This is a Solicitation/Contract/Order for Commercial Products and Commercial Services (Standard Form 1449) issued by the National Park Service (NPS), Northeast Regional Contracting for Independence National Historical Park (INDE) in Philadelphia, Pennsylvania.

The solicitation seeks contractor services for inspection, maintenance, and repair of backflow prevention devices at multiple INDE locations to ensure compliance with Philadelphia Water Department (PWD) Regulation 403 and Pennsylvania Code requirements. The base contract period runs from September 28, 2026 to September 27, 2027, with four one-year options extending through September 27, 2031. Line items include annual testing and certification of all backflow devices per PWD standards (Item 00010), maintenance and repair services for up to 10 devices annually (Item 00020), and corresponding optional year testing and maintenance line items. All work must be performed by City-certified backflow prevention technicians (domestic and fire). The contract is a total small business set-aside (NAICS 561210) structured as firm-fixed price. Offerors must submit electronic proposals by 5:00 PM Eastern Time on September 21, 2026 to ellie_delerme-velez@ios.doi.gov. A mandatory site visit is scheduled for September 16, 2026 at 10:00 AM at the Merchant Exchange Building. Technical questions must be submitted by September 18, 2026. Evaluation will use a Lowest Price Technically Acceptable (LPTA) methodology, with proposals assessed on technical capability, contractor compliance, and price. Required submittals include proof of PWD certifications, technical approach documentation, relevant project experience (three prior similar projects), and biobased product certifications. Contractor Performance Assessment Reporting System (CPARS) ratings of "Satisfactory" or above are required for past performance acceptability.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3.AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE

. YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4.

FAR 52.212-3 AND 52.212-5 ARE ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

DATED.

OFFER

ADDENDA

ADDENDA

140P4226Q0059

See Schedule See Schedule

DOI, NPS, NERO & NER SOUTH MABO

National Park Service Northeast Regional Contracting South/Philadelphia MABO 1234 Market Street, 20th Floor Philadelphia PA 19107

09/21/2026 1700 ED

0044039027

Ellie Delerme-Velez

PNC 100.00

PNC

Deborah Coles

561210

$47

09/09/2026

0011283495

ADMINISTERED BY:

DOI, NPS, NERO & NER SOUTH MABO

National Park Service

Northeast Regional Contracting

South/Philadelphia MABO

1234 Market Street, 20th Floor

Continued...

STOCK RECORD (S/R)

STANDARD FORM 1449 (REV. 11/2021) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

ACCEPTED,

Philadelphia PA 19107 US

DELIVER TO:

NPS, Independence NHP

Independence Natl. Hist. Park

143 S. 3rd. Street

Philadelphia PA 19106 US

The National Park Service at Independence

National Historical Park (INDE), Philadelphia, PA has a requirement for a contractor to provide Inspection, Maintenance, and Repair of

Backflow Devices in accordance with the scope of work (SOW).

This is a total small business set-aside acquisition. The resulting contract will be firm-fixed price.

A site visit is scheduled for September 16, 2026, at 10:00 AM ET. The meeting location is

Merchant Exchange Building, 143 S. 3rd St., Philadelphia, PA 19106. Park Point of Contact -

Ricardo Nieves, Phone: 267-250-1457.

Please send all questions to the contract specialist Ellie Delerme at ellie_delerme-velez@ios.doi.gov no later than

September 18, 2026, 12:00 PM ET.

Period of Performance: 09/28/2026 to

09/27/2031

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

00010 Base Year - Testing and Certification in accordance with the requirements of the SOW.

Product/Service Code: J045

Product/Service Description:

MAINT/REPAIR/REBUILD

OF EQUIPMENT- PLUMBING, HEATING, AND WASTE

DISPOSAL EQUIPMENT

Delivery: 09/27/2027

Period of Performance: 09/28/2026 to

09/27/2027

00020 Base Year - Maintenance & Repair

Estimated Repair or replacement of up to 10 devices for the base year.

Prior to the commencement of any repair or maintenance work, the Contractor shall submit a detailed cost estimate (device type/spec, cut sheets, installation method, schedule, cost) to the COR for review and written approval.

Product/Service Code: J045

Product/Service Description:

MAINT/REPAIR/REBUILD

OF EQUIPMENT- PLUMBING, HEATING, AND WASTE

DISPOSAL EQUIPMENT

Delivery: 09/30/2026

Period of Performance: 09/28/2026 to

09/27/2027

00030 Option Year One - Testing and Certification in accordance with the requirements of the SOW.

(Option Line Item)

Anticipated Exercise Date 09/27/2027

Product/Service Code: J045

Product/Service Description:

MAINT/REPAIR/REBUILD

OF EQUIPMENT- PLUMBING, HEATING, AND WASTE

DISPOSAL EQUIPMENT

Delivery: 09/30/2026

Period of Performance: 09/28/2027 to

09/27/2028

00040 Option Year One - Maintenance & Repair

Not to exceed $10,000 for the year. Subject to

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) the availability of funds.

Prior to any repair/replacement the contractor must submit a written proposal (device type/spec, cut sheets, installation method, schedule, cost) for COR review. If approved a modification will be issued to fund the repair.

No work shall be performed prior to or without a modification.

(Option Line Item)

Anticipated Exercise Date 09/27/2027

Product/Service Code: J045

Product/Service Description:

MAINT/REPAIR/REBUILD

OF EQUIPMENT- PLUMBING, HEATING, AND WASTE

DISPOSAL EQUIPMENT

Delivery: 09/30/2026

Period of Performance: 09/28/2027 to

09/27/2028

00050 Option Year Two - Testing and Certification in accordance with the requirements of the SOW.

(Option Line Item)

Anticipated Exercise Date 0

Product/Service Code: J045

Product/Service Description:

MAINT/REPAIR/REBUILD

OF EQUIPMENT- PLUMBING, HEATING, AND WASTE

DISPOSAL EQUIPMENT

Delivery: 09/30/2026

Period of Performance: 09/28/2028 to

09/27/2029

00060 Option Year Two - Maintenance & Repair

Not to exceed $10,000 for the year. Subject to the availability of funds.

Prior to any repair/replacement the contractor must submit a written proposal (device type/spec, cut sheets, installation method, schedule, cost) for COR review. If approved a modification will be issued to fund the repair.

No work shall be performed prior to or without a modification.

(Option Line Item)

Anticipated Exercise Date 0

Product/Service Code: J045

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

Product/Service Description:

MAINT/REPAIR/REBUILD

OF EQUIPMENT- PLUMBING, HEATING, AND WASTE

DISPOSAL EQUIPMENT

Delivery: 09/30/2026

Period of Performance: 09/28/2028 to

09/27/2029

00070 Option Year Three - Testing and Certification in accordance with the requirements of the

SOW.

(Option Line Item)

Anticipated Exercise Date 0

Product/Service Code: J045

Product/Service Description:

MAINT/REPAIR/REBUILD

OF EQUIPMENT- PLUMBING, HEATING, AND WASTE

DISPOSAL EQUIPMENT

Delivery: 09/30/2026

Period of Performance: 09/28/2029 to

09/27/2030

00080 Option Year Three - Maintenance & Repair

Not to exceed $10,000 for the year. Subject to the availability of funds.

Prior to any repair/replacement the contractor must submit a written proposal (device type/spec, cut sheets, installation method, schedule, cost) for COR review. If approved a modification will be issued to fund the repair.

No work shall be performed prior to or without a modification.

(Option Line Item)

Anticipated Exercise Date 0

Product/Service Code: J045

Product/Service Description:

MAINT/REPAIR/REBUILD

OF EQUIPMENT- PLUMBING, HEATING, AND WASTE

DISPOSAL EQUIPMENT

Delivery: 09/30/2026

Period of Performance: 09/28/2029 to

09/27/2030

00090 Option Year Four - Testing and Certification in

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) accordance with the requirements of the SOW.

(Option Line Item)

Anticipated Exercise Date 0

Product/Service Code: J045

Product/Service Description:

MAINT/REPAIR/REBUILD

OF EQUIPMENT- PLUMBING, HEATING, AND WASTE

DISPOSAL EQUIPMENT

Delivery: 09/30/2026

Period of Performance: 09/28/2030 to

09/27/2031

00100 Option Year Four - Maintenance & Repair

Not to exceed $10,000 for the year. Subject to the availability of funds.

Prior to any repair/replacement the contractor must submit a written proposal (device type/spec, cut sheets, installation method, schedule, cost) for COR review. If approved a modification will be issued to fund the repair.

No work shall be performed prior to or without a modification.

(Option Line Item)

Anticipated Exercise Date 0

Product/Service Code: J045

Product/Service Description:

MAINT/REPAIR/REBUILD

OF EQUIPMENT- PLUMBING, HEATING, AND WASTE

DISPOSAL EQUIPMENT

Delivery: 09/30/2026

Period of Performance: 09/28/2030 to

09/27/2031

REFERENCE NO. OF DOCUMENT BEING CONTINUED

140P4226Q0059

PAGE OF

SECTION A - TABLE OF CONTENTS

SECTION DESCRIPTION PAGE

PART I – The Schedule A Solicitation/Contract Form 1 B Schedule of Items 5 C Description/specifications/requirements 7 D Packaging and Marking 21 E Inspection and Acceptance 21 F Deliveries or Performance 21 G Contract Administration Data 21 H Special Contract Requirements 27

PART II – Contract Clauses I Contract Clauses 30

PART III – List of Documents, Exhibits, and Other Attachments J List of Attachments 41

PART IV – Representations and Instructions K Representations, Certifications, and Other Statements of Offerors 42 L Instructions, Conditions, and Notices to Offerors 51 M Evaluation Factors for Award 59

140P4226Q0059

SECTION B - SCHEDULE OF SERVICES

19.

ITEM

NO.

20.

SCHEDULE OF SERVICES

21.

QTY

22.

UNIT OF

MEASURE

23.

UNIT

PRICE

24.

TOTAL

Base Items

00010 Base Year - Testing and Certification in accordance with the requirements of the

SOW.

1 Lump Sum $ $

00020 Base Year - Maintenance & Repair (Estimated Repair or replacement of up to 10 devices for the base year.)

10 Each $ $

Total $ Optional Item

00030 Option Year One - Testing and Certification in accordance with the requirements of the

SOW.

1 Lump Sum $ $

00040 Option Year One - Maintenance & Repair Not to exceed $10,000 for the year. Subject to the availability of funds.

1 Lump Sum $ $

00050 Option Year Two - Testing and Certification in accordance with the requirements of the

SOW.

1 Lump Sum $ $

00060 Option Year Two - Maintenance & Repair Not to exceed $10,000 for the year. Subject to the availability of funds.

1 Lump Sum $ $

00070 Option Year Three - Testing and Certification in accordance with the requirements of the

SOW.

1 Lump Sum $ $

00080 Option Year Three - Maintenance & Repair Not to exceed $10,000 for the year. Subject to the availability of funds.

1 Lump Sum $ $

00090 Option Year Four - Testing and Certification in accordance with the requirements of the

SOW.

1 Lump Sum $ $

00100 Option Year Four - Maintenance & Repair 1 Lump Sum $ $

140P4226Q0059

Not to exceed $10,000 for the year. Subject to the availability of funds.

Optional Item Total $ Base and Optional Item Total $

NOTE: This acquisition utilizes Revolutionary FAR Updates (RFO) FAR 12 Acquisition of Commercial Products and Commercial Services – Specifically RFO FAR 12.201-1 – Simplified Procedures.

The contract includes the FAR Clause 52.217-8 – Option to Extend Services for up to six (6) months. If the Government elects to exercise FAR 52.217-8 – Option to Extend Services after the base period, the contractor is hereby notified that the Government will require continued performance of any services within the limits and at the unit prices specified in the Schedule of Services above, unless any of the unit prices require adjustment per revisions to the prevailing labor rates provided by the Secretary of Labor. The prices under this clause are hereby considered to be evaluated at the time of award of the base contract.

140P4226Q0059

SECTION C – Description/Specification/Requirements

Independence National Historical Park (INDE) – Backflow Devices

C.0 NATIONAL PARK SERVICE

The National Park Service (NPS) is a bureau of the U.S. Department of the Interior (DOI) that has been entrusted with the care of our national parks since 1916. The National Park System currently has 433 units (often referred to as parks), covering more than 85 million acres in all 50 states, the District of Columbia, and US territories.

The NPS also has more than 150 related areas that are linked in importance and purpose to places managed directly by the National Park Service by preserving important segments of the nation's natural and cultural heritage. They are designated by acts of Congress or by the Secretary of the Interior (affiliated areas). The majority of related areas are not units of the National Park Service and are managed by other government agencies or non-government organizations and landowners. The National Park Service is involved in related areas by directly managing the entire or sections of a related area, or by providing technical or financial assistance.

The NPS preserves unimpaired natural and cultural resources, and values of the National Park System for the enjoyment, education, and inspiration of this and future generations. The NPS cooperates with partners to extend the benefits of natural and cultural resource conservation and outdoor recreation throughout this country and the world.

The NPS – Business Service Contracting Division (BSCD) – Contracting Operations – Northeast Region – Philadephia MABO. The NPS – BSCD-Northeast issues contracts through the Federal Acquisition Regulation’s (FAR) for supplies, services, construction, A&E for Northeast Regional Parks only.

C.1 INDEPENDENCE NATIONAL HISTORICAL PARK (INDE)

Independence National Historical Park (INDE) is a designated unit of the National Park Service (NPS), located in the heart of downtown Philadelphia. The park preserves, protects, and interprets some of the most historically significant buildings and sites in the United States associated with the struggle for independence and the creation of the early American republic. The park is home to numerous historic buildings and icons like Independence Hall, where the Declaration of Independence and the US Constitution were debated and signed, and the Liberty Bell, a globally recognized symbol of democracy.

C.2 BACKGROUND

The National Park Service at Independence National Historical Park (INDE) has a requirement for a contractor to provide annual testing and certification of all backflow prevention devices (and air-gap separations), plus responsive maintenance and repair when devices fail or fall out of compliance.

Independence National Historical Park (INDE) is a federally managed, historically significant site in Philadelphia, PA. Its potable and fire-protection systems must be safeguarded from cross-connection and backflow hazards through compliant devices and documented annual testing.

Applicable Regulations (summary):

• Title 25 Pennsylvania Code §109.709 requires elimination of cross-connections or provision of backflow devices to prevent contamination of public water supplies, with customer responsibility for annual testing and maintenance.

• Philadelphia Water Department (PWD) Regulation 403 requires approved backflow protection on domestic and fire service connections, annual testing by City-certified personnel, and submittal of test results to PWD Industrial Waste & Backflow Compliance (IWBC) (9001 State Road, Philadelphia, PA 19107).

C.3 SUMMARY OF WORK

The contractor shall furnish all labor, qualified personnel, supervision, tools, equipment, and materials necessary to perform the services described herein.

C.4 OBJECTIVES/TASKS

• Maintain full compliance with PWD requirements through regular, annual inspections/testing of all covered devices.

• Provide responsive maintenance and repair for devices found non functional or non compliant.

• When additional protection is required to meet code, submit installation proposals for Government review and approval.

• Ensure all work is performed by City Certified Backflow Prevention Technicians (Domestic or Fire, as applicable).

140P4226Q0059

Testing & Certification (Actions First)

• Annual Testing: Perform annual functional tests and certification for every covered backflow prevention device or air gap separation, using appropriate City certified technicians (Domestic or Fire). Submit results to PWD IWBC and provide copies to the COR. Maintain detailed testing logs (device ID, make/model, size, location, pass/fail, corrective actions) for three (3) years.

• New Devices: Test any newly installed devices prior to service initiation.

Maintenance & Repair

• Fault Identification: Identify faulty or non-compliant devices via inspection or reported issues.

• Corrective Actions: Repair or replace faulty devices with PWD approved equipment installed per manufacturer instructions and applicable codes. Perform final verification tests post work and document the results.

• Proposals for New/Replacement Devices: When repair is infeasible or protection is missing, submit a written proposal

(device type/spec, cut sheets, installation method, schedule, cost) for COR approval prior to work.

C.5 OTHER INCIDENTAL WORK

Device Inventory (Park-Wide Table)

The following locations are confirmed to have backflow preventers and are covered under this contract. The Contractor shall verify and complete the inventory with device-specific details (size, type, serial number, device location, last inspection date, next due date) during initial mobilization and keep it current thereafter.

Device ID

(TBD)

Park-Referenced Location Address

Water Service Address

Device Physical Location

Size / Spec / Type

Domestic / Fire

Make / Model

Serial No.

Last Test Date

Next Due Date

Status

TBD-001 Thaddeus Kosciuszko National Memorial

301 Pine St., Philadelphia, PA 19106

Same TBD TBD TBD TBD TBD TBD TBD Active

TBD-002 Merchant Exchange Building

143 S. 3rd St., Philadelphia, PA 19106

Same TBD TBD TBD TBD TBD TBD TBD Active

TBD-003 313 Walnut Street Philadelphia, PA 19106 Same TBD TBD TBD TBD TBD TBD TBD Active

TBD-004 City Tavern 138 S. 2nd St., Philadelphia, PA 19106

Same TBD TBD TBD TBD TBD TBD TBD Active

TBD-005 LEOC / Chiller Plant 140 S. 3rd St., Philadelphia, PA 19106

Same TBD TBD TBD TBD TBD TBD TBD Active

TBD-006 Second Bank 420 Chestnut St., Philadelphia, PA 19106

Same TBD TBD TBD TBD TBD TBD TBD Active

TBD-007 Independence Hall 520 Chestnut St., Philadelphia, PA 19106

Same TBD TBD TBD TBD TBD TBD TBD Active

TBD-008 Deshler Morris & Bringhurst Houses

Philadelphia, PA 19144 Same TBD TBD TBD TBD TBD TBD TBD Active

TBD-009 Liberty Bell Center 526 Market St., Philadelphia, PA 19106

Same TBD TBD TBD TBD TBD TBD TBD Active

TBD-010 Declaration House / Graff House

700 Market St., Philadelphia, PA 19106

Same TBD TBD TBD TBD TBD TBD TBD Active

TBD-011 Washington Square 210 W. Washington Sq., Philadelphia, PA 19106

Same TBD TBD TBD TBD TBD TBD TBD Active

TBD-012 Magnolia Garden 412 Locust St., Philadelphia, PA 19106

Same TBD TBD TBD TBD TBD TBD TBD Active

140P4226Q0059

Device ID

(TBD)

Park-Referenced Location Address

Water Service Address

Device Physical Location

Size / Spec / Type

Domestic / Fire

Make / Model

Serial No.

Last Test Date

Next Due Date

Status

TBD-013 Maintenance Facility 275 S. 5th St., Philadelphia, PA 19106

Same TBD TBD TBD TBD TBD TBD TBD Active

TBD-014 Benjamin Franklin Museum – Post Office

322 Market St., Philadelphia, PA 19106

Same TBD TBD TBD TBD TBD TBD TBD Active

TBD-015

Benjamin Franklin Museum – Underground

317 Chestnut St., Philadelphia, PA 19106

Same TBD TBD TBD TBD TBD TBD TBD Active

TBD-016 Independence Visitor Center

599 Market St., Philadelphia, PA 19106

Same TBD TBD TBD TBD TBD TBD TBD Active

TBD-017 Edgar Allan Poe House Philadelphia, PA 19123 Same TBD TBD TBD TBD TBD TBD TBD Active

(Locations originate from your “Back Flow Preventer List.xlsx”; device-level details will be completed by the Contractor and validated by the COR.)

Service Levels & Response Times (Outside Annual Cycle)

• Non-Emergency Suspected Failure (Domestic): On-site response within 1 business day of notification; corrective action within 10 business days unless long-lead parts or access constraints exist (communicated to COR).

• Fire Protection Devices / Main Service Hazards: On-site response within 8 business hours of notification; isolate and restore compliant protection as soon as practicable, with interim risk controls coordinated with COR.

• Immediate Hazard to Public Water Supply: Dispatch as soon as practicable; coordinate promptly with COR and, when required, PWD IWBC.

Communication & Coordination

• Maintain regular updates to the COR on progress, findings, and upcoming work.

• Shutdowns: Coordinate any planned water shutoff with the COR and provide a minimum two-week notice if park programs/business may be interrupted. Provide 72 hours’ notice before scheduled work for access/escort arrangements.

C.6 PLACE OF PERFORMANCE AND HOURS OF OPERATION

Work will occur across Independence National Historical Park properties at locations defined in the Device Inventory Table and subsequent schedules. Parking is in public areas at Contractor’s cost; public restrooms may be available (subject to COR direction). Avoid damage to property, collections, and historic materials. Coordinate water shutoff schedules with the COR.

Hours of Operation: Work shall be performed generally between 7:00 AM–4:30 PM, Monday–Friday, unless otherwise approved by COR. Early morning work is not permitted. Weekend/holiday work requires prior authorization in writing by the COR. Specific hours may be determined at award. If the NPS determines that the safety of visitors is threatened by the Contractor’s operations, all or part of the Contractor’s operations may be suspended until agreement is reached on additional safety measures and precautions. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

No work shall occur on the following Federal Holidays:

New Year’s Day – January 1st Martin Luther King Junior’s Birthday – Third Monday in January President’s Day – Third Monday in February

140P4226Q0059

Memorial Day – Last Monday in May Juneteenth – June 19th Independence Day – July 4th Labor Day – First Monday in September Columbus Day/Indigenous Peoples Day – Second Monday in October Veteran’s Day – November 11th Thanksgiving Day – Fourth Thursday in November Christmas Day – December 25th

Note - if any of the holidays stated above fall on a Saturday, the Friday before the actual day is the official day the Government takes for the holiday. If the holiday falls on a Sunday, the Monday after the actual day is the official day the Government takes for the holiday. These dates do not account for any other days or shorten days that may be added prior to any of the holidays mentioned above that may be added at the discretion of any Presidential Administration and implemented by the DOI.

• Special Events: COR will coordinate to minimize impacts during Park events.

C.7 SCHEDULING AND COORDINATION

The COR will be responsible for acting on behalf of the Contracting Officer (CO) on all matters of work within the scope of the contract. Approval of all work beyond the scope of the contract is reserved for the CO. The contractor is responsible for notifying the COR in writing all work that is beyond the scope of the contract.

Period of Performance:

Base Year 9/28/26 – 9/27/27 Option One 9/28/27 – 9/27/28 Option Two 9/28/28 – 9/27/29 Option Three 9/28/29 – 9/27/30 Option Four 9/28/30 – 9/27/31

C.8 INSPECTION

The NPS reserves the right to conduct any inspection it may deem necessary prior to acceptance and approval of payment, to ensure that all work conforms to the Statement of Work and any applicable standards, regulations, or laws.

C.9 GENERAL CONTRACTOR RESPONSIBLITIES

Deliverables & Quality Assurance Surveillance Plan (QASP) Deliverables (What the Contractor Must Submit)

1. Accident Prevention Plan – prior to mobilization.

2. Annual Testing Schedule – submitted before mobilization and updated as needed.

3. Completed Device Inventory Table – with all required fields (size, type, serial, device location, last test date, next due date).

4. Annual Test Certificates & Reports – device-by-device results; copies to COR; formal submittal to PWD IWBC.

5. Maintenance & Repair Reports – per incident/device, including corrective actions and final test results.

6. New/Replacement Device Proposals – when required to meet code (type/specs, cut sheets, installation method, schedule, cost).

7. Progress Reports – written updates within 2 business days after any on-site work.

140P4226Q0059

8. Shutdown Notifications – required advance notices (e.g., two weeks if programs may be impacted).

9. Final Acceptance Report(s) – per work package, confirming compliance and readiness.

10. Records Retention – maintain all testing/maintenance/compliance records for three (3) years and provide upon request.

Quality Assurance Surveillance Plan (QASP) How the Government will evaluate Contractor performance:

• Timeliness o Annual testing NLT September 30 each year.

o Response times met: Domestic (1 business day), Fire (8 business hours), immediate dispatch for public water hazards.

• Accuracy & Completeness o Inventory fully populated, validated, and kept current.

o Test/repair reports include device ID, location, size, type, make/model, serial, test results, and corrective actions.

• Compliance o Work performed by City-Certified technicians; meets PWD, OSHA, Park safety policies; test results submitted to PWD IWBC and COR.

• Communication o Regular updates to COR; required notices and immediate hazard/incident reporting are met.

• Quality of Work o Devices pass final acceptance testing; no damage to historic fabric or Park property; adherence to the Secretary of the Interior’s Standards.

Deliverable Packaging & Format

• All reports shall be digital (PDF or Word) and include device-level details. Inventory should be maintained in Excel and PDF formats, updated after each testing/repair cycle, and transmitted to the COR.

Notification & Reporting

• Provide a written progress report to the COR within 2 business days of any work performed and immediate notification of identified deficiencies, safety hazards, or incidents.

Inspection, Testing & Procedures

• Develop procedures consistent with industry best practices and regulatory requirements; ensure test reports are complete and submitted to PWD IWBC and the COR.

Quality Assurance & Control

• Implement a Quality Assurance program documenting all inspections, tests, maintenance, and corrective actions.

Final Acceptance

• Verify devices are fully operational and compliant; submit a Final Acceptance Report including device location, size, type, and inspection outcome for COR review and acceptance.

Records Retention

• Retain all testing/maintenance/compliance records for three (3) years and provide upon request.

140P4226Q0059

C.10 CONTRACTOR/EMPLOYEE QUALIFICATIONS

a) Philadelphia Water Department (PWD) Regulation 403 requires approved backflow protection on domestic and fire service connections, annual testing by City certified personnel, and submittal of test results to PWD Industrial Waste & Backflow Compliance (IWBC) (9001 State Road, Philadelphia, PA 19107).

b) Certified Personnel Assign only personnel holding appropriate city licenses and certifications for backflow testing and service. Proof must be submitted with quote as specified in section L.2 and after award provide credential documentation to the COR upon request.

C.11 SAFETY

1. The Contractor shall be responsible for the safe conduct of all operations, shall adhere to applicable OSHA standards (29 CFR 1910.266), and be subject to inspection by NPS Safety Officer.

2. During the execution of this contract, the Contractor must conform to the rules and regulations, as amended and as set forth by:

• 29 CFR 1910 – OSHA General Industry Regulations & Standards.

• National Park Service Occupational Safety and Health Program – Reference Manual 50B - Reference Manual 50B: NPS

Occupational Safety and Health Program

• Most Recent Superintendents Compendiums as amended:

Superintendent's Compendium - Independence National Historical Park (U.S. National Park Service)

• All Contractor or employee conduct is subject to park rules and regulations concerning: littering, wildlife harassment, collecting, resource damage and other topics as specified for the NPS in the Code of Federal Regulations title 36 (eCFR :: 36 CFR Part 2 -- Resource Protection, Public Use and Recreation).

• Comply with all local, state, and federal requirements for backflow prevention and potable water quality, including PWD guidelines and applicable OSHA standards. Follow Park safety policies (Hot Work, Lockout/Tagout, Construction Safety).

Where OSHA regulations and ANSI standards conflict, OSHA regulations will take precedence.

• Permitting & Federal Jurisdiction - Because INDE is a federal jurisdiction, City permits are generally not required, except for connections to water lines or street closures where applicable. All new work proposals will be reviewed under NHPA and NEPA prior to commencement; the COR will coordinate the Park’s interdisciplinary review.

• Work area shall always be maintained in a clean and safe condition.

• All personnel providing service on-site shall have pictured identification and uniform displaying the name of the company (if appliable).

• All on-site vehicles will also be marked with the company name (if applicable).

• Smoking of any kind will not be permitted on premises. The COR/POC may authorize the use of a designated smoking if requested.

• Contract employees shall not possess, distribute, consume, use or cause to be used any controlled substance or alcohol on the job site on Government property. Any employee using a controlled substance prescribed by a physician shall get written permission from the Contracting Officer to continue performance of assigned duties for this contract. Any contractor or contractor employee found to be in violation of this section will be permanently prohibited from the NPS property. Actions taken under this section shall not relieve the contractor of the requirement to provide sufficient personnel to perform adequate and timely service as required in this contract.

3. The contractor shall maintain the ability to contact 911 or, Park dispatch (215-597-7077) within 15 minutes in case of an emergency.

4. The Contractor shall ensure that any Contractor employee shall be in good health and free of any communicable disease prior to commencing work at this facility. The Contractor shall maintain and follow an exposure control plan for bloodborne pathogens in accordance with OSHA standard 29 CFR 1910.1030. Any necessary medical certificates, exams and treatments are at the expense of the Contractor.

C.12 PERSONAL PROTECTIVE EQUIPMENT (PPE)

1. The Contractor shall furnish personal protective equipment (PPE) to crew members respective of the type of work being https://www.nps.gov/subjects/policy/upload/RM-50B_Contents.pdf?msclkid=621da23cc59111ec9bbf5daecf70f928 https://www.nps.gov/subjects/policy/upload/RM-50B_Contents.pdf?msclkid=621da23cc59111ec9bbf5daecf70f928 https://www.nps.gov/inde/learn/management/compendium.htm https://www.ecfr.gov/current/title-36/chapter-I/part-2 https://www.ecfr.gov/current/title-36/chapter-I/part-2

140P4226Q0059 completed.

2. The contractor shall train workers in the safe operation and use of equipment that they will be using to accomplish the work under this contract. Occupation Safety & Health Administration (OSHA) standards PPE shall be followed; information can be found at OSHA PPE Standards.

3. PPE, including personal protective equipment for eyes, face, head, and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered in a manner capable of causing injury or impairment in the function of any part of the body.

4. Defective or damaged PPE shall not be used and shall be either repaired or replaced.

C.13 SAFETY PLAN

The Contractor shall provide a copy of their safety plan at the pre-work meeting. The Safety Plan shall be available to all employees and subcontractors working on the contract and subsequent task orders. The Safety Plan should cover at a minimum:

1. Name or responsible party to ensure program compliance.

2. Safety briefings covering the area working in, equipment being used, and any special considerations for the work under the contract.

3. Personal Protective Equipment required for the work under the contract.

4. Appropriate OSHA requirements for the type of work under the contract.

5. Weather considerations for the time of year of the contract.

6. Communication issues and locations of the nearest medical facilities to the job site.

7. Emergency numbers to contact if an accident happens.

8. Outline of the methods proposed to ensure property protection and safety of the public, National Park Service personnel, and

Contractor’s employees.

C.14 ACCIDENT REPORTING

1. Accident Reporting: Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of $100, and fires. Within 7 days of a reportable accident, send a report of the accident to the Contracting Officer.

2. All Other Accidents: The Contractor shall report all other accidents to the Contracting Officer as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.

3. The COR will provide the numbers for the rescue services to the contractor upon award.

C.15 FIRE PREVENTION AND PROTECTION

• Any accidental fire starts shall be reported immediately to COR and/or INDE Fire Management Fire Management. Should the fire exceed the size of a campfire and threaten workers safety, the contractor should depart the area and call 911 or INDE Fire Management Fire Management immediately.

• Hazard Control: Take all necessary precautions to prevent fire during construction. Keep flammable substances or materials at a safe distance from use of volatile or noxious substances.

• Smoking is prohibited in the work areas in sites designated for the contractor’s use. Designate a space away from the work area be used for smoking. Cigarette butts must be disposed of properly.

C.16 SECURITY

1. The contractor’s employees shall have personal identification on their person at all times while working at this project.

Employees working after normal working hours must check in with the on-duty NPS Law Enforcement Officer.

2. Any contractor-owned vehicle(s) used must meet established Philadelphia Department of Transportation and NPS regulations (e.g. safety, insurance, etc.). All vehicles will be identified with the contractor’s logo to facilitate easy identification.

140P4226Q0059

3. The contractor is responsible for safeguarding all Government property that they come in contact with during the performance of this contract. The contractor shall also be expressly responsible for safeguarding their property. At the close of each workday, facilities, equipment and supplies shall be secured.

4. The contractor shall be responsible for restoring any damaged property or equipment caused by the contractor. The restoration shall be to its original condition at no additional charge to the Government.

5. The Contractor, or any representative, and all contractor employees entering the Government reservation, shall abide by all security regulations of this installation which may be in effect during the contract period; and shall be subject to such checks as may be deemed necessary to insure that no violations occur. All contractor personnel shall follow any instructions given by the COR, and NPS Law Enforcement personnel in case of fire, hurricane or any other emergencies.

6. All Contractor personnel shall wear attire appropriate for the specific task. Clothing not to be worn tank tops, shorts, sandals, or other inappropriate clothing as determined by the Contracting Officer’s Technical Representative (COR). The contractor shall ensure that each employee or representative of the Contractor shall present a clean and professional appearance.

C.17 DRONES/UNMANNED AERIAL VEHICLE (UAV) USAGE

The use of drones and/or UAVs are not authorized at any NPS location during performance of this contract.

C.18 PROHIBITION OF WEAPONS/FIREARMS

18 USC 930 is Federal law that supersedes Section 512 of Public Law 111-24 and prohibits the possession of a firearm or other dangerous weapon in a Federal facility. Federal facilities are buildings or parts thereof owned or leased by the Federal Government, where Federal employees are regularly present for the purpose of performing official duties. No weapon or firearms are authorized within INDE at any time.

C.19 GENERAL COMMUNICATION REQUIREMENTS

• Contractor shall furnish a serviceable cellular telephone, radio, or other NPS-approved device while on- site to communicate with the National Park Service and to provide for the safety of the contract employees.

• If the Contractor’s employees do not speak English, the Contractor’s job site supervisor shall be fluent and conversant in both English and the language of their non-English speaking employees.

• The Contractor shall contact the COR/POC with project progress notifications prior to completion. The time frame for these progress notifications shall be coordinated in writing between COR/POC and Contractor, and maybe either daily, weekly, etc.

As the Contractor near the completion of the specified work, a site visit will be scheduled with the COR/POC to determine if the work has been successfully completed.

C.20 PROJECT MEETINGS

Prior to commencement of the Work a site visit will be scheduled by the COR/POC to ensure that the Contractor and project POC/COR visually identify and agree upon the Scope of Work to be accomplished under the contract. Other areas that may be discussed to develop mutual understanding relative to scheduling and administration of work performed under this contract.

• Correspondence procedures

• Designation of responsible personnel

• Labor standards provisions

• Changes

• Payments to Contractor

• Subcontractors

• National Park Service regulations

• Accident prevention program (including name of responsible Supervisor)

140P4226Q0059

• Accident reporting

• Documents required under the contract

• Park rules and regulations

• Park Access

• Working hours and days

• Safety program (compliance with the "Accident Prevention" clause of the General Provisions)

• Tentative work schedule.

C.21 RESOURCE DAMAGE

All conduct outside of the specified work is subject to park rules and regulations concerning littering, wildlife harassment, collecting, resource damage and other topics as specified for the NPS in the Code of Federal Regulations title 36, which can be found at http://www.gpoaccess.gov/ecfr/

C.22 IDENTIFICATION OF CONTRACTOR EMPLOYEES

All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor personnel not required to obtain and wear badges in the performance of this service.

In accordance with AP&P 1443.37-1 the following requirements will be applicable to any and all on-site contractor personnel:

a) Contractor personnel should not in any way represent themselves as government employees. Contractor personnel shall wear badges clearly identifying them as contractors when working outside of government office space. Badging should be visible at all times. In addition, contractor personnel shall dress in clothing appropriate to the office/environment in which they are working.

b) Government office space occupied by contractor personnel shall be clearly labeled with the individual’s name and/or company affiliation.

c) Contractor personnel shall be clearly identified as “contractors” in printed material such as telephone directories, etc. They shall be listed separately on organization charts or any other document that shows direct lines of supervision.

d) Contractors shall provide proper identification when making phone calls or speaking to others during performance of their scope of services. This means they shall indicate to the other party that they are a contractor, rather than a government employee.

e) Contractor personnel shall complete all necessary computer and security training/documentation before receiving access to the NPS computer network.

f) Contractor personnel shall not receive "all-employee" e-mail or other communications intended for NPS employees, unless it relates directly to the work the contractor is doing for the NPS or involves health or safety issues, for example security alerts or severe weather conditions. They shall not have access to internal NPS web pages, unless it relates directly to the work the contract employee is doing for the NPS.

g) Contractor personnel may use NPS e-mail systems when it is required to perform the work the contractor is doing for the NPS. The e-mail addresses of the contractor must include a label that identifies their contractor status (e.g. John Doe contractor would have an e-mail address john_doe@contractor.nps.gov). In addition, contractor personnel shall indicate in their e-mail signature block that they are a contractor and the contractor for whom they work. Doing so clearly identifies this individual each time they send an e-mail message using the NPS system, and it identifies their status as a contractor employee in the e-mail directory.

h) Unless stipulated in the contract, contractor personnel shall not drive government vehicles.

i) Contractor personnel are not authorized to purchase property and supplies with government funds.

j) Generally, all Government-furnished property shall be set forth in the contract or agreement; however, when it is not, use of additional property must be approved, in advance, by the CO.

k) Contractor personnel shall not be invited to official NPS “social” events, functions, meetings, or orientation tours which are not specific to the contract. However, attendance of contractor personnel at staff meetings, which convey some benefit in the contractor personnel performing their contractual duties, is allowed at the discretion of the CO.

l) Contractor personnel must sign appropriate agreements to protect sensitive, privileged and confidential information.

http://www.gpoaccess.gov/ecfr/

140P4226Q0059

C.23 THE ROLE OF GOVERNMENT PERSONNEL AND RESPONSIBILITY FOR CONTRACT ADMINISTRATION

1. Contracting Officer: The Contracting Officer (CO) has overall responsibility for the administration of this contract. The CO alone, without delegation, is authorized to amend, modify, or deviate from the contract. Other responsibilities may be delegated to authorized representatives.

2. Contracting Officer's Representative (COR): The COR will be designated in writing at the time of award to assist the CO in the day-to-day on-site administration of the contract requirements. The responsibilities of the COR include, but are not limited to;

(A) Determining the compliance and adequacy of performance by the Contractor in accordance with the terms and conditions of this contract;

(B) Requesting removal of unsuitable contractor employees;

(C) Ensuring adequacy of schedule and Quality Control Plan, including changes;

(D) Ordering re-performance of unacceptable work or performance by other mean, etc.

3. Point-of-Contact (POC): The POC will be used if an official certified COR cannot be designated at the time of award. The POC will not be designated in writing and will assist the CO in the day-to-day on-site administration of the contract requirements.

4. Access & Escorts: Provide escorted access via NPS staff for Contractor while inside Park buildings unless the Park approves unescorted access via an NPS approved federal background check and credentials; practicality will be determined by the

COR.

C.24 INTERRUPTION OF WORK

ENVIRONMENTAL - The Contracting Officer, by issuance of a stop work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions or fire danger. The Contractor shall be given a resume work order, which shall document the date the stop work order ended. An allowance has been included in the contract time for short-term environmental delays up to one day at a time. The count of contract time shall therefore continue during stop work of one day or less, but the count of contract time shall stop during stop work orders in excess of one day at a time. All periods of stop work by the Government shall be documented. Actions taken under this paragraph shall be subject to Special Clause 1 – Stop Work.

C.25 ENVIRONMENTAL REGULATIONS

All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by their subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to:

• Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards;

• Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ);

• Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);

• Endangered Species Act, as amended (16 U.S.C. Sec 1531 ET SEQ);

• Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ);

• National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ);

• Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ);

• Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ).

Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.

140P4226Q0059

C.26 PRESERVATION OF HISTORICAL/ARCHEOLOGICAL/CULTURAL RESOURCES

1. Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of terrain because of any Federal construction project.

2. The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, cultural, or archeological data the contractor must notify the CO and COR in writing within 24 hours of first discovery. The notification must indicate time of discovery, the nature of the findings and location.

3. Immediately stop work if paleontological, archaeological, or historical remains (including burials or skeletal material) are encountered, until work is permitted to resume by written order from the CO. the contractor must notify the CO and COR in writing within 24 hours of first discovery. The notification must indicate time of discovery, the nature of the findings and location. The CO and/or COR will notify the Regional Archaeologist, so the provisions of 36 CFR 800.7 (Resources Discovered During Construction) and other relevant laws are followed. Work in other areas may proceed as approved by the

CO.

4. Where appropriate by reason of discovery, the CO may order delays in the time of performance and/or changes in the work.

If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract.

5. The Contractor must insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.

C.27 HAZARDOUS MATERIALS

Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .