This is a Request for Quote (RFQ) from the National Park Service (NPS) for repair and maintenance of stormwater structures and pervious pavement at Rock Creek Park in Washington, DC. The solicitation is a 100% small business set-aside with a NAICS code of 561730 and a small business size standard of $9.5 million. The contract period is from September 23, 2025 to September 22, 2026, with a total project area of approximately 4.5 miles of pervious trails and parking lot pavement spanning about 228,400 square feet.
Key requirements include monthly inspection, cleaning, debris removal, and maintenance of pervious pavement and stormwater structures. Offerors must submit technical proposals demonstrating relevant experience, technical approach, and key personnel qualifications. The evaluation will be lowest price technically acceptable (LTPA), with technical factors including relevant experience, technical approach, and key personnel. Quotes are due by September 22, 2025 at 12:00 PM EST, submitted electronically to Bophany Drakeford. A pre-proposal site visit is scheduled for September 10, 2025 at 9:00 AM ET at the Rock Creek Park Maintenance Yard. The government intends to award a firm-fixed price contract based on the most advantageous offer.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
PCR
Washington DC 20242-0001 1100 Ohio Drive SW Contracting Anne Acquisition Management Division NPS, NCR - Regional Contracting
0011282952 CODE 16. ADMINISTERED BYCODE
X
X
X
561730
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED ORPCR
REQUEST FOR
PROPOSAL
(RFP)
INVITATION
FOR BID (IFB)
10. THIS ACQUISITION ISCODE
REQUEST FOR
QUOTE (RFQ)
14. METHOD OF SOLICITATION
13b. RATING
NORTH AMERICAN INDUSTRY
CLASSIFICATION STANDARD
(NAICS):
SMALL BUSINESS
09/22/2025 1200 ED
09/04/2025
2026196357Bophany Drakeford (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140P3025Q0043
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 60 0044014766OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
Washington DC 20008-1207 3545 Williamsburg Lane, NW NPS, Rock Creek Park
15. DELIVER TO
Washington DC 20242-0001 1100 Ohio Drive SW Contracting Anne Acquisition Management Division
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$9.5
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FREE ON BOARD
(FOB) DESTINATION UNLESS
BLOCK IS MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS THIS CONTRACT IS A RATED
ORDER UNDER THE DEFENSE
PRIORITIES AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
8(A)
NPS, NCR - Regional Contracting
WOMEN-OWNED SMALL
BUSINESS (WOSB)
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Delivery: 09/22/2026 Period of Performance: 09/23/2025 to 09/22/2026
00010 Repair and Maintenance of Stormwater Structures and Pervious Pavement Product/Service Code: R499 Product/Service Description: SUPPORT-
PROFESSIONAL: OTHER
Continued ...
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
X
XX
DATED
Bophany Drakeford
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Government Use Only)
OFFER
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT: REFERENCE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 11/2021) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
60 2 of
REFERENCE NO. OF DOCUMENT BEING CONTINUED
Solicitation 140P3025Q0043
PAGE OF
3 | 60
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested, and a written solicitation will not be issued.
(ii) This announcement constitutes the only solicitation issued as a Request for Quote under 140P3025Q0043.
(iii) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2025-05 and are available in full text through Internet access at https://www.acquisition.gov.
(iv) This is a 100% Total Small Business Set-Aside for the North American Industry Classification System (NAICS) code 561730 Landscaping Services, and the small business size standard is $9.5 million.
(v) See Schedule B for list of line-item numbers.
(vi) The work to be performed consists of landscaping service for approximately 4.5 miles of pervious trails and parking lot pavement located at Rock Creek Park and Fort Reno Park as specified in the Performance Work Statement attachment. The pervious surface area is approximately 228,400 square feet. The work will includes but it is not limited to the following: inspection of pavement, clean and collect debris and sediment, dry out any moist areas, if moss is observed, use a lime mortar mix to kill moss, vacuum clean surface, mulch and maintain and repair stormwater structures and pervious pavement monthly.
(vii) Period of Performance will be 9/23/2025 – 9/22/2026.
(viii) The provision at 52.212-1, Instructions to Offerors-Commercial Products and Commercial Services, and any addenda to the provision applies to this acquisition.
(ix) The provision at 52.212-2, Evaluation-Commercial Products and Commercial Services and technical evaluation criteria stated applies to this acquisition.
(x) Offerors shall include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications- Commercial Products and Commercial Services, with its offer.
(xi) The clause at 52.212-4, Contract Terms and Conditions-Commercial Products and Commercial Services, and any addenda to the clause applies to this acquisition.
(xii) The clause at 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders- Commercial Products and Commercial Services applies to this acquisition.
(xiii) DOL Service Wage Determination (WD) No. 2015-4281 (REV. 34) dated 7-8-2025 applies to this acquisition.
(xiv) To be considered for award, offerors shall be registered in System for Award Management (SAM.gov) at time of proposal submission under the appropriate NAICS code.
(xv) Proposals are due by September 22, 2025, at 12:00 PM EST to Bophany_drakeford@nps.gov.
(xvi) The Point of Contact for this solicitation is Bophany Drakeford. All questions relating to this solicitation are due by September 12, 2025, to Bophany_drakeford@nps.gov.
https://www.acquisition.gov/far/subpart-12.6#FAR_Subpart_12_6 http://www.acquisition.gov/ https://www.acquisition.gov/far/subpart-52.2#FAR_52_212_1 https://www.acquisition.gov/far/subpart-52.2#FAR_52_212_2 https://www.acquisition.gov/far/subpart-52.2#FAR_52_212_3 https://www.acquisition.gov/far/subpart-52.2#FAR_52_212_4 https://www.acquisition.gov/far/subpart-52.2#FAR_52_212_5 mailto:Bophany_drakeford@nps.gov mailto:Bophany_drakeford@nps.gov
PAGE OF
4 | 60
PART I – THE SCHEDULE
SECTION B - PRICE SCHEDULE
B.1 PRICE SCHEDULE
Offerors are required to completely fill out the below Price Schedule and return it with their proposal.
REPAIR AND MAINTENANCE OF STORMWATER STRUCTURES
AND PERVIOUS PAVEMENT AT ROCK CREEK PARK
LINE
ITEM DESCRIPTION QUANTITY UNIT UNIT
PRICE TOTAL
PRICE
CLIN
00010A Labor 1 L.S.
00010B Equipment 1 L.S.
00010C Materials 1 L.S.
CLIN
00010D Other Direct Costs 1 L.S.
TOTAL
B.2 SUPPLIES AND/OR SERVICE TO BE FURNISHED
The contractor shall furnish all labor, supervision, materials, supplies, equipment and transportation necessary to complete the service for the repair and maintenance of stormwater structures and pervious pavement as specified in the Performance Work Statement and attachments.
The offeror shall field verify all required quantities, materials, equipment and labor necessary to successfully perform and complete the work identified in this solicitation or through award.
(End of Section)
PAGE OF
5 | 60
SECTION C – STATEMENT OF WORK
C.0 NATIONAL PARK SERVICE
The National Park Service (NPS) is a bureau of the U.S. Department of the Interior (DOI) that has been entrusted with the care of our national parks since 1916. The NPS preserves unimpaired natural and cultural resources, and values of the National Park System for the enjoyment, education, and inspiration of this and future generations.
The NPS cooperates with partners to extend the benefits of natural and cultural resource conservation and outdoor recreation throughout this country and the world.
The NPS - National Capital Area (NCA) supports natural wonders to man-made marvels in Virginia, West Virginia, Maryland, and the District of Columbia. The NCA parks include Antietam National Battlefield, Catoctin Mountain Park, Chesapeake & Ohio Canal National Historical Park, George Washington Memorial Parkway, Harpers Ferry National Historical Park, Manassas National Battlefield Park, Monocacy National Battlefield, National Capital Parks - East, National Mall and Memorial Parks, Potomac Heritage National Scenic Trail, President’s Park, Prince William Forest Park, Rock Creek Park, and Wolf Trap National Park for the Performing Arts.
C.1 BACKGROUND
Rock Creek Park (ROCR) is a 1,754-acre city park located in the nation’s capital of Washington, DC. Rock Creek Park has several open-play tennis courts, 13 miles of bridle trails, 32 miles of hiking trails, Rock Creek Park Golf Course, the Carter Baron Amphitheater, Meridian Hill, Nature Center and Planetarium, several Civil War, and historic sites.
For more detailed and general information checkout the website at: Rock Creek Park (U.S. National Park Service)
C.2 PURPOSE
The National Park Service (NPS), a bureau of the Department of Interior (DOI), proposes to procure landscaping/grounds maintenance service for the repair and maintenance of stormwater structures and pervious pavement of Rock Creek Park in accordance with the attached documents.
C.3 PERIOD OF PERFORMANCE / DELIVERY DATE
The anticipated period of performance is 9/23/2025 to 9/22/2026.
C.4 SPECIAL PROJECT SPECIFICATIONS
All specific details, requirements are listed in Section J and are considered part of the overall requirements, in addition to everything stated in Section A-J on the award, and K-M in the solicitation.
The work to be performed under this contract consists of services to as specified in the Performance Work Statement and attachments. The work includes but is not limited to the following:
Permeable Pavement Maintenance Permeable Pavement Repairs Inspect, Repair and Maintain Stormwater Structures
C.5 GOVERNMENT PROVIDED INFORMATION
• Photos and Maps, if applicable
• Wage Determination https://www.nps.gov/rocr/index.htm https://www.nps.gov/rocr/index.htm
PAGE OF
6 | 60
C.6 CONTRACTOR AND PRODUCT ADDITIONAL REQUIREMENTS
• The contractor is responsible for adherence to all Occupational Safety and Health Administration (OSHA) Regulation, specifically 29 CFR 1910 - General Industry and applicable State Regulations.
• Contractor shall be responsible for obtaining all required permits, at no additional cost to the Government (if applicable) and scheduling all applicable inspections. All inspections must be signed off on by the COR and completed prior to receipt of final payment.
• All applicable submittals required, which may include warranty, production information, operation, and maintenance documentation, etc. as defined throughout various sections and specifications must be provided to COR and CO prior to submission of final invoice. Invoice will be rejected until the required documentation is submitted. Please refer to Section J for all additional documents.
• All trash and debris removal must be in accordance with local, state, and federal regulations.
• All materials are to be installed per manufacturer’s installation guidance.
C.7 HOURS OF OPERATION
Normal operational hours are from 7:00 am to 5:00 PM ET, Monday through Friday.
No work shall occur on weekends or the following Federal Holidays:
New Year’s Day – January 1st
Martin Luther King Junior’s Birthday – Third Monday in January President’s Day – Third Monday in February Memorial Day – Last Monday in May Juneteenth – June 19th Independence Day – July 4th
Labor Day – First Monday in September Columbus Day/Indigenous Peoples Day – Second Monday in October Veteran’s Day – November 11th
Thanksgiving Day – Fourth Thursday in November Christmas Day – December 25th
Note - if any of the holidays stated above fall on a Saturday, the Friday before the actual day is the official day the Government takes for the holiday. If the holiday falls on a Sunday, the Monday after the actual day is the official day the Government takes for the holiday. These dates do not account for any other days or shorten days that may be added prior to any of the holidays mentioned above that may be added at the discretion of any Presidential Administration and implemented by the DOI.
C.8 SITE MANAGEMENT
Maintain walkways, driveways, roads, parking, and project site to be free of all demolition debris, equipment, and materials daily. Always maintain site free of hazards. Occupancy access shall be negotiated on a project specific basis. Maintain the level of access provided to the facility through the project duration if tenant occupancy is retained. Safety equipment, fencing and barriers shall be installed per safety plan. Erosion control and sedimentation structures shall be constructed in according with EPA standards as needed. All historical and/or archeological issues shall be addressed as needed and stated in the contract and its attachments.
C.9 RECYCLING AND DISPOSAL OF REFUSE
Except for materials specifically indicated or specified to be salvaged for reuse, or turned over to the Government;
all refuse, excess or waste materials resulting from demolition operations shall become the property of the contractor (excluding native vegetative and soil debris) and shall be recycled and/or disposed of. All disposals shall be in accordance with federal, state, and local laws and regulations. No disposal, viewing or sale of materials and/or equipment shall be allowed on Government property.
PAGE OF
7 | 60
C.10 SAFETY
During the execution of this contract, the Contractor must conform to the rules and regulations, as amended and as set forth by:
• 29 CFR 1910 - OSHA Occupational Safety and Health Standards
General Requirements:
Compliance with Reference Manual 50B (RM-50B), NPS Occupational Safety and Health Program, Section 7.0 Contractor Safety: Contractor Safety program responsibilities shall be considered during the requirements development phase of the acquisition. The CO, COR, and other park staff consulted with the certified Safety Officer, for guidance on RM 50B requirements. A comprehensive safety assessment was performed to assure any necessary requirements above and beyond existing federal or state safety and health codes are written into the contract specifications. The COR or park representative provided the name of the certified Safety Officer to the CO. The CO then consulted with the Safety Officer on contract clauses and special conditions. The CO shall ensure contractor compliance with all safety requirements throughout contract performance.
• Work area shall always be maintained in a clean and safe condition.
• All personnel providing service on-site shall have pictured identification and uniform displaying the name of the company (if appliable).
• All on-site vehicles will also be marked with the company name (if applicable).
• Use of barricades, ropes, signs, or audible signals is required, and the contractor must take all necessary precautions for the protection of the work, property, and safety of the public.
• Any accident or incident, regarding the work under this contract, shall be reported immediately, in writing, to the Contracting Officer.
• Smoking of any kind will not be permitted on premises. The COR/POC may authorize the use of a designated smoking area, if requested.
Safety Officer responsibilities include the following:
• Provide technical assistance to contracting officer, the contracting officer’s technical representative and project author in administration and enforcement of appropriate safety and health codes.
• Review all bidding packages, proposals and/or quotes to certify compliance with safety and health codes.
• Review all contractor-documented safety plans for completeness and competency.
• Attend safety meeting with contractor to review additional safety requirements before work begins.
• Conduct periodic formal and informal inspections of the worksite. Inspections can be both announced and unannounced.
Contracting Officer responsibilities include the following:
• Secure appropriate safety officer’s name on all bid packages prior to announcement, certifying all safety clauses (FAR, as well as special conditions), have been included.
• Seek participation of safety officer in pre-award meetings or briefings.
• Consider safety officer’s rating of all responsive bidders’, offerors and/or quoters documented safety plans in the award of contract.
• Meet with COR, safety officer and contractor to discuss work-site safety before authorizing work to begin.
• Transmit notices of unsafe or unhealthful conditions to contractor and ensure that corrective action is taken within established timeframe.
• Check to see all manufacturers’ specifications, operations manuals or other safety data has been provided to safety officer before certifying final payment.
• Receive certification of occupancy from safety officer before releasing contractor and facility for use.
C.11 FIRE CONTROL
Contractor's Responsibility for Contractor-Caused Fires. The contractor, whether or not directed by the NPS, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by contractor's employees, whether set directly or indirectly as a result of contractor operations.
PAGE OF
8 | 60
The contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the contractor's employees or resulting from contract operations.
• Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material must be stored either in a separate building used exclusively for such storage, or at a site when all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the NPS when unusually hazardous conditions exist.
• Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed fromwithin a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.
C.12 TEMPORARY FACILITIES
A. STAGING AREA: The contractor shall arrange the location for exterior stockpiling of materials (i.e. storage) with the COR/POC. The contractor must be present when any materials are delivered to ensure proper placement within the designated location. The Government will provide an adequate staging area as close to the site as practicable. The Government will NOT provide any secured storage/staging areas for the contractor. The contractor shall be responsible for protecting materials stockpiled against adverse weather, damage, theft, and other risks of loss. The Government assumes no responsibility for material or equipment left in the storage area. Barbed wire or razor wire is not permitted to be used for security purposes for this requirement.
B. SANITARY FACILITIES: Toilet facilities will not be provided by the Government.
C. WATER, AND ELECTRICITY: Water and electricity will not be provided by the Government.
D. TELEPHONE: The Contractor may elect to hook-up commercial phone services using the local telephone service provider, at no cost to the Government. Cell phone or wireless access may or may not be available at the work site.
C.13 LANDSCAPE PRESERVATION
During the execution of this contract, the Contractor must conform to the performance work statement and rules and regulations.
A. The contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
B. Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
C. Pollutants such as fuels, lubricants, bitumen’s, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or wastewater from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
D. Temporary Erosion and Sedimentation Control: Provide effective erosion control measures to prevent soil erosion and discharge of soil-bearing water runoff at the earliest feasible stage of performance. Regularly inspect and maintain the measures in effective working order. Promptly stop work in area(s) of any ineffective erosion control measures.
E. Damage: Protect adjacent vegetation, property, structures, and improvements from damage.
F. Hazardous Materials: Perform any hazardous materials work in strict accordance with governing hazardous materials regulations. Workers shall be knowledgeable and well trained in the handling of project-specific hazardous materials.
PAGE OF
9 | 60
G. Spill Control: Provide effective spill containment measures at the earliest feasible stage of performance.
Regularly inspect and maintain the measures in effective working order.
C.14 EXISTING UTILITIES
The contractor shall field verify all utility locations before digging or trenching. This shall include but not be limited to the use of sonic, electronic, or magnetic detection devices, by noting pull box and utility box locations at the surface, use of locator services, and by test pitting at no additional cost to the Government. The contractor shall be responsible for repairing any utilities damaged during performance at no additional cost to the Government.
C.15 ENVIRONMENTAL REGULATIONS
All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by their subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to:
• Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards;
• Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ);
• Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);
• Endangered Species Act, as amended (16 U.S.C. Sec 1531 ET SEQ);
• Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ);
• National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ);
• Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ);
• Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ).
Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.
C.16 PRESERVATION OF HISTORICAL/ARCHEOLOGICAL/CULTURAL RESOURCES
A. Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of terrain because of any Federal project.
B. The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, cultural, or archeological data the contractor must notify the CO and COR in writing within 24 hours of first discovery. The notification must indicate time of discovery, the nature of the findings and location.
C. Immediately stop work if paleontological, archaeological, or historical remains (including burials or skeletal material) are encountered, until work is permitted to resume by written order from the CO. the contractor must notify the CO and COR in writing within 24 hours of first discovery. The notification must indicate time of discovery, the nature of the findings and location. The CO and/or COR will notify the Regional Archaeologist, so the provisions of 36 CFR 800.7 (Resources Discovered During Performance) and other relevant laws are followed. Work in other areas may proceed as approved by the CO.
D. Where appropriate by reason of discovery, the CO may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract which are incorporated by reference at the Task Order Level.
E. The Contractor must insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.
C.17 HAZARDOUS MATERIALS
Any material suspected of being hazardous that is encountered during performance of a project shall immediately
PAGE OF
10 | 60 be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed.
If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract.
The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize, or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation, or coating. Non-friable asbestos containing materials do not normally release airborne asbestos fiber during routine handling and end-use.
However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR 1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new projects.
C.18 HAZARDOUS MATERIAL IDENTIFICATION
Submit Safety Data Sheet (SDS)’s as required per 29 CFR 1910.1200 as amended. The contractor must provide one digital copy of each SDS for applicable hazardous chemicals used and/or provided in performance of any work under this contract.
C.19 MATERIAL & EQUIPMENT TRANSPORTATION, HANDLING AND STORAGE
A. Contactor shall have a representative on site to receive material deliveries, and the contractor shall remain responsible for all material deliveries whether their representative is on site at the time of delivery or not.
B. Government-owned equipment is not available for Contractor’s use to accomplish any work, and Government buildings and other facilities are not available for storage of Contractor’s materials, equipment, and tools.
C. Transport, handle, and store materials and equipment in accordance with the manufacturer’s written instructions, and in a secure manner.
D. Store products that are subject to damage by the elements, under cover in a weathertight enclosure above ground, with ventilation adequate to prevent condensation. Protect liquids from freezing.
E. Promptly remove from the project site any materials or equipment that are damaged or are otherwise unsuitable.
C.20 DAMAGES
The Contractor shall assume all risks of injury to persons or property in connection with the performance of work under this contract shall indemnify and save harmless the Government against all claims, causes of action, cost and expense, because of bodily injuries, death, or damages to Property arising from all work activities of the Contractor.
If due to fault, neglect, dishonesty of the contractor, his agency or employees, loss or damage to government property is incurred during the performance of this contract, the contractor shall be responsible for the same. The government, at its option, in lieu of repayment, may require the contractor to replace at his own expense, all property as directed by the Contracting Officer.
C.21 PROJECT MANAGER/ON-SITE SUPERVISOR
The contractor shall provide a responsible Project Manager to represent the contractor in all matters pertaining to work under this contract. The Project Manager shall have the responsibility of overall supervision, quality control, cost estimating and be responsible for the management of all ongoing work. The Project Manager must be available in person, by telephone, or radio to respond to any and all problems during normal working hours. The
PAGE OF
11 | 60 response from the Project Manager must be within 1 hours after receiving the notification and should be in the same means as the request. Written follow up notification (via email is acceptable) must be provided to COR/POC within 24 hours, which confirms response.
The Project Manager shall be fluent in the English language to effectively communicate with the contractor’s employees and/or subcontractors as well as the COR and other Government personnel.
If the Project Manager is not present or absent due to illness or other reasons, the contractor shall provide an alternate Manager to manage and direct all contract personnel and operations. The alternate Manager shall possess the same qualifications as the Project Manager.
The proposed Project Manager must be the Project Manager responsible for the Contract after award throughout performance. If during the term of this contract, the contractor changes or replaces the Project Manager, the contractor must notify the COR and CO in writing within 3 business days of the proposed change, or as soon as possible if the departure was unplanned or unexpected.
C.22 ADDITIONAL REQUIREMENTS FOR CONTRACTOR AND PRODUCT INSTALLATION
The contractor is required to Comply with applicable requirements of all Occupational Safety and Health Administration (OSHA) Regulation, specifically 29 CFR 1910 - General Industry and 29 CFR 1926 – Construction.
C.23 BIOBASED AND SUSTAINABLE PRODUCTS
The contractor shall comply with the Federal Acquisition Regulation (FAR), the Agriculture Act of 2014, and the USDA BioPreferred Program to the extent practicable in the performance of this contract. In accordance with FAR 52.223-2, the contractor shall use USDA-designated biobased products where feasible and report qualifying purchases annually through the System for Award Management (SAM.gov).
To the extent practicable and reasonable, supplies and materials used in performance shall:
• Conform to applicable federal specifications and standards;
• Include biobased and recycled content products; and
• Support the goals of Executive Orders on sustainable acquisition.
A non-exhaustive list of biobased product categories potentially applicable to this contract includes: erosion control materials, mulches and compost, multipurpose cleaners, hand sanitizers, greases, and dust suppressants.
Contractors must submit biobased product reporting in SAM.gov no later than October 31 for the previous fiscal year (October 1 – September 30), as required under FAR 52.223-2. For additional information, visit:
https://www.biopreferred.gov https://www.biopreferred.gov/
PAGE OF
12 | 60
SECTION D - PACKAGING AND MARKING
A. All shipments of materials, equipment and/or supplies to the project site shall be addressed to the Contractor and not the Government. Preservation, packaging and packing shall be in accordance with standard practices for commercial packing.
B. Government personnel are not authorized to accept deliveries for the contractor, nor are they responsible for off-loading shipments. A contractor representative must be present to accept deliveries.
(End of Section)
SECTION E - INSPECTION AND ACCEPTANCE
E.1. FEDERAL ACQUISITION REGULATION (FAR) CLAUSES INCORPORATED BY REFERENCE
52.246-4 Inspection of Services – Fixed Price AUG 1996
(End of Section)
SECTION F - DELIVERIES OR PERFORMANCE
F.1. FEDERAL ACQUISITION REGULATION (FAR) CLAUSES INCORPORATED BY FULL TEXT
52.242-15 Stop-Work Order AUG 1989
F.2. PRINCIPAL PLACE OF PERFORMANCE
The effort required for this contract shall be performed at various locations throughout Rock Creek Park, Washington, DC.
Location of Pervious Pavement:
Rock Creek Park - Beach Drive NW from Shoreham Drive NW to Picnic Grove 10.
Rock Creek Park Multi-Use Trail – Broad Branch Road NW to P Street NW Ramp.
Fort Reno Park.
Locations of Structures:
Rock Creek Park – Beach Drive NW from Shoreham Drive NW to Picnic Grove 10.
Rock Creek Park Multi-Use Trail – Broad Branch Road NW to P Street NW Ramp.
Fort Reno Park.
Bingham Drive NW, east of Oregon Avenue NW.
PAGE OF
13 | 60
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 POST AWARD CONFERENCE/PROJECT KICK-OFF MEETING
After the receipt of award, the CO/CS shall arrange a meeting with the COR, relevant park staff, and the contractor to discuss the contract terms and work performance requirements. The meeting date(s) and location(s) of the conference will be mutually agreed upon and may be held via Microsoft Teams, onsite, or a combination of both.
G.2 GOVERNMENT FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the “Government Property” FAR clause contained elsewhere in the contract.
Item No.
Property Description Qty Location Date Available or Delivery Date
1 NONE
G.3 THE ROLE OF GOVERNMENT PERSONNEL AND RESPONSIBILITY FOR CONTRACT
ADMINISTRATION
Contracting Officer: The Contracting Officer (CO) has the overall responsibility for the administration of this contract. The CO alone, without delegation, is authorized to amend, modify, or deviate from the contract. Other responsibilities may be delegated to authorized representatives.
Contracting Officer's Representative (COR): The COR will be designated in writing at the time of award to assist the CO in the day-to-day on-site administration of the contract requirements. The responsibilities of the COR are solely those authorized by FAR 1.602-2(d)(5), DIAR clause 1452.201-70, AP&P 1443.01-06, and the COR Appointment Letter.
Point-of-Contact (POC): The POC will be used if an official certified COR cannot be designated at the time of award. The POC will not be designated in writing and will assist the CO in the day-to-day on-site administration of the contract requirements.
G.4 ADMINISTRATIVE CONTRACTING OFFICE
NPS, CONOPS National, NCR MABO 12795 West Alameda Parkway P.O. Box 25287 Denver, Colorado 80225
G.5. ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING
PLATFORM (IPP) (FEB 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice http://www.ipp.gov/
PAGE OF
14 | 60
Contractor’s Invoice.
1. Invoice to include description of work, location and period performed.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
G.6 NOTICE TO CONTRACTOR - CONTRACTOR PERFORMANCE ASSESSMENT REPORTING
SYSTEM (CPARS) (DEC 2015)
1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a) Contractor Representatives may then provide comments in response to the evaluation or return the evaluation without comment.
b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c) All information provided should be reviewed for accuracy prior to submission.
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6) The following guidelines apply concerning your use of the past performance evaluation:
mailto:IPPCustomerSupport@fiscal.treasury.gov https://www.cpars.gov/ https://www.cpars.gov/
PAGE OF
15 | 60
a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
G.7 NOTIFICATION OF SUBCONTRACTING
The contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement.
The subcontractor shall have the experience and be equipped for such work. The written notification shall be provided on Standard Form 1413 and must include as a minimum:
A. Prime Contract Number and Subcontract Number (if applicable) B. The name and address of the Prime Contractor.
C. The name and address of the subcontractor.
D. The date upon which the subcontract was entered into and its duration.
E. A detailed description of the work being subcontracted.
F. Project Name and Location of Work.
G. Identify the names of any intermediate subcontractors (if applicable) H. Must be signed by both Prime Contractor and Subcontractor
Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract, including any included through contract modification, if applicable.
PAGE OF
16 | 60
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1: KEY PERSONNEL
(a) The Contractor shall assign to this contract the following key personnel: Project Manager or On-site Supervisor
(b) During the first 30 days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 30-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 7 calendar days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 7 calendar days after receipt of all required information of the decision on substitutions.
H.2: RESTRICTIONS AGAINST DISCLOSURE
(a) The Contractor agrees, in the performance of this contract, to keep all information contained in source documents or other media furnished by the Government in the strictest confidence. The Contractor also agrees not to publish or otherwise divulge such information in whole or in part in any manner or form, or to authorize or permit others to do so, taking such reasonable measures as are necessary to restrict access to such information while in the Contractor's possession, to those employees needing such information to perform the work provided herein, i.e., on a "need to know" basis. The Contractor agrees to immediately notify in writing, the Contracting Officer, named herein, in the event that the Contractor determines or has reason to suspect a breach of this requirement.
(b) The Contractor agrees not to disclose any information concerning the work under this contract to any persons or individual unless prior written approval is obtained from the Contracting Officer. The Contractor agrees to insert the substance of this clause in any consultant agreement or subcontract hereunder.
H.3: INDEMNIFICATION
The contractor is an 'independent contractor' and shall obtain all necessary insurance to protect themselves from liability arising out of this contract. The contractor hereby agrees to indemnify and hold the Government harmless in connection with, any loss or liability from damage to or destruction of property or from injuries to or death of persons (including the agents and employees of both parties) if such damage, destruction, injury or death arises out of, or is caused by performance of work under this contract, unless such damage, destruction, injury or death is caused solely by the negligence of the Government, its agents or employees. The contractor agrees to include this clause, appropriately modified, in all subcontracts to be performed under this contract.
H.4: REQUIRED INSURANCE
The contractor shall procure and maintain insurance during the entire period of performance consistent with full text clause DIAR 1452.228-70 on page 22.
PAGE OF
17 | 60
PART II - CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Acquisition.GOV | www.acquisition.gov
The following contract clauses pertinent to this section are hereby incorporated by reference in accordance with FAR 52.252-2:
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.212-4 Contract Terms and Conditions – Commercial Products and Commercial
Services NOV 2023 52.222-4 Contract Work Hours and Safety Standards-Overtime Compensation MAY 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payroll and Basic Records JUL 2021 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.223-5 Pollution Prevention and Right-to-know Information MAY 2024 52.232-13 Notice on Progress Payments APR 1984 52.232-16 Progress Payments (ALT 1) MAR 2000 52.232-17 Interest MAY 2014 52.232-23 Assignment of Claims MAY 2014 52.243-4 Changes JUN 2007 52.249-4 Termination for Convenience of the Government (Services) APR 1984 52.249-8 Default (Fixed Price Supply and Service) APR 1984
DOI ACQUISITION REGULATION (DIAR) CLAUSES
1452.201-70 Authorities and Delegations SEP 2011 1452.203-70 Restrictions on Endorsements JUL 1996 1452.204-70 Release of Claims JUL 1996 1452.215-70 Examination of Records by the Department of the Interior APR 1984 1452.224-1 Privacy Act Notification JUL 1996 1452.227-70 Appeals of Use of Exceptions JUL 1996
FULL-TEXT CLAUSES
DIAR 1452.228-70 LIABILITY INSURANCE (JUL 1996)
(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer.
The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
https://www.acquisition.gov/
PAGE OF
18 | 60
$200,000.00 each person $500,000.00 each occurrence $20,000.00 property damage
(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed.