- FOMA REPLACE NATURE TRAIL BOARDWALK RS Federal contract opportunity
- Solicitation number
- 140P5426R0010
About this file
This is a Request for Proposal (RFP) for construction services to replace a nature trail boardwalk at Fort Matanzas National Monument in St. Augustine, Florida.
The solicitation is a Women-Owned Small Business (WOSB) set-aside with a firm fixed-price contract type. The project magnitude is estimated between $250,000 and $500,000. Proposals are due June 26, 2026, at 1:00 p.m. ET, submitted via email to william_vazquez@ios.doi.gov. The contract must commence within 10 calendar days of award and be completed within 90 calendar days. Work is scheduled to begin July 13, 2026, and conclude by October 13, 2026. The site visit is mandatory and scheduled for June 8, 2026, at 10:00 a.m. ET at Fort Matanzas National Monument Visitor Center. Questions must be submitted by June 10, 2026, by 5:00 p.m. ET. A 20% bid guarantee (bid bond) and performance and payment bonds at 100% are required. The site superintendent must be a prime contractor employee with no exceptions.
Proposals must include: completed SF-1442, technical proposal (not to exceed 20 pages), capabilities and experience statement, subcontractor list with work history, at least three past performance questionnaires from previous clients reflecting similar project magnitude and complexity within the past five years, and detailed cost proposal with prime and subcontractor cost breakouts. Evaluation criteria include technical approach, past performance/experience/technical capability, and cost reasonableness. The Department of the Interior (National Park Service) is the issuing federal agency. Contracting Officer William Vazquez administers the contract. Payment must be submitted electronically through the Invoice Processing Platform (IPP).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions___Answers_0002.pdf | ||
| Sol_140P5426R0010_Amd_0002.pdf | ||
| Statement_of_Work_-_Revised_0001.pdf | ||
| Sol_140P5426R0010_Amd_0001.pdf | ||
| Wage_Determination.pdf | ||
| Statement_of_Work.pdf | ||
| Past_Performance_Questionnaire.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NO.
5. REQUISITION/PURCHASE REQUEST NO.
CODE
6. PROJECT NO.
8. ADDRESS OFFER TO
4. CONTRACT NO.
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
NEGOTIATED (RFP) REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF
SEALED BID (IFB) INVITATION FOR BID
9. FOR
INFORMATION CALL
PAGES
140P5426R0010
NPS, SER - South MABO
40001 SR 9336
Homestead FL 33034
William Vazquez william_vazquez@ios.doi.gov
0044039423 140P5426R0010
PSS
William Vazquez 4708190934
05/11/2026
06/26/2026
10 90
Proposals to Replace Nature Trail Boardwalk - Riverside at Fort Matanzas National Monument (FOMA) must be submitted via email to william_vazquez@ios.doi.gov. This solicitation is a Women-Owned Small Business set aside.
Contract Type: Firm Fixed Price Construction.
Solicitation #: 140P5426R0010
Date of Issuance: May 27, 2026
Proposal Due Date: June 26, 2026, at 1:00 p.m. ET
Requisition #: 0044039423
Contractors are responsible to review the solicitation in its entirety, specifically Sections L and M, which cover how the proposal must be put together before submission and how they will be evaluated. A past performance questionnaire is attached and should be distributed to past clients. Past clients are instructed to send the questionnaires directly to william_vazquez@ios.doi.gov after completion.
Prospective contractors must provide the company's name and complete address, including street, city, state, zip code, phone number, email address, and SAM.gov UEI number on their proposal cover page.
Prospective contractors must also include the solicitation number on their proposals. A Bid Guarantee
(Bid Bond) is required to be submitted with your proposal at 20% of the bid total.
1 25
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Continued...
AMENDMENT
NUMBER
DATE.
NPS, SER - South MABO
40001 SR 9336
Homestead FL 33034
PSS
William Vazquez
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140P5426R0010
Delivery: 10/13/2026
Delivery Location Code: 0011283041
NPS, Castillo de San Marcos
1 Castillo Dr.
St. Augustine FL 32084 US
Period of Performance: 07/13/2026 to
10/13/2026
00010 Replace Nature Trail Boardwalk - Riverside
Product/Service Code: Y1PA
Product/Service Description: CONSTRUCTION OF
RECREATION FACILITIES (NON-BUILDING)
TABLE OF CONTENTS
PART I – The Schedule
A – Solicitation Form
B – Bid Schedule
Price Schedule
C - Description/Specifications
D - Packaging and Marking
E - Inspection and Acceptance
Inspection of Construction
F - Deliveries or Performance
Commencement, Prosecution, and Completion of Work
Performance of Work by the Contractor
Suspension of Work
G - Contract Administration Data
Administration Contacts
Technical Direction
Correspondence, Contract Payments, and Job Site Administration
Subcontracting
H - Special Contract Requirements
EO-Prohibition of Text Messaging While Driving
Safety, Progress Meetings, and Payroll
Work Hours and Use of Premises
Disposal, Contractor Employees, and Permits
Quality of Work, Completion of Work, and Material Approval Submittals
DOI Electronic Invoicing and Payment Requirements (IPP)
PART II - Contract Clauses
I - Contract Clauses
Clauses Incorporated by Reference
Release of Claims
Liability Insurance
PART III - List of Documents, Exhibits, and Other Attachments
J - List of Attachments
Statement of Work (Attachment 1)
Past Performance Questionnaire (Attachment 2)
Wage Determination (Attachment 3)
PART IV - Representations and Instructions
K - Representations, Certifications, and Other Statements of Bidders
Preparation of Proposals
L - Instructions, Conditions, and Notices to Bidders
Technical Proposal Submission
Past Performance, Cost Proposal, and Proposal File Format
Service Protest
Solicitation Provision Incorporated by Reference
M - Evaluation Factors for Award
A – Solicitation Form
PROJECT TITLE: Replace Nature Trail Boardwalk - Riverside
SITE LOCATION: Fort Matanzas National Monument (FOMA)
NOTICE TO PROSPECTIVE OFFERORS
This solicitation is being set aside as a Women-Owned Small Business competitive action. Bidding contractors must have this designation in their SAM.gov registration. If in review it is determined they lack this designation, the submitted proposal will be removed from consideration.
SUBMISSION OF DOCUMENTS: Your offer must include the following documentation and information:
1. Completed SF-1442
2. Technical Proposal
3. Capabilities and Experience
4. Subcontractor Use and Work History Together
5. Past Performance Questionnaires
6. Cost Proposal to include a detailed breakout of the prime and subcontractor costs
PLEASE NOTE: The SF-1442 must be signed, and dated, and Blocks 14 through 20c must be completed.
SF-1442, ITEM 17, Offeror is cautioned to review acceptance time stated in Item 13d before completing this item. Proposals offering less than specified time will cause proposal to be rejected.
SUBMIT AN OFFER TO THE FOLLOWING EMAIL:
william_vazquez@ios.doi.gov
THE MAGNITUDE OF THIS PROJECT IS BETWEEN $250,000 AND $500,000
BONDING – Successful offeror will be required to furnish Performance and Payment bonds on Standard Forms 25 and 25A based on total contract amounts in the following ranges: 100 percent performance bond, 100 percent payment bond. Offerors are now advised that the Government will inspect, accept, and take possession of completed work and release the bonding on completion/acceptance of the work per FAR 28.203-5.
Site Superintendent for the project must be the prime contractor’s employee. No Exceptions will be made.
An organized site visit has been scheduled for June 08, 2026, at 10:00 a.m. ET. Contractors will meet the COR at Fort Matanzas National Monument Visitor Center, 8635 A1A S, St. Augustine, FL 32080. Coordinates: 29.7150, -81.2347 Contractors must contact the Contracting Officer via email to confirm their attendance at the scheduled site visit by June 05, 2026, at 5:00 p.m. ET. If the CO receives no emails confirming attendance by the specified date, the site visit will be cancelled.
Point of Contact: – Stephen Greulich – E: stephen_greulich@nps.gov
Submit all questions regarding this solicitation to the Contracting Officer via email. You must submit questions by June 10, 2026, by 5:00 p.m. ET. Questions submitted after this time may NOT be considered. Answers to the questions submitted in writing will be posted to the solicitation as an amendment on or around June 15, 2026.
PROPOSALS ARE DUE June 26, 2026, at 1:00 p.m. ET.
B – Bid Schedule
The contractor should provide all labor, parts, tools, equipment, supervision, and all incidentals necessary to replace the nature trail boardwalk - riverside at FOMA per the attached procurement documentation.
Price Schedule
Solicitation 140P5426R0010 Number:
PARK - PMIS: 350320
Project Title: Replace Nature Trail Boardwalk - Riverside – FOMA
Contract Line-Item Number
Contract Line Item
Quantity
Unit of
Measure
Unit Price
Total Price
010 Replace Nature Trail Boardwalk - Riverside
1 Lump Sum
TOTAL COMBINED PROPOSED PRICE:
NOTE: Along with their lump sum bid, contractors must submit a complete detailed cost breakout that includes both prime contractor and any applicable subcontractor pricing with their cost proposal. Not providing a detailed cost breakout may result in a less favorable rating during evaluation.
C – Specifications and Drawings
Specifications Attachment 001
D - Packaging and Marking
Payment and Postage Fees
All postage and fees related to submitting information forms, reports, etc., to the Contracting Officer (CO), Contract Specialist (CS), or the Contracting Officer’s Representative (COR) shall be paid by the contractor.
Marking
All information submitted to the CO, CS, or the COR shall clearly indicate the contract’s Contract Number for which the information is being submitted.
E - Inspection and Acceptance
52.246-12 Inspection of Construction. (AUG 1996)
F - Deliveries or Performance
52.211-13 Time Extensions. (SEP 2000)
52.242-14 Suspension of Work. (APR 1984)
G - Contract Administration Data
Contracting Officer’s Representative (COR) for this contract will be determined at time of award.
Contracting Officer responsible of administering this contract:
William Vazquez
Contracting Officer
Department of the Interior
Con Ops East, South MABO
Work: (470) 819-0934 william_vazquez@ios.doi.gov mailto:william_vazquez@ios.doi.gov
Technical Direction
The performance of the required work shall be subject to the COR’s or designee’s technical direction and surveillance. As used herein, “technical direction” is direction to the Contractor which requires pursuit of certain lines of inquiry, filing in detail or otherwise serving to accomplish the contract specifications. The technical direction, to be valid:
(a) Must be issued in writing consistent with the general scope of the work set forth in the contract.
(b) May not constitute a new assignment of work changes to the expressed terms, conditions, or specifications incorporated into this contract.
(c) Shall not constitute a basis for extension of the contract delivery schedule.
Nothing contained in this part authorizes the Contractor to incur costs more than the contract price or other limitations of funds set forth in the contract due to extra work performed in response to informal directions, suggestions, or instructions (oral or written) given by representatives of the CO, unless before commencing such work, the Contractor:
1) directly notifies the CO.
2) requests a formal contract modification.
3) receives written authorization to proceed from the CO.
Correspondence
Any correspondence initiated by the Contractor shall include the Contract Number and shall be addressed to the Contracting Officer via email.
Contract Payments
The Contractor shall submit invoices to the COR for the percentage of work completed. Contractor and COR at the site must agree on the percentage of work completed.
Job Site Administration
The COR will be available at the site to inspect the work as it progresses. The COR is not authorized to make technical decisions or give technical directions. The Contractor or the Contractor’s Superintendent must contact the COR about the decisions and directions.
The Contractor shall have a competent superintendent (the “Contractor’s Superintendent”) who is (1) deemed acceptable to the Government; (2) authorized to act on the Contractor’s behalf; and (3) to always be present on the job site when contract work is being performed.
Subcontracting
The Prime Contractor shall complete a Standard Form (SF1413) for each subcontractor and submit the form to the Contracting Officer. No subcontractor shall be allowed on the site without an executed SF 1413. The Prime shall be held responsible for ensuring that their subcontractor’s DO NOT subcontract any portion of this work. The Prime Contractor is responsible to ensure that all subcontractors carry sufficient insurance in accordance with this contract.
H - Special Contract Requirements
Executive Order 13513 Prohibition on Text Messaging and Using Electronic Equipment supplied by the Government While Driving as Prescribed in Federal Leadership on Reducing Text Messaging While Driving
Prohibition on text messaging and using electronic equipment supplied by the Government while driving
(OCT 2009)
This Executive Order introduces a Federal Government-wide Prohibition on the use of text messaging while driving on official business or while using Government –supplied equipment. Additional guidance enforcing the ban will be issued at a later date. In the meantime, please adopt and enforce policies that immediately ban text messaging while driving company-owned or –rented vehicles, government-owned or leased vehicles, or while driving privately owned vehicles when on official government business or when performing any work for or on the behalf of the government.
(End of order)
Safety
The Contractor is responsible for establishing and maintaining compliance with all applicable laws, regulations, rules, and standards, including without limitation, those regulations, rules, and standards, promulgated for the administration and enforcement of the following laws: the Occupational Safety and Health Act (OSHA) or Federally approved State equivalent(s) thereof; the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) as amended by Superfund Amendments and Reauthorization Act (SARA);
Emergency Planning and Community Right- to-Know Act (EPCRA); Clean Air Act (CAA); Clean Water Act (CWA) and Toxic Substances Control Act (TSCA); and Solid Waste Disposal Act (SWDA), as amended by Resource Conservation and Recovery Act (RCRA).
Progress Meetings
(a) The Contractor shall be available to meet with the CO or his/her representative at the job site during construction to discuss work progress.
(b) Meetings will be scheduled by the CO with timely notification to the Contractor.
(c) At the progress meetings, the Contractor shall give oral reports of the progress on the project to the
CO. If the work is behind schedule, the Contractor shall be prepared to:
(i) discuss the work and any causes of work delay(s);
(ii) present a plan to bring the work back into conformance with the schedule; or, if necessary
(iii) to propose a revised work schedule.
Payrolls
The Contractor must furnish copies of his weekly payrolls to the CO. Payroll submission is required weekly, seven calendar days after the payroll period closes.
Operation of Facility During Construction
Construction activities must not interrupt the function and the facility’s daily operations during construction.
The contractor must coordinate with the COR for any temporary measures. All temporary measures employed shall be at the Contractor’s expense and shall be removed upon completion of the contract.
Work Hours
Normal work hours are from 7:00 a.m. through 4:30 p.m., Monday through Friday. Contractor will not be permitted to work at the job site on Saturday, Sunday, or legal holidays unless the CO authorized otherwise.
Use of Premises
(a) Before any location, other than shown in the photos or during the site visit, is accessed, written permission shall be obtained through the Contracting Officer. Such permission, if granted, will be without charge to the Contractor.
(b) Unless provided otherwise, the Contractor shall provide and maintain a sanitary working environment for the workforce at the site. Solid waste shall be disposed of in accordance with applicable federal, state, and local regulations.
Maximum Work Week
The maximum work week that will be approved is 40 hours. The Contractor’s proposed hours of work are to include daily starting and stopping times.
Excavation and Utility Clearances
The Chief of Maintenance, for each park, shall ensure that the Contractor is provided with necessary excavation and utility clearances. The Contractor shall request such clearances and staking in writing to the Contracting Officer no less than ten (10) calendar days before the date which they anticipate commencement of work. The Contractor will not proceed with excavation of any kind until such clearances have been issued.
Clearances will be valid from the date of issue or completion of or otherwise directed by the issuing authority.
Disposal
Contractors will dispose of all debris, rubbish and non-useable material from the site and all federal property in a manner that meets federal, state, county, and local laws.
Contractor Employees
(a) The Contractor shall provide the Contracting Officer with the name of the responsible supervisor authorized to act for the Contractor.
(b) The Contractor shall furnish sufficient personnel to perform, supervise and manage all work.
(c) Contractor employees shall conduct themselves properly, efficiently, courteously, and professionally.
(d) The Contractor shall remove from the site any individual whose continued employment is deemed by the contracting officer to be contrary to public interest or inconsistent with the National Park Service.
Permits
The contractor shall, without additional expense to the government, obtain all appointments, licenses, and permits required to perform work under this contract. The contractor shall follow federal, state, and local laws.
Evidence of such permits and licenses shall be provided to the CO before work commences, or as requested.
The contractor will always display the permits and license on the job site.
Quality of Work
Workmanship shall be of the highest quality and best practices of the trade. Contractor shall conform to all requirements of the state and county code, ANSI A 10.6 and applicable codes of the National Fires Protection Association. All replacement materials shall conform to the manufacturer specifications and standards.
Substitute items shall be equal to or better that the original material and must be approved by the Government.
Completion of Work
The time stated for completion of the project includes all materiel procurement, payroll records, corrections of all discrepancies (Punch List Items), and final clean up on premises as stated in the clause “Commencement, Prosecution and Completion of Work”, FAR 52.211-10 (APR 1984) Section F.
Material Approval Submittals
The submittals contemplated by the clause herein entitles “Materials and Workmanship”, FAR 52.236-5 (APR 1984), Section I, shall be submitted to the Contracting Officer through the COR in 5 copies. The Denver Service Center Form (DSC-1) entitled “Transmittal USDI, National Park Service”, shall be used. Contractor shall re-submit any disapproved submittals within 7 calendar days of disapproval.
Archeological Findings
Petroglyphs, artifacts, burial grounds or remains, structural features, ceremonial, domestic, and archeological objects of any nature, historic or prehistoric, found within the construction area, are the property of and will be removed and only by the Government. Should Contractor’s operations uncover, or his employees find any archeological remains, Contractor shall suspend operations at the site of discovery; notify Contracting Officer immediately of the findings; and continue operation in other areas. Included with the notification shall be a brief statement of the location and details of the findings. Should the temporary suspension of work at the site result in delays, or the discovery site requires archeological studies resulting in delays or additional work for the contractor, he will be compensated by an equitable adjustment under the General Provision of the Contract.
Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (February 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor.
To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:
https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
COR approved invoice.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment.
The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause) http://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov
I - Contract Clauses
52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. On request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/
1452.201-70 Authorities and Delegations (SEP 2011)
1452.203-70 Restrictions on Endorsements (JUL 1996)
1452.215-70 Examination of Records by the Department of the Interior (APR 1984)
1452.224-1 Privacy Act Notification (JUL 1996) Deviation
1452.236-70 Prohibition Against Use of Lead-based Paint (JUL 1996)
52.202-1 Definitions (JUN 2020)
52.203-3 Gratuities. (APR 1984)
52.203-5 Covenant Against Contingent Fees. (MAY 2014)
52.203-7 Anti-Kickback Procedures. (JUN 2020)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (MAY 2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (JUN 2020)
52.203-16 Preventing Personal Conflicts of Interest. (JUN 2020)
52.203-17 Contractor Employee Whistleblower Rights. (NOV 2023)
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. (JAN 2017)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (MAR 2026)
52.204-13 System for Award Management Maintenance. (MAR 2026)
52.204-14 Service Contract Reporting Requirements. (MAR 2026)
52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014) http://www.acquisition.gov/
52.208-9 Contractor Use of Mandatory Sources of Supply or Services. (MAR 2026)
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded (MAY 2026)
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. (MAY 2026)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. (MAY 2026)
52.215-2 Audit and Records - Negotiation. (JUN 2020)(Deviation Date)
52.215-8 Order of Precedence - Uniform Contract Format. (OCT 1997)(Deviation Date)
52.219-6 Notice of Total Small Business Set-Aside. (JAN 2026)
52.219-8 Utilization of Small Business Concerns. (JAN 2026)
52.219-14 Limitations on Subcontracting. (JAN 2026)
52.219-28 Postaward Small Business Program Rerepresentation. (JAN 2026)
52.219-33 Nonmanufacturer Rule. (JAN 2026)
52.222-1 Notice to the Government of Labor Disputes. (FEB 1997)(Deviation Date)
52.222-3 Convict Labor. (JUN 2003)(Deviation Date)
52.222-4 Contract Work Hours and Safety Standards - Overtime Compensation. (MAY 2026)
52.222-6 Construction Wage Rate Requirements. (MAY 2026)
52.222-7 Withholding of Funds. (MAY 2014)(Deviation Date)
52.222-8 Payrolls and Basic Records. (JUL 2021)(Deviation Date)
52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)(Deviation Date)
52.222-11 Subcontracts (Labor Standards). (MAY 2026)
52.222-12 Contract Termination - Debarment. (MAY 2014)
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (MAY 2014)
52.222-14 Disputes Concerning Labor Standards. (FEB 1988)(Deviation Date)
52.222-15 Certification of Eligibility. (MAY 2014)
52.222-35 Equal Opportunity for Veterans. (MAY 2026)
52.222-36 Equal Opportunity for Workers with Disabilities. (MAY 2026)
52.222-37 Employment Reports on Veterans. (MAY 2026)
52.222-40 Notification of Employee Rights Under the National Labor Relations Act. (DEC 2010)(Deviation Date)
52.222-50 Combating Trafficking in Persons. (MAY 2026)
52.222-54 Employment Eligibility Verification. (MAY 2026)
52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. (JAN 2022)(Deviation Date)
52.222-62 Paid Sick Leave Under Executive Order 13706. (JAN 2022)(Deviation Date)
52.222-90 Addressing DEI Discrimination by Federal Contractors. (MAY 2026)
52.223-2 Reporting of Biobased Products Under Service and Construction Contracts. (MAY 2026)
52.223-3 Hazardous Material Identification and Material Safety Data. (MAY 2026)
52.223-3 Hazardous Material Identification and Material Safety Data. (MAY 2026) - Alternate I (Deviation Date)
52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2024)
52.225-9 Buy American - Construction Materials. (OCT 2022)(Deviation Date)
52.227-1 Authorization and Consent. (JUN 2020)
52.228-2 Additional Bond Security. (OCT 1997)
52.228-11 Individual Surety-Pledge of Assets. (FEB 2021)
52.228-12 Prospective Subcontractor Requests for Bonds. (DEC 2022)
52.228-14 Irrevocable Letter of Credit. (NOV 2014)
52.228-15 Performance and Payment Bonds - Construction. (JUN 2020)
52.229-3 Federal, State, and Local Taxes. (FEB 2013)
52.232-5 Payments Under Fixed-Price Construction Contracts. (MAY 2014)
52.232-16 Progress Payments. (NOV 2021)(Deviation Date)
52.232-16 Progress Payments. (NOV 2021) - Alternate I (MAR 2000)
52.232-17 Interest. (MAY 2014)
52.232-23 Assignment of Claims. (MAY 2014)
52.232-27 Prompt Payment for Construction Contracts. (JAN 2017)
52.232-33 Payment by Electronic Funds Transfer - System for Award Management. (OCT 2018)
52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (MAR 2023)
52.233-1 Disputes. (MAY 2014)(Deviation Date)
52.233-1 Disputes. (MAY 2014) - Alternate I (DEC 1991)(Deviation Date)
52.233-3 Protest After Award. (AUG 1996)(Deviation Date)
52.233-3 Protest After Award. (AUG 1996) - Alternate I (JUN 1985)(Deviation Date)
52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) (Deviation Date)
52.236-1 Performance of Work by the Contractor. (APR 1984)
52.236-2 Differing Site Conditions. (JAN 2026)
52.236-3 Site Investigation and Conditions Affecting the Work. (JAN 2026)
52.236-5 Material and Workmanship. (JAN 2026)
52.236-6 Superintendence by the Contractor. (JAN 2026)
52.236-7 Permits and Responsibilities. (JAN 2026)
52.236-8 Other Contracts. (JAN 2026)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (JAN 2026)
52.236-10 Operations and Storage Areas. (JAN 2026)
52.236-11 Use and Possession Prior to Completion. (JAN 2026)
52.236-12 Cleaning Up. (JAN 2026)
52.236-13 Accident Prevention. (JAN 2026)
52.236-14 Availability and Use of Utility Services. (JAN 2026)
52.236-17 Layout of Work. (JAN 2026)
52.236-21 Specifications and Drawings for Construction. (JAN 2026)
52.236-21 Specifications and Drawings for Construction. (JAN 2026) - Alternate I (APR 1984)
52.242-13 Bankruptcy. (JUL 1995)
52.243-4 Changes. (OCT 2025)
52.244-2 Subcontracts. (JUN 2020)
52.244-6 Subcontracts for Commercial Products and Commercial Services. (MAY 2026)
52.248-3 Value Engineering - Construction. (OCT 2025)
52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012)
52.249-2 Termination for Convenience of the Government (Fixed-Price) – Alternate I (SEP 1996)
52.249-10 Default (Fixed-Price Construction). (APR 1984)
52.252-4 Alterations in Contract. (APR 1984)
52.252-6 Authorized Deviations in Clauses. (NOV 2020)
52.253-1 Computer Generated Forms. (MAY 2026)
1452.204-70 Release of Claims – Department of the Interior (JUL 1996)
After completion of work and before final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.
1452.228-70 Liability Insurance (JUL 1996)
(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
1. Worker’s compensation and employer’s liability: $1,000,000
2. General Liability: $500,000 each person and $1,000,000 each occurrence
3. Property Damage: $2,000,000
(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 calendar days before the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number, and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate before beginning the work.
(c) The contractor shall name the United States, National Park Service, as the insured party(ties) on the liability insurance policy.
J - List of Documents, Exhibits and Other Attachments
List of Documents, Exhibits, and Other Attachments
Attachment Number Title Date Number of
Pages Document Version
001 Specifications 05/27/2026 8 BASE 002 Past Performance Questionnaire 05/27/2026 2 BASE 003 Wage Determination 05/27/2026 4 BASE
K - Representations, Certifications, and Other Statements of Bidders
52.209-7 Information Regarding Responsibility Matters. (MAY 2026)
As prescribed at 9.104-7(b), insert the following provision:
(a) Definitions. As used in this provision-
Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.
Federal contracts and grants with total value greater than $10,000,000 means-
(1) The total value of all current, active contracts and grants, including all priced options; and
(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).
Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).
(b) The offeror [ ] has [ ] does not have current active Federal contracts and grants with total value greater than $10,000,000.
(c) If the offeror checked "has" in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:
(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:
(i) In a criminal proceeding, a conviction.
(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.
(iii) In an administrative proceeding, a finding of fault and liability that results in-
(A) The payment of a monetary fine or penalty of $5,000 or more; or
(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.
(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.
(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
(End of provision)
L - Instructions, Conditions, and Notices to Bidders
Although brand names may be mentioned in the specifications and drawings of this solicitation, contractors are not mandated to submit only those specific brand names for consideration and are encouraged to submit materials that are equal to those brand names when bidding on this project.
All complete proposal submissions shall include: three (3) sections addressing the factors listed in Section M of the solicitation: Section I-Technical Proposal, Section II-Past Performance, and Section III-Cost Proposal.
Section I: Technical Proposal (Not to exceed 20 pages)
Technical proposal shall address the work to be accomplished in the specifications and address the evaluation criteria (Technical Approach) listed in section M of this solicitation. Offerors shall provide a list of subcontractors planned for use on this project. Offerors should describe the number of years or previous contracts that the offeror and subcontractor(s) have teamed together (state clearly if this is the first time you have teamed together). A technical proposal that is not complete will not be evaluated.
Section II: Past Performance
The past performance questionnaire is part of the proposal package attached to the solicitation (Attachment 002). The offeror, via previous clients, must supply at least three past performance questionnaires that reflect experience with projects of similar magnitude and nature, involving comparable technical requirements, disciplines, and performance conditions as outlined in the specifications for this contemplated contract, that have been completed in the past five years from the issuance of this solicitation. Contractors must demonstrate previous experience working in remote geographic locations, with logistical complexity that required coordination with project stakeholders. The Government will conduct an assessment utilizing the past performance questionnaires provided to the government based on the quality, relevance, and recency of the offeror's past performance.
Offerors are cautioned that in conducting the past performance questionnaire the Government may use data provided in the offerors proposal and data obtained from other sources, such as the Contractor Performance Assessment Reporting System (CPARS) or similar systems. Since the Government may not necessarily interview all the sources provided by the offerors, it is incumbent upon the offerors to explain the relevance of the data provided. Offerors are reminded that while the Government may elect to consider data obtained from other sources, the burden of proving low performance risk rests with the offerors.
Section III: Cost Proposal
All contractors are required to provide a detailed cost proposal with a breakout of costs associated with general conditions, materials, labor, overhead, profit, bonding, and insurance. All contractors must complete this section as part of their cost proposal. Costs will be evaluated against current industry standards. In cases of a perceived discrepancy, offerors may be asked to clarify costs based on the findings of the Government.
Additionally, all offerors must submit with their proposal, a signed SF-1442 solicitation and signed amendments to the solicitation if applicable, http://www.sam.gov/
Proposal File Format:
• Page setup parameters:
• Margins Top, Bottom, Left, Right - 1
• Gutter 0
• From Edge Header, Footer - 0.5
• Page Size, Width 8.5
• Page Size, Height 11
Font may be no smaller than 10-point font. Proposal shall be legible and file format shall be in Acrobat Reader (.pdf). Proposals must not exceed 20 pages. Company logos are prohibited except on the title page. Pages that exceed the margin, font or total page limit will not be evaluated. Page count will NOT be based upon the numbers of pages printed but rather dictated by the number of pages in a print layout view in the application based upon the above prescribed document settings. Counting pages in the order they appear for viewing will make up the page count. Drawing, tables, and figures may be attached to proposals when applicable and will not count towards the page count. Cost and past performance questionnaires will not count towards the page count of the proposal.
1452.215-71 Use and Disclosure of Proposal Information – Department of the Interior (APR 1984)
1452.233-02 Service of Protest – Department of the Interior (JUL 1996) (DEVIATION)
a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the General Accounting Office (GAO), shall be served on the Contracting Officer at National Park Service, South Major Acquisition Office, 40001 SR9336, Homestead, FL 33034 by obtaining written and dated acknowledgment of receipt from NPS.
b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
c) A copy of the protest served on the Contracting Officer shall be simultaneously furnished by the protester to the Department of the Interior Assistant Solicitor for Procurement and Patents, 1849 C Street, NW, Room 6511, Washington, D.C. 20240.
52.204-7 System for Award Management. (NOV 2024)(Deviation Date)
52.214-3 Amendments to Invitations for Bids. (DEC 2016)(Deviation Date)
52.214-4 False Statements in Bids. (APR 1984)
52.214-5 Submission of Bids. (DEC 2016)(Deviation Date)
52.214-6 Explanation to Prospective Bidders. (APR 1984)
52.214-7 Late Submissions, Modifications, and Withdrawals of Bids. (NOV 1999)(Deviation Date)
52.214-18 Preparation of Bids - Construction. (APR 1984)
52.215-1 Instructions to Offerors - Competitive Acquisition. (NOV 2021)(Deviation Date)
52.216-1 Type of Contract. (APR 1984)(Deviation Date)
The Government contemplates award of a firm fixed price construction contract resulting from this solicitation.
(End of provision)
52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. (MAY 2014)(Deviation Date)
52.225-10 Notice of Buy American Requirement - Construction Materials. (MAY 2014)
52.228-1 Bid Guarantee. (SEP 1996)
52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee). (FEB 2021)
52.232-13 Notice of Progress Payments (APR 1984)
52.233-2 Service of Protest. (SEP 2006)(Deviation Date)
52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
Home | Acquisition.GOV
(End of provision) https://www.acquisition.gov/?q=browsefar
52.252-3 Alterations in Solicitation. (APR 1984)
Portions of this solicitation are altered as follows: [ ]
(End of provision)
52.252-5 Authorized Deviations in Provisions. (NOV 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR chapter 1) provision with an authorized deviation is indicated by the addition of (DEVIATION) after the date of the provision.
(b) The use in this solicitation of any [insert regulation name] (48 CFR chapter [ ]) provision with an authorized deviation is indicated by the addition of (DEVIATION) after the name of the regulation.
(End of provision)
M - Evaluation Factors for Award
Basis for Contract Award – Proposal Evaluation Criteria
The techniques and procedures described under FAR 15.404-1 will be the primary means of assessing proposal reasonableness. The Government intends to award a contract without discussion with respective offerors to the most suitable contractor per the evaluation process; however, the contracting officer reserves the right to establish a competitive range and open discussions with offerors if it is deemed necessary. The Government's technical evaluation committee will evaluate the proposals submitted against the following evaluation criteria:
Factor A – Technical Approach
Evaluation of this factor will be based on the offeror's description of their technical approach to the project.
Offerors are encouraged to provide detailed specific information. Failure to provide sufficient information so that the evaluation team cannot discern if the offeror has a thorough understanding of the work in question may lead to the proposal receiving a lower rating. Information provided in the Technical Proposal should be relevant to the specifications of the project. The Government will evaluate the offeror's means and methods to accomplish the construction project, including selection of subcontractor(s) and their role in the project.
Estimated time of completion will also be considered.
Factor B – Past Performance, Experience, and Technical Capability
This criterion will evaluate the offeror’s past performance based on feedback from previous clients through past performance questionnaires, Attachment 002. The recency and relevancy of the contractor’s past performance will be considered. The offeror, via previous clients, must supply at least three past performance questionnaires that reflect experience with projects of similar magnitude and nature, involving comparable technical requirements, disciplines, and performance conditions as outlined in the specifications for this contemplated contract, that have been completed in the past five years from the issuance of this solicitation.
Contractors must demonstrate previous experience working in remote geographic locations, with logistical complexity that required coordination with project stakeholders. If the offeror submits more than three past performance questionnaires, the Government will only review and consider the first three questionnaires submitted to the contracting officer. The Government may also use past performance information gathered from other sources in its evaluation. Offerors shall have an opportunity to address adverse past performance information if the offeror has not had a previous opportunity to respond to the information. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance. However, the Government may assign higher confidence to those proposals which present a record of relevant past performance. The contracting officer will not accept questionnaires that are not sent directly to the contracting officer’s email address provided on the questionnaire.
Factor C – Cost Proposals
Evaluation of this factor will be based on the reasonableness of the detailed cost proposal. Cost will be evaluated for reasonableness through a comprehensive comparison of each proposal received. Reasonableness will be determined based on costs submitted by the competition, current market conditions, and comparison to the Government estimate. Offerors must provide a cost breakout to include all costs associated with their proposal.
Each proposal shall be evaluated to ensure that all information provided in the RFP has been addressed, is accurate and complete, and each individual cost category under each division is properly identified (e.g., design, general requirements, concrete, masonry, mechanical, electrical, site work, etc.). Offerors shall identify the subtotal cost for each standard construction division, and the aggregate total cost for each phase of the overall project. The proposed costs will also be evaluated using the cost techniques listed at Federal Acquisition Regulation (FAR) 15.404-1 (b)(2)(i), (b)(2)(v), and (b)(2)(vi). The offeror's total cost shall be identified by divisions as shown in the project specifications schedule.
Relative Weight of Evaluation Criteria
All evaluation factors other than cost, when combined, are "significantly more important" than cost. All non-cost factors will be combined and evaluated as an overall technical proposal rating. Thereafter, cost will be considered after each technical proposal has been evaluated and scored. The best value is determined by comparing differences in the value of non-cost features with differences in cost to the Government. In making this comparison, the Government is more concerned with obtaining superior non-cost features than with making an award at the lowest overall cost to the Government.
However, the Government will not make an award at a significantly higher overall cost to achieve slightly superior non-cost features. Therefore, cost is not expected to be the controlling factor in the selection of an Offeror, but the degree of importance of cost as a factor could become greater depending upon the equality of the proposals for other factors evaluated.