Sol_140P8624Q0053.pdf

PDF 496 KB Posted

Attached to
REPAIR/REPLACE ROOFING ON AZ STRUCTURES Federal contract opportunity
Solicitation number
140P8624Q0053
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This document is a Solicitation for Request for Proposals (RFP) for the repair and replacement of roofing on structures located on Alcatraz Island within the Golden Gate National Recreation Area. The National Park Service is seeking construction work to repair the roofs of the Dock Restrooms and Electric Shop on Alcatraz.

The project is estimated to be between $100,000 and $250,000 and is set aside for small businesses under NAICS code 238160, with a $19 million size standard. The performance period is 138 calendar days after the notice to proceed is issued. Proposals are due by 1700 local time on 07/22/2024. The government contemplates awarding a firm-fixed price contract. Relevant documents such as specifications, drawings, and safety requirements are provided as attachments. A site visit has been scheduled, and contractors are instructed to submit questions according to the solicitation instructions.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION CALL

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040646388

NPS, PWR - GOGA MABO

Building 201, Fort Mason

San Francisco CA 94123

PPG

Arcoiris Cuetara-Higa 0000000000

107/09/2024

140P8624Q0053

INVITATION FOR BID

REQUEST FOR PROPOSAL

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Repair/Replace Roofing on AZ structures, Golden Gate National Recreation Area.

The National Park Service (NPS) at Golden Gate National Recreation Area at Alcatraz

Island, is seeking construction work for the roofing repairs at the Dock restrooms and Electric Shop. This work has specific requirements with Historically classified buildings as well as unique mobilization efforts to the Island. The contractor shall provide all supervision, labor, equipment, testing, and supplies necessary to complete all demo, cleaning and repairs necessary to complete the work as identified in the project specifications and solicitation. All work shall be performed in accordance with local, state, and federal laws. The contractor shall obtain all necessary permits required to successfully complete the work.

Per FAR 36.204 the Project range is estimated to be between $100,000 and $250,000.

The North American Industry Classification System (NAICS) Code for this requirement is 238160, with a corresponding size standard of $19 million in annual gross receipts for the past years.

The Government contemplates award of a firm-fixed price contract resulting from this

Continued ...

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

5 138 calendar days and complete it within ________________ ________________ calendar days after receiving

FAR 52.211-10

07/22/2024

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 12/2022)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

NPS, PWR - GOGA MABO

Building 201, Fort Mason

San Francisco CA 94123

PPG

28. NEGOTIATED AGREEMENT 29. AWARD

and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

10 U.S.C. 3204(a) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 12/2022) BACK

Continued...

and return

(Contractor is not required to sign this document.) Your offer on this

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 63

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140P8624Q0053 solicitation.

This acquisition is a Total Small Business

Set-Aside. Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected.

Attachment 1 Specifications

Attachment 2 Exhibit A Existing Conditions.

Attachment 3 Exhibit B Install Sketch.

Attachment 4 Exhibit C Safety Plan Guidance.

Attachment 5 Exhibit D Badge Template.

Attachment 6 Exhibit E California Code.

Attachment 7 Exhibit F Dock Restroom Plan.

Attachment 9 Exhibit G Historical Records

Attachment 10 Wage Rate Determination

Attachment 11 Limitations on Subcontracting.

Attachment 12 Tech Info.

Attachment 13 Past Performance.

Attachment 14 Bid Schedule.

Attachment 15 General References.

Refer to provisions and clauses and other attachments for additional information about this requirement and instructions on how to submit a proposal.

A Site Visit has been scheduled. See solicitation documents for detailed information. RSVP in advance to the Contacting Officer

Representative.

Submit questions in accordance with the instructions.

Proposals must be received in their entirety no later than the date and time specified in Block

13 of the SF 1442.

Hirameliz Lopez-Diaz is designated as the NPS

Contacting Officer Representative (COR) for this contract and will be responsible for certifying receipt and acceptance of the services rendered.

Delivery: 12/06/2024

Delivery Location Code: 0009060573

NPS, GOLDEN GATE NRA

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

4 63

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140P8624Q0053

Bldg. 201, Fort Mason

San Francisco CA 94123-1307 US

Period of Performance: 07/22/2024 to 12/06/2024

00010 Replace roof Alcatraz Electric Shop

Product/Service Code: Z2JZ

Product/Service Description: REPAIR OR ALTERATION

OF MISCELLANEOUS BUILDINGS

00020 Repair roof Alcatraz dock restroom

Product/Service Code: Z2JZ

Product/Service Description: REPAIR OR ALTERATION

OF MISCELLANEOUS BUILDINGS

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 5

Table of Contents

Part I – The Schedule

Section A – Solicitation/Contract Form

Section B – Supplies or Services and Prices

B.1 – Bid Schedule

Section C – Description/Specifications/Statement of Work

C.1 – Project Specifications

Section D – Packaging and Marking

Section E – Inspection and Acceptance

E.1 – 52.246-12 – Inspection of Construction (AUG 1996)

Section F – Deliveries or Performance

F.1 – Clauses Incorporated by Reference

F.2 –52.211-10 – Commencement, Prosecution, and Completion of Work (APR 1984)

F.3 – Deliverable (Post-Award): Contractor’s Daily Logs

Section G – Contract Administration Data

G.1 – Contract Administration

G.2 –1452.201-70 – Authorities and Delegations (SEP 2011)

G.3 – 1452.204-70 – Release of Claims – Department of the Interior (JUL 1996)

G.4 – Construction Contract Administration

G.5 – Contractor Performance Assessment Reporting System (NOV 2015)

G.6 – Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (APR 2013)

Section H – Special Contract Requirements

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 6

H.1 – Wage Rates

H.2 – Workers Compensation

H.3 – Site Specific Safety and Health Plan

H.5 – Archeological Findings

H.6 – Conduct of Operations

Part II – Contract Clauses

Section I – Contract Clauses

I.1 – Clauses Incorporated by Reference

I.2 – 52.203-19 – Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)

I.3 – 52.204-30 – FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—

PROHIBITION (DEC 2023)

I.4 –52.219-17 – Section 8(a) Award (OCT 2019)

I.5 – 52.222-35 – Equal Opportunity for Veterans (JUN 2020)

I.6 – 52.222-36 – Equal Opportunity for Workers with Disabilities (JUN 2020)

I.7 – 52.222-55 – Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022)

I.8 – 52.223-9 – Estimate of Percentage of Recovered Material Content for EPA Designated Items

(MAY 2008)

I.9 – 52.225-9 – Buy American–Construction Materials (OCT 2022)

I.11 – 1452.228-70 – Liability Insurance – Department of Interior (JUL 1996)

I.12 – 1452.236-70 Prohibition Against Use of Lead-based Paint (JUL 1996)

I.13 – 1452.237-70, Information Collection – Department of the Interior (JUL 1996)

I.14 – 52.252-2 – Clauses Incorporated by Reference (FEB 1998)

Part III – List of Documents, Exhibits, and Other Attachments

Section J – List of Attachments

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 7

J.1 – Attachments

Part IV – Representations and Instructions

Section K – Representations, Certifications, and Other Statements of Offerors

K.1 – 52.204-8 – Annual Representations and Certifications (MAR 2023)

K.2 – 52.204-24 – Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021)

K.3 – 52.204-26 - Covered Telecommunications Equipment or Services-Representation (OCT 2020)

K.4 – 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—

REPRESENTATION AND DISCLOSURES (DEC 2023)……………………………………………………………..57

Section L – Instructions, Conditions, and Notices to Offerors

L.1 – Provisions Incorporated by Reference

L.2 – 52.216-1 – Type of Contract (APR 1984)

L.3 – 52.222-5 – Construction Wage Rate Requirements—Secondary Site of the Work (MAY 2014)

L.4 – 52.222-23 – Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999)

L.5 – 52.225-10 – Notice of Buy American Requirement--Construction Materials (MAY 2014) ..54

L.6 – 52.228-1 – Bid Guarantee (SEP 1996)

L.7 – 52.236-27 – Site Visit (Construction) (FEB 1995)-Alternate I (FEB 1995)

L.8 – 52.252-1 – Solicitation Provisions Incorporated by Reference (FEB 1998)

L.9 – Instructions for the Submission of Quotations and Other Information

L.10 – Responsibility Determination

Section M - Evaluation Factors for Award

M.1 – Evaluation Factors for Award

Section M - Evaluation Factors for Award

M.1 – Evaluation Factors for Award

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 8

Part I – The Schedule

Section A – Solicitation/Contract Form

Solicitation, Offer, and Award (SF 1442).

Section B – Supplies or Services and Prices

B.1 – Bid Schedule

The following Quote/Price Sheet shall be used to quote/state pricing.

CONTRACT

LINE ITEM

NUMBER

(CLIN)

CONTRACT LINE ITEM

(CLI) TITLE QUANTITY UNIT OF

MEASURE Material Labor Equipment Markups

1 Repair Roof Alcatraz Dock Restroom 1 LS

Dock Restroom Dry Rot.

Square Feet (SF) Unit Pricing (To include demo, repair, put back, cleaning, labor, materials and markups)

106 SF

3 Replace Roof Alcatraz Electric Shop 1 LS

Electric Shop Dry Rot.

Linear Feet (LF) Unit Pricing (To include demo, repair, put back, cleaning, labor, materials and markups)

110 LF

TOTAL BASE PRICE (Contract Line Item Number 1 through 4) ---------------------------------- All measurement and payment information is included in Division 01 Specifications Section 01 27 00

LIST OF CONTRACT LINE ITEMS.

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 9

(End of Clause)

Section C – Description/Specifications/Statement of Work

C.1 – Project Specifications

See the attached project specifications and associated documents, listed in Section J of this procurement, for project requirements.

(End of Clause)

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 10

Section D – Packaging and Marking

There are no clauses in this section.

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 11

Section E – Inspection and Acceptance

E.1 – 52.246-12 – Inspection of Construction (AUG 1996)

(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not --

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may --

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor’s right to proceed.

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 12

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 13

Section F – Deliveries or Performance

F.1 – Clauses Incorporated by Reference

The following contract clauses pertinent to this section are incorporated by reference (by Citation Number, Title, and Date) per the clause at FAR “52.252-2 – Clauses Incorporated By Reference” in Section I of this contract. See FAR 52.252-2 for an internet address (if specified) for electronic access to a clause’s full text.

52.2042-14 Suspension of Work (APR 1984)

(End of Clause)

F.2 –52.211-10 – Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to

(a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed,

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than 138 days following receipt of the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of Clause)

F.3 – Deliverable (Post-Award): Contractor’s Daily Logs

Contractor shall prepare a daily log for each day work is performed under this contract. Copies of daily logs shall be submitted to the Contracting Officer, and may be compiled and submitted weekly, with payroll.

Time necessary for completion of daily log is approximately 15 to 30 minutes. The contractor may choose to use its own format as long as the following elements are included on the log:

(a) Project Name

(b) Contract number

(c) Date

(d) Prime Contractor and/or Subcontractor

(e) Work performed, including number of employees by job categories (indicate if "prime" or "sub")

(f) Heavy equipment on job, hours worked (indicate if "prime" or "sub")

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 14

(g) Materials delivered

(h) Official visitors to site

(i) Inspections performed

(j) Verbal instruction received from government on construction deficiencies

(k) Certification (prime contractor's signature/COR's signature)

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 15

Section G – Contract Administration Data

G.1 – Contract Administration

The Contracting Officer's Representative (COR) for this contract will be:

Hirameliz Lopez-Diaz Alcatraz Project Manager/Facility Manager Golden Gate National Recreation Area 415-622-5454 hirameliz_lopez-diaz@nps.gov

The Contract Specialist (CS) responsible for administering this contract will be:

Arcoiris Cuetara-Higa Contract Specialist arcoiris_cuetara-higa@nps.gov

The Contracting Officer (CO) with overall responsibility for this contract will be:

Liset Gomez Contracting Officer

(415) 623-2260 liset_gomez@nps.gov

(End of Clause)

G.2 –1452.201-70 – Authorities and Delegations (SEP 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 16

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority.

The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

(End of Clause)

G.3 – 1452.204-70 – Release of Claims – Department of the Interior (JUL 1996)

After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-

137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.

(End of Clause)

G.4 – Construction Contract Administration

Federal Acquisition Regulation (FAR) 36.211(b) requires agencies provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at:

https://www.doi.gov/pam/acquisition/policy/constructioncontract.

https://www.doi.gov/pam/acquisition/policy/constructioncontract

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 17

(End of clause)

G.5 – Contractor Performance Assessment Reporting System (NOV 2015)

In accordance with DOI and NPS policy, past performance evaluations may be prepared for this acquisition.

For more information see the Contractor Performance Assessment Reporting System (CPARS), available online at https://cpars.gov/.

G.6 – Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (APR 2013)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

The Contractor shall submit a draft Invoice Package, including copies of the following documents, to the National Park Service’s (NPS) Contracting Officer’s Representative (COR), with a copy to the Contract Specialist/Contracting Officer, a minimum of 5 working days prior to submittal of the formal Invoice through IPP. Within 5 working days of receipt, the COR shall provide an acceptability recommendation to both the NPS Contract Specialist/Contracting Officer (CS/CO) and the Contractor. If the COR recommends acceptance, the Contractor shall submit a copy of the final version of the COR’s checklist and the Invoice Package to the NPS through IPP.

1. Completed copy of the COR’s final Construction Payment Request Checklist (Submit only with the formal submittal to IPP)

2. Completed copy of the Pay Estimate Form (including signed certification of subcontractor payments as required by contract clause 52.232-5)

3. Certified copies of Payroll Reports per Contract clause 52.222-8 Payrolls and Basic Records.

4. Completed copy of the Payroll Report PII Certification sheet

5. Information required by contract clause 52.232-27, Prompt Payment for Construction Contracts

6. A copy of the current construction schedule (refer to project specification section 013216)

7. A copy of the current Schedule of Values (refer to project specification section 013216) https://cpars.gov/ https://www.ipp.gov/

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 18

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its quotation.

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 19

Section H – Special Contract Requirements

H.1 – Wage Rates

Davis-Bacon Wage Rates apply for this project and are attached to this solicitation (See Section J). The project is located in San Francisco County, California.

(End of Clause)

H.2 – Workers Compensation

The Contractor is required to be insured against liability for workmen's compensation or to undertake self-insurance in accordance with the provisions of Section 3700 of the Labor Code of the State of California.

Evidence of coverage is required before commencement of project work.

(End of Clause)

H.3 – Site Specific Safety and Health Plan

A site specific safety and health plan shall be prepared covering on-site work to be performed by the contractor and all subcontractors. The prime contractor shall be responsible for development, implementation, and oversight of the site specific plan. The site specific safety and health plan shall establish in detail, the protocols necessary for recognition, evaluation, and control of hazards associated with each task performed. The plan shall address site specific safety and health requirements and procedures based upon site specific conditions. The level of detail provided in the site specific safety and health plan shall be tailored to the type of work, complexity of operations to be performed, and hazards anticipated. The site specific safety and health plan shall address, in as much detail as possible, anticipated tasks, their related hazards, and anticipated control measures.

As work proceeds, the site specific safety and health plan shall be adapted to new situations and new conditions. Changes and modifications to the accepted site specific safety and health plan shall be made with the knowledge and concurrence of the safety office, site superintendent, and contracting office. Should any unforeseen hazard become evident during the performance of work, the contractor shall bring such hazard to the attention of the safety office and COR, both verbally and in writing for resolution as soon as possible. In the interim, necessary action shall be taken to re-establish and maintain safe working conditions in order to safeguard on-site personnel, visitors, the public, and the environment.

Prior to submittal to the COR, the site specific safety and health plan shall be signed and dated by the prime contractor's safety and health manager and site superintendent. The site specific safety and health plan shall be part of the contractor's safety and Health program. The contractor shall submit to the COR the contractor's site specific safety and health plan for review and approval by the safety office.

Work performed under this contract shall comply with applicable federal, state, and local safety and occupational health laws and regulations. This includes, but is not limited to, Occupational Safety and

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 20

Health Administration (OSHA) standards, 29 CFR, Part 1910 and Part 1926. Where the requirements of applicable laws, criteria, ordinances, regulations, and referenced documents vary the most stringent requirements shall apply.

(End of Clause)

H.X – Key Personnel

(a) The Contractor shall assign to this contract the following key personnel:

Project Manager:

Site Superintendent:

Quality Control Manager:

Safety Manager:

(b) During the first _30___days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 30-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. This clause will be modified to reflect any approved changes of key personnel.

(End of clause)

H.5 – Archeological Findings

(a) Petroglyphs, artifacts, burial grounds or remains, structural features, ceremonial, domestic, and archeological objects of any nature, historic or prehistoric, found within the construction area, are the property of and will be removed only by the Government. Should Contractor's operations uncover or his employees find any archeological remains, Contractor shall suspend operations at the site of discovery;

notify Contracting Officer immediately of the findings; and continue operations in other areas. Included with the notification shall be a brief statement of the location and details of the findings. Should the temporary suspension of work at the site result in delays, or the discovery site require archeological studies resulting in delays or additional work for Contractor, he will be compensated by an equitable adjustment under the General Provisions of the Contract.

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 21

(End of Clause)

H.6 – Conduct of Operations

At all times the Contractor shall conduct his organization in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and with such appropriate regulations as the Superintendent may prescribe. Work on Saturdays, Sundays, Federal holidays or at night may be performed only with the prior consent of the Contracting Officer. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park except with approval of the Contracting Officer.

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 22

Part II – Contract Clauses

Section I – Contract Clauses

I.1 – Clauses Incorporated by Reference

The following contract clauses pertinent to this section are incorporated by reference (by Citation Number, Title, and Date) per the clause at FAR “52.252-2 – Clauses Incorporated By Reference” in Section I of this contract. See FAR 52.252-2 for an internet address (if specified) for electronic access to a clause’s full text.

52.202-1 Definitions (JUN 2020) 52.203-3 Gratuities (APR 1984) 52.203-7 Anti-Kickback Procedures (JUN 2020) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-22 Alternative Line Item Proposal (JAN 2017) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021) 52.204-27 Prohibition on a ByteDance Covered Application (JUN 2023) 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) 52.219-28 Post-Award Small Business Program Representation (SEP 2021) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY 2018) 52.222-6 Construction Wage Rate Requirements (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (JUL 2021) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination-Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEP 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015)

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 23

52.222-50 Combating Trafficking in Persons (NOV 2021) 52.222-54 Employment Eligibility Verification (MAY 2022) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2022) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

(SEP 2013)

52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

(AUG 2018)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020) 52.225-13 Restriction on Certain Foreign Purchases (FEB 2021) 52.227-1 Authorization and Consent (Jun 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) 52.228-11 Individual Surety – Pledges of Assets (FEB 2021) 52.228-12 Prospective Subcontractor Requests for Bonds (DEC 2022) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.228-15 Performance and Payment Bonds-Construction (JUN 2020) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer-System for Award Management (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) 52.233-1 Disputes-(MAY 2014)-Alternate I (DEC 1991) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984) 52.244-6 Subcontracts for Commercial Items and Commercial Services (MAR 2023) 52.246-21 Warranty of Construction (MAR 1994)

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 24

52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

(End of Clause)

I.2 – 52.203-19 – Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)

(a) Definitions. As used in this clause--

“Internal confidentiality agreement or statement” means a confidentiality agreement or any other written statement that the contractor requires any of its employees or subcontractors to sign regarding nondisclosure of contractor information, except that it does not include confidentiality agreements arising out of civil litigation or confidentiality agreements that contractor employees or subcontractors sign at the behest of a Federal agency.

“Subcontract” means any contract as defined in subpart 2.1 entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract. It includes but is not limited to purchase orders, and changes and modifications to purchase orders.

“Subcontractor” means any supplier, distributor, vendor, or firm (including a consultant) that furnishes supplies or services to or for a prime contractor or another subcontractor.

(b) The Contractor shall not require its employees or subcontractors to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting waste, fraud, or abuse related to the performance of a Government contract to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information (e.g., agency Office of the Inspector General).

(c) The Contractor shall notify current employees and subcontractors that prohibitions and restrictions of any preexisting internal confidentiality agreements or statements covered by this clause, to the extent that such prohibitions and restrictions are inconsistent with the prohibitions of this clause, are no longer in effect.

(d) The prohibition in paragraph (b) of this clause does not contravene requirements applicable to Standard Form 312 (Classified Information Nondisclosure Agreement), Form 4414 (Sensitive Compartmented Information Nondisclosure Agreement), or any other form issued by a Federal department or agency governing the nondisclosure of classified information.

(e) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015, (Pub. L. 113-235), and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions) use of funds appropriated (or otherwise made available) is prohibited, if the Government determines that the Contractor is not in compliance with the provisions of this clause.

(f) The Contractor shall include the substance of this clause, including this paragraph (f), in subcontracts under such contracts.

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 25

(End of Clause)

I.3 52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—PROHIBITION (DEC 2023)

(a) Definitions. As used in this clause—

Covered article, as defined in 41 U.S.C. 4713(k), means—

(1) Information technology, as defined in 40 U.S.C. 11101, including cloud computing services of all types;

(2) Telecommunications equipment or telecommunications service, as those terms are defined in section 3 of the Communications Act of 1934 ( 47 U.S.C. 153);

(3) The processing of information on a Federal or non-Federal information system, subject to the requirements of the Controlled Unclassified Information program (see 32 CFR part 2002); or

(4) Hardware, systems, devices, software, or services that include embedded or incidental information technology.

FASCSA order means any of the following orders issued under the Federal Acquisition Supply Chain Security Act (FASCSA) requiring the removal of covered articles from executive agency information systems or the exclusion of one or more named sources or named covered articles from executive agency procurement actions, as described in 41 CFR 201–1.303(d) and (e):

(1) The Secretary of Homeland Security may issue FASCSA orders applicable to civilian agencies, to the extent not covered by paragraph (2) or (3) of this definition. This type of FASCSA order may be referred to as a Department of Homeland Security (DHS) FASCSA order.

(2) The Secretary of Defense may issue FASCSA orders applicable to the Department of Defense (DoD) and national security systems other than sensitive compartmented information systems. This type of FASCSA order may be referred to as a DoD FASCSA order.

(3) The Director of National Intelligence (DNI) may issue FASCSA orders applicable to the intelligence community and sensitive compartmented information systems, to the extent not covered by paragraph (2) of this definition. This type of FASCSA order may be referred to as a DNI FASCSA order.

Intelligence community, as defined by 50 U.S.C. 3003(4), means the following—

(1) The Office of the Director of National Intelligence;

(2) The Central Intelligence Agency;

(3) The National Security Agency;

(4) The Defense Intelligence Agency;

https://www.govinfo.gov/link/uscode/41/4713 https://www.govinfo.gov/link/uscode/40/11101 https://www.govinfo.gov/link/uscode/47/153 https://www.ecfr.gov/current/title-32/part-2002 https://www.ecfr.gov/current/title-41/section-201-1.303#p-201-1.303(d) https://www.ecfr.gov/current/title-41/section-201-1.303#p-201-1.303(e) https://www.govinfo.gov/link/uscode/50/3003

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 26

(5) The National Geospatial-Intelligence Agency;

(6) The National Reconnaissance Office;

(7) Other offices within the Department of Defense for the collection of specialized national intelligence through reconnaissance programs;

(8) The intelligence elements of the Army, the Navy, the Air Force, the Marine Corps, the Coast Guard, the Federal Bureau of Investigation, the Drug Enforcement Administration, and the Department of Energy;

(9) The Bureau of Intelligence and Research of the Department of State;

(10) The Office of Intelligence and Analysis of the Department of the Treasury;

(11) The Office of Intelligence and Analysis of the Department of Homeland Security; or

(12) Such other elements of any department or agency as may be designated by the President, or designated jointly by the Director of National Intelligence and the head of the department or agency concerned, as an element of the intelligence community.

National security system, as defined in 44 U.S.C. 3552, means any information system (including any telecommunications system) used or operated by an agency or by a contractor of an agency, or other organization on behalf of an agency—

(1) The function, operation, or use of which involves intelligence activities; involves cryptologic activities related to national security; involves command and control of military forces; involves equipment that is an integral part of a weapon or weapons system; or is critical to the direct fulfillment of military or intelligence missions, but does not include a system that is to be used for routine administrative and business applications (including payroll, finance, logistics, and personnel management applications); or

(2) Is protected at all times by procedures established for information that have been specifically authorized under criteria established by an Executive order or an Act of Congress to be kept classified in the interest of national defense or foreign policy.

Reasonable inquiry means an inquiry designed to uncover any information in the entity's possession about the identity of any covered articles, or any products or services produced or provided by a source. This applies when the covered article or the source is subject to an applicable FASCSA order. A reasonable inquiry excludes the need to include an internal or third-party audit.

Sensitive compartmented information means classified information concerning or derived from intelligence sources, methods, or analytical processes, which is required to be handled within formal access control systems established by the Director of National Intelligence.

Sensitive compartmented information system means a national security system authorized to process or store sensitive compartmented information.

Source means a non-Federal supplier, or potential supplier, of products or services, at any tier.

https://www.govinfo.gov/link/uscode/44/3552

RFQ No. 140P8624Q0053, GOLDEN GATE NATIONAL RECREATION AREA – REPAIR/REPLACE ROOFING ON AZ STRUCTURES

Page | 27

(b) Prohibition.

(1) Unless an applicable waiver has been issued by the issuing official, Contractors shall not provide or use as part of the performance of the contract any covered article, or any products or services produced or provided by a source, if the covered article or the source is prohibited by an applicable FASCSA orders as follows:

(i) For solicitations and contracts awarded by a Department of Defense contracting office, DoD FASCSA orders apply.

(ii) For all other solicitations and contracts DHS FASCSA orders apply.

(2) The Contractor shall search for the phrase “FASCSA order” in the System for Award Management (SAM) at https://www.sam.gov to locate applicable FASCSA orders identified in paragraph (b)(1).

(3) The Government may identify in the solicitation additional FASCSA orders that are not in SAM, which are effective and apply to the solicitation and resultant contract.

(4) A FASCSA order issued after the date of solicitation applies to this contract only if added by an amendment to the solicitation or modification to the contract (see FAR 4.2304(c)). However, see paragraph

(c) of this clause.

(5)

(i) If the contractor wishes to ask for a waiver of the requirements of a new FASCSA order being applied through modification, then the Contractor shall disclose the following:

(A) Name of the product or service provided to the Government;

(B) Name of the covered article or source subject to a FASCSA order;

(C) If applicable, name of the vendor, including the Commercial and Government Entity code and unique entity identifier (if known), that supplied or supplies the covered article or the product or service to the Offeror;

(D) Brand;

(E) Model number (original equipment manufacturer number,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .