALTERNATE I (APR 1984)

(RFO-DEV SEP 2025)

I-87 RFO 52.243-4 CHANGES. (JUN 2007) (RFO-DEV SEP 2025)

I-88 RFO 52.243-5 CHANGES AND CHANGED CONDITIONS. (APR 1984) (RFO-DEV SEP 2025)

I-89 RFO 52.244-5 COMPETITION IN SUBCONTRACTING. (AUG 2024)

I-90 RFO 52.244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES.

(OCT 2025) (DEVIATION APR 2026)

I-91 RFO 52.246-21 WARRANTY OF CONSTRUCTION. (MAR 1994)

I-92 RFO 52.246-25 LIMITATION OF LIABILITY - SERVICES. (FEB 1997)

I-93 RFO 52.248-3 VALUE ENGINEERING - CONSTRUCTION. (OCT 2025)

I-94 RFO 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE). (APR 2012)

I-95 RFO 52.249-3 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (DISMANTLING,

DEMOLITION, OR REMOVAL OF IMPROVEMENTS). (APR 2012)

I-96 RFO 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION). (APR 1984)

I-97 RFO 52.252-2 CLAUSES INCORPORATED BY REFERENCE. (FEB 1998)

I-98 RFO 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES. (NOV 2020)

I-99 RFO 52.253-1 COMPUTER GENERATED FORMS. (JAN 1991) (RFO-DEV SEP 2025)

SECTION J - List of Documents, Exhibits and Other Attachments

SECTION K - Representations, Certifications, and Other Statements of Bidders

K-1 FAR 52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN

ACTIVITIES OR TRANSACTIONS RELATING TO IRAN-REPRESENTATION AND CERTIFICATIONS. (JUN 2020)

K-2 EPAAR 1552.209-70 ORGANIZATIONAL CONFLICT OF INTEREST NOTIFICATION. (APR 1984)

K-3 EPAAR 1552.209-72 ORGANIZATIONAL CONFLICT OF INTEREST CERTIFICATION. (APR 1984)

K-4 EPAAR 1552.224-70 SOCIAL SECURITY NUMBERS OF CONSULTANTS AND CERTAIN SOLE

PROPRIETORS AND PRIVACY ACT STATEMENT. (APR 1984)

K-5 RFO 52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS-

REPRESENTATION. (NOV 2015) (RFO-DEV AUG 2025)

K-6 RFO 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS. (AUG 2020) (DEVIATION

EFFECTIVE DATE)

K-7 RFO 52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR

A FELONY CONVICTION UNDER ANY FEDERAL LAW. (FEB 2016) (RFO-DEV AUG 2025)

K-8 RFO 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS. (FEB 2024) (RFO-DEV SEP 2025)53

SECTION L - Instructions,Conditions, and Notices to Bidders

L-1 EPAAR 1552.233-70 NOTICE OF FILING REQUIREMENTS FOR AGENCY PROTESTS. (JUL 1999)

L-2 Local Clauses EPA-L-15-104 ELECTRONIC SUBMISSION OF PROPOSALS/BIDS/ OFFERS/QUOTES ..57

L-3 Local Clauses EPA-L-36-101 PROPOSAL INSTRUCTIONS

L-4 RFO 52.204-7 SYSTEM FOR AWARD MANAGEMENT-REGISTRATION. (NOV 2024) (RFO-DEV AUG 2025)

L-5 RFO 52.216-1 TYPE OF CONTRACT. (APR 1984) (RFO-DEV SEP 2025)

L-6 RFO 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS-SECONDARY SITE OF THE WORK.

(MAY 2014) (MAR 2026)

L-7 RFO 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT - CONSTRUCTION MATERIALS. (MAY 2014)

L-8 RFO 52.233-2 SERVICE OF PROTEST. (SEP 2006) (RFO-DEV AUG 2025)

L-9 RFO 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (DEVIATION DATE)…………….62

L-10 RFO 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE. (FEB 1998)

L-11 RFO 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS. (NOV 2020)

SECTION M - Evaluation Factors for Award

M-1 Local Clauses EPA-M-15-101 EVALUATION FACTORS FOR CONTRACT AWARD

SECTION A - Solicitation/Contract Form

There are no Clauses in this section

SECTION B - Supplies or Services/Prices

B-1 IDENTIFICATION OF SERVICES AND PRICES

Payment for work performed under this contract shall be based on the following prices, which shall constitute complete compensation for all plant, labor, material, equipment, services, and bonds necessary for completing work in conformance with all contract requirements:

Item No./Description Quantity Unit Amount

Item 0001: Design, installation and testing of a new fire sprinkler/suppression system in building 10 at the US Environmental Protection Agency, Edison Environmental Center, located at 2890 Woodbridge Avenue, Edison, New Jersey 08837.

1 Job $________________________

Total Proposal Amount

SECTION C - Description/Specifications

C-1 EPAAR 1552.211-79 COMPLIANCE WITH EPA POLICIES FOR INFORMATION RESOURCES

MANAGEMENT. (JUL 2016)

C-2 Local Clauses EPA-C-10-101 STATEMENT OF WORK/PERFORMANCE WORK

STATEMENT/SPECIFICATIONS

The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities (except as otherwise specified), to perform the Statement of Work included in Attachment 1- Statement of Work - Fire Sprinkler Design and Install- EPA Edison NJ. Work will be ordered against the subject SOW through Contracting Officer issuance of Notice to Proceed (NTP).

SECTION D - Packaging and Marking

There are no Clauses in this section

SECTION E - Inspection and Acceptance

E-1 RFO 52.246-4 INSPECTION OF SERVICES - FIXED-PRICE. (AUG 1996)

E-2 RFO 52.246-12 INSPECTION OF CONSTRUCTION. (AUG 1996)

E-3 RFO 52.246-13 INSPECTION - DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS.

(AUG 1996)

SECTION F - Deliveries or Performance

F-1 RFO 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS. (APR 1984) (RFO-DEV JUL 2025)

F-2 RFO 52.242-14 SUSPENSION OF WORK. (APR 1984)

F-3 RFO 52.242-15 STOP-WORK ORDER. (AUG 1989)

F-4 Local Clauses EPA-F-12-101 PERIOD OF PERFORMANCE

The period of performance of this contract shall be from 10/1/2026 through 4/9/2027 inclusive of all required reports.

SECTION G - Contract Administration Data

G-1 EPAAR 1552.232-70 SUBMISSION OF INVOICES. (MAY 2019)

(a) Electronic invoicing and the Invoice Processing Platform (IPP)-(1) Definitions. As used in this clause-

Contract financing payment and invoice payment are defined in Federal Acquisition Regulation

(FAR) 32.001.

Electronic form means an automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, email, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Invoice Processing Platform or another electronic form authorized by the Contracting Officer.

Payment request means any request for contract financing payment or invoice payment submitted by the Contractor under this contract.

(2)(i) Except as provided in paragraph (c) of this clause, the Contractor shall submit invoices using the electronic invoicing program Invoice Processing Platform (IPP), which is a secure web-based service provided by the U.S. Treasury that more efficiently manages government invoicing.

(ii) Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: (This is a fillin for acceptable types of required documentation, such as an SF 1034 and 1035, or an invoice/self-designed form on company letterhead that contains the required information.)

(iii) The Contractor's Government Business Point of Contact (as listed in System for Award Management (SAM)) will receive enrollment instructions via email from the IPP. The Contractor must register within 3 to 5 days of receipt of such email from IPP.

(iv) Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email at IPPCustomerSupport@fiscal.treasury.gov or by telephone at (866) 973-3131.

(3) If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor shall submit a waiver request in writing to the Contracting Officer. The Contractor may submit an invoice using other than IPP only when-

(i) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor; and in such cases, the Contracting Officer shall modify the contract to include a copy of the Determination; or

(ii) When the Governmentwide commercial purchase card is used as the method of payment.

(4) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.

(5) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

(6) Invoices submitted through IPP will be either rejected, or accepted and paid, in their entirety, and will not be paid on a partial basis.

(b) Invoice preparation. The Contractor shall prepare its invoice or request for contract financing payment in accordance with FAR 32.905 on the prescribed Government forms, or the Contractor may submit self-designed forms which contain the required information. Standard Form 1034, Public Voucher for Purchases and Services other than Personal, is prescribed for used by contractors to show the amount claimed for reimbursement. Standard Form 1035, Public Voucher for Purchases and Services other than Personal-Continuation Sheet, is prescribed for use to furnish the necessary supporting detail or additional information required by the Contracting Officer.

(c) Invoice content. (1) The Contractor shall prepare a contract level invoice or request for contract financing payment in accordance with the invoice preparation instructions. If contract work is authorized by an individual task order or delivery order (TO/DO), the invoice or request for contract financing payment shall also include a summary of the current and cumulative amounts claimed by cost element for each TO/DO and for the contract total, as well as any supporting data for each TO/DO as identified in the instructions.

(2) The invoice or request for contract financing payment shall include current and cumulative charges by major cost element such as direct labor, overhead, travel, equipment, and other direct costs. For current costs, each major cost element shall include the appropriate supporting schedule identified in the invoice preparation instructions. Cumulative charges represent the net sum of current charges by cost element for the contract period.

(d) Subcontractor charges. (1) The charges for subcontracts shall be further detailed in a supporting schedule showing the major cost elements for each subcontract.

(2) On a case-by-case basis, when needed to verify the reasonableness of subcontractor costs, the Contracting Officer may require that the contractor obtain from the subcontractor cost information in the detail set forth in paragraph (c)(2) of this section.

This information should be obtained through a means which maintains subcontractor confidentiality (for example, via sealed envelopes), if the subcontractor expresses Confidential Business Information (CBI) concerns.

(e) Period of performance indication. Invoices or requests for contract financing payment must clearly indicate the period of performance for which payment is requested. Separate invoices or requests for contract financing payment are required for charges applicable to the base contract and each option period.

(f) Invoice submittal. (1) Notwithstanding the provisions of the clause of this contract at FAR 52.216-7, Allowable Cost and Payment, invoices or requests for contract financing payment shall be submitted once per month unless there has been a demonstrated need and Contracting Officer approval for more frequent billings. When submitted on a monthly basis, the period covered by invoices or requests for contractor financing payments shall be the same as the period for monthly progress reports required under this contract.

(2) If the Contracting Officer allows submissions more frequently than monthly, one submittal each month shall have the same ending period of performance as the monthly progress report.

(3) Where cumulative amounts on the monthly progress report differ from the aggregate amounts claimed in the invoice(s) or request(s) for contract financing payments covering the same period, the contractor shall provide a reconciliation of the difference as part of the payment request.

(g) EPA Invoice Preparation Instructions-SF 1034. The information which a contractor is required to submit in its Standard Form 1034 is set forth as follows:

(1) U.S. Department, Bureau, or establishment and location-Insert the names and address of the servicing finance office, unless the contract specifically provides otherwise.

(2) Date Voucher Prepared-Insert date on which the public voucher is prepared and submitted.

(3) Contract/Delivery Order Number and Date-Insert the number and date of the contract and task order or delivery order, if applicable, under which reimbursement is claimed.

(4) Requisition Number and Date-Leave blank.

(5) Voucher Number-Insert the appropriate serial number of the voucher. A separate series of consecutive numbers, beginning with Number 1, shall be used by the contractor for each new contract. For an adjustment invoice, write "[invoice number]

#Adj" at the voucher number. For a final invoice, put invoice number F. For a completion invoice, put invoice number #C.

(6) Schedule Number; Paid By; Date Invoice Received-Leave blank.

(7) Discount Terms-Enter terms of discount, if applicable.

(8) Payee's Account Number-This space may be used by the contractor to record the account or job number(s) assigned to the contract or may be left blank.

(9) Payee's Name and Address-Show the name of the contractor exactly as it appears in the contract and its correct address, except when an assignment has been made by the contractor, or the right to receive payment has been restricted, as in the case of an advance account. When the right to receive payment is restricted, the type of information to be shown in this space shall be furnished by the Contracting Officer.

(10) Shipped From; To; Weight Government B/L Number-Insert for supply contracts.

(11) Date of Delivery or Service-Show the month, day and year, beginning and ending dates of incurrence of costs claimed for reimbursement. Adjustments to costs for prior periods should identify the period applicable to their incurrence, e.g., revised provisional or final indirect cost rates, award fee, etc.

(12) Articles or Services-Insert the following: "For detail, see Standard Form 1035 total amount claimed transferred from Page _of Standard Form 1035." Insert "COST REIMBURSABLE-PROVISIONAL PAYMENT" or "INDEFINITE QUANTITY/INDEFINITE DELIVERY-PROVISIONAL PAYMENT" on the Interim public vouchers. Insert "COST REIMBURSABLE-COMPLETION VOUCHER" or "INDEFINITE QUANTITY/INDEFINITE DELIVERY-COMPLETION VOUCHER" on the Completion public voucher. Insert "COST REIMBURSABLE-FINAL VOUCHER" or "INDEFINITE QUANTITY/INDEFINITE DELIVERY- FINAL VOUCHER" on the final public voucher. Insert the following certification, signed by an authorized official, on the face of the Standard Form 1034:

"I certify that all payments requested are for appropriate purposes and in accordance with the agreements set forth in the contract."

(Name of Official)

(Title)

(13) Quantity; Unit Price-Insert for supply contracts.

(14) Amount-Insert the amount claimed for the period indicated in paragraph (g)(11) of this clause.

(h) EPA Invoice Preparation Instructions-SF 1035. The information which a contractor is required to submit in its Standard Form 1035 is set forth as follows:

(1) U.S. Department, Bureau, or Establishment-Insert the name and address of the servicing finance office.

(2) Voucher Number-Insert the voucher number as shown on the Standard Form 1034.

(3) Schedule Number-Leave blank.

(4) Sheet Number-Insert the sheet number if more than one sheet is used in numerical sequence. Use as many sheets as necessary to show the information required.

(5) Number and Date of Order-Insert payee's name and address as in the Standard Form 1034.

(6) Articles or Services-Insert the contract number as in the Standard Form 1034.

(7) Amount-Insert the latest estimated cost, fee (fixed, base, or award, as applicable), total contract value, and amount and type of fee payable (as applicable).

(8) A summary of claimed current and cumulative costs and fee by major cost element- Include the rate(s) at which indirect costs are claimed and indicate the base of each by identifying the line of costs to which each is applied. The rates invoiced should be as specified in the contract or by a rate agreement negotiated by EPA's Cost and Rate Negotiation Team.

(9) Fee-The fee shall be determined in accordance with instructions appearing in the contract.

Note to paragraph (h)-Amounts claimed on vouchers must be based on records maintained by the contractor to show by major cost element the amounts claimed for reimbursement for each applicable contract. The records must be maintained based on the contractor's fiscal year and should include reconciliations of any differences between the costs incurred and amounts claimed for reimbursement. A memorandum record reconciling the total indirect cost(s) claimed should also be maintained.

(i) Supporting Schedules for Cost Reimbursement Contracts. The following backup information is required as an attachment to the invoice as shown by category of cost:

(1) Direct Labor-Identify the number of hours (by contractor labor category and total) and the total loaded direct labor hours billed for the period in the invoice.

(2) Indirect Cost Rates-Identify by cost center, the indirect cost rate, the period, and the cost base to which it is applied.

(3) Subcontracts-Identify the major cost elements for each subcontract.

(4) Other Direct Costs-When the cost for an individual cost (e.g., photocopying, material and supplies, telephone usage) exceeds $1,000 per the invoice period, provide a detailed explanation for that cost category.

(5) Contractor Acquired Equipment (if authorized by the contract)-Identify by item the quantities, unit prices, and total dollars billed.

(6) Contractor Acquired Software (if authorized by the contract)-Identify by item the quantities, unit prices, and total dollars billed.

(7) Travel-When travel costs exceed $2,000 per invoice period, identify by trip, the number of travelers, the duration of travel, the point of origin, destination, purpose of trip, transportation by unit price, per diem rates on daily basis and total dollars billed.

Detailed reporting is not required for local travel. The manner of breakdown, e.g., task order/delivery order basis with/without separate program management, contract period will be specified in the contract instructions.

Note to paragraph (i)-Any costs requiring advance consent by the Contracting Officer will be considered improper and will be disallowed, if claimed prior to receipt of Contracting Officer consent. Include the total cost claimed for the current and cumulative-to-date periods. After the total amount claimed, provide summary dollar amounts disallowed on the contract as of the date of the invoice. Also include an explanation of the changes in cumulative costs disallowed by addressing each adjustment in terms of: Voucher number, date, dollar amount, source, and reason for the adjustment. Disallowed costs should be identified in unallowable accounts in the contractor's accounting system.

(j) Supporting Schedules for Time and Materials Contracts. The following backup information is required as an attachment to the invoice as shown by category of cost:

(1) Direct Labor-Identify the number of hours (by contractor labor category and total) and the total direct labor hours billed for the period of the invoice.

(2) Subcontracts-Identify the major cost elements for each subcontract.

(3) Other Direct Costs-When the cost for an individual cost (e.g., photocopying, material and supplies, telephone usage) exceeds $1,000 per the invoice period, provide a detailed explanation for that cost category.

(4) Indirect Cost Rates-Identify by cost center, the indirect cost rate, the period, and the cost base to which it is applied.

(5) Contractor Acquired Equipment-Identify by item the quantities, unit prices, and total dollars billed.

(6) Contractor Acquired Software-Identify by item the quantities, unit prices, and total dollars billed.

(7) Travel-When travel costs exceed $2,000 per invoice period, identify by trip, the number of travelers, the duration of travel, the point of origin, destination, purpose of trip, transportation by unit price, per diem rates on daily basis and total dollars billed.

Detailed reporting is not required for local travel. The manner of breakdown, e.g., task order/delivery order basis with/without separate program management, contract period will be specified in the contract instructions.

Note to paragraph (j)-Any costs requiring advance consent by the Contracting Officer will be considered improper and will be disallowed, if claimed prior to receipt of Contracting Officer consent. Include the total cost claimed for the current and cumulative-to-date periods. After the total amount claimed, provide summary dollar amounts disallowed on the contract as of the date of the invoice. Also include an explanation of the changes in cumulative costs disallowed by addressing each adjustment in terms of: Voucher number, date, dollar amount, source, and reason for the adjustment. Disallowed costs should be identified in unallowable accounts in the contractor's accounting system.

(k) Adjustment vouchers. Adjustment vouchers should be submitted if finalized indirect rates were received but the rates are not for the entire period of performance. For example, the base period of performance is for a calendar year but your indirect rates are by fiscal year. Hence, only part of the base period can be adjusted for the applicable final indirect rates. These invoices should be annotated with "adj" after the invoice number.

(l) Final vouchers. Final Vouchers shall be submitted if finalized rates have been received for the entire period of performance. For example, the base period of performance is for a calendar year but your indirect rates are by fiscal year. You have received finalized rates for the entire base period that encompass both fiscal years that cover the base period. In accordance with FAR 52.216-7, these invoices shall be submitted within 60 days after settlement of final indirect cost rates. They should be annotated with the word "Final" or "F" after the invoice number. Due to system limitations, the invoice number cannot be more than 11 characters to include spaces.

(m) Completion vouchers. In accordance with FAR 52.216-7(d)(5), a completion voucher shall be submitted within 120 days (or longer if approved in writing by the Contracting Officer) after settlement of the final annual indirect cost rates for all years of a physically complete contract.

The voucher shall reflect the settled amounts and rates. It shall include settled subcontract amounts and rates. The prime contractor is responsible for settling subcontractor amounts and rates included in the completion invoice. Since EPA's invoices must be on a period of performance basis, the contractor shall have a completion invoice for each year of the period of performance. This voucher must be submitted to the Contracting Officer for review and approval before final payment can be made on the contract. The Contracting Officer may request an audit of the completion vouchers before final payment is made. In addition, once approved, the Contracting Officer will request the appropriate closeout paperwork for the contract. For contracts separately invoiced by delivery or task order, provide a schedule showing final total costs claimed by delivery or task order and in total for the contract. In addition to the completion voucher, the contractor must submit the Contractor's Release;

Assignee's Release, if applicable; the Contractor's Assignment of Refunds, Rebates, Credits and other Amounts; the Assignee's Assignment of Refunds, Rebates, Credits and other Amounts, if applicable; and the Contractor's Affidavit of Waiver of Lien, when required by the contract.

(End of clause)

G-2 Local Clauses EPA-G-36-101 GOVERNMENT CONTRACT-LEVEL COR (CONSTRUCTION)

The Government Contract-Level COR identified in the Section G Clause "CONTRACT ADMINISTRATION REPRESENTATIVES" is authorized to make an interpretation as to the meaning of the specifications and drawings based on request, and therefore is responsible for ensuring conformance with the technical requirements of the contract. The Contract-Level COR shall also approve all pre-final progress payment requests. However, the Contract-Level COR is not authorized to make any commitments or changes which affect the contract price or other contract terms and conditions, as any such changes shall be immediately referred to the Contracting Officer for necessary action. Recommendation for final acceptance of work shall be by the Contract-Level COR. Final acceptance of work shall be by the Contracting Officer, or his authorized representative.

G-3 Local Clauses EPA-G-42-101 CONTRACT ADMINISTRATION REPRESENTATIVES

Contract-Level Contracting Officers Representatives (CORs)/Project Officers for this contract are as follows:

COR: TBD

Alt COR: TBD

Contracting Officials responsible for administering this contract are as follows:

Contracting Officer: Amber Hawkins, hawkins.amber@epa.gov, 513-487-2126

Contract Specialist: Paul Buechlein, buechlein.paul@epa.gov, 513-487-2046

SECTION H - Special Contract Requirements

H-1 EPAAR 1552.203-71 DISPLAY OF EPA OFFICE OF INSPECTOR GENERAL HOTLINE POSTER. (JUL 2016)

(a) For EPA contracts valued at $1,000,000 or more including all contract options, the contractor shall prominently display EPA Office of Inspector General Hotline posters in contractor facilities where the work is performed under the contract.

(b) Office of Inspector General hotline posters may be obtained from the EPA Office of Inspector General, ATTN: OIG Hotline (2443), 1200 Pennsylvania Avenue NW., Washington, DC 20460, or by accessing the OIG Web site at: http://www.epa.gov/oig/hotline.html.

(c) The Contractor need not comply with paragraph (a) of this clause if it has established a mechanism, such as a hotline, by which employees may report suspected instances of improper conduct, and has provided instructions that encourage employees to make such reports.

(End of clause)

H-2 EPAAR 1552.209-71 ORGANIZATIONAL CONFLICTS OF INTEREST. (MAY 1994)

(a) The Contractor warrants that, to the best of the Contractor's knowledge and belief, there are no relevant facts or circumstances which could give rise to an organizational conflict of interest, as defined in FAR subpart 9.5, or that the Contractor has disclosed all such relevant information.

(b) Prior to commencement of any work, the Contractor agrees to notify the Contracting Officer immediately that, to the best of its knowledge and belief, no actual or potential conflict of interest exists or to identify to the Contracting Officer any actual or potential conflict of interest the firm may have. In emergency situations, however, work may begin but notification shall be made within five (5) working days.

(c) The Contractor agrees that if an actual or potential organizational conflict of interest is identified during performance, the Contractor will immediately make a full disclosure in writing to the Contracting Officer. This disclosure shall include a description of actions which the Contractor has taken or proposes to take, after consultation with the Contracting Officer, to avoid, mitigate, or neutralize the actual or potential conflict of interest. The Contractor shall continue performance until notified by the Contracting Officer of any contrary action to be taken.

(d) Remedies-The EPA may terminate this contract for convenience, in whole or in part, if it deems such termination necessary to avoid an organizational conflict of interest. If the Contractor was aware of a potential organizational conflict of interest prior to award or discovered an actual or potential conflict after award and did not disclose it or misprepresented relevant information to the Contracting officer, the Government may terminate the contract for default, debar the Contractor from Government contracting, or pursue such other remedies as may be permitted by law or this contract.

(e) The Contractor agrees to insert in each subcontract or consultant agreement placed hereunder, except for subcontracts or consultant agreements for well drilling, fence erecting, plumbing, utility hookups, security guard services, or electrical services, provisions which shall conform substantially to the language of this clause, including this paragraph (e), unless otherwise authorized by the Contracting Officer.

(End of clause)

H-3 EPAAR 1552.235-79 RELEASE OF CONTRACTOR CONFIDENTIAL BUSINESS INFORMATION. (DEC 2018)

(a) The Environmental Protection Agency (EPA) may find it necessary to release information submitted by the Contractor either in response to this solicitation or pursuant to the provisions of this contract, to individuals not employed by EPA. Business information that is ordinarily entitled to confidential treatment under existing EPA regulations (40 CFR part 2) may be included in the information released to these individuals. Accordingly, by submission of this proposal or signature on this contract or other contracts, the Contractor hereby consents to a limited release of its confidential business information (CBI).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .