Sol_140R2025Q0058.pdf

PDF 620 KB Posted

Attached to
CCAO Fire Alarm Services Federal contract opportunity
Solicitation number
140R2025Q0058
Issued by
Department of the Interior Bureau of Reclamation

About this file

This is a Combined Synopsis/Solicitation for fire alarm and suppression system inspection services for the Bureau of Reclamation's Central California Area Office. The solicitation (140R2025Q0058) seeks a contractor to perform comprehensive fire alarm system inspections and testing at multiple facilities including New Melones Dam, Folsom Dam, Nimbus Dam, and associated power plants over a five-year period from August 2025 to August 2030.

The contract is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with a base year and four option years. The scope includes inspecting and testing multiple fire alarm systems across various buildings, with a total of 590 devices across different system types including Edwards, Simplex, Honeywell, and Ansul systems. Key requirements include performing weekly, monthly, quarterly, semi-annual, and annual inspections, maintaining comprehensive documentation, conducting functional testing, and ensuring compliance with NFPA standards. The solicitation indicates quotes are due by August 4, 2025, at 11:00 am PDT, with a site visit scheduled for July 24, 2025, at the Folsom Dam Road location.

View the file

Other files for this federal contract opportunity

Other files attached to CCAO Fire Alarm Services, newest first.
File Type Posted
Questions_and_Answers_from_the_Site_Visit_v2_0003.pdf PDF
Sol_140R2025Q0058_Amd_0003.pdf PDF
Questions_and_Answers_from_the_Site_Visit_0002.pdf PDF
Sol_140R2025Q0058_Amd_0002.pdf PDF
Sol_140R2025Q0058_Amd_0001.pdf PDF
C05_01_Combined_Synopsis-Solicitation_Amd_0001_0001.pdf PDF
C05_01_Wage_Determinations_2015-5631_Rev_24.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

R20

See Schedule

CODE 16. ADMINISTERED BYCODE

X

X

541350

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED ORR20

REQUEST FOR

PROPOSAL

(RFP)

INVITATION

FOR BID (IFB)

10. THIS ACQUISITION ISCODE

REQUEST FOR

QUOTE (RFQ)

14. METHOD OF SOLICITATION

13b. RATING

NORTH AMERICAN INDUSTRY

CLASSIFICATION STANDARD

(NAICS):

SMALL BUSINESS

08/04/2025 1100 PD

07/17/2025

9169785291Rashayla Brown (No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

140R2025Q0058

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 41 OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

15. DELIVER TO

Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815 Division of Acquisition Services Regional Office Mid-Pacific Region

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$11.5

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

11.

SEE SCHEDULE

12. DISCOUNT TERMS THIS CONTRACT IS A RATED

ORDER UNDER THE DEFENSE

PRIORITIES AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

8(A)

X

Bureau of Reclamation

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

ADMINISTERED BY:

Bureau of Reclamation Mid-Pacific Region Regional Office Division of Acquisition Services 2800 Cottage Way, Room E-1815 Sacramento CA 95825-1898 US See Quote Submission Instructions in 52.212-1 and Evalutation Criteria in 52.212-2 of the Combined Synopsis/Solicitation below.

Period of Performance: 08/08/2025 to 08/07/2030

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

XX

DATED

Chelsea Tikotsky

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Government Use Only)

OFFER

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT: REFERENCE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 11/2021) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

41 2 of

COMBINED SYNOPSIS/SOLICITATION

140R2025Q0058

Fire Alarm and Suppression System Inspection

Central California Area Office

Folsom, California

Contracting Office:

Bureau of Reclamation Interior Region 10 · California-Great Basin

Acquisitions and Services Division Supply and Services Branch

Sacramento CA 95825

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with FAR parts 13 and additional information included in this notice. The Bureau of Reclamation intends to award a Firm-Fixed Price Purchase Order for services represented in the Performance Work Statement. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.

The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-04, as of 6/11/2025.

This requirement is being solicited as 100% Service-Disabled Veteran Owned Small Business set-aside.

EVALUATION CRITERIA: The Government will award a Purchase Order resulting from the Comparative Evaluation of quotes received in response to this solicitation in evaluating technical, price, and past performance.

GENERAL INFORMATION

RFQ Number: 140R2025Q0058

Request for Quotation (RFQ) Request for Proposal

(RFP) Invitation for Bid

(IFB)

North American Industry Classification Code

(NAICS):

541350 Size Standard: $11.5M

Competition: 100% SDVSOB SET-ASIDE

QUOTES DUE: August 4 at 11:00 AM Pacific Time

EMAIL TO: RaShayla Brown, rbrown@usbr.gov

Business Information:

Business Name: ___________________________________________________

Agency Point of Contact (POC): ___________________________________________

Agency POC Email & Phone Number: ______________________________________

UEI Number/Cage Code: _________________________________________________ mailto:rbrown@usbr.gov

Base Year: August 8, 2025, to August 7, 2026

CLIN Description Estimated Qty

Unit Unit Price Total

00010

Perform Fire Alarm System Inspection & Testing in accordance with the Performance work statement

Option Year 1: August 8, 2026, to August 7, 2027

00020

Option Year 2: August 8, 2027, to August 7, 2028

00030

Option Year 3: August 8, 2028, to August 7, 2029

00040

Option Year 4: August 8, 2029, to August 7, 2030

00050

Grand Total $

Site Visit Information

Location: 7794 Folsom Dam Road, Folsom, CA

Date and Time: July 24, 2025, at 10am PDT

Interested vendors shall register by email to RaShayla Brown rbrown@usbr.gov no later than July 23, 2025, at 1:00 pm PDT. Vendors shall provide company name, telephone number and name of all attendees with contact information that will come to the site visit for an accurate headcount. No more than 3 person per company at the site visit.

mailto:rbrown@usbr.gov

PERFORMANCE WORK STATEMENT (PWS)

CCAO FIRE ALARM SYSTEMS

1.0 Background

The Central California Area Office (CCAO) manages fire alarm and suppression systems at various facilities, including dams and power plants. While Operations and Maintenance (O&M) personnel can perform some inspections and repairs, they are not authorized to certify these systems. Regulatory requirements stipulate that inspections and testing must be conducted by certified third-party professionals in accordance with National Fire Protection Association (NFPA) standards. O&M personnel do not possess the specialized training and certifications required for official system certification. Notably, all fire alarms are connected to an auto dialer that alerts the Folsom Operations Control Room.

The purpose of this contract is to provide comprehensive services for the inspection, maintenance, repair, testing, and documentation of fire alarm and suppression systems. The contract includes a base year with options for additional years, contingent on the contractor's satisfactory performance and the Government's needs. These services are essential for identifying deficiencies and ensuring the effective operation of the systems, thereby safeguarding both maintenance personnel and the public.

1.1 Introduction

This Performance Work Statement (PWS) outlines the requirements for the inspection, maintenance, and repair of fire alarm systems at various facilities managed by the Central California Area Office (CCAO). The Contractor is responsible for ensuring compliance with all relevant regulations, including those set by the Occupational Safety and Health Administration (OSHA), National Fire Protection Association (NFPA), and Hazardous Energy Control Procedures (HECP). The Contractor must deliver high-quality services to ensure the safety and functionality of the fire alarm systems.

Work will be performed at the following locations:

New Melones Dam and Powerplant, 16805 Peoria Flat Road, Jamestown, CA 95327 Folsom Dam, Powerplant & Facilities, 7794 Folsom Dam Road, Folsom, CA 95630 Nimbus Dam and Powerplant, 1901 Hazel Avenue, Gold River, CA 95670

2. Scope of Work

The Contractor shall provide comprehensive fire alarm inspection, maintenance, and repair services for the following systems:

Civil Maintenance Building: Edwards EST 3 system with 75 devices.

Folsom Admin Building: Chemetron MICRO 1002 system with 13 devices.

Folsom Auxiliary Dam: Edwards EST 3 system with 29 devices.

Folsom Dam: SimplexGrinnell 4100U system with 19 devices.

Folsom Power Plant Generators: Ansul Auto Pulse IQ-301 system with 35 devices.

Folsom Powerplant: Edwards EST4 system with 368 devices.

New Melones Power Plant: Honeywell XLS 140-2 system with 74 devices.

New Melones Power Plant Generators: Ansul Auto Pulse IQ-301 system with 27 devices.

New Melones Power Plant Oil Room: Fenwal NET 6000 system with 43 devices.

Nimbus Power Plant: Simplex 4020 system with 66 devices.

Devices Clean Agent CO2

Suppression Sprinkler Alarm System

Civil Maintenance Building 29 46 Edwards EST 3 29 46

Air Compressor 1 Alarm Valve 1 Annunciator 1 Battery 10 Control Panel 1 Control Valve 4 Deluge Valve 1 Drain Device 3 Dry Pipe Valve 1 Duct Detector 4 Fast Response 2 Fire Dept. Connection 1 Gauge Device 5 Indicating Device 1 Inspector's Test 1 Power Supply 3 Pressure Switch 2 Pull Station 19 Smoke Detector 7 Solenoid 1 Sprinkler Box 1 Tamper Switch 4 Waterflow Switch 1

Folsom Admin Building 13

Chemetron MICRO 1002 13 Abort Station 1 Actuator 1 Agent Tank 1 Battery 2 Control Panel 1 Horn/Strobe 1 Nozzle 1 Pull Station 1 Smoke Detector 4

Devices Clean Agent CO2 Suppression Sprinkler Alarm

System Folsom Auxiliary Dam 29

Edwards EST 3 29 Annunciator 1 Battery 10 Control Panel 1 Power Supply 1 Pull Station 10 Smoke Detector 5 Voice Evacuation 1

Folsom Dam 19 SimplexGrinnell 4100U 19

Annunciator 2 Battery 2 Control Panel 1 Elevator 2 Smoke Detector 12

Folsom Power Plant Generators 35 Ansul Auto Pulse IQ-301 35

Battery 2 CO2 Tank 2 Control Panel 2 Fusible Link 18 Hose 1 Manual Station 3 Nozzle 1 Pressure Switch 3 Releasing Device 2 Valve 1

System Folsom Powerplant 368

Edwards EST 4 368 Beam Detectors 2 Booster Panel 4 Control Modules (Signal) 11 Door Holders 3

FACP 1

FACU 2

Heat Detector 1 Monitoring Modules 20 Notification Appliances 162 Photoelectric Smoke 103 Pull Stations 24 Relays 34 Smoke Control Systems 1

New Melones Power Plant 74 Honeywell XLS 140-2 74

Battery 21 Beam Detector 2 Communicator 1 Control Panel 1 Heat Detector 6 Indicating Device 1 Multi-Criteria Detector 16 Power Supply 9 Pull Station 7 Smoke Detector 6 Special Control 3 Voice Evacuation 1

New Melones Power Plant Generators 27

Ansul Auto Pulse IQ-301 27 Carbon Dioxide System 1 CO2 Tank 2 Heat Detector 12 Hose 1 Manual Station 2 Nozzle 3 Pressure Switch 2 Releasing Device 4

System New Melones Power Plant Oil Room 43

Fenwal NET 6000 43 Abort Station 3 Agent Tank 6 Annunciator 1 Battery 2 Control Panel 1 Damper 2 Flame Detector 3 Heat Detector 6 Horn/Strobe 1 Maintenance Bypass Switch 1 Nozzle 2 Pressure Switch 2 Pull Station 3 Relays 2 Releasing Device 4 Smoke Detector 4

Nimbus Power Plant 12 54 Simplex 4020 12 54

Battery 4 Beam Detector 2 Control Panel 1 Control Valve 4 Damper Control 1 Drain Device 2 Duct Detector 1 Fan Shutdown 1 Indicating Device 1 Inspector's Test 2 Pull Station 6 Pump 2 Smoke Detector 37 Sprinkler Box 1 Standard Response 1

Grand Total 56 62 41 590

2.1 Fire Suppression Systems

The Contractor shall provide testing services for fire suppression systems, including CO2, Clean Agent, and sprinkler systems. The scope includes:

System Inspection: Conduct visual checks of components for proper installation and signs of damage.

Functional Testing: Ensure systems activate correctly and simulate fire conditions to verify operational readiness.

Flow & Pressure Testing: Measure water supply and pressure; document findings for compliance.

Nozzle Testing: Verify the operation and coverage of suppression nozzles.

Documentation: Maintain comprehensive records and submit detailed reports on findings and compliance with NFPA standards.

3. Performance Requirements The Contractor shall perform the following tasks as defined in NFPA 72 Table 14.3.1 Visual Inspections and 14.4.3.2 Testing:

3.1 Inspections

Weekly Inspections (Provide comprehensive job plans that meet NFPA 12, NFPA 72, NFPA 2001, and NFPA 750 compliance for each system. Will be performed by inhouse crafts.)

Monthly Inspections (Provide comprehensive job plans that meet NFPA 12, NFPA 72, NFPA 2001, and NFPA 750 compliance for each system. Will be performed by inhouse crafts.)

Quarterly Inspections

Perform inspections every three months to ensure compliance with NFPA standards, including:

Inspect supervisory signaling devices and radiant energy fire detectors.

Inspect water lines connected to the fire sprinkler system.

Conduct battery tests, including charge and load tests.

Test initiating and signaling systems.

Semi-Annual Inspections

Conduct inspections every six months to evaluate system performance, including:

Sensitivity Testing: Use calibrated equipment to verify smoke detector responsiveness within the prescribed sensitivity range. Make adjustments or replacements as needed.

Annual Inspections

Execute a comprehensive annual inspection, including:

Testing of all components and systems to ensure compliance with regulatory requirements, along with a review of all previous inspection and testing records.

3.2 Routine Maintenance

Conduct routine maintenance on all fire alarm systems in accordance with manufacturer specifications and industry best practices. This includes, but is not limited to:

• Testing and calibrating alarm systems.

• Cleaning and adjusting detectors and panels.

• Replacing batteries, fuses and other consumables.

3.3 Repairs

Coordinate all necessary repairs identified during inspections or reported by facility personnel.

• Collaborate with the Contracting Officer (CO) and Contracting Officer's Representative (COR) for contract modification approval.

*** Current list of discrepancies and repair needs attached.***

4. Deliverables and Requirements The Contractor shall provide the following deliverables:

4.1 Job Hazard Analyses (JHAs)

The Contractor shall submit written JHAs as outlined in Sections 3 and 4 of the Reclamation Safety and Health Standard (RSHS) for review and acceptance by Reclamation.

JHAs must be submitted for all tasks associated with the contract.

JHAs are an annual requirement and should include updates as necessary. The Contractor shall submit a new program annually or provide updates to the original if minor.

JHAs must be site-specific for the planned inspection and testing tasks.

The Contractor shall provide printed JHAs on the day of a planned task and review and sign them with the Contracting Officer's Representative (COR). Participation in joint JHA field meetings with Reclamation is mandatory prior to the commencement of any on-site activities.

No work shall proceed without an approved safety program and JHAs pertinent to specific inspection and/or testing activities.

4.2 Annual Work Plan and Schedule

The Contractor shall provide an annual work plan and schedule for approval/acceptance based on the list of facilities and systems indicated.

The annual work schedule and plan must include a list of inspection and testing items per the latest NFPA 12, NFPA 72, NFPA 2001, and NFPA 750 publications, formatted in a spreadsheet.

Due to the high impact of loss of power generation, outages should be scheduled only during the months of October, November, December, January, February, and March, with few exceptions.

Reclamation allows alternative methods to measure CO2 content in cylinders per FIST 5-12, Appendix C, to mitigate hazards associated with weighing high-pressure cylinders.

4.3 Test Plans

The Contractor shall provide an appropriate test plan for each scheduled inspection/testing activity, as outlined in NFPA 72, Chapter 14.2.10.

Test plans must be submitted at least five business days prior to the scheduled inspection/testing activity if no outage is required, and at least three weeks' notice if an outage is required.

The test plan should identify any steps/actions to be performed by others, such as removing the discharge head from a CO2 manifold for the purpose of simulating a discharge.

4.4 Inspection and Testing Requirements

The Contractor shall perform inspections and testing per the approved work plan, schedule, and test plans. The Government reserves the right to cancel or defer an inspection or testing activity for various reasons.

Testing shall include “bringing-in” 100% of the devices annually. The Contractor shall document the devices tested on a six-month interval and include this information in their report.

Inspection Reports: Detailed reports shall be submitted within 7 calendar days of each inspection, including findings, recommendations, and actions taken. The report must:

Identify any deficiencies preventing “certification” of the systems that must be corrected.

Maintenance, repair of CO2, Clean Agent, and Wet Pipe or Deluge fire suppression systems inspection and testing requirements associated with NFPA 72, NFPA 12, NFPA 2001, and NFPA 750, respectively.

Any recommendations for maintenance or improvements should be clearly delineated in the report, separate from items requiring correction.

4.5 Maintenance Reports

A report summarizing maintenance activities, compliance with schedules, and any issues encountered shall be maintained. Logs of all routine maintenance activities performed, including dates, tasks completed, and personnel involved, must be kept.

a. Repair Documentation

Provide documentation for all repairs, including a cost estimate that includes justification for the repair, estimated labor hours, hourly rate, number of employees, costs of materials and equipment, overhead, and profit fee.

Documentation of repairs conducted must include before-and-after photos, parts used, and costs incurred.

4.6 Annual Summary Report

An executive summary report detailing all inspections, maintenance, and repairs. Provide list of discrepancies associated with each system.

5. Government Furnished Equipment (GFE) and Use of Utilities

The Contractor shall provide all qualified personnel, ladders, equipment, materials, etc., necessary to complete the work.

The Contractor is responsible for providing potable water on-site for their personnel.

Toilet facilities should be available for use at most facilities.

120 VAC power should generally be available; however, any special power requirements or power needed at unusual locations shall be the responsibility of the Contractor.

6. Regulatory Compliance

The Contractor shall ensure compliance with all applicable regulations, including OSHA, RSHS, NFPA, and HECP publications.

6.1 Contractor Key Personnel and Qualifications

The Contractor shall submit a list of personnel and any subcontractors involved in inspecting and testing the systems at the facilities indicated under this contract for acceptance by the COR. A list of qualified personnel shall always be maintained.

The team must meet NFPA 72 qualification requirements for servicing fire alarm systems.

NICET or equivalent - qualified personnel in the inspection and testing of Fire Alarm Systems, Special Hazard Systems, and Water-Based Systems. The list shall include data/certificates, brief resumes, and years of experience related to the scope of this contract.

The Contractor shall maintain all necessary certifications and licenses required to perform the work.

NFPA 72 Qualification Requirements for Servicing Fire Alarm Systems

What are the qualification requirements for servicing fire alarm systems? According to NFPA 72, qualified fire alarm service personnel must meet one or more of the following:

1. Factory trained and certified for the specific type and brand of system serviced

2. Certified by a nationally recognized certification organization acceptable to the authority having jurisdiction

3. Either individually or through their affiliation with an organization that is registered, licensed, or certified by a state or local authority to perform service on systems addressed within the scope of this code

4. Employed and qualified by an organization listed by a nationally recognized testing laboratory for the servicing of systems within the scope of this code

6.2 Special Work Permits, LOTO, Clearances

Work must adhere to Facility Instruction Standards and Techniques 1-1 (FIST 1-1) and the Hazardous Energy Control Program (HECP).

The Operations Supervisor or COR will provide FIST 1-1 HECP training annually to the lead technician.

A Special Work Permit must be issued before any contractor work can proceed with Lock Out Tag Out (LOTO) or Clearance Hazardous Energy Control Procedure. The COR will coordinate and issue this permit to the Contractor.

Personal LOTO may be used for systems that do not impact power generation and/or water delivery, with prior approval from operations.

Suppression system testing of New Melones and Folsom Powerplants requires a Bulk Electric System planned outage.

Work must be coordinated at least 4 weeks in advance and is subject to approval from CVO and WAPA. Clearance and Outage will be submitted by the COR.

7. Coordination and Communication

Open Communication: The Contractor shall maintain open lines of communication with the Contracting Officer's Representative (COR) and facility personnel to ensure timely coordination of inspections, maintenance, and repairs.

Modification Requests: All requests for modifications or additional funding must be submitted in writing to the Contracting Officer (CO). Each request should include sufficient justification and supporting documentation.

Email Communication: The Contractor shall ensure clear and prompt email communication with the CO and COR.

7.1 Hours of Operation

Normal business hours are Monday through Friday, 7:00 AM to 5:00 PM, excluding federal holidays. The Contractor is responsible for performing work during these hours unless otherwise directed by the Government.

7.2 Recognized Holidays

The Contractor shall observe the following federal holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, and Christmas Day.

No work shall occur on these holidays unless authorized by the Contracting Officer (CO) for emergency services.

7.3 Period of Performance

August 1, 2025, through July 31, 2030

8. Performance Assessment

The Contractor's performance will be assessed based on the successful completion of inspections, maintenance, and repairs, as well as adherence to timelines and quality standards.

Monitoring Performance

The COR will track Contractor performance during the evaluation period. Interim evaluations may be provided to identify strengths and weaknesses. At the end of the evaluation period, the COR will assess performance according to the Quality Assurance Surveillance Plan (QASP) and report to the Contracting Officer.

Contractor Self-Assessment

Following each evaluation period, the Contractor may submit a written self-assessment of its performance to the COR within 5 working days after the evaluation period ends. The self-assessment should not exceed one page per Performance Requirement Summary (PRS) element and must address both strengths and weaknesses, including actions taken to correct deficiencies.

COR Recommendation

The COR will consider all evaluations and any pertinent information, including the Contractor's self-assessment, and prepare a report with findings and recommendations for the Contracting Officer. The Contractor will receive a copy of the draft findings and will have the opportunity to identify factual errors. The draft recommendation is not negotiable, and the COR will not engage in discussions with the Contractor.

9. Quality Assurance

The Contractor shall adhere to the Acceptable Quality Levels (AQL) as outlined in the performance standards.

The Contracting Officer's Representative (COR) will conduct regular surveillance to ensure compliance with all performance standards.

Quality Assurance Surveillance Plan

Performance Standard

Quality Requirement Monitoring Method Reference

Site Safety - 100% compliance with safety regulations (OSHA, NFPA, etc.)

- Zero safety incidents - Section 6.0 of PWS

Inspection and Testing

- Conduct inspections per approved plans with no safety issues

- 100% compliance during inspections

- Section 3.1 of PWS

Inspection Reports - Submit reports within 7 days post-inspection/testing

- 95% accuracy report details

- Section 4 of

PWS

Repairs - Clear communication with CO and COR regarding:

- Issues and justifications for repairs

- Contract modifications as necessary

- Develop job plans for all repairs within 4 weeks (extensions allowed if needed)

- Schedule approved repairs with COR

- 90% on-time completion of scheduled tasks

- Maintenance report

Preventive Maintenance Schedule

- 100% on-time completion of scheduled tasks

- Review maintenance logs

- Maintenance report

Job Hazard Analysis (JHAs)

- Submit 4 weeks prior to start date - 90% timely submission

- Section 3.1 of PWS

Annual Work Plan and Schedule

- Submit to COR and coordinate outages / LOTO for suppression system testing.

-Collaborate with COR to adjust start dates on specific activities as needed.

- 95% approval within 60 days

- Section 3.2 of PWS

Test Plans - Submit 4 weeks prior to outages. - 90% timely submission

- Section 3.4 of PWS

Personnel Qualifications

- Submit qualified personnel list. - 95% approval;

notify of changes

- Section 3.3 of PWS

Coordination and Communication

Respond to emails and/or phone calls within 48 hours.

Provide test plans and schedule to COR with 4 weeks advance notice to coordinate outages prior to work start.

95% timely response.

95% of test plans and schedule submitted with advance notice.

Section 7 of

PWS

10. Attachments

Facility Fire Installation Drawings and Data

The following drawings and data are provided as the best available information. The Contractor may visit the various sites for familiarization and planning purposes after contract award.

Folsom Powerplant and UHA

Folsom Powerplant Floor Plans

Folsom Powerplant Simplex Schematic Drawings

Folsom Powerplant Simplex Wiring Drawings

Switchyard UHA Trachte Electrical and Alarm Installation Drawings

Folsom Generator Building

Generator Building Existing Installation Drawing

Civil Maintenance Building

Folsom Civil Maintenance Building Fire Alarm Drawings

Administrative Building Server Room

Admin Building Server Room Clean Agent System Drawings

Folsom Dam

Folsom Dam Floor Plans and Elevations

Note: No specific fire alarm drawings are available; approximately a dozen smoke detectors are installed outside of the elevators and in the elevator machine room.

Folsom Auxiliary Dam

Folsom Auxiliary Dam Fire Alarm Drawings

Nimbus Powerplant

Nimbus Powerplant Simplex Fire Alarm Drawings

New Melones Power Plant

New Melones Power Plant Honeywell Fire Alarm Drawings

New Melones Power Plant Clean Agent System Drawings

New Melones CO2 Fire Suppression System Drawings

End of PWS

SECTION C - COMMERCIAL CLAUSES

NOTE: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are no included in agency solicitation, including 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation, and paragraph (t) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Agencies will not consider or use these representations. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

52.252-2 Clauses Incorporated by Reference February 1998 This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/ http://www.acquisition.gov/diar/

(End of Clause)

Clauses below are incorporated by reference:

52.252-6 Authorized Deviations in Clauses Nov 2020

(a)The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b)The use in this solicitation or contract of any Federal Acquisition Regulation Supplement (48 CFR Chapter 14) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of clause)

52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Products and Commercial Services (DEVIATION Feb 2025)

Jan 2025

Clauses Title Date 52.204-13 System for Award Management Maintenance Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance Aug 2020 52.212-4 Contract Terms and Conditions—Commercial Products and

Commercial Services Nov 2023

52.232-40 Providing Accelerated Payments to Small Business Subcontractors

Dec 2013

52.237-2 Protection of Government Buildings, Equipment, and Vegetation

Apr 1984

52.242-15 Stop-Work Order Aug 1989 http://www.acquisition.gov/far/ http://www.acquisition.gov/diar/

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-

235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5)52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023)(31 U.S.C. 3805 note)).

(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

_X_ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

__(2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).

__(3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

_X_(4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

_X_(5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).

__(6) [Reserved].

__(7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

__(8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111- 117, section 743 of Div. C).

_X_(9) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of Division R of Pub. L.

117-328).

https://www.acquisition.gov/far/52.203-19#FAR_52_203_19 https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.209-10#FAR_52_209_10 https://www.acquisition.gov/far/52.233-3#FAR_52_233_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.233-4#FAR_52_233_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.203-6#FAR_52_203_6 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4655&num=0&edition=prelim https://www.acquisition.gov/far/52.203-13#FAR_52_203_13 https://www.acquisition.gov/far/52.203-15#FAR_52_203_15 https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4712&num=0&edition=prelim https://www.acquisition.gov/far/3.900#FAR_3_900 https://www.acquisition.gov/far/52.204-10#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/52.204-14#FAR_52_204_14 https://www.acquisition.gov/far/52.204-15#FAR_52_204_15 https://www.acquisition.gov/far/52.204-27#FAR_52_204_27

__(10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec 2023) ( Pub. L. 115–390, title II).

_X_(11) (i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec 2023) ( Pub. L. 115– 390, title II).

__(ii) Alternate I (Dec 2023) of 52.204-30.

_X_(12) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Nov 2021) ( 31 U.S.C. 6101 note).

__(13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) ( 41 U.S.C. 2313).

__(14) [Reserved].

__(15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) ( 15 U.S.C. 657a).

__(16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__(17) [Reserved]

_X_(18) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

__(ii) Alternate I (Mar 2020) of 52.219-6.

__(19) (i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

__(ii) Alternate I (Mar 2020) of 52.219-7.

_X_(20) 52.219-8, Utilization of Small Business Concerns (Feb 2024) (15 U.S.C. 637(d)(2) and (3)).

__(21) (i) 52.219-9, Small Business Subcontracting Plan (Sep 2023) (15 U.S.C. 637(d)(4)).

__(ii) Alternate I (Nov 2016) of 52.219-9.

__(iii) Alternate II (Nov 2016) of 52.219-9.

__(iv) Alternate III (Jun 2020) of 52.219-9.

__(v) Alternate IV (Sep 2023) of 52.219-9.

__(22) (i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).

__(ii) Alternate I (Mar 2020) of 52.219-13.

__(23) 52.219-14, Limitations on Subcontracting (Oct 2022) (15 U.S.C. 657s).

__(24) 52.219-16, Liquidated Damages—Subcontracting Plan (Sep 2021) (15 U.S.C. 637(d)(4)(F)(i)).

_X_(25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (Feb 2024) (15 U.S.C. 657f).

_X_(26) (i) 52.219-28, Post Award Small Business Program Representation (Feb 2024) (15 U.S.C. 632(a)(2)).

__(ii) Alternate I (Mar 2020) of 52.219-28.

https://www.acquisition.gov/far/52.204-28#FAR_52_204_28 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.govinfo.gov/link/plaw/115/public/390 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.acquisition.gov/far/52.209-6#FAR_52_209_6 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/52.209-9#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/52.219-3#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/52.219-4#FAR_52_219_4 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-8#FAR_52_219_8 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-14#FAR_52_219_14 https://www.acquisition.gov/far/52.219-16#FAR_52_219_16 https://www.acquisition.gov/far/52.219-27#FAR_52_219_27 https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-28#FAR_52_219_28

__(27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).

__(28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022) (15 U.S.C. 637(m)).

__(29) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) ( 15 U.S.C. 644(r)).

__(30) 52.219-33, Nonmanufacturer Rule (Sep 2021) ( 15 U.S.C. 637(a)(17)).

_X_(31) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).

__(32) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (Feb 2024).

_X_(33) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

_X_(34) (i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).

__(ii) Alternate I (Feb 1999) of 52.222-26.

_X_(35) (i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) ( 38 U.S.C. 4212).

__(ii) Alternate I (Jul 2014) of 52.222-35.

__(36) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) ( 29 U.S.C. 793).

__(ii) Alternate I (Jul 2014) of 52.222-36.

_X_(37) 52.222-37, Employment Reports on Veterans (Jun 2020) ( 38 U.S.C. 4212).

_X_(38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

_X_(39) (i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O. 13627).

__(ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

_X_(40) 52.222-54, Employment Eligibility Verification (May 2022) (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)

__(41) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__(ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__(42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (May 2024) ( 42 U.S.C. 7671, et seq.).

__(43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (May 2024) ( 42 U.S.C. 7671, et seq.).

__(44) 52.223-20, Aerosols (May 2024) ( 42 U.S.C. 7671, et seq.).

__(45) 52.223-21, Foams (May 2024) ( 42 U.S.C. 7671, et seq.).

https://www.acquisition.gov/far/52.219-29#FAR_52_219_29 https://www.acquisition.gov/far/52.219-30#FAR_52_219_30 https://www.acquisition.gov/far/52.219-32#FAR_52_219_32 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section644&num=0&edition=prelim https://www.acquisition.gov/far/52.219-33#FAR_52_219_33 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.222-3#FAR_52_222_3 https://www.acquisition.gov/far/52.222-19#FAR_52_222_19 https://www.acquisition.gov/far/52.222-21#FAR_52_222_21 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 https://www.acquisition.gov/far/52.222-37#FAR_52_222_37 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-40#FAR_52_222_40 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-54#FAR_52_222_54 https://www.acquisition.gov/far/22.1803#FAR_22_1803 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 https://www.acquisition.gov/far/52.223-11#FAR_52_223_11 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-12#FAR_52_223_12 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-20#FAR_52_223_20 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-21#FAR_52_223_21 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim

_X_(46) 52.223-23, Sustainable Products and Services (May 2024)[(DEVIATION FEB 2025)] ( 7 U.S.C. 8102, 42 U.S.C.

6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l).

__(47) (i) 52.224-3 Privacy Training (Jan 2017) ( 5 U.S.C. 552 a).

__(ii) Alternate I (Jan 2017) of 52.224-3.

__(48) (i) 52.225-1, Buy American-Supplies (Oct 2022) (41 U.S.C. chapter 83).

__(ii) Alternate I (Oct 2022) of 52.225-1.

__(49) (i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV 2023) ( 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Public Law 103- 182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

__(ii) Alternate I [Reserved].

__(iii) Alternate II (Jan 2025) of 52.225-3.

__(iv) Alternate III (Feb 2024) of 52.225-3.

__(v) Alternate IV (Oct 2022) of 52.225-3.

__(50) 52.225-5, Trade Agreements (NOV 2023) ( 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

_X_(51) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

__(52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).

__(53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

__(54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

_X_(55) 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) ( E.O. 13513).

__(56) 52.229-12, Tax on Certain Foreign Procurements (Feb 2021).

__(57) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

__(58) 52.232-30, Installment Payments for Commercial Products and Commercial Services (Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

_X_(59) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Oct2018) ( 31 U.S.C. 3332).

__(60) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (Jul 2013) (31 U.S.C. 3332).

__(61) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).

__(62) 52.239-1, Privacy or Security Safeguards (Aug 1996) ( 5 U.S.C. 552a).

_X_(63) 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (Nov 2024) (Sections 1821-1826, Pub. L. 118-31, 41 U.S.C. 3901 note prec.).

https://www.acquisition.gov/far/52.223-23#FAR_52_223_23 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6962&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6962&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8259&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.224-3#FAR_52_224_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section552&num=0&edition=prelim https://www.acquisition.gov/far/52.224-3#FAR_52_224_3 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2112&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2112&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3805&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section4001&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title19-chapter29&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0MC1jaGFwdGVyMzctZnJvbnQ%3D%7C%7C%7C0%7Cfalse%7Cprelim&edition=prelim https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-5#FAR_52_225_5 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2501&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://www.acquisition.gov/far/52.225-13#FAR_52_225_13 https://www.acquisition.gov/far/52.225-26#FAR_52_225_26 https://www.acquisition.gov/far/52.226-4#FAR_52_226_4 https://www.acquisition.gov/far/52.226-5#FAR_52_226_5 https://www.acquisition.gov/far/52.226-8#FAR_52_226_8 https://www.federalregister.gov/executive-order/13513 https://www.acquisition.gov/far/52.229-12#FAR_52_229_12 https://www.acquisition.gov/far/52.232-29#FAR_52_232_29 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3805&num=0&edition=prelim https://www.acquisition.gov/far/52.232-30#FAR_52_232_30 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3805&num=0&edition=prelim https://www.acquisition.gov/far/52.232-33#FAR_52_232_33 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3332&num=0&edition=prelim https://www.acquisition.gov/far/52.232-34#FAR_52_232_34 https://www.acquisition.gov/far/52.232-36#FAR_52_232_36 https://www.acquisition.gov/far/52.239-1#FAR_52_239_1 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section552a&num=0&edition=prelim https://www.acquisition.gov/far/52.240-1#FAR_52_240_1 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section3901&num=0&edition=prelim

__(64) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C. 637(d)(13)).

__(65) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) ( 46 U.S.C. 55305 and 10 U.S.C. 2631).

__(ii) Alternate I (Apr 2003) of 52.247-64.

__(iii) Alternate II (Nov 2021) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

_X_(1) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter67).

_X_(2) 52.222-42, Statement of Equivalent Rates…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .