Sol_140R2025Q0048.pdf

PDF 783 KB Posted

Attached to
NCAO Modular Indoor Shooting Range Federal contract opportunity
Solicitation number
140R2025Q0048
Issued by
Department of the Interior Bureau of Reclamation

About this file

This is a Request for Quote (RFQ) solicitation for a Modular Indoor Shooting Range (MISR) for the Bureau of Reclamation's Northern California Area Office. The solicitation (140R2025Q0048) seeks a firm-fixed price purchase order for a two-lane .308 ball munition rated 100-yard transportable small arms training range, with specific technical requirements including full ballistic containment, dimmable lighting, 360-degree target retrieval system, HVAC capabilities, and sound control. The range must be capable of supporting live fire with weapons up to 5.56mm and .223 ammunition, withstand various weather conditions, and be pre-engineered for potential relocation.

The solicitation is set aside 100% for small businesses, with quotes due by June 25, 2025 at 3:00 p.m. PDT, to be submitted via email. The government will evaluate quotes based on technical approach, past performance, prior experience, and price. The primary delivery location is the Shasta Maintenance Center in Shasta Lake, CA, with an optional second unit delivery location at Folsom Dam. The contract includes a two-hour training session for Reclamation personnel and an option to purchase a second range with the same specifications, expiring on 01/01/2027. Contractors must provide comprehensive maintenance documentation and be responsible for all installation labor, parts, and materials.

View the file

Other files for this federal contract opportunity

Other files attached to NCAO Modular Indoor Shooting Range, newest first.
File Type Posted
Sol_140R2025Q0048_Amd_0003.pdf PDF
C06__Amendment_3_Q-A_Document_0003.pdf PDF
C06__Amendment_3_SOW_Update_0003.pdf PDF
Sol_140R2025Q0048_Amd_0002.pdf PDF
C06__Amendment_2_SOW_Update_0002.pdf PDF
C06__Amendment_2_Q-A_Document_0002.pdf PDF
C06__Amendment_2_Updated_Solicitation_Document_0002.pdf PDF
Sol_140R2025Q0048_Amd_0001.pdf PDF
C05__Attachment_Buy_American_Act_Certificate_140R2025Q0048.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

R20

See Schedule

CODE 16. ADMINISTERED BYCODE

X

X

X

332311

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED ORR20

REQUEST FOR

PROPOSAL

(RFP)

INVITATION

FOR BID (IFB)

10. THIS ACQUISITION ISCODE

REQUEST FOR

QUOTE (RFQ)

14. METHOD OF SOLICITATION

13b. RATING

NORTH AMERICAN INDUSTRY

CLASSIFICATION STANDARD

(NAICS):

SMALL BUSINESS

06/25/2025 1500 PD

06/11/2025

916-978-4302Steven Teves (No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

140R2025Q0048

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 68 OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

15. DELIVER TO

Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815 Division of Acquisition Services Regional Office Mid-Pacific Region

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

11.

SEE SCHEDULE

12. DISCOUNT TERMS THIS CONTRACT IS A RATED

ORDER UNDER THE DEFENSE

PRIORITIES AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

8(A)

Bureau of Reclamation

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

ADMINISTERED BY:

Bureau of Reclamation Mid-Pacific Region Regional Office Division of Acquisition Services 2800 Cottage Way, Room E-1815 Sacramento CA 95825-1898 US Northern California Area Office (NCAO) Modular Indoor Shooting Range (MISR)

DO NOT USE THIS FORM TO SUBMIT QUOTES/PRICING

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

XX

DATED

Steven Teves

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Government Use Only)

OFFER

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT: REFERENCE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 11/2021) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

SEE THE FOLLOWING COMBINED SYNOPSIS/SOLICITATION

DOCUMENT

DIRECT ALL QUESTIONS TO STEVEN TEVES AT

STEVES@USBR.GOV

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

68 2 of

140R2025Q0048 NCAO Modular Indoor Shooting

Range (MISR)

Solicitation # 140R2025Q0048

COMBINED SYNOPSIS/SOLICITATION

Northern California Area Office (NCAO)

Modular Indoor Shooting Range

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with FAR Part 13.5 and additional information included in this notice. The Bureau of Reclamation intends to award a Firm-Fixed Price Purchase

Order for Northern California Area Office (NCAO) Modular Indoor Shooting Range (MISR) represented in the Statement of Specification. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. Solicitation number 140R2025Q0048 is issued as a request for quotation (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular

2025-03 (01/17/2025).

GENERAL INFORMATION

RFQ Number: 140R2025Q0048

Request for Quotation

(RFQ)

Request for Proposal

(RFP)

Invitation for Bid

(IFB)

This acquisition is set-aside 100 percent Small Business concerns only. (Large businesses may not submit a quote.)

North American Industry Classification

Code (NAICS): 332311

Size

Standard: 750 Employees

The Government will award items based on comparative evaluation of Technical

Approach, Past Performance, Prior Experience, and Price.

Site Visit:

Not Applicable

Quote Due Date:

Quote

Submission:

June 25, 2025

3:00 p.m. PDT

By email to steves@usbr.gov

Contact

Information:

Steven Teves

Phone Number/Email: 916 978-4302 / steves@usbr.gov

Request for Information: All questions regarding this solicitation should be emailed to steves@usbr.gov no later than June 18, 2025 @ 11:00 a.m. PDT.

mailto:steves@usbr.gov

QUOTER INFORMATION:

Entity Name: _______________________________

SAM Unique ID or Cage Code: ______________________

QUOTE PRICING SCHEDULE:

CLIN

NO.

Description Qty Unit of

Issue

Unit Price Extended Price

00010

MISR (includes shipping and installation)

LS

00020 MISR Training Kit Software and

Hardware

1 LS $ $

00030 MISR (includes shipping and installation) – Optional Item

1 EA $ $

00040 MISR Training Kit Software and

Hardware – Optional Item

1 EA $ $

Proposed Grand Total

All unit prices submitted will be firm-fixed pricing throughout the duration of the contract.

Optional CLIN 00030 and 00040 will be used in the calculation of overall evaluated price.

Quotes shall be valid for 60 days from the date quotes are due.

Delivery Terms: F.O.B. Destination.

Refer to Provisions 52.212-1 Instructions to Offerors – Commercial Products and Commercial

Services Addendum, Quote Submittal Instructions and 52.212-2 Evaluation – Commercial

Products and Commercial Services, and Attachments for further instructions.

Documents necessary for quote submission are as follows:

1. Completed and signed quote pricing schedule

2. Technical Approach documentation (see evaluation criteria at 52.212-2)

3. Prior Experience documentation (see evaluation criteria at 52.212-2)

4. Buy American Act Certificate (see Attachments and 52.212-1 Addendum)

5. Fully executed and completed offeror representations, certifications, and acknowledgments required by FAR 52.212-3 of this solicitation, (only paragraph b must be completed if necessary). If SAM representations, certifications and acknowledgments are correct in SAM as it pertains to this solicitation then the quoter verifies by submission of this quote that their representation and certifications in SAM have been entered or updated in the last 12 months, and are current, accurate, complete, and applicable to this solicitation.

*System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation, and paragraph (t) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Agencies will not consider or use these representations. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

Authorized Agent’s Signature/Date:_____________________________________

STATEMENT OF WORK

1.0 BACKGROUND

Shasta Dam is considered a National Critical Infrastructure (NCI), and it is imperative to ensure the dam and powerplant continue to operate without interruption. Based on a Security Effective

Assessment in January of 2024, the Region and NCAO leadership have determined the need for a response capable armed guard force at Shasta Dam, specifically the Security Response Force

(SRF). Shasta Dam has a requirement for an indoor range for SRF personnel to conduct firearms training and qualifications year around.

2.0 OBJECTIVE

The objective of this contract is to obtain a live fire range that eliminates SRF personnel from having to travel offsite to conduct training and the ability to conduct firearms training during inclement weather.

3.0 SCOPE

The scope of work for this requirement includes:

a) Supplying the one (1) modular indoor shooting range, in accordance with the specifications identified in Section 4.0

b) Transporting and placing the modular indoor shooting range on-site

c) Installing the modular indoor shooting range on-site in accordance with all local, state and

Federal requirements.

d) Providing one, 2-hour training session to Reclamation personnel covering system maintenance, operations, and troubleshooting.

e) The option to purchase a second indoor range with the same salient characteristics and requirements listed on this statement of work (SOW). The option will expire on 01/01/2027.

4.0 TYPE OF CONTRACT

This will be a firm-fixed price purchase order.

5.0 LOCATION – The location of delivery for primary unit will be as follows:

Bureau of Reclamation

Shasta Maintenance Center

16349 Shasta Dam Blvd

Shasta Lake, CA 96022-9019

The exact coordinates of the proposed placement are:

40°42’54.45” N 122°25’46.92” W elev. 630 ft

Optional Unit (if exercised) location:

Folsom Dam

Bureau of Reclamation

7794 Folsom Dam Road-Receiving

Folsom, CA 95630

6.0 REQUIREMENTS

The contractor shall provide a modular containerized build indoor shooting range that has a two

(2) lane .308 ball munition rated 100-yard modular, transportable, small arms training range. The modular range must equal a 100-yard shooting distance not to exceed 360’ in length and must be capable of supporting live fire with weapons up to (and including) 5.56mm and .223 ammunitions, hollow point and frangible ammunition for weapon training up to 3240 FPS and/or

1286 ft. lbs.

The modular range system shall be designed to retain full structural integrity to support all ballistic treatments, ventilation equipment, and accessories. The system must maintain 100% full ballistics (projectile & ricochets) containment to allow for placement at a zero-surface danger zone (SDZ) site creating a safe shooting environment. Containment integrity shall be coordinated with the design and installation of ventilation systems, environmental control systems, noise reduction controls, entry/exit controls and general construction. The modular containerized range system shall be designed and constructed with .308 caliber rated ballistic interior walls, ceiling, and must have two (2) steel vertical bullet traps to eliminate the possibility of projectiles from ricocheting toward the shooting stalls and shooters.

a) The modular containerized range system shall be pre-engineered to allow for assembly and full operation in its original design, possess the capability to be disassembled, transported and reassembled as a complete fully operational two (2) lane modular range system at different locations utilizing standard construction methods and commercial transportation.

The range system must be able to withstand numerous weather conditions to include but not limited to rain, snow, wind and prolonged exposure to sun including heat of approximately

115°F for sustained periods.

b) The modular range system shall be designed with the ability to control dimmable lighting during live fire operations to allow for simulation of nighttime firing and with a turning, self-propelled 360-degree target retrieval system able to be controlled from a master control panel and at each lane of fire. The MISR must have a 110/220v AC power connections setup for a training simulator to be installed at a later date.

c) The modular range system shall be designed and constructed in a manner that allows for the

SRF firearm instructor to have access to control panels of all range operations from a single point while maintaining vision of each lane of fire.

d) The modular range system must be equipped with an HVAC system that is permanently fixed to the system, in an area that will not impede the moveability of the range. The HVAC must be capable of maintaining a consistent interior temperature of 72 degrees Fahrenheit regardless of the exterior temperature outside. The HVAC system must maintain constant air flow and a negative pressure to ensure that lead, smoke and airborne particulate are moved away from the shooter. All air must pass through a high efficiency particulate air (HEPA) filter rack before it is exhausted outside of the range system.

e) The flooring from the shooting stalls and everything behind will be painted black. The stalls must have a swing down shooter’s tray, and a collapsible shooting barricade.

f) Sound test results shall be submitted prior to award of contract. Standard that the contractor should meet includes using a 5.56mm and .223 rifle. The sound when using both at 25 feet shall be under 100db, 50 feet under 90db, 75 feet under 80 db and 100 feet should be under

70db.

g) The contractor shall be responsible for removing all debris and surplus chemicals or liquids used during the installation.

h) The contractor will provide a comprehensive list of all maintenance that needs to be completed on the infrastructure and operating system. This includes but is not limited to routine maintenance (on a monthly and yearly basis) as well as preventative maintenance (on a monthly and yearly basis).

i) The contractor shall be responsible for all labor, parts and materials necessary for installation. No Government furnished property will be provided.

7.0 DELIVERY AND SET UP

F.O.B Delivery Terms. The contractor shall include all shipping costs in the order.

The transportation and delivery of the modular indoor shooting range shall be in accordance with the local and state requirements.

The contractor shall provide all the materials required to set up the modular indoor shooting range on site. The modular indoor shooting range is to be leveled and supported by steel piers with pressure treated wood pads. Seismic anchoring is also required in accordance with local code.

The Government shall be responsible for making connections to the modular indoor shooting range to provide power and communications.

Contractor shall notify Reclamation no less than two weeks prior to delivery to arrange for access to site. The contractor will arrange for delivery to the Warehouse location within the working hours of 0600-1600 Monday through Friday.

8.0 ADMINISTRATIVE INFORMATION

a) Recognized Holidays – The Contractor is not required to work on the following Federal

Holidays:

• New Year’s Day

• Birthday of Martin Luther King Jr.

• President’s Day

• Memorial Day

• Juneteenth National Independence Day

• Independence Day

• Labor Day

• Columbus Day

• Veteran’s Day

• Thanksgiving Day

• Christmas Eve/Christmas Day

*If any new Federal Holiday is declared, it will be added to this list of Recognized Federal

Holidays and the Contractor will not be required to perform work on that day.

9.0 APPLICABLE STANDARDS, ORGANIZATIONS, AND REFERENCES

The SRF must comply with OSHA 29 CFR 1910.1025 (Lead Standard) in protecting its employees from hazards associated with lead exposure. The range system must have a ventilation system designed to supply and exhaust air flow to ensure that lead, smoke, and airborne particles are moved away from the shooter. The ventilation system must utilize HEPA filters to prevent lead from entering the outside environment. The filtered exhaust area must be at/or behind the bullet trap.

• All paints must comply with the USDA Biopreferred Program standards at:

https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml

• All lighting must comply with Energy Star or Federal Energy Management Program

(FEMP) at: https://www.energystar.gov/products

• The Architectural Barriers Act (ABA) Standards, 2015 https://www.access-board.gov/files/aba/ABAstandards.pdf

The contractor shall design and manufacture the product to ensure accessibility as required by law for persons with disabilities in accordance with the Architectural Barriers Act of 1968 (82.

Stat. 718), as amended (42 U.S.C. 4151 et seq.) and Section 504 of the Rehabilitation Act of

1973, as amended (29 U.S.C. 794).

Specific requirements are set forth in the Americans with Disabilities Act/Architectural Barriers

Act Accessibility Guidelines: ABA Chapter 1 (Application & Administration); Chapter 2

(Scoping Requirements); Chapters 3-10 (Technical Requirements), commonly referred to as

ABAAS, and shall be used by the Contractor to ensure requirements set forth in ABAAS. It is the sole responsibility of the Contractor to determine beforehand how to address tolerances to ensure that the finished products comply with Federal standards. Should the finished product fail https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml https://www.energystar.gov/products https://www.access-board.gov/files/aba/ABAstandards.pdf https://www.access-board.gov/files/aba/ABAstandards.pdf to comply, it shall be the responsibility of the Contractor, at its sole expense, to make any adjustments necessary to bring the deficient components into compliance.

Specifically, the technical requirements under ABAAS Chapter 3 Section 303 requires where change in level are permitted in floor or ground surfaces, they shall comply with:

a) 303.2 Vertical: Changes in level of 1/4” high maximum shall be permitted to be vertical. or

b) 303.3 Beveled: Changes in level between 1/4” high minimum and 1/2” maximum shall be beveled with a slope not steeper than 1:2 (50% bevel).

**END OF STATEMENT OF WORK**

CLAUSES

52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL PRODUCTS

AND COMMERCIAL SERVICES (NOV 2023)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The

Government must exercise its post-acceptance rights-

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act

( 31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the

Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_233_1 https://www.acquisition.gov/far/part-52#FAR_52_202_1 occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting

Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include-

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice;

and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct

EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer-System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer-Other Than System for Award

Management), or applicable agency procedures.

https://www.acquisition.gov/far/part-52#FAR_52_232_33 https://www.acquisition.gov/far/part-52#FAR_52_232_34

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act ( 31

U.S.C.3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR Part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.-

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt

Payment Act ( 31 U.S.C.3903) and prompt payment regulations at 5 CFR Part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall-

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_212_5

(ii) Provide a copy of the remittance and supporting documentation to the Contracting

Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the

Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if–

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-33#FAR_33_211 https://www.acquisition.gov/far/part-32#FAR_32_607_2

(A) The date on which the designated office receives payment from the

Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt;

or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in FAR 32.608-2 in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the

Contractor shall be liable to the Government for any and all rights and remedies provided by law.

If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

https://www.acquisition.gov/far/part-32#FAR_32_608_2

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the

Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with

31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain

Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services.

(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with

Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;

(3) The clause at 52.212-5.

(4) Addenda to this solicitation or contract, including any license agreements for computer software.

(5) Solicitation provisions if this is a solicitation.

(6) Other paragraphs of this clause.

(7) The Standard Form 1449.

(8) Other documents, exhibits, and attachments.

(9) The specification.

(t) [Reserved]

(u) Unauthorized Obligations.

https://www.acquisition.gov/far/part-52#FAR_52_212_5 https://www.gsa.gov/forms-library/solicitationcontractorder-commercial-items

(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency

Act violation (31 U.S.C. 1341), the following shall govern:

(i) Any such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an "I agree" click box or other comparable mechanism

(e.g., "click-wrap" or "browse-wrap" agreements), execution does not bind the

Government or any Government authorized end user to such clause.

(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.

(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

(End of clause)

ADDENDUM TO 52.212-4

52.217-7 OPTIONS FOR INCREASED QUANTITY-SEPARATELY PRICED LINE

ITEMS – (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting

Officer may exercise the option by written notice to the Contractor within 60 DAYS. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

DIAR 1452.201-70 AUTHORITIES AND DELEGATIONS - (SEP 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

2) Waive or agree to modification of the delivery schedule;

3) Make any final decision on any contract matter subject to the Disputes Clause;

4) Terminate, for any reason, the Contractor's right to proceed;

5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction

(written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the

Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the

COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting

Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

(End of Clause)

DOI-AAAP-0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-

INVOICE PROCESSING PLATFORM (IPP) (FEB 2021)

Payment requests must be submitted electronically through the U. S. Department of the

Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the

Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the

IPP invoice:

When submitting invoices to IPP, the Contractor is advised to upload supporting documentation that will allow Reclamation to verify that the products or services comply with the terms of the contract. The information in the uploaded documents should not conflict with the data fields in the IPP submissions (service dates, invoice number, etc.).

Prior to submitting an invoice to IPP, the contractor may coordinate with the designated

Contracting Officer's Representative (COR), for review and verification of quantities for payment and for compliance with the applicable progress payment requirements of this contract. Prior coordination with the COR will allow for streamlined processing of the invoice.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 - 5 business days of the contract award date.

Contractor assistance with enrollment can be obtained by contacting the IPP Production

Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING

SYSTEM (DEC 2015)

1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor

Performance Assessment Reporting System (CPARS) to comply with this regulation.

One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.

https://www.ipp.gov/ mailto:ippgroup@bos.frb.org

2) The past performance evaluation process is a totally paperless process using CPARS.

CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance

Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.

3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.

4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.

5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.

(a) Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.

(b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.

(c) All information provided should be reviewed for accuracy prior to submission.

(d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting

“Accept the Ratings and Close the Evaluation”.

(e) Your response is due within 60 calendar days after receipt of the CPAR. On day

15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.

(f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."

6) The following guidelines apply concerning your use of the past performance evaluation:

http://www.cpars.gov/ http://www.cpars.gov/

(a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.

(b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

(c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.

7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.

8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S AUTHORITIES

AND LIMITATIONS -- BUREAU OF RECLAMATION (MAY 2018)

(a) Performance of the work under this contract shall be subject to the technical direction of the

Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:

(1) Inspecting and accepting or rejecting work performed under the contract.

(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.

(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.

(b) The Contractor will receive a copy of the written COR designation from the Contracting

Officer. It will specify the extent of the COR’s authority to act on behalf of the Contracting

Officer.

(c) Technical direction must be within the scope of work stated in the contract. Only the

Contracting Officer is authorized to determine if a change is within the scope of the contract;

therefore, the COR does not have the authority to, and may not, issue any technical direction that

(1) Constitutes a direction of additional work outside the Contract requirements;

(2) Constitutes a change as defined in the contract clause entitled “Changes;”

(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;

(4) Changes any of the expressed terms, conditions or specifications of the contract; or

(5) Interferes with the Contractors right to perform the terms and conditions of the contract.

(d) All technical direction shall be issued in writing by the COR.

(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the

COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the

Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting

Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must –

(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the

Changes clause of the contract; or

(2) Advise the Contractor that the Government will issue a written change order.

(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”

WBR 1452.237-80 SECURITY REQUIREMENTS--BUREAU OF RECLAMATION

(MAR 2022)

(a) General Security Requirements:

(1) This clause addresses security requirements, including general procedural requirements, information security requirements, contractor employee suitability requirements, identification card requirements, site security requirements, vessel exclusion barriers, and information technology security requirements. Within this clause, COR means Contracting Officer's

Representative. If there is no COR appointed and identified to the Contractor, the term instead will mean the Program Manager or any other authorized individual responsible for technical oversight under the contract. “Work site” means the Government facility, office, construction site, and any other area within the Government office or facility that the Contractor must access to accomplish work under this contract.

(2) The work performed under this contract shall only be accomplished by individuals (in the employment of the Contractor or any subcontractors) whose conduct and behavior is consistent with the efficiency of the Federal Service and the requirements of this contract, and who are acceptable to the contracting officer. If Reclamation finds a Contractor employee to be unsuitable or unfit for his or her assigned duties, the contracting officer will direct the Contractor to remove the individual from the contract and access to the Federal facility at which the contract activities are occurring.

(3) The Contractor’s employees governed by this contract may need access to sensitive information and/or sensitive areas. The Federal Government

(Government) reserves the right, in its sole discretion, to determine suitability of Contractor personnel and deny access to any sensitive information or project specific area to any personnel for any cause.

(4) The Contractor is responsible for informing and ensuring compliance by its employees with any applicable security procedures of the Government facility where work may be performed under this contract.

(5) Any Contractor employee that will have access to a Federally-controlled facility or information system will be required to have a Government-issued identification card, consisting of a Personal Identity Verification (PIV) Card, a temporary identification card, or a visitor badge.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .