Sol_140P5426Q0006_Attach__0001-_SOW.pdf
PDF 180 KB Posted
- Attached to
- ELEVATOR INSPECTION & MAINTENANCE SERVICE Federal contract opportunity
- Solicitation number
- 140P5426Q0006
About this file
This is a Statement of Work (SOW) for annual elevator maintenance services at San Juan National Historic Site in Old San Juan, Puerto Rico, issued by the National Park Service Southeast Region South Major Acquisition Buying Office in February 2026.
The contract covers preventive, corrective, and emergency maintenance for two elevators: a Schindler passenger elevator (2,500 lbs capacity, two stops) at Castillo San Cristóbal Visitor Center and a freight/industrial elevator (manufacturer and capacity to be confirmed) at Castillo San Felipe del Morro American Cistern. The contractor must perform monthly preventive maintenance including cleaning, lubrication, and adjustment of mechanical components; visual and operational inspections; safety device testing; and corrective maintenance only when authorized in writing with cost estimates. The contractor shall provide 24/7 emergency response with acknowledgment within 60 minutes and on-site technician within 2 hours, and respond to non-emergency calls within one business day. Work hours are 7:00 a.m. to 3:00 p.m., Monday through Friday, excluding federal holidays, coordinated with the Contracting Officer's Representative. The base contract period is one year with up to four optional one-year extensions, with initial services commencing within 15 days after award. The contractor must comply with OSHA requirements, Secretary of the Interior's Standards for Historic Preservation, and NPS Reference Manuals 10A and 10B. Deliverables include a Safety Plan, Schedule of Values, product submittals, one hardbound O&M Manual, and one hour of training for park personnel prior to contract completion.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5426Q0006_Amend_002_Attach__0004-_Q_and_A_0002.pdf | ||
| Sol_140P5426Q0006_Amd_0002.pdf | ||
| Sol_140P5426Q0006_Amd_0001.pdf | ||
| Sol_140P5426Q0006_Amend_001_Attach__0003-_Q_and_A_0001.pdf | ||
| Sol_140P5426Q0006_Attach__0002-WD.pdf | ||
| Sol_140P5426Q0006.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAN JUAN NATIONAL HISTORIC SITE
OLD SAN JUAN, PUERTO RICO
Castillo San Cristobal Visitor Center Elevator and San Felipe del morro Cargo Elevator
Maintenance
STATEMENT OF WORK
FEBRUARY 2026
NATIONAL PARK SERVICE
SOUTHEAST REGION
SOUTH MAJOR ACQUISITION BUYING OFFICE
SCOPE OF WORK
Annual Elevator Maintenance Contract San Juan National Historic Site
San Juan, Puerto Rico
1. BACKGROUND
San Juan National Historic Site (SAJU) is one of more than 400 units of the National Park Service (NPS) and includes Castillo San Felipe del Morro, Castillo San Cristóbal, the historic city walls, San Juan Gate, and Fort San Juan de la Cruz. These 17th- and 18th-century fortifications were constructed to defend the San Juan coastline and are designated historic resources.
Two elevators located within historic structures at SAJU are subject to extreme environmental conditions, including high humidity, salt-laden air, corrosion, and high winds. These conditions accelerate deterioration of mechanical, electrical, and structural components and require a proactive, comprehensive maintenance program to ensure continued safe operation, reliability, and preservation of historic fabric.
2. OBJECTIVES
The objective of this contract is to provide preventive, corrective, and emergency elevator maintenance services to ensure both elevators remain safe, reliable, code-compliant, and operational for visitor and operational use.
The Contractor shall:
• Provide a base one-year maintenance plan, with pricing and scope for up to four
(4) optional years.
• Identify all labor, materials, equipment, testing, and processes required to maintain the elevators.
• Maintain elevators in accordance with manufacturer recommendations, applicable codes, and NPS historic preservation standards.
• Minimize downtime, visitor disruption, and risk to historic resources.
All plans, costs, and work processes are subject to Government review and approval prior to award.
3. ELEVATOR INVENTORY
3.1 Castillo San Cristóbal – Visitor Center Elevator
• Manufacturer: Schindler
• Capacity: 2,500 lbs.
• Stops: Two (2)
• Use: Passenger elevator for visitor access and light operational use
• Maintenance Basis: Normal passenger use and light material handling
3.2 Castillo San Felipe del Morro – American Cistern Elevator
• Manufacturer: To be confirmed by Contractor
• Capacity: To be confirmed by Contractor
• Stops: Two (2)
• Use: Freight/industrial service under harsh environmental conditions
The Contractor shall verify and document equipment details during initial inspection.
4. PLACE OF PERFORMANCE
San Juan National Historic Site 501 Calle Norzagaray San Juan, Puerto Rico 00901
4.1 Castillo San Cristóbal – Visitor Center
• Coordinates: 18.466483, -66.110975
• Access: Via Avenida Muñoz Rivera
• Parking: Two (2) Contractor vehicles permitted at the South Entrance parking lot Additional vehicles must park off-site (e.g., Doña Fela Parking Garage, approx. 0.4 miles)
4.2 Castillo San Felipe del Morro – American Cistern
• Coordinates: 18.470067, -66.123727
• Access: By coordination with NPS-assigned staff only
5. WORK HOURS AND ACCESS
• Work Hours: 7:00 a.m. to 3:00 p.m., Monday through Friday
• Excluding: Federal holidays
• Access: Provided by NPS staff
• Contractor shall coordinate all site access and shutdowns in advance with the COR
6. PERIOD OF PERFORMANCE
• Base Period: One (1) year
• Option Periods: Up to four (4) additional one-year options
• Initial services shall commence within 15 days after contract award.
7. TASKS AND SERVICES
7.1 Inspections
The Contractor shall perform visual and operational inspections of all elevator systems and associated components to verify safe operation, condition, and code compliance.
Inspections shall include, but are not limited to:
• Car interiors, fixtures, and controls
• Door operators, interlocks, and safety edges
• Hoist way, pit, and machine room
• Controllers, wiring, and electrical components
• Safety devices and emergency systems
Findings shall be documented and provided to the COR.
7.2 Testing
The Contractor shall test elevator systems and safety devices in accordance with applicable codes and manufacturer requirements.
Testing shall include, but is not limited to:
• Door operation and interlocks
• Emergency alarms and stop devices
• Leveling accuracy
• Normal and emergency operating modes
Testing shall be coordinated with park staff to minimize visitor impact. Written documentation of test results and deficiencies shall be provided prior to departing the site.
7.3 Preventive Maintenance
The Contractor shall provide monthly preventive maintenance services to reduce equipment failure and extend service life.
Preventive maintenance includes:
• Cleaning and lubrication of mechanical components
• Adjustment of moving parts
• Minor corrective actions required to maintain proper operation
Preventive maintenance does not include major repairs or component replacement, which are addressed under corrective maintenance.
7.4 Corrective (Non-Routine) Maintenance
Corrective maintenance includes repairs resulting from component failure, abnormal wear, or deficiencies identified during inspections or testing.
• All non-routine repairs require prior written approval from the Contracting Officer or COR.
• Contractor shall submit a written cost estimate identifying labor, materials, and total cost.
• Replacement parts shall be original or functionally equivalent and compliant with applicable codes.
7.5 Emergency Service and Response
The Contractor shall provide 24/7 emergency elevator service.
Emergency conditions include:
• Entrapment
• Complete shutdown
• Unsafe operation
• Any condition deemed critical by NPS staff
Response requirements:
• Acknowledge call within 60 minutes
• On-site technician within 2 hours
Emergency response is limited to evaluation and stabilization. Repairs beyond stabilization require authorization.
7.6 Non-Emergency Service
Non-emergency service calls shall be responded to within one (1) business day, unless otherwise approved by park staff.
8. PERFORMANCE REQUIREMENTS
• Monthly preventive maintenance for both elevators
• Compliance with manufacturer recommendations and applicable codes
• Corrective maintenance performed only when authorized and within NTE limits
9. CONTRACTOR RESPONSIBILITIES
• Provide traffic control measures as required
• Protect adjacent areas and restore disturbed areas to original condition
• Comply with all safety, environmental, and historic preservation requirements
10. DELIVERABLES
Prior to Notice to Proceed:
• Safety Plan
• Schedule of Values
• Product submittals (if applicable)
• Equipment data and manufacturer documentation
Upon Completion:
• One hardbound O&M Manual
• One (1) hour training session for park personnel
11. SAFETY AND HEALTH
• Comply with all OSHA requirements
• Address confined spaces, heat, humidity, corrosion, and slip hazards
• Immediately report accidents or damage
• Comply with Park Safety Officer directives
12. CULTURAL RESOURCES
• Contractors shall protect all historic fabrics
• Work shall comply with Section 106 NHPA
• All discoveries shall be reported immediately and work stopped as directed
13. SECURITY AND SITE CONTROL
• Secure work areas and restrict public access
• No doors left open unattended
• Proper identification required for all personnel
• Parking restricted to approved areas only
14. QUALITY ASSURANCE
The Contractor shall implement a quality control program to ensure services meet industry standards and contract requirements. All deficiencies shall be corrected at no cost to the Government.
15. APPLICABLE STANDARDS
• OSHA regulations
• Federal, state, and local codes
• Secretary of the Interior’s Standards for Historic Preservation
• NPS Reference Manuals 10A and 10B