SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040621071

NPS, PWR - SF/SEA MABO

333 Bush Street

Suite 500 San Francisco CA 94104

PPO

brenda_lewis@nps.gov

Brenda Lewis 2093791050

105/19/2023

140P8423Q0066

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

The National Park Service (NPS) at Point Reyes National Seashore (PORE) has a requirement for repainting of the Historic Lighthouse. This project is to include repair and repainting of the Lighthouse, repairs to leaking window panels on the

Lighthouse, repairs to leaking ventilator shutters on the Lighthouse and an option to include touch-up painting of the adjacent Fog Signal Equipment Building. The project is located approximately 20 miles west of Olema, CA on the western tip of the Point Reyes peninsula. The Contractor shall provide all supervision, labor, equipment, testing, and supplies necessary to complete the work as identified in the project specifications and associated documents provided as attachments to the solicitation.

Per FAR 36.204 the project range is estimated to be between $100,000 and $250,000.

The North American Industry Classification System (NAICS) Code for this requirement is 238320, with a corresponding size standard of $19 million in annual gross receipts for the past three years.

This acquisition is a Total Small Business Set-Aside. Quotations are solicited only from small business concerns. Quotations received from concerns that are not small

Continued ...

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 120 calendar days and complete it within ________________ ________________ calendar days after receiving

Section F

06/20/2023

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 8/2014)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

DOI, NPS, PWR - PORE MABO

Point Reyes National Seashore

1 Bear Valley Road Point Reyes Station CA 94950

PPR

Elizabeth Chico

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 8/2014) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 52

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140P8423Q0066 business concerns shall not be considered.

The Government anticipates award of a firm-fixed-price purchase order resulting from this solicitation. Evaluation for award will be made in accordance with the simplified acquisition procedures outlined in FAR Part

13.106. The Government anticipates issuing an

order resulting from this request for quotation to the responsible quoter whose quotation will be most advantageous to the Government, price and other factors considered as listed in the Request for Quotation (see Section M).

See Section J Attachment 1: Specifications and

Drawings, for a detailed description of the requirement.

Refer to provisions and clauses and other attachments for additional information about this requirement and instructions on how to submit a quotation.

SITE VISIT information can be located in Section

L. A SITE VISIT is scheduled for Thursday, June

1, 2023 at 10:00 a.m. Pacific Daylight Time. RSVP is required. See Section L for more information.

Submit questions only through email to the person identified in Section L.

Quotations must be received in their entirety via email as instructed in Section L no later than the date and time specified in Block 13 of the SF

1442.

Delivery: 11/30/2023

Delivery Location Code: 0009060605

NPS, Point Reyes NS

1 Bear Valley Road

Point Reyes Station CA 94956 US

Period of Performance: 08/01/2023 to 11/30/2023

00010 Repaint Historic Lighthouse Point Reyes NS

Product/Service Code: Z2JA

Product/Service Description: REPAIR OR ALTERATION

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

4 52

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140P8423Q0066

OF MUSEUMS AND EXHIBITION BUILDINGS

00020 Repaint Historic Lighthouse Point Reyes NS

Product/Service Code: Z2JA

Product/Service Description: REPAIR OR ALTERATION

OF MUSEUMS AND EXHIBITION BUILDINGS

00030 Repaint Historic Lighthouse Point Reyes NS

Product/Service Code: Z2JA

Product/Service Description: REPAIR OR ALTERATION

OF MUSEUMS AND EXHIBITION BUILDINGS

00040 Repaint Historic Lighthouse Point Reyes NS

Product/Service Code: Z2JA

Product/Service Description: REPAIR OR ALTERATION

OF MUSEUMS AND EXHIBITION BUILDINGS

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

RFQ No. 140P8423Q0066, Repaint Historic Lighthouse, Point Reyes National Seashore

Table of Contents

Part I – The Schedule

Section A – Solicitation/Contract Form

Section B – Supplies or Services and Prices

B.1 – Bid Schedule

Section C – Description/Specifications/Statement of Work

C.1 – Project Specifications

Section D – Packaging and Marking

Section E – Inspection and Acceptance

E.1 – 52.246-12 – Inspection of Construction (AUG 1996)

Section F – Deliveries or Performance

F.1 – Clauses Incorporated by Reference

F.2 –52.211-10 – Commencement, Prosecution, and Completion of Work (APR 1984)

F.3 – Deliverable (Post-Award): Contractor’s Daily Logs

Section G – Contract Administration Data

G.1 – Contract Administration

G.2 –1452.201-70 – Authorities and Delegations (SEP 2011)

G.3 – 1452.204-70 – Release of Claims – Department of the Interior (JUL 1996)

G.4 – Construction Contract Administration

G.5 – Contractor Performance Assessment Reporting System (NOV 2015)

G.6 – Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (APR 2013)

Section H – Special Contract Requirements

H.1 – Wage Rates

H.2 – Workers Compensation

H.3 – Site Specific Safety and Health Plan

H.4 – Seasonal Shutdown

H.5 – Archeological Findings

H.6 – Conduct of Operations

H.7 – Option for Additional Services – Separately Priced Line Item(s)

Part II – Contract Clauses

Section I – Contract Clauses

I.1 – Clauses Incorporated by Reference

I.2 – 52.203-19 – Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)

I.4 – 52.222-35 – Equal Opportunity for Veterans (JUN 2020)

I.5 – 52.222-36 – Equal Opportunity for Workers with Disabilities (JUN 2020)

I.6 – 52.222-55 – Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022)

I.7 – 52.223-9 – Estimate of Percentage of Recovered Material Content for EPA Designated Items

(MAY 2008)

I.8 – 52.225-9 – Buy American–Construction Materials (NOV 2021)

I.10 – 1452.228-70 – Liability Insurance – Department of Interior (JUL 1996)

I.11 – 1452.236-70 Prohibition Against Use of Lead-based Paint (JUL 1996)

I.12 – 1452.237-70, Information Collection – Department of the Interior (JUL 1996)

I.13 – 52.252-2 – Clauses Incorporated by Reference (FEB 1998)

Part III – List of Documents, Exhibits, and Other Attachments

Section J – List of Attachments

J.1 – Attachments

Part IV – Representations and Instructions

Section K – Representations, Certifications, and Other Statements of Offerors

K.1 – 52.204-8 – Annual Representations and Certifications (MAR 2023)

K.2 – 52.204-24 – Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021)

K.3 – 52.204-26 - Covered Telecommunications Equipment or Services-Representation (OCT 2020)

Section L – Instructions, Conditions, and Notices to Offerors

L.1 – Provisions Incorporated by Reference

L.2 – 52.216-1 – Type of Contract (APR 1984)

L.3 – 52.222-5 – Construction Wage Rate Requirements—Secondary Site of the Work (MAY 2014)

L.4 – 52.222-23 – Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999)

L.5 – 52.225-10 – Notice of Buy American Requirement--Construction Materials (MAY 2014) ..45

L.6 – 52.228-1 – Bid Guarantee (SEP 1996)

L.7 – 52.236-27 – Site Visit (Construction) (FEB 1995)-Alternate I (FEB 1995)

L.8 – 52.252-1 – Solicitation Provisions Incorporated by Reference (FEB 1998)

L.9 – Instructions for the Submission of Quotations and Other Information

L.10 – Responsibility Determination

Section M - Evaluation Factors for Award

M.1 – Evaluation Factors for Award

M.2 – Evaluation of Options

Part I – The Schedule

Section A – Solicitation/Contract Form

Solicitation, Offer, and Award (SF 1442) - pages 1- 4 of this package.

Section B – Supplies or Services and Prices

B.1 – Bid Schedule

The following Quote/Price Sheet shall be used to quote/state pricing.

QUOTE/PRICE SHEET

SOLICITATION NUMBER: 140P8423Q0066

PARK - PMIS: PORE - 323979

DEVELOPED AREA: Point Reyes National Seashore, Marin County, California PROJECT TITLE: Repaint Historic Lighthouse Quoters are required to submit, at a minimum, a quotation that conforms to the solicitation documents with pricing for all Base line items and all Option line items (if any). Failure to do so may render your quotation unacceptable. For any lump-sum (LS) line items, provide the total price only. For any unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs on a related item. In case of error in summation, the total of the corrected amounts govern.

Round totals and extend prices to whole dollars. Refer to section “H” of this solicitation for additional information regarding contract options.

CONTRACT LINE

ITEM NUMBER

(CLIN)

CONTRACT LINE ITEM (CLI)

TITLE

QUANTITY

UNIT OF

MEASURE

UNIT

PRICE

TOTAL

PRICE

Repairs and repainting of the Lighthouse

1 LS

2 Repairs to leaking windows 1 LS

3 Repairs to leaking ventilators 1 LS

TOTAL BASE PRICE (Contract Line Item Number 1 through 3) --------------------------------------------

Option 4 Touch-up painting of the Fog Signal Building

1 LS

TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 4 through 4) -------------------------

TOTAL QUOTED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 4) --

All measurement and payment information is included in the project specifications, Section 011100.

(End of Clause)

Section C – Description/Specifications/Statement of Work

C.1 – Project Specifications

See the attached project specifications and associated documents, listed in Section J of this procurement, for project requirements.

(End of Clause)

Section D – Packaging and Marking

There are no clauses in this section.

Section E – Inspection and Acceptance

E.1 – 52.246-12 – Inspection of Construction (AUG 1996)

(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not --

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may --

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor’s right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

(End of Clause)

Section F – Deliveries or Performance

F.1 – Clauses Incorporated by Reference

The following contract clauses pertinent to this section are incorporated by reference (by Citation Number, Title, and Date) per the clause at FAR “52.252-2 – Clauses Incorporated By Reference” in Section I of this contract. See FAR 52.252-2 for an internet address (if specified) for electronic access to a clause’s full text.

52.2042-14 Suspension of Work (APR 1984)

(End of Clause)

F.2 –52.211-10 – Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to

(a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than 120 days following receipt of the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of Clause)

F.3 – Deliverable (Post-Award): Contractor’s Daily Logs

Contractor shall prepare a daily log for each day work is performed under this contract. Copies of daily logs shall be submitted to the Contracting Officer, and may be compiled and submitted weekly, with payroll.

Time necessary for completion of daily log is approximately 15 to 30 minutes. The contractor may choose to use its own format as long as the following elements are included on the log:

(a) Project Name

(b) Contract number

(c) Date

(d) Prime Contractor and/or Subcontractor

(e) Work performed, including number of employees by job categories (indicate if "prime" or "sub")

(f) Heavy equipment on job, hours worked (indicate if "prime" or "sub")

(g) Materials delivered

(h) Official visitors to site

(i) Inspections performed

(j) Verbal instruction received from government on construction deficiencies

(k) Certification (prime contractor's signature/COR's signature)

Section G – Contract Administration Data

G.1 – Contract Administration

The Contracting Officer's Representative (COR) for this contract will be:

Jason Nemeth Civil Engineer Point Reyes National Seashore 415-858-2562 Jason_nemeth@nps.gov

The Contract Specialist (CS) responsible for administering this contract will be:

Brenda Lewis Contract Specialist 805-835-2227 Brenda_lewis@nps.gov

The Contracting Officer (CO) with overall responsibility for this contract will be:

Elizabeth Chico Contracting Officer 559-580-2693 Elizabeth_chico@nps.gov

(End of Clause)

G.2 –1452.201-70 – Authorities and Delegations (SEP 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority.

The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

(End of Clause)

G.3 – 1452.204-70 – Release of Claims – Department of the Interior (JUL 1996)

After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-

137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.

(End of Clause)

G.4 – Construction Contract Administration

Federal Acquisition Regulation (FAR) 36.211(b) requires agencies provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at:

https://www.doi.gov/pam/acquisition/policy/constructioncontract.

(End of clause) https://www.doi.gov/pam/acquisition/policy/constructioncontract

G.5 – Contractor Performance Assessment Reporting System (NOV 2015)

In accordance with DOI and NPS policy, past performance evaluations may be prepared for this acquisition.

For more information see the Contractor Performance Assessment Reporting System (CPARS), available online at https://cpars.gov/.

G.6 – Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (APR 2013)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

The Contractor shall submit a draft Invoice Package, including copies of the following documents, to the National Park Service’s (NPS) Contracting Officer’s Representative (COR), Jason Nemeth, with a copy to the Contract Specialist/Contracting Officer (CS/CO) Brenda Lewis/Elizabeth Chico, a minimum of 5 working days prior to submittal of the formal Invoice through IPP. Within 5 working days of receipt, the COR shall provide an acceptability recommendation to both the NPS CS/CO and the Contractor. If the COR recommends acceptance, the Contractor shall submit a copy of the final version of the COR’s checklist and the Invoice Package to the NPS through IPP.

1. Completed copy of the COR’s final Construction Payment Request Checklist (Submit only with the formal submittal to IPP)

2. Completed copy of the Pay Estimate Form (including signed certification of subcontractor payments as required by contract clause 52.232-5)

3. Certified copies of Payroll Reports per Contract clause 52.222-8 Payrolls and Basic Records.

4. Completed copy of the Payroll Report PII Certification sheet

5. Information required by contract clause 52.232-27, Prompt Payment for Construction Contracts

6. A copy of the current construction schedule (refer to project specification section 013100)

7. A copy of the current Schedule of Values (refer to project specification section 013100)

8. Completed copy of the Limitations on Subcontracting Report

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 - 5 business days of the contract award date. Contractor assistance with enrollment can https://cpars.gov/ https://www.ipp.gov/ be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its quotation.

Section H – Special Contract Requirements

H.1 – Wage Rates

Davis-Bacon Wage Rates apply for this project and are attached to this solicitation (See Section J). The project is located in Marin County, California.

(End of Clause)

H.2 – Workers Compensation

The Contractor is required to be insured against liability for workmen's compensation or to undertake self-insurance in accordance with the provisions of Section 3700 of the Labor Code of the State of California.

Evidence of coverage is required before commencement of project work.

(End of Clause)

H.3 – Site Specific Safety and Health Plan

A site specific safety and health plan shall be prepared covering on-site work to be performed by the contractor and all subcontractors. The prime contractor shall be responsible for development, implementation, and oversight of the site specific plan. The site specific safety and health plan shall establish in detail, the protocols necessary for recognition, evaluation, and control of hazards associated with each task performed. The plan shall address site specific safety and health requirements and procedures based upon site specific conditions. The level of detail provided in the site specific safety and health plan shall be tailored to the type of work, complexity of operations to be performed, and hazards anticipated. The site specific safety and health plan shall address, in as much detail as possible, anticipated tasks, their related hazards, and anticipated control measures.

As work proceeds, the site specific safety and health plan shall be adapted to new situations and new conditions. Changes and modifications to the accepted site specific safety and health plan shall be made with the knowledge and concurrence of the safety office, site superintendent, and contracting office. Should any unforeseen hazard become evident during the performance of work, the contractor shall bring such hazard to the attention of the safety office and COR, both verbally and in writing for resolution as soon as possible. In the interim, necessary action shall be taken to re-establish and maintain safe working conditions in order to safeguard on-site personnel, visitors, the public, and the environment.

Prior to submittal to the COR, the site specific safety and health plan shall be signed and dated by the prime contractor's safety and health manager and site superintendent. The site specific safety and health plan shall be part of the contractor's safety and Health program. The contractor shall submit to the COR the contractor's site specific safety and health plan for review and approval by the safety office.

Work performed under this contract shall comply with applicable federal, state, and local safety and occupational health laws and regulations. This includes, but is not limited to, Occupational Safety and Health Administration (OSHA) standards, 29 CFR, Part 1910 and Part 1926. Where the requirements of applicable laws, criteria, ordinances, regulations, and referenced documents vary the most stringent requirements shall apply.

(End of Clause)

H.4 – Seasonal Shutdown

It is recognized that seasonal climatic conditions regularly occur in some of the National Park Service areas that restrict and in some cases prohibit normal construction activities. The actual timing of a seasonal shutdown will be determined by the Contracting Officer. The Contractor shall give the Contracting Officer at least two weeks’ notice prior to the anticipated resumption of work. The actual date that work is resumed is subject to the approval of the Contracting Officer. The amount of time during a seasonal shutdown is taken into consideration when the completion time as stated in the Contract is determined.

Therefore, the contract time will not be extended due to seasonal shutdowns.

(End of Clause)

H.5 – Archeological Findings

(a) Petroglyphs, artifacts, burial grounds or remains, structural features, ceremonial, domestic, and archeological objects of any nature, historic or prehistoric, found within the construction area, are the property of and will be removed only by the Government. Should Contractor's operations uncover or his employees find any archeological remains, Contractor shall suspend operations at the site of discovery;

notify Contracting Officer immediately of the findings; and continue operations in other areas. Included with the notification shall be a brief statement of the location and details of the findings. Should the temporary suspension of work at the site result in delays, or the discovery site require archeological studies resulting in delays or additional work for Contractor, he will be compensated by an equitable adjustment under the General Provisions of the Contract.

(End of Clause)

H.6 – Conduct of Operations

At all times the Contractor shall conduct his organization in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and with such appropriate regulations as the Superintendent may prescribe. Work on Saturdays, Sundays, Federal holidays or at night may be performed only with the prior consent of the Contracting Officer. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park except with approval of the Contracting Officer.

H.7 – Option for Additional Services – Separately Priced Line Item(s)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days after contract award. Performance of added line item tasks shall be at the price negotiated in the contract Schedule.

Part II – Contract Clauses

Section I – Contract Clauses

I.1 – Clauses Incorporated by Reference

The following contract clauses pertinent to this section are incorporated by reference (by Citation Number, Title, and Date) per the clause at FAR “52.252-2 – Clauses Incorporated By Reference” in Section I of this contract. See FAR 52.252-2 for an internet address (if specified) for electronic access to a clause’s full text.

52.202-1 Definitions (JUN 2020) 52.203-3 Gratuities (APR 1984) 52.203-7 Anti-Kickback Procedures (JUN 2020) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-22 Alternative Line Item Proposal (JAN 2017) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021) 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) 52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (SEP 2021) 52.219-28 Post-Award Small Business Program Representation (SEP 2021) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY 2018) 52.222-6 Construction Wage Rate Requirements (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (JUL 2021) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination-Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEP 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-37 Employment Reports on Veterans (JUN 2020)

52.222-50 Combating Trafficking in Persons (NOV 2021) 52.222-54 Employment Eligibility Verification (MAY 2022) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2022) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

(SEP 2013)

52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

(AUG 2018)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020) 52.225-13 Restriction on Certain Foreign Purchases (FEB 2021) 52.227-1 Authorization and Consent (Jun 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) 52.228-2 Additional Bond Security (OCT 1997) 52.228-11 Individual Surety – Pledges of Assets (FEB 2021) 52.228-12 Prospective Subcontractor Requests for Bonds (DEC 2022) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.228-15 Performance and Payment Bonds-Construction (JUN 2020) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer-System for Award Management (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) 52.233-1 Disputes-(MAY 2014)-Alternate I (DEC 1991) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984) 52.244-6 Subcontracts for Commercial Items and Commercial Services (MAR 2023) 52.246-21 Warranty of Construction (MAR 1994) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form) (APR 1984)

52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

(End of Clause)

I.2 – 52.203-19 – Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)

(a) Definitions. As used in this clause--

“Internal confidentiality agreement or statement” means a confidentiality agreement or any other written statement that the contractor requires any of its employees or subcontractors to sign regarding nondisclosure of contractor information, except that it does not include confidentiality agreements arising out of civil litigation or confidentiality agreements that contractor employees or subcontractors sign at the behest of a Federal agency.

“Subcontract” means any contract as defined in subpart 2.1 entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract. It includes but is not limited to purchase orders, and changes and modifications to purchase orders.

“Subcontractor” means any supplier, distributor, vendor, or firm (including a consultant) that furnishes supplies or services to or for a prime contractor or another subcontractor.

(b) The Contractor shall not require its employees or subcontractors to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting waste, fraud, or abuse related to the performance of a Government contract to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information (e.g., agency Office of the Inspector General).

(c) The Contractor shall notify current employees and subcontractors that prohibitions and restrictions of any preexisting internal confidentiality agreements or statements covered by this clause, to the extent that such prohibitions and restrictions are inconsistent with the prohibitions of this clause, are no longer in effect.

(d) The prohibition in paragraph (b) of this clause does not contravene requirements applicable to Standard Form 312 (Classified Information Nondisclosure Agreement), Form 4414 (Sensitive Compartmented Information Nondisclosure Agreement), or any other form issued by a Federal department or agency governing the nondisclosure of classified information.

(e) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015, (Pub. L. 113-235), and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions) use of funds appropriated (or otherwise made available) is prohibited, if the Government determines that the Contractor is not in compliance with the provisions of this clause.

(f) The Contractor shall include the substance of this clause, including this paragraph (f), in subcontracts under such contracts.

I.4 – 52.222-35 – Equal Opportunity for Veterans (JUN 2020)

(a) Definitions. As used in this clause--

“Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,’ and “recently separated veteran” have the meanings given at FAR 22.1301.

(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.

(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of $150,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate of identify properly the parties and their undertakings.

(End of Clause)

I.5 – 52.222-36 – Equal Opportunity for Workers with Disabilities (JUN 2020)

(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60.741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.

(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

(End of Clause)

I.6 – 52.222-55 – Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022)

(a) Definitions. As used in this clause—

United States means the 50 states , the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, and the outer Continental Shelf as defined in the Outer Continental Shelf Lands Act (43 U.S.C. 1331, et seq.).

Worker –

(1)

(i) Means any person engaged in performing work on, or in connection with, a contract covered by Executive Order 14026, and–

(A) Whose wages under such contract are governed by the Fair Labor Standards Act ( 29 U.S.C. chapter 8), the Service Contract Labor Standards statute ( 41 U.S.C. chapter 67), or the Wage Rate Requirements (Construction) statute ( 40 U.S.C. chapter 31, subchapter IV);

(B) Other than individuals employed in a bona fide executive, administrative, or professional capacity, as those terms are defined in 29 CFR part 541; and

(C) Regardless of the contractual relationship alleged to exist between the individual and the employer.

(ii) Includes workers performing on, or in connection with, the contract whose wages are calculated pursuant to special certificates issued under 29 U.S.C. 214(c).

(iii) Also includes any person working on, or in connection with, the contract and individually registered in a bona fide apprenticeship or training program registered with the Department of Labor’s Employment and Training Administration, Office of Apprenticeship, or with a State Apprenticeship Agency recognized by the Office of Apprenticeship.

(2)

(i) A worker performs on a contract if the worker directly performs the specific services called for by the contract; and

(ii) A worker performs in connection with a contract if the worker's work activities are necessary to the performance of a contract but are not the specific services called for by the contract.

(b) Executive Order Minimum wage rate.

(1) The Contractor shall pay to workers , while performing in the United States , and performing on, or in connection with, this contract, a minimum hourly wage rate of $15.00 per hour beginning January 30, 2022.

(2) The Contractor shall adjust the minimum wage paid, if necessary, beginning January 1, 2023, and annually thereafter, to meet the applicable annual E.O. minimum wage. The Administrator of the Department of Labor’s Wage and Hour Division (the Administrator) will publish annual determinations in the Federal Register no later than 90 days before the effective date of the new E.O. minimum wage rate. The Administrator will also publish the applicable E.O. minimum wage on https://www.sam.gov (or any successor website), and a general notice on all wage determinations issued under the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute, that will provide information on the E.O. minimum wage and how to obtain annual updates. The applicable published E.O.

minimum wage is incorporated by reference into this contract.

(3)

(i) The Contractor may request a price adjustment only after the effective date of the new annual E.O.

minimum wage determination. Prices will be adjusted only for increased labor costs (including subcontractor labor costs) as a result of an increase in the annual E.O. minimum wage, and for associated labor costs (including those for subcontractors ). Associated labor costs shall include increases or decreases that result from changes in social security and unemployment taxes and workers ’ compensation http://uscode.house.gov/ http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/ http://uscode.house.gov/ https://www.sam.gov/ insurance, but will not otherwise include any amount for general and administrative costs, overhead, or profit.

(ii) Subcontractors may be entitled to adjustments due to the new minimum wage, pursuant to paragraph (b)(2). Contractors shall consider any subcontractor requests for such price adjustment.

(iii) The Contracting Officer will not adjust the contract price under this clause for any costs other than those identified in paragraph (b)(3)(i) of this clause, and will not provide duplicate price adjustments with any price adjustment under clauses implementing the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute.

(4) The Contractor warrants that the prices in this contract do not include allowance for any contingency to cover increased costs for which adjustment is provided under this clause.

(5) A pay period under this clause may not be longer than semi-monthly, but may be shorter to comply with any applicable law or other requirement under this contract establishing a shorter pay period. Workers shall be paid no later than one pay period following the end of the regular pay period in which such wages were earned or accrued.

(6) The Contractor shall pay, unconditionally to each worker, all wages due free and clear without subsequent rebate or kickback. The Contractor may make deductions that reduce a worker’s wages below the E.O. minimum wage rate only if done in accordance with 29 CFR 23.230, Deductions.

(7) The Contractor shall not discharge any part of its minimum wage obligation under this clause by furnishing fringe benefits or, with respect to workers whose wages are governed by the Service Contract Labor Standards statute, the cash equivalent thereof.

(8) Nothing in this clause shall excuse the Contractor from compliance with any applicable Federal or State prevailing wage law or any applicable law or municipal ordinance or any applicable contract establishing a minimum wage higher than the E.O. 14026 minimum wage. However, wage increases under such other laws or municipal ordinances are not subject to price adjustment under this subpart.

(9) The Contractor shall pay the E.O. minimum wage rate whenever it is higher than any applicable collective bargaining agreement(s) wage rate.

(10) The Contractor shall follow the policies and procedures in 29 CFR 23.240(b) and 23.280 for treatment of workers engaged in an occupation in which they customarily and regularly receive more than $30 a month in tips.

(c)

(1) This clause applies to workers as defined in paragraph (a). As provided in that definition–

(i) Workers are covered regardless of the contractual relationship alleged to exist between the contractor or subcontractor and the worker;

(ii) Workers…

This is the start of the file's text. The full file is on GovTribe.