This document provides details for a federal contract solicitation to replaster the interior of a springhouse at Carl Sandburg National Historic Site. The solicitation is a firm fixed price, 100% small business set-aside issued by the National Park Service Southeast Region. Interested vendors must register in the System for Award Management and ensure registration is complete before the January 17, 2024 deadline for proposal submissions via email. The period of performance is January 22, 2024 to July 1, 2024. The solicitation seeks to replace damaged wooden lath and install new lath and wire mesh on the interior walls and ceiling. The project requires the contractor provide all labor, materials, equipment and supplies.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A5_-_CARL_335487A_SOW_UPDATED_1_11_2024_0002.pdf | ||
| Sol_140P5324R0002_Amd_0002.pdf | ||
| Sol_140P5324R0002_Amd_0001.pdf | ||
| A1_-_Statement_of_Work.pdf | ||
| A3_-_Wage_Determination.pdf | ||
| A2_-_Pictures_.pdf | ||
| Construction_Contract_Administration.docx | DOCX document | |
| Sol_140P5324R0002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140P5324R0002
CARL – Replaster Springhouse
Questions and Answers
1. Question: Did someone start the work on this and not complete it? why?
Answer: Previous contractor tore off the old plaster, installed wire mesh then abandoned the job. We don't know why the contractor abandoned the job.
2. Question: Can they have sand delivered and where can it be staged?
Answer: Yes, we would prefer bags because we don't have enough space for a truck load.
3. Question: Will the park supply water? Where can they get water in the park?
Answer: Yes, we have a water faucet 150 yards away. Though point 3 in the scope of work states: 3. Specific Requirements: The contractor shall provide all supervision, labor, material, equipment, and other related services and supplies to replace the interior plaster of the Spring House.
4. Question: Finnish smooth Trowel or sanded flat?
Answer: Smooth
5. Question: Does the park have electric they can use, or will they need a generator?
Answer: You will need a Generator :3. Specific Requirements: The contractor shall provide all supervision, labor, material, equipment, and other related services and supplies to replace the interior plaster of the Spring House.
6. Question: Scope of work says wood lath will need to be replaced, how much?
Answer: Scope of work did not say that metal mesh was already installed over wood lath, and it would need to be removed. Metal mesh would have to be removed; damaged wooden lath needs to be replaced with new wooden lath and wire mesh installed over repaired wooden lath.