Sol_140R4023R0029.pdf
PDF 1 MB Posted
- Attached to
- Repair of Potomac Dam #5 Left Abutment
- Solicitation number
- 140R4023R0029
About this file
This solicitation is for repair work on Potomac Dam No. 5's left abutment. Key work includes towpath detour maintenance, erosion control, concrete work, shotcrete application, masonry repointing and repairs, earthwork, drainage installation, and revegetation. The period of performance is November 2023 through September 2025.
The solicitation uses firm-fixed-price contracts and includes four additive price schedules for the base work, guard lock repairs, mule bridge abutment reconstruction, and a dry-laid stone retaining wall. Offerors must submit pricing for all schedules, and the Bureau of Reclamation intends to award the base work with options for the additional schedules. Invoices require as-built drawings, quantity surveys, and percentage completion tracking by CLIN. The Department of the Interior and Bureau of Reclamation are involved, using the Federal Acquisition Regulation and additional Reclamation-specific clauses.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040635604
Bureau of Reclamation
Upper Colorado Region
Regional Office 125 South State Street, Room 8100
R40
Salt Lake City UT 84138
Andrew Taylor 0000000000
1x 09/14/2023
140R4023R0029
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
The principal components of work for the Potomac Dam No. 5 Left Abutment Repair includes providing detour of the canal towpath for public access maintenance of pedestrian traffic, providing erosion and sedimentation control, placing cast-in-place concrete, placing fiber reinforced shotcrete furnishing and installing metal fabrications, earthwork for left abutment and guard lock, mechanically stabilizing the existing wall, slush grouting, installing secant piles, furnishing and installing PVC drainpipes, including some portions utilizing trenchless methods, and Repairing left abutment masonry wall, mule bridge abutment, and dry-laid stone retaining wall.
LOCATION OF WORK: A. Work is located at Potomac Dam No. 5 along the Potomac River, approximately 5 miles west of Williamsport, Maryland in Washington County. Nearest street address is 10746 Dam Number 5 Rd, Clear Spring, MD 21722. This work takes place within the Chesapeake & Ohio Canal National Historical Park, a unit of the
U.S. National Park Service, Department of the Interior.
Per the Reclamation Acquisition Regulation (RAR) - WBR 1426.204 - Disclosure of
Magnitude - the estimated magnitude of construction is between $7,500,000 and
$11,000,000.
Continued ...
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
21 639 calendar days and complete it within ________________ ________________ calendar days after receiving
10/30/2023
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 8/2014)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Bureau of Reclamation Upper Colorado Region
Regional Office 125 South State Street, Room 8100
R40
Salt Lake City UT 84138
Ashton Jones
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 8/2014) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 87
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140R4023R0029
Drawings Are Controlled and will be required to requested in order to receive a copy. Only legitimate entities will be furnished a copy.
00010 Potomac Dam #5 Left Abutment Repair 1 AU
See Specifications (Section J Attachment 1) and
Drawings (Section J Attachment 2) for more details.
Quantity (QTY) - One (1)
Unit of Issue - Activity Unit (A/U)
Pricing Arrangement - Firm-Fixed Price (FFP)
See Schedule B for the Price Schedule continuation which includes all CLINs and sub-CLINs.
All inclusive of items, equipment, materials, personnel, specialized personnel, etc. All invoices against this CLIN must include quantity survey data. Full time safety representative and quality control representative, as well as qualified survey personnel are required.
Product/Service Code: Z2KA
Product/Service Description: REPAIR OR ALTERATION
OF DAMS
Period of Performance: 11/29/2023 to 09/05/2025
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Potomac Dam No. 5 Left Abutment Repair
Solicitation No. 140R4023R0029
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF RECLAMATION
UPPER COLORADO REGION
SALT LAKE CITY, UTAH
Solicitation
Document No.
140R4023R0029
Document Title
Contents
SECTION A – SF-1442
SECTION B – Supplies or Services and Prices Potomac Dam No. 5 Left Abutment Repair SECTION C – Statement / Description / Specification of Work SECTION D – Packaging and Marking SECTION E – Inspection and Acceptance
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
SECTION F -- Deliveries or Performance
F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
F.2 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK APRIL 1984
F.3 52.211-12 LIQUIDATED DAMAGES-CONSTRUCTION SEPTEMBER 2000
SECTION G - Contract Administration Data
G.1 1452.201-70 AUTHORITIES AND DELEGATIONS SEPTEMBER 2011
G.2 DOI-AAAP 0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM
(IPP) APRIL 2013
G.3 WBR 1452.242-80 POST AWARD CONFERENCE BUREAU OF RECLAMATION MARCH 2022
G.4 WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S AUTHORITIES AND LIMITATIONS BUREAU OF
RECLAMATION MAY 2018
SECTION H -- Special Contract Requirements H.1 DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM DECEMBER 2015 H.2 PE Hydro Generation Warranty/Insurance
SECTION I - Contract Clauses
I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
I.2 52.203-14 DISPLAY OF HOTLINE POSTER(S) NOVEMBER 2021
I.3 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS NOVEMBER 2021
I.4 52.209-1 QUALIFICATION REQUIREMENTS FEBRUARY 1995
I.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION MARCH 2023
I.6 52.222-35 EQUAL OPPORTUNITY FOR VETERANS JUNE 2020
I.7 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES JUNE 2020
I.8 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS DECEMBER 2022
I.9 52.236-4 PHYSICAL DATA APRIL 1984
I.10 52.236-8 OTHER CONTRACTS APRIL 1984
I.11 52.252-4 ALTERATIONS IN CONTRACT APRIL 1984
I.12 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES NOVEMBER 2020
I.13 1452.203-70 RESTRICTION ON ENDORSEMENTS DEPARTMENT OF INTERIOR JULY 1996
I.14 1452.204-70 RELEASE OF CLAIMS DEPARTMENT OF THE INTERIOR JULY 1996
I.15 1452.215-70 EXAMINATION OF RECORDS BY THE DEPARTMENT OF THE INTERIOR APRIL 1984
I.16 WBR 1452.223-80 ASBESTOS FREE WARRANTY -- BUREAU OF RECLAMATION AUGUST 2021
I.17 WBR 1452.223-81 SAFETY AND HEALTH – BUREAU OF RECLAMATION AUGUST 2021
I.18 WBR 1452.232-81 – PAYMENT FOR MOBILIZATION AND PREPARATORY WORK – BUREAU OF RECLAMATION
ALT II MARCH 2022
I.19 WBR 1452.236-84 PRESERVATION OF CULTURAL RESOURCES BUREAU OF RECLAMATION MARCH 2022
I.20 WBR 1452.243-80 MODIFICATION PROPOSALS – BUREAU OF RECLAMATION MARCH 2022
SECTION J – List of Attachments and Exhibits SECTION K – Representations, Certifications and Other Statements of OFFERORS
K.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE FEBRUARY 1998
K.2 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS MARCH 2023
K.3 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE
SERVICES OR EQUIPMENT NOVEMBER 2021
K.4 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS OCTOBER 2018
K.5 52.209-12 CERTIFICATION REGARDING TAX MATTERS OCTOBER 2020
K.6 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS – CERTIFICATION NOVEMBER 2021 K.7 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT
OPPORTUNITY FOR CONSTRUCTION FEBRUARY 1999
SECTION L – Instructions, Conditions and Notices to Bidders
L.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE FEBRUARY 1998
L.2 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS, FPMR PART 101-29 AUGUST 1998
L.3 52.211-2 AVAILABILITY OF SPECIFICATIONS, STANDARDS, AND DATA ITEM DESCRIPTIONS LISTED IN THE ACQUISITION STREAMLINING AND STANDARDIZATION INFORMATION SYSTEM (ASSIST) JULY 2021
L.4 52.216-1 – TYPE OF CONTRACT APRIL 1984
L.5 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK MAY 2014 L.6 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE
AGREEMENTS MAY 2014
L.7 52.252-5 AUTHORIZED DEVIATIONS IN PROVIVIONS NOVEMBER 2020
L.8 1452.215-71 USE AND DISCLOSURE OF PROPOSAL INFORMATION – DEPARTMENT OF THE INTERIOR APRIL 1984
L.9 WBR 1452.215-81 PROPOSAL INSTRUCTIONS MAR 2021
L.10 52.228-1 BID GUARANTEE SEPT 1996
L.11 52.228-1 INDIVIDUAL SURETY – PLEDGE OF ASSETS (BID GUARANTEE) FEB 2021
L.12 1452.233-2 – SERVICE OF PROTEST DEPARTMENT OF THE INTERIOR JUL 1996 (Deviation) L.13 WBR 1452.236-85 INSTRUCTION FOR MOBILIZATION AND PREPARATORY WORK SCHEDULE LINE ITEM -
BUREAU OF RECLAMATION MAR 2022
SECTION M -- Evaluation Factors for Award
M.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE FEBRUARY 1998
M.2 WBR 1452.215-80 SOURCE SELECTION EVALUATION PROCEDURES – BUREAU OF RECLAMATION MAR 2021
M.3 WBR 1452.215-84 EVALUATION FACTORS FOR AWARD—QUALITY AND COST/PRICE APPROXIMATELY EQUAL –
BUREAU OF RECLAMATION MAR 2021
SECTION A – SF-1442
See continuation pages for SF-1442.
SECTION B – Supplies or Services and Prices Potomac Dam No. 5 Left Abutment Repair
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
POTOMAC DAM NO. 5
LEFT ABUTMENT STABILIZATION
CHESAPEAKE & OHIO CANAL NATIONAL HISTORICAL PARK
NATIONAL PARK SERVICE – CLEAR SPRING, MARYLAND
PMIS 287511 and LRF N014
ETIC Number 412/180414
PRICE SCHEDULES
(a) Offers will be considered for award on the following Price Schedules, but no offer will be considered for award on partial Price Schedules.
(1) Offerors shall complete Price Schedules 1, 2, 3, and 4. Offerors that do not submit all Price Schedules (1-4) in its proposal will be considered incomplete/unacceptable and will not be evaluated for award.”
(2) Price Schedules 2, 3, and 4 are Additive Price Schedules.
(3) Offers will be evaluated based on the total of Price Schedules 1, 2, 3, and 4.
(4) The Government intends to award Price Schedule 1. The Government may award Price Schedule
2, Price Schedule 3, or Price Schedule 4 depending on available funds.
(b) Offers are subject to the terms and conditions of this solicitation.
(c) Quantities in the Price Schedules are estimated quantities for comparison of offers only. Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.
(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1-1.
(e) Definitions:
(1) CLIN – Contract Line Item Number
PRICE SCHEDULE 1
LEFT ABUTMENT
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1-1 WBR
1452.232 -81
Mobilization and Preparatory Work
For the lump sum of $
1-2 01 31 30 Contract Document Management System
For the lump sum of $
1-3 01 53 23 Temporary Access Crossing For the lump sum of $
1-4 01 55 20 Traffic Control For the lump sum of $
1-5 02 04 10 Towpath Detour For the lump sum of $
1-6 02 41 10 Removal of Existing River Debris
350 yd2 $ $
1-7 02 41 12 Removing, Storing, and Reinstalling Existing Signs
For the lump sum of $
1-8 03 15 12 PVC Waterstops 35 lin ft $ $
1-9 03 15 14 PVC Retro-Fit Waterstop 145 lin ft $ $
1-10 03 30 00 Concrete 27 yd3 $ $
1-11 03 37 10 Shotcrete 240 yd2 $ $
1-12 04 01 40 Cleaning and Preparing Left Abutment Wall for Repointing
7,100 ft2 $ $
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1-13 04 01 40 Repointing Left Abutment Wall
5,000 ft2 $ $
1-14 04 03 06 Left Abutment Wall Grouting
720 ft3 $ $
1-15 04 03 07 Resetting Existing Left Abutment Wall Coping Stones Sta. 0+28 to Sta.
1+00
360 ft2 $ $
1-16 04 03 07 New Left Abutment Wall Coping Stones Sta. 0+28 to Sta. 1+00
95 ft3 $ $
1-17 04 03 07 New Left Abutment Wall Stones Up Station of Sta.
1+00
50 ft3 $ $
1-18 04 03 07 Crack Repair of Left Abutment Wall Stone Blocks
240 lin ft $ $
1-19 04 03 07 Installing Left Abutment Wall Joint Infill Stone
4,500 ft2 $ $
1-20 31 03 33 Removal and Control of Water
For the lump sum of $
1-21 31 09 13 Left Abutment Masonry Wall Stability Monitoring Services
For the lump sum of $
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1-22 31 11 00 Clearing and Grubbing 0.5 acres $ $
1-23 31 11 00 Tree Removal 9 trees $ $
1-24 31 14 10 Stripping 185 yd3 $ $
1-25 31 23 10 Excavation for Left Abutment
3,300 yd3 $ $
1-26 31 23 12 Sand Filter Material 500 yd3 $ $
1-27 31 23 14 Gravel Drain Material 11 yd3 $ $
1-28 31 23 15 Clay Cap 790 yd3 $ $
1-29 31 23 16 Clay Backfill 220 yd3 $ $
1-30 31 23 17 No. 57 Stone Fill 1,200 yd3 $ $
1-31 31 23 39 Disposal of Excavated Materials to a Suitable Disposal Location
660 yd3 $ $
1-32 31 23 70 Controlled Low Strength Material (CLSM)
6 yd3 $ $
1-33 31 24 16 Rockfill Buttress 460 yd3 $ $
1-34 31 25 10 Erosion Control For the lump sum of $
1-35 31 32 32 No. 57 Stone Geotextile 970 yd2 $ $
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1-36 31 32 32 Rockfill Buttress Geotextile 170 yd2 $ $
1-37 31 32 72 Articulating Concrete Block Revetment
925 yd2 $ $
1-38 31 34 00 Post Installed Adhesive Anchors anchors
1-39 31 34 00 Double Twist Hexagonal Mesh Netting (DTHMN)
210 yd2 $ $
1-40 31 34 00 Geocomposite Strip Drains 270 lin ft $ $
1-41 31 34 00 Geogrid Connections 750 lin ft $ $
1-42 31 34 19 Geogrid Reinforcement 2,800 yd2 $ $
1-43 31 56 20 Secant Pile Cutoff Wall 2,100 lin ft $ $
1-44 32 15 10 Gravel Surfacing for Towpath
345 yd2 $ $
1-45 32 15 10 Gravel Surfacing for Parking Lot
490 yd2 $ $
1-46 32 91 20 Placing Topsoil 280 yd3 $ $
1-47 32 92 20 Seeding 0.85 acres $ $
1-48 33 12 33 River Staff Gage For the lump sum of $
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1-49 33 46 36 8-Inch Diameter Slotted PVC Drain Pipes
170 lin ft $ $
1-50 33 46 36 8-Inch Diameter Solid PVC Drain Pipes
95 lin ft $ $
1-51 33 46 36 Drain Cleanouts 6 drain cleanouts
1-52 33 46 42 Weir Box For the lump sum of $
TOTAL FOR PRICE SCHEDULE 1 $_________________
PRICE SCHEDULE 2, ADDITIVE
GUARD LOCK
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
2-1 31 03 33 Removal and Control of Water
For the lump sum of $
2-2 31 09 13 Guard Lock Stability Monitoring Services
For the lump sum of $
2-3 31 11 00 Clearing and Grubbing 0.05 acres $ $
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
2-4 31 14 10 Stripping 125 yd3 $ $
2-5 31 23 11 Excavation for Guard Lock 800 yd3 $ $
2-6 31 23 12 Sand Filter Material 400 yd3 $ $
2-7 31 23 14 Gravel Drain Material 19 yd3 $ $
2-8 31 23 15 Clay Cap 160 yd3 $ $
2-9 31 23 16 Clay Backfill 65 yd3 $ $
2-10 31 23 18 Structural Fill Layer 245 yd3 $ $
2-11 31 23 39 Disposal of Excavated Materials to a Suitable Disposal Location
285 yd3 $ $
2-12 31 23 70 Controlled Low Strength Material (CLSM)
3 yd3 $ $
2-13 31 32 72 Articulating Concrete Block Revetment
325 yd2 $ $
2-14 32 91 20 Placing Topsoil 80 yd3 $ $
2-15 32 92 20 Seeding 0.05 acres $ $
2-16 33 46 36 8-Inch Diameter Slotted PVC Drain Pipes
260 lin ft $ $
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
2-17 33 46 36 8-Inch Diameter Solid PVC Drain Pipes
85 lin ft $ $
2-18 33 46 42 Weir Box For the lump sum of $
TOTAL FOR PRICE SCHEDULE 2 $_________________
TOTAL FOR PRICE SCHEDULES 1 AND 2 $_________________
PRICE SCHEDULE 3, ADDITIVE
MULE BRIDGE ABUTMENT
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
3-1 02 41 16 Removing and Preserving Existing Mule Bridge Abutment Concrete Cap Beam
For the lump sum of $
3-2 02 41 16 Disassembling and Preserving Existing Mule Bridge Abutment Stone Wall
160 ft2 $ $
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
3-3 02 43 10 New Stones for Mule Bridge Abutment
82 ft3 $ $
3-4 02 43 10 Installing Mule Bridge Abutment Stone Facing
32 ft2 $ $
3-5 02 43 10 Reconstructing Mule Bridge Abutment Dry-Laid Masonry
93 ft2 $ $
3-6 02 43 10 Reinstalling Mule Bridge Abutment Concrete Cap Beam
For the lump sum of $
3-7 02 43 10 Stainless Steel Bearing Plate for Mule Bridge Abutment
For the lump sum of $
3-8 03 20 50 Foundation Anchor Bars 12 anchor bars
3-9 03 30 00 Concrete 9 yd3 $ $
3-10 31 14 10 Stripping 7 yd3 $ $
3-11 31 23 13 Excavation for Mule Bridge Abutment
53 yd3 $ $
3-12 31 23 39 Disposal of Excavated Materials to a Suitable Disposal Location
53 yd3 $ $
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
3-13 31 23 70 Controlled Low Strength Material (CLSM)
53 yd3 $ $
3-14 31 32 13 Slush Grouting 135 ft3 $ $
3-15 31 32 42 Geocomposite Sheet Drains for Mule Bridge Abutment
125 ft2 $ $
3-16 32 91 20 Placing Topsoil 7 yd3 $ $
3-17 32 92 20 Seeding 0.01 acres $ $
TOTAL FOR PRICE SCHEDULE 3 $_________________
TOTAL FOR PRICE SCHEDULES 1, 2, AND 3 $_________________
PRICE SCHEDULE 4, ADDITIVE
DRY-LAID STONE RETAINING WALL
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
4-1 04 03 07 Rebuilding Top of Dry-laid Stone Retaining Wall
290 ft3 $ $
PRICE SCHEDULE 4, ADDITIVE
DRY-LAID STONE RETAINING WALL
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
4-2 04 03 07 Dry-laid Stone Retaining Wall Chinking and Stone Replacement
1,300 ft2 $ $
(a)
TOTAL FOR PRICE SCHEDULE 4 $_________________
TOTAL FOR PRICE SCHEDULES 1, 2, 3, AND 4 $_________________
END OF SUPPLIES OR SERVICES AND PRICES/COSTS
This page intentionally left blank.
SECTION C – Statement / Description / Specification of Work
Please See Section J Attachment(s) 1-2 for specifications, drawings, and supporting data.
Drawings will only be provided to verified entities that have requested the drawings. Send all requests to Andrew Taylor at ataylor@usbr.gov. Delivery of these Drawings will be made via MS Teams or Kiteworks.
mailto:ataylor@usbr.gov
SECTION D – Packaging and Marking
There are no clauses included in this section.
SECTION E – Inspection and Acceptance
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following addresses:
FAR Clauses - https://www.acquisition.gov/far/
CLAUSES INCORPORATED BY REFERENCE
Clause Title Date
52.246-12 Inspection of Construction August 1996 https://www.acquisition.gov/far/
SECTION F -- Deliveries or Performance
F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following addresses: FAR Clauses - https://www.acquisition.gov/far/
52.211-13 Time Extensions September 2000 52.211-18 Variation in Estimated Quantity April 1984 52.242-14 Suspension of Work April 1984
F.2 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK APRIL
The Contractor shall be required to
(a) Commence work under this contract within 21 calendar days after the date the Contractor receives:
1) Notice to Proceed for non-site work under this contract, which is anticipated within twenty-one (21) calendar days after contract award.
2) Notice to Proceed for site work, which is anticipated to be issued no later than November 29, 2023.
(b) Prosecute the work diligently, and
(c) Complete the entire work ready for use not later than September 5, 2025 after the contractor receives the initial non-site work Notice to Proceed issued in accordance with (a)(1) above. The time stated for completion shall include final cleanup of the premises.
1) Complete the construction for use by September 5, 2025.
(End of Clause)
F.3 52.211-12 LIQUIDATED DAMAGES-CONSTRUCTION SEPTEMBER 2000
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $6,500 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
SECTION G - Contract Administration Data
G.1 1452.201-70 AUTHORITIES AND DELEGATIONS SEPTEMBER 2011
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers having been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers exceeding the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR via electronic transmission. This can be through email, mail, or fax. If by fax please request the appropriate fax number. Email is the preferred method of delivery.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
G.2 DOI-AAAP 0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS –
INVOICE PROCESSING PLATFORM (IPP) APRIL 2013
Payment requests must be submitted electronically through the U.S. Department of the Treasury's Internet Payment Platform System (IPP).
"Payment requests" means any request for contract financing payment or invoicing payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions-Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice, failure to provide the items will result in invoice rejection:
1 – Quantity Surveys (if applicable) 2 – Current Copy of As-Built Drawings 3 – Quantity sheets reflecting the CLIN in schedule B, percentage complete, and bold any items nearing or exceeding 100% of the CLIN amount.
4 – Approved construction schedule
Once the invoice has been submitted into the IPP system, the Contractor shall also submit an electronic copy of the invoice to the following:
Contracting Officer: (Ashton Jones – ajones@usbr.gov) Contract Specialist: (Andrew Taylor – ataylor@usbr.gov) Procurement Technician: (Chris Zook – czook@usbr.gov)
Failure to transmit invoices via electronic transmission may cause significant delay or possible rejection of your payment request.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in CCR) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3-5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
G.3 WBR 1452.242-80 POST AWARD CONFERENCE BUREAU OF RECLAMATION MARCH
(a) Prior to the contractor starting work, a postaward conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The contractor's project manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.
(b) The conference (if in-person) will be held at: (Location to be determined). This Post Award Conference will be held in person as well as via MS TEAMS for geographically separated personnel.
(c) The Contracting Officer and the Contractor will agree to the date and time of the conference after award of the contract. In event of a conflict in schedules, the contracting officer shall establish the date for the conference.
(d) The Contractor shall not be entitled to the reimbursement any costs associated with attendance at the conference beyond the agreed-to contract price.
https://www.ipp.gov/ mailto:ajones@usbr.gov mailto:ataylor@usbr.gov mailto:czook@usbr.gov mailto:ippgroup@bos.frb.org
G.4 WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S AUTHORITIES
AND LIMITATIONS BUREAU OF RECLAMATION MAY 2018
(a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:
(1) Inspecting and accepting or rejecting work performed under the contract.
(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.
(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.
(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting Officer.
(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract; therefore, the COR does not have the authority to, and may not, issue any technical direction that -
(1) Constitutes a direction of additional work outside the Contract requirements;
(2) Constitutes a change as defined in the contract clause entitled “Changes;”
(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;
(4) Changes any of the expressed terms, conditions or specifications of the contract; or
(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.
(d) All technical direction shall be issued in writing by the COR.
(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -
(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or
(2) Advise the Contractor that the Government will issue a written change order.
(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”
SECTION H -- Special Contract Requirements
H.1 DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM
DECEMBER 2015
1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at: https://www.cpars.gov/.
a) Contractor Representatives may then provide comments in response to the evaluation or return the evaluation without comment.
b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c) All information provided should be reviewed for accuracy prior to submission.
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6)The following guidelines apply concerning your use of the past performance evaluation:
a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
https://www.cpars.gov/
H.2 PE Hydro Generation Warranty/Insurance
Contractor shall secure and maintain the following minimum insurance coverages for the PE Hydro Generation area’s as follows:
1. Commercial general liability Limits of liability:
$2,000,000. General aggregate $2,000,000. Products/completed operations aggregate $1,000,000. Personal & advertising injury limit $1,000,000. Per occurrence
2. Automobile liability:
Limits of liability: $1,000,000. Per accident
3. Workers’ compensation: Limits of liability: statutory
4. Employers’ liability:
Limits of liability: $1,000,000. Per occurrence
5. Umbrella/excess liability:
$3,000,000. Aggregate excess over primary limits of liability required for commercial general liability, automobile liability and employers’ liability.
6. Professional liability: Limits of liability:
$1,000,000. Each claim $2,000,000. Aggregate
All other project areas shall maintain standard commercial insurance coverage.
SECTION I - Contract Clauses
I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following addresses:
FAR Clauses - https://www.acquisition.gov/far/
52.202-1 Definitions June 2020 52.203-3 Gratuities April 1984 52.203-5 Covenant Against Contingent Fees May 2014 52.203-6 Restrictions on Subcontractor Sales to the Government June 2020 52.203-7 Anti-Kickback Procedures June 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity May 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity May 2014 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions June 2020
52.203-13 Contractor Code of Business Ethics and Conduct November 2021 52.203-17 Contractor Employee Whistleblower Rights and Requirement to
Inform Employees of Whistleblower Rights June 2020
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
January 2017
52.204-4 Printed or Copied Double-Sided on Post-Consumer Fiber Content Paper
May 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
June 2020
52.204-13 System for Award Management Maintenance October 2018 52.204-14 Service Contract Reporting Requirements October 2016 52.204-18 Commercial and Government Entity Code Maintenance August 2020 52.204-19 Incorporation by Reference of Representations and
Certifications December 2014
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Entities
November 2021
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
November 2021
52.204-27 Prohibition on a ByteDance Covered Application June 2023 52.209-6 Protecting the Government's Interest When Subcontracting With
Contractors Debarred, Suspended, or Proposed for Debarment November 2021
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
October 2018
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations November 2015 52.210-1 Market Research November 2021 52.215-2 Audit and Records – Negotiations June 2020 52.215-8 Order of Precedence – Uniform Contract Format October 1997
52.215-10 Price Reduction for Defective Certified Cost or Pricing Data August 2011 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data—
Modifications June 2020
52.215-12 Subcontractor Certified Cost or Pricing Data June 2020 52.215-13 Subcontractor Certified Cost or Pricing Data-Modifications June 2020 52.215-17 Waiver of Facilities Capital Cost or Money October 1997 52.215-21 Requirements for Certified Cost or Pricing Data and Data Other
Than Certified Cost or Pricing Data – Modifications November 2021
52.219-6 Notice of Total Small Business Set-Aside November 2020 52.219-8 Utilization of Small Business Concerns October 2022 52.222-3 Convict Labor June 2003 52.222-4 Contract Work Hours and Safety Standards Act – Overtime
Compensation May 2018
52.222-6 Construction Wage Rate Requirements August 2018 52.222-7 Withholding of Funds May 2014 52.222-8 Payrolls and Basic Records July 2021 52.222-9 Apprentices and Trainees July 2005 52.222-10 Compliance with Copeland Act Requirements February 1988 52.222-11 Subcontracts (Labor Standards) May 2014 52.222-12 Contract Termination-Debarment May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and
Related Regulations May 2014
52.222-14 Disputes Concerning Labor Standards February 1988 52.222-15 Certification of Eligibility May 2014 52.222-21 Prohibition of Segregated Facilities April 2015 52.222-26 Equal Opportunity September 2016 52.222-27 Affirmative Action Compliance Requirements for Construction April 2015 52.222-37 Employment Reports on Veterans June 2020 52.222-40 Notification of Employee Rights Under the National Labor
Relations Act December 2010
52.222-50 Combating Trafficking in Persons November 2021 52.222-54 Employment Eligibility Verification May 2022 52.222-55 Minimum Wages Under Executed Order 13658 January 2022 52.222-62 Paid Sick Leave Under Executive Order 13706 January 2022 52.223-2 Affirmative Procurement of Biobased Products Under Service
And Construction Contracts September 2013
52.223-3 Alt I Hazardous Material Identification and Material Safety Data – Alternate I
July 1995
52.223-5 Pollution Prevention and Right-to-Know Information May 2011 52.223-6 Drug Free Workplace May 2001 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts August 2018
52.223-18 Encouraging Contractor Policies to Ban text Messaging While Driving
June 2020
52.225-12 Notice of Buy American Requirement-Construction Materials Under Trade Agreements
May 2014
52.225-13 Restrictions on Certain Foreign Purchases February 2021 52.227-1 Authorization and Consent June 2020 52.227-2 Notice and Assistance Regarding Patent and Copyright
Infringement June 2020
52.227-4 Patent Indemnity – Construction Contracts December 2007 52.228-2 Additional Bond Security October 1997 52.228-11 Pledges Of Assets February 2021 52.228-12 Prospective Subcontractor Requests for Bonds December 2022 52.228-14 Irrevocable Letter of Credit November 2014 52.228-15 Performance and Payment Bonds–Construction June 2020 52.229-3 Federal, State And Local Taxes February 2013 52.232-5 Payments Under Fixed-Price Construction May 2014 52.232-17 Interest May 2014 52.232-23 Assignment Of Claims May 2014 52.232-27 Prompt Payment for Construction Contracts January 2017 52.232-33 Payment by Electronic Funds Transfer-System for Award
Management October 2018
52.232-39 Unenforceability of Unauthorized Obligations June 2013 52.232-40 Providing Accelerated Payment to Small Business
Subcontractors March 2023
52.233-1 Disputes May 2014 52.233-3 Protest After Award August 1996 52.233-4 Applicable Law for Breach of Contract Claim October 2004 52.236-2 Differing Site Conditions April 1984 52.236-3 Site Investigation and Conditions Affecting the Work April 1984 52.236-5 Material and Workmanship April 1984 52.236-6 Superintendence by the Contractor April 1984 52.236-7 Permits and Responsibilities November 1991 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements April 1984
52.236-10 Operations and Storage Areas April 1984 52.236-11 Use and Possession Prior to Completion April 1984 52.236-12 Cleaning Up April 1984 52.236-13 Accident Prevention November 1991 52.236-15 Schedules for Construction Contracts April 1984 52.236-16 Alt I Quantity Survey April 1984 52.236-17 Layout of Work April 1984 52.236-21 Alt II Specifications and Drawings for Construction Alternate II April 1984 52.236-26 Preconstruction Conference February 1995 52.242-13 Bankruptcy July 1995 52.243-4 Changes (CONST) June 2007 52.246-21 Warranty of Construction March 1994 52.248-3 Value Engineering – Construction October 2020 52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price)
Alternate I (September 1996) (CONST) September 1996
52.249-10 Default (Fixed-Price Construction) April 1984 52.253-1 Computer Generated Forms January 1991
I.2 52.203-14 DISPLAY OF HOTLINE POSTER(S) NOVEMBER 2021
(a) Definition.
United States, as used in this clause, means the 50 States, the District of Columbia, and outlying areas.
(b) Display of fraud hotline poster(s). Except as provided in paragraph (c)—
(1) During contract performance in the United States, the Contractor shall prominently display in common work areas within business segments performing work under this contract and at contract work sites-
(i) Any agency fraud hotline poster or Department of Homeland Security (DHS) fraud hotline poster identified in paragraph (b)(3) of this clause; and
(ii) Any DHS fraud hotline poster subsequently identified by the Contracting Officer.
(2) Additionally, if the Contractor maintains a company website as a method of providing information to employees, the Contractor shall display an electronic version of the poster(s) at the website.
(3) Any required posters may be obtained as follows:
Poster(s) Obtain from
Hotline Posters IAW DIAR 1403.1004
Downloadable hotline posters as well as instructions for obtaining a hard copy poster are available at https://www.dol.gov/general/topics/posters & https://www.doioig.gov/complaints-requests/contractor-recipient-resources
(i) Appropriate agency name(s) and/or title of applicable Department of Homeland Security fraud hotline poster); and
(ii) The website(s) or other contact information for obtaining the poster(s).)
(c) If the Contractor has implemented a business ethics and conduct awareness program, including a reporting mechanism, such as a hotline poster, then the Contractor need not display any agency fraud hotline posters as required in paragraph (b) of this clause, other than any required DHS posters.
(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in all subcontracts that exceed the threshold specified in Federal Acquisition Regulation 3.1004(b)(1) on the date of subcontract award, except when the subcontract —
(1) Is for the acquisition of a commercial product or commercial service; or
(2) Is performed entirely outside the United States.
I.3 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION
SYSTEMS NOVEMBER 2021
(a) Definitions. As used in this clause–
“Covered contractor information system” means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
https://www.dol.gov/general/topics/posters https://www.doioig.gov/complaints-requests/contractor-recipient-resources https://www.doioig.gov/complaints-requests/contractor-recipient-resources
“Federal contract information” means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public Web sites) or simple transactional information, such as necessary to process payments.
“Information” means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction
(CNSSI) 4009).
“Information system” means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).
“Safeguarding” means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements and procedures.
(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users,…
This is the start of the file's text. The full file is on GovTribe.