This solicitation is for plaster installation services at the Carl Sandburg Historic Site in Flat Rock, North Carolina. The National Park Service seeks to replace the plaster on the interior walls and ceiling of the site's Spring House building, which measures approximately 10 feet by 10 feet by 10 feet and was constructed circa 1853. Offerors are to provide firm fixed prices for the removal of existing wire lath and installation of new wire lath and plaster. The period of performance is January 22, 2024 to July 1, 2024. The solicitation includes specifications, drawings, delivery and acceptance terms, and standard contract clauses pertaining to progress payments, Buy American requirements, and other administrative requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A5_-_CARL_335487A_SOW_UPDATED_1_11_2024_0002.pdf | ||
| A6_-_Questions_and_Answers_0002.pdf | ||
| Sol_140P5324R0002_Amd_0002.pdf | ||
| Sol_140P5324R0002_Amd_0001.pdf | ||
| A1_-_Statement_of_Work.pdf | ||
| A3_-_Wage_Determination.pdf | ||
| A2_-_Pictures_.pdf | ||
| Construction_Contract_Administration.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040646487
NPS, SER - North MABO
107 Park Headquarters Road
Gatlinburg TN 37738
PSN
Ashley Warcewicz
112/21/2023
140P5324R0002
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Statement of Work and DOL Wage Determination
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 90 calendar days and complete it within ________________ ________________ calendar days after receiving
01/17/2024
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
NPS, SER - North MABO 107 Park Headquarters Road
Gatlinburg TN 37738
PSN
Ashley Warcewicz
28. NEGOTIATED AGREEMENT 29. AWARD
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
10 U.S.C. 3204(a) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 12/2022) BACK
Continued...
and return
(Contractor is not required to sign this document.) Your offer on this
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 46
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140P5324R0002
This project will replace the plaster on the interior walls and ceiling of the Spring House at the Carl Sandburg Home National Historic Site in
Flat Rock, NC. The building built circa 1853 is approximately 10ft x 10ft x 10ft on the interior with plaster walls and ceiling and a concrete floor. The work performed under the contract will consist of removing the existing wire lath and installing new wire lath and plaster. POC Jamie
Mahan
Delivery: 07/01/2024
Delivery Location Code: 0009060290
NPS, Carl Sandburg Home NHS
81 Carl Sandsburg Lane
Flat Rock NC 28731-8635 US
Period of Performance: 01/22/2024 to 07/01/2024
00010 Plaster Installation
Product/Service Code: Z1JA
Product/Service Description: MAINTENANCE OF
MUSEUMS AND EXHIBITION BUILDINGS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
140P5324R0002 Carl Sandburg – Replace Plaster on Springhouse Page 5
Table of Contents Part I – The Schedule…… ...................................................................................................................................A-1 Section A – Solicitation/Contract Form..............................................................................................................A-1 SF 1442 Solicitation, Offer, and Award Notice: Set-Aside For, 8(a) (Construction, Alteration, or Repair) ...A-1 Section B – Bid Schedule ......................................................................................................................................B-3 B.1 Price/Cost Schedule..........................................................................................................................................B-3 Section C – Specifications/Drawings ...................................................................................................................C-5 Section D – Packaging and Marking (Not applicable) Section E - Inspection and Acceptance................................................................................................................E-7 E.1 52.246-12 Inspection of Construction (AUG 1996) .........................................................................................E-7 Section F – Deliveries or Performance ................................................................................................................F-8 F.1 Clauses Incorporated by Reference...................................................................................................................F-8 F.2 52.211-10 Commencement, Prosecution and Completion of work (APR 1984)……………………………...F-8 F.3 Principal Place of Performance.......................................................................................................................F-11 Section G – Contract Administration Data ......................................................................................................G-12 G.1 Identification of Government Officials..........................................................................................................G-12 G.2 Invoices..........................................................................................................................................................G-12 Section H – Special Contract Requirements ....................................................................................................H-14 H.1 1452.228-70 Liability Insurance (JUL 1996) ..................................................................................................H-2 H.2 1452.236-70 Prohibition against use of Lead-based Paint – Department of the Interior (JUL 1996).............H-3 H.3 Notice to Contractors – Contractor Performance Assessment Reporting System (DEC 2015) ......................H-5 Part II - Contract Clauses ...................................................................................................................................I-18 Section I - Contract Clauses ................................................................................................................................I-18 I.1 Clauses Incorporated by Reference .................................................................................................................I-18 I.2 52.204-27 Prohibition on a BYTEDANCE Covered Application (JUNE 2023) ............................................I-19 I.3 52.204-25 Prohibition on Contracting for Certain Telecommunications and video Surveillance Services or Equipment (Nov 2021) ...........................................................................................................................................I-25 I.4 52.219-14 Limitations on Subcontracting (OCT 2022)(Deviation OCT 2022) ...............................................I-21 I.5 52.222-21 Prohibition of Segregated Facilities (APR 2015) ............................................................................I-23 I.6 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) ...............I-24 I.7 52.223-9 Estimate of Percentage of recovered material content for EPA- Designated Items (MAY 2008) ....I-25 I.8 52.225-9 Buy American Act – Construction Materials (OCT 2022)................................................................I-25 I.9 52.232-16 Progress Payments (NOV 2021) .....................................................................................................I-26 I.10 52.232-27 Prompt Payment for Construction Contracts (JAN 2017).............................................................I-30 I.11 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (MAR 2023........................I-30 I.12 52.236-2 Differing Site Conditions (APR 1984) ...........................................................................................I-34 I.13 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) ................................................I-34 I.14 52.236-5 Material and Workmanship ............................................................................................................I-34 I.15 52.236-6 Superintendence by the contractor (APR 1984) .............................................................................I-35 I.16 52.236-7 Permits and Responsibilities ( NOV 1991) ....................................................................................I-35 I.17 52.236-8 Other Contracts (APR 1984) ...........................................................................................................I-36 I.18 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, Improvements (Apr 1984) ...I-36 I.19 52.236-10, Operations and Storage Areas (Apr 1984) ...................................................................................I-36 I.20 52.236-11, Use and Possession Prior to Completion (Apr 1984) ...................................................................I-36 I.21 52.236-12 Cleaning Up (APR 1984) ..............................................................................................................I-37 I.22 52.236-13 Accident Prevention (NOV 1991) .................................................................................................I-37 I.23 52.236-14 Availability and Use of Utility Services (APR 1984) ...................................................................I-38 I.24 52.236-15 Schedules for Construction Contracts (APR 1984) ......................................................................I-38 I.25 52.236-21 Specifications and Drawings for Construction (FEB 1997) .........................................................I-40 I.26 52.246-21 Warranty of Construction (MAR 1994) ........................................................................................I-41 I.27 52.249-10 Default (Fixed-Price Construction) (APR 1984) ……………………………………………… .I-41 https://www.acquisition.gov/far/part-52#FAR_52_236_10 https://www.acquisition.gov/far/part-52#FAR_52_236_11
140P5324R0002 Carl Sandburg – Replace Plaster on Springhouse Page 6
I.28 1452.201-70 Authorities and Delegations (SEPT 2011) ............................................................................... I-42 I.29 1452.203-70 Restrictions on Endorsements (JULY 1996) ............................................................................ I-42 I.30 1452.204-70 Release of Claims —Department of Interior ............................................................................I-42 PART III – List of Documents, Exhibits and Other Attachments ..................................................................J-42 Section J – List of Attachments Section K – Representations, certifications and other statements of offerors ................................................K-1 K.1 52.204-8 ANNUAL REPRESENTATIONS & CERTIFICATIONS (Mar 2023) ..........................................K-2 K.2 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATION (Sept 2023) ...........................................K-8 K.3 52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999)...............................K-11 SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS ..................................L-1 L.1 NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED BY REFERENCE .......................L-1
L.2 52.225-10 NOTICE OF BUY AMERICAN ACT REQUIREMENT--CONSTRUCTION MATERIALS
(MAY 2014) ............................................................................................................................................................L-2 L.3 52.233-3 PROTEST AFTER AWARD (AUG 1996).......................................................................................L-3 L.4 PROPOSAL PREPARATION AND SUBMISSION INSTRUCTIONS.........................................................L-3 SECTION M - EVALUATION FACTORS FOR AWARD ............................................................................M-1
SECTION M – EVLAUTATION FACTORS FOR AWARD…………………………………….……………M-1
140P5324R0002 Carl Sandburg – Replace Plaster on Springhouse Page 7
SECTION B – BID SCHEDULE
B.1 PRICE/COST SCHEDULE
Provide Firm Fixed Price:
SECTION C – SPECIFICATIONS/DRAWINGS
Attachment 1 – Statement of Work Attachment 2 – Pictures of Springhouse Attachment 3 – Wage Determination Attachment 4 – Construction Contract Administration
SECTION E - INSPECTION AND ACCEPTANCE
E.1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
(a) Definition."Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not-
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this-section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may-
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
140P5324R0002 Carl Sandburg – Replace Plaster on Springhouse Page 8
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
SECTION F - DELIVERIES OR PERFORMANCE
F.1 CLAUSES INCORPORATED BY REFERENCE
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/far.
NUMBER TITLE DATE
52.242-14 SUSPENSION OF WORK APR 1984
F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, ALT 1 (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 Calendar days. The time stated for completion shall include final cleanup of the premises.
F.3 PRINCIPAL PLACE OF PERFORMANCE
The effort required under this contract shall be performed at: Carl Sandburg Historic Site, Flat Rock, NC, 28731.
G - CONTRACT ADMINISTRATION DATA
G.1 IDENTIFICATION OF GOVERNMENT OFFICIALS
The Government Officials assigned to this contract are as follows:
Contracting Officer (CO): Ashley Warcewicz
Email: Ashley_Warcewicz@nps.gov
Contracting Officer's Representative (COR): Ryan Williams
G.2 INVOICES - Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice A Contractor generated Invoice signed by the COR. Also, the contractor must submit certified payrolls and release of claims for final payment.
140P5324R0002 Carl Sandburg – Replace Plaster on Springhouse Page 9
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 1452.228-70 LIABILITY INSURANCE (JUL 1996)
(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
$100,000.00 each person* $500,000.00 each occurrence* $1,000,000.00 property damage*
(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
H.2 1452.236-70 PROHIBITION AGAINST USE OF LEAD-BASED PAINT - DEPARTMENT OF THE INTERIOR
(JUL 1996)
Paint containing more than .06 percent by weight of lead in paint, or the equivalent measure of lead in the dried film of paint already applied, shall not be used in the construction or rehabilitation of residential structures under this contract or any resulting subcontracts.
H.3 NOTICE TO CONTRACTORS-Contractor Performance Assessment Reporting System (DEC 2015)
FAR 42.1502 direct all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
1. The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
2. We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the
140P5324R0002 Carl Sandburg – Replace Plaster on Springhouse Page 10
Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
3. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
4. Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.
b. Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c. All information provided should be reviewed for accuracy prior to submission.
d. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e. Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f. If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
5. The following guidelines apply concerning your use of the past performance evaluation:
a. Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b. Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c. Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
6. If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
7. A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
SECTON I - CONTRACT CLAUSES
I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address (es): http://www.acquisition.gov/far/index.html
NUMBER TITLE DATE
52.203-5 COVENANT AGAINST CONTINGENT FEES MAY 2014
52.203-7 ANTI-KICKBACK PROCEDURES JUN 2020
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS
AND REQUIREMENT TO INFORM EMPLOYEES OF
WHISTLEBLOWER RIGHTS JUN 2020
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-
TIER SUBCONTRACT AWARDS JUN 2020
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE. OCT 2018
http://www.acquisition.gov/far/index.html
140P5324R0002 Carl Sandburg – Replace Plaster on Springhouse Page 11
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS
AND CERTIFICATIONS JAN 2017
52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN SUB-
CONTRACTING WITH CONTRACTOR’S DEBARRED,
SUSPENDED, OR PROPOSED FOR DEBARMENT NOV 2021
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS NOV 2015
52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT. OCT 1997
52.222-3 CONVICT LABOR JUN 2003
52.222-6 DAVIS-BACON ACT AUG 2018
52.222-7 WITHHOLDING OF FUNDS. MAY 2014
52.222-8 PAYROLLS AND BASIC RECORDS. JUL 2021
52.222-9 APPRENTICES AND TRAINEES. JUL 2005
52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS. FEB 1988
52.222-11 SUBCONTRACTS (LABOR STANDARDS). MAY 2014
52.222-12 CONTRACT TERMINATION - DEBARMENT. MAY 2014
52.222-13 COMPLIANCE WITH DAVIS-BACON AND RELATED ACT
REGULATIONS MAY 2014
52.222-14 DISPUTES CONCERNING LABOR STANDARDS FEB 1988
52.222-15 CERTIFICATION OF ELIGIBILITY MAY 2014
52.222-21 PROHIBITION OF SEGREGATED FACILITIES APR 2015
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO
ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR
CONSTRUCTION FEB 1999
52.222-26 EQUAL OPPORTUNITY SEPT 2015
52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR
CONSTRUCTION APR 2015
52.222-35 EQUAL OPPORTUNITY VETERANS JUN 2020
52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES JUN 2020
52.222-37 EMPLOYMENT REPORTS ON VETERANS JUN 2020
52.222-50 COMBATING TRAFFICKING IN PERSONS NOV 2021
52.223-6 DRUG-FREE WORKPLACE MAY 2001
52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN
TEXT MESSAGING WHILE DRIVING JUN 2020
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES. FEB 2021
52.227-4 PATENT INDEMNITY – CONSTRUCTION CONTRACTS DEC 2007
52.228-2 ADDITIONAL BOND SECURITY OCT 1997
52.228-11 PLEDGES OF ASSETS FEB 2021
52.228-14 IRREVOCABLE LETTER OF CREDIT NOV 2014
52.229-2 NORTH CAROLINA STATE AND LOCAL SALES AND USE TAX APR 1984
52.229-3 FEDERAL, STATE, AND LOCAL TAXES FEB 2013
52.232-5 PAYMENTS UNDER FIXED PRICE CONTRUCTION CONTRACTS MAY 2014
52.232-16 PROGRESS PAYMENTS, ALT 1 NOV 2021
52.232-23 ASSIGNMENT OF CLAIMS MAY 2014
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR
AWARD MANAGEMENT OCT 2018
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS JUN 2013
52.233-1 DISPUTES MAY 2014
52.233-3 PROTEST AFTER AWARD AUG 1996
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM OCT 2004
52.236-26 PRECONSTRUCTION CONFERENCE FEB 1995
140P5324R0002 Carl Sandburg – Replace Plaster on Springhouse Page 12
52.243-4 CHANGES JUNE 2007
52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS DEC 2022
52.252-4 ALTERATIONS IN CONTRACT APR 1984
52.253-1 COMPUTER GENERATED FORMS JAN 1991
I.2. 52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUNE 2023)
(a) Definitions. As used in this clause— Covered application means the social networking service TikTok or any successor application or service developed or provided by ByteDance Limited or an entity owned by ByteDance Limited.
Information technology, as defined in 40 U.S.C. 11101(6)—
(1) Means any equipment or interconnected system or subsystem of equipment, used in the automatic acquisition, storage, analysis, evaluation, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information by the executive agency, if the equipment is used by the executive agency directly or is used by a contractor under a contract with the executive agency that requires the use—
(i) Of that equipment; or
(ii) Of that equipment to a significant extent in the performance of a service or the furnishing of a product;
(2) Includes computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources; but
(3) Does not include any equipment acquired by a Federal contractor incidental to a Federal contract.
(b) Prohibition. Section 102 of Division R of the Consolidated Appropriations Act, 2023 (Pub. L. 117-328), the No TikTok on Government Devices Act, and its implementing guidance under Office of Management and Budget (OMB) Memorandum M- 23-13, dated February 27, 2023, “No TikTok on Government Devices” Implementation Guidance, collectively prohibit the presence or use of a covered application on executive agency information technology, including certain equipment used by Federal contractors. The Contractor is prohibited from having or using a covered application on any information technology owned or managed by the Government, or on any information technology used or provided by the Contractor under this contract, including equipment provided by the Contractor’s employees; however, this prohibition does not apply if the Contracting Officer provides written notification to the Contractor that an exception has been granted in accordance with OMB Memorandum M-23-13.
(c) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts, including subcontracts for the acquisition of commercial products or commercial services.
I.3 52.204-25 Prohibition on Contracting for Certain Telecommunications and video Surveillance Services or Equipment (Nov 2021)
(a) Definitions. As used in this clause— Backhaul means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network). Backhaul can be wireless (e.g., microwave) or wired (e.g., fiber optic, coaxial cable, Ethernet).
Covered foreign country means The People’s Republic of China.
Covered telecommunications equipment or services means–
(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities);
(2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities);
(3) Telecommunications or video surveillance services provided by such entities or using such equipment; or
(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the
Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of
140P5324R0002 Carl Sandburg – Replace Plaster on Springhouse Page 13
Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.
Critical technology means–
(1) Defense articles or defense services included on the United States Munitions List set forth in the International
Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;
(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export Administration
Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled-
(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or
(ii) For reasons relating to regional stability or surreptitious listening;
(3) Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);
(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal Regulations (relating to export and import of nuclear equipment and material);
(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such Code, or part 73 of title 42 of such Code; or
(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control Reform Act of 2018 (50 U.S.C. 4817).
Interconnection arrangements means arrangements governing the physical connection of two or more networks to allow the use of another's network to hand off traffic where it is ultimately delivered (e.g., connection of a customer of telephone provider A to a customer of telephone company B) or sharing data and other information resources.
Reasonable inquiry means an inquiry designed to uncover any information in the entity's possession about the identity of the producer or provider of covered telecommunications equipment or services used by the entity that excludes the need to include an internal or third-party audit.
Roaming means cellular communications services (e.g., voice, video, data) received from a visited network when unable to connect to the facilities of the home network either because signal coverage is too weak or because traffic is too high.
Substantial or essential component means any component necessary for the proper function or performance of a piece of equipment, system, or service.
(b) Prohibition.
(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-
232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. The Contractor is prohibited from providing to the Government any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-
232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract, or extending or renewing a contract, with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract.
(c) Exceptions. This clause does not prohibit contractors from providing—
(1) A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements;
or
(2) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(d) Reporting requirement.
https://www.acquisition.gov/far/part-4#FAR_4_2104 https://www.acquisition.gov/far/part-4#FAR_4_2104
140P5324R0002 Carl Sandburg – Replace Plaster on Springhouse Page 14
(1) In the event the Contractor identifies covered telecommunications equipment or services used as a substantial or essential component of any system, or as critical technology as part of any system, during contract performance, or the Contractor is notified of such by a subcontractor at any tier or by any other source, the Contractor shall report the information in paragraph (d)(2) of this clause to the Contracting Officer, unless elsewhere in this contract are established procedures for reporting the information; in the case of the Department of Defense, the Contractor shall report to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.
(2) The Contractor shall report the following information pursuant to paragraph (d)(1) of this clause
(i) Within one business day from the date of such identification or notification: the contract number; the order number(s), if applicable; supplier name; supplier unique entity identifier (if known); supplier Commercial and Government Entity (CAGE) code (if known); brand; model number (original equipment manufacturer number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.
(ii) Within 10 business days of submitting the information in paragraph (d)(2)(i) of this clause: any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of covered telecommunications equipment or services, and any additional efforts that will be incorporated to prevent future use or submission of covered telecommunications equipment or services.
(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e) and excluding paragraph (b)(2), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products or commercial services.
I.4 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022) (DEVIATION OCT 2022)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Definition. Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that—
(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and
(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.
(c) Applicability. This clause applies only to—
(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;
(4) Orders expected to exceed the simplified acquisition threshold and that are—
(i) Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);
(5) Orders, regardless of dollar value, that are—
(i) Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and
(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.
(d) Independent contractors. An independent contractor shall be considered a subcontractor.
(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees to the following requirements in the performance of a contract assigned a North American Industry Classification System (NAICS) code applicable to this contract:
https://dibnet.dod.mil/ https://dibnet.dod.mil/
140P5324R0002 Carl Sandburg – Replace Plaster on Springhouse Page 15
(1) Services (except construction). It will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding certain other direct costs and certain work performed outside the United States (see paragraph (e)(1)(i)), to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract.
(i) The following services may be excluded from the 50 percent limitation:
(A) Other direct costs, to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service. Examples include airline travel, work performed by a transportation or disposal entity under a contract assigned the environmental remediation NAICS code (562910), cloud computing services, or mass media purchases.
(B) Work performed outside the United States on awards made pursuant to the Foreign Assistance Act of 1961, or work performed outside the United States required to be performed by a local contractor.
(2) Supplies (other than procurement from a nonmanufacturer of such supplies). It will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract.
(3) General construction. It will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded.
(4) Construction by special trade contractors. It will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 75 percent subcontract amount that cannot be exceeded.
(f) The Contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause – x By the end of the base term of the contract and then by the end of each subsequent option period; or __ By the end of the performance period for each order issued under the contract.
(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.
(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protégé in the joint venture must be more than administrative functions.
(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture.
Work performed by the 8(a) participants in the joint venture must be more than administrative functions.
I.5 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
(a) Definitions. As used in this clause “Gender identity” has the meaning given by the Department of Labor’s Office of Federal Contract Compliance Programs, and is found at www.dol.gov/ofccp/LGBT/LGBT_FAQs.html.
“Segregated facilities,” means any waiting rooms, work areas, rest rooms and wash rooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees, that are segregated by explicit directive or are in fact segregated on the basis of race, color, religion, sex, sexual orientation, gender identity, or national origin because of written or oral policies or employee custom.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .