This solicitation is for construction services for crosswalk striping and roadway markings at National Mall and Memorial Parks in Washington, DC. The National Park Service seeks to apply thermoplastic to designated crosswalks and roadway areas to improve visibility. The base project includes crosswalk striping at various park locations, while optional line items cover additional areas such as Rock Creek Parkway, Lincoln Circle, and Buckeye Drive. Proposals are due by September 21, 2023, with award anticipated for a one-year period of performance from September 2022 to August 2024. The contractor must complete work within 120 days of notice to proceed and adhere to specifications for approved liquid thermoplastic and traffic marking paint. This set-aside opportunity is for small disadvantaged small business concerns.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040614211
NPS, NCR - Regional Contracting
Acquisition Management Division
1100 Ohio Drive SW Contracting Anne Washington DC 20242-0001
PCR
Bophany Drakeford 3016631482
1x 08/21/2023
140P3023R0029
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Attachment 1 - Map 1 Base Crosswalk and Line Thermoplastic
Attachment 2 - Map 2 Options Line Striping
Attachment 3 - Map 3 Option 1 Rock Creek Parkway 3200 feet
Attachment 4 - Map 4 Option 2 Lincoln Circle 1.48 mile
Attachment 5 - Map 5 Option 3 Buckeye Drive 1.86 mile
Attachment 6 - Specifications Federal Approved Liquid Thermoplastic
Attachment 7 - Specifications Setfast Traffic Marking Paint SDS
Attachment 8 - Specifications Setfast Traffic Marking Paint Traffic Zone Products
Attachment 9 - DOL WD DC20230002 effective 8-4-23
Attachment 10 - CAAC letter 2020-04 - Regarding Bonds
Attachment 11 - Construction Contract Administration
Attachment 12 - Biobased Certification
Attachment 13 - Proposal Submission Package
Attachment 14 - Subcontracting Percentage Worksheet
Attachment 15 - Price Sheet
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
3 120 calendar days and complete it within ________________ ________________ calendar days after receiving
09/21/2023
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 8/2014)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
NPS, NCR - Regional Contracting Acquisition Management Division
1100 Ohio Drive SW Contracting Anne Washington DC 20242-0001
PCR
Bophany Drakeford
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 8/2014) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 67
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140P3023R0029
This is a solicitation for construction service for Crosswalk Striping and Roadway Markings at
National Mall and Memorial Parks (NAMA) in accordance with the Statement of Work, map, and its attachments.
This solicitation is set-aside for Small
Disadvantaged Small Business concern.
The anticipated award will be a firm-fixed price contract to one responsible offeror who meets the requirements in accordance with the solicitation.
Proposals are due by September 21, 2023 at 5:00PM
ED to bophany_drakeford@nps.gov
All questions are due by September 7, 2023 at
5:00 PM ED to bophany_drakeford@nps.gov
Delivery: 120 Days After Notice to Proceed
Delivery Location Code: 0009060180
NPS, National Mall & Mem Parks
East Potomac Maintenance Yard
1100 Buckeye Drive, SW
Washington DC 20024-2000 US
Period of Performance: 09/22/2023 to 08/31/2024
00010 Base Items - NAMA Crosswalk and Line Striping
Product/Service Code: Z1LB
Product/Service Description: MAINTENANCE OF
HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
00020 Optional Item # 1 - Rock Creek Parkway
(Option Line Item)
Anticipated Exercise Date 12/31/2023
Product/Service Code: Z1LB
Product/Service Description: MAINTENANCE OF
HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
00030 Optional Item # 2 - Lincoln Circle
(Option Line Item)
Anticipated Exercise Date 12/31/2023
Product/Service Code: Z1LB
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 67
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140P3023R0029
Product/Service Description: MAINTENANCE OF
HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
00040 Optional Item # 3 - Buckeye Drive
(Option Line Item)
Anticipated Exercise Date 12/31/2023
Product/Service Code: Z1LB
Product/Service Description: MAINTENANCE OF
HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140P3023R0029
PAGE OF
5 | 67
PART I - THE SCHEDULE
SECTION B – PRICE SCHEDULE
National Park Service – National Capital Area
National Mall and Memorial Parks – East Potomac Maintenance Yard 500 Buckeye Drive SW, Washington, DC 20024
Item Description Unit Total No.
00010 Base Items: Crosswalk Striping Lump Sum $ 00020 Optional Item 1: Rock Creek Parkway Lump Sum $ 00030 Optional Item 2: Lincoln Circle Lump Sum $ 00040 Optional Item 3: Buckeye Drive Lump Sum $
TOTAL BASE AND OPTIONAL LINE ITEMS $
(Add CLIN 00010 thru CLIN 00040 for Total Base and Optional Line Items)
Lump Sum Quantities: These quantities denote one complete unit of work as required by or described in the contract including necessary labor, equipment, materials, and indirect costs to complete the job. They will not be measured.
FAR 36.204 Disclosure of the magnitude of construction projects
The Government’s total estimate is:
Between $250,000 and $500,000
6 | 67
SECTION C – STATEMENT OF WORK
C.0 NATIONAL PARK SERVICE
The National Park Service (NPS) is a bureau of the U.S. Department of the Interior (DOI) that has been entrusted with the care of our national parks since 1916. The NPS preserves unimpaired natural and cultural resources, and values of the National Park System for the enjoyment, education, and inspiration of this and future generations.
The NPS cooperates with partners to extend the benefits of natural and cultural resource conservation and outdoor recreation throughout this country and the world.
The NPS - National Capital Area (NCA) supports natural wonders to man-made marvels in Virginia, West Virginia, Maryland, and the District of Columbia. The NCA parks include Antietam National Battlefield, Catoctin Mountain Park, Chesapeake & Ohio Canal National Historical Park, George Washington Memorial Parkway, Harpers Ferry National Historical Park, Manassas National Battlefield Park, Monocacy National Battlefield, National Capital Parks - East, National Mall and Memorial Parks, Potomac Heritage National Scenic Trail, President’s Park, Prince William Forest Park, Rock Creek Park, and Wolf Trap National Park for the Performing Arts.
C.1 BACKGROUND
The NPS National Mall and Memorial Parks (NAMA) is America’s front yard in the heard of the nation’s capital that brings visitors face to face with larger-than-life presidents and visionaries, open park lands, and elaborate memorials honoring our nation’s veterans and military history. NAMA is visited by approximately 25 million visitors each year from around the world that want to experience the unique collection of structures and spaces honoring the nation, its democracy, and its citizenry.
The National Mall is a great swath of green in the middle of Washington, DC that stretches from the foot of the Unites States Capitol building to the Potomac River. Both inside, as well as, outside the boundaries of the National Mall there are numerous iconic monuments and memorials, and over 1,000 acres of greenspace in Washington, DC. NAMA is host and/or the backdrop to hundreds of events each year, from the Presidential Inauguration every four (4) years to the yearly National Independence Day Celebration and other large public events. Except for the Washington Monument, the National Mall and Memorial Parks is open 24/7 to the General Public.
The crosswalks and roadway markings are striped throughout the Park’s roads and over time become faded and worn due to weather and traffic. The faded markings make them nonfunctional for what they are intended to do;
which is to make crossings and parking areas both convenient and safe at locations with adequate visibility.
For more detailed and general information visit the park’s website at: National Mall and Memorial Parks (U.S.
National Park Service) (nps.gov)
C.2 PURPOSE
The DOI – NPS - NCA – NAMA has a new requirement to apply an approved Thermoplastic to the listed crosswalks and roadway areas throughout the park so that they are visible to pedestrians, motorists and cyclists.
Ensure that crosswalk and road markings are visible to motorists, particularly at night and adhere to the Manual on Uniform Traffic Control Devices (MUTCD) and ADA compliance. Crosswalks should not be slippery, create tripping hazards, or be difficult to traverse by those with diminished mobility or visual capabilities. Crosswalk materials must be installed to meet ADA compliance. This is a base project with three optional line items.
https://www.nps.gov/nama/index.htm
7 | 67
C.3 LOCATION OF WORK
Base project location is shown in Attachment 1 (Map 1 Base Crosswalk and Line Thermoplastic).
Optional Line Item’s location is shown in Attachment 2, Attachment 3, Attachment 4 and Attachment 5 that shows aerial pictures of routes that lists the crosswalk and roadway areas to be refurbished.
C.4 SCOPE OF WORK
Independently, and not as an agent of the Government, the contractor shall provide the National Park Service, with all labor, supervision, supplies, materials, equipment, travel and all other necessary items to perform the work described in this contract for the National Mall and Memorial Parks in accordance with this Statement of Work, maps, specifications and all attachments through this solicitation and award in order to ensure quality workmanship. The work shall include but is not limited to the following:
A. Using the Thermoplastic Federally Approved specifications (Attachment 6 Specifications Federal Approved Liquid Thermoplastic) as a guide, the contractor shall supply a product that meets or exceeds Federal Highway standards. And aerial picture documents; perform the necessary work to apply Thermoplastic to the designated crosswalks and roadway areas. This will include removing old markings as needed to ensure adherence to road surfaces. All work and signage will conform to the MUTCD.
B. Provide all necessary traffic control, safety and road signage needed to perform the work in this contract. (Per MUTCD, you are responsible for your own traffic control, you must submit a traffic control plan to the COR for approval before any work can begin)
C. Perform work during time when it will impact traffic the least. Work schedule will be coordinated with the Contracting Officer’s Representative (COR). Between 8p and 5a. Outside rush hour traffic hours.
D. Remove all waste, debris, equipment, and signage once work is done.
E. Some areas of pavement are uneven, pitted, and rough, Contractor will block, tape or stencil areas of concern to minimize Thermoplastic run out.
F. Contractor will discuss areas of concern with the COR before that area is refurbished. (You are the professional and know your products and limits)
G. During your inspection of ALL areas please make notes to areas that need swept, cleaned, scraped, pressure washed, and dried or any means necessary to insure a good clean bond.
H. Contractor must submit for approval documentation of products that will be used in this project.
I. Crosswalk materials must meet ADA compliance.
J. This project is base funded with options for 3 additional areas. Maps are included and details are shown on bid sheets for all areas.
This is a base project with three (3) optional line items as listed below.
Base project includes the following:
Attachment 1 MAP 1 page 1 - NAMA Headquarters area roadway and crosswalks
8 | 67
Attachment 1 MAP 1 page 2– Tennis Parking Lot area crosswalks, East Potomac Maintenance Yard Entrance crosswalks Attachment 1 MAP 1 page 3 – I-395 Ramp Buckeye Dr. SW crosswalks Attachment 1 MAP 1 page 4 – Buckeye Drive SW and Ohio Drive SW (River Side) crosswalks Attachment 1 MAP 1 page 5 – West Basin Drive SW, FDR Memorial crosswalks Attachment 1 MAP 1 page 6 – West Basin Drive SW, Independence Ave SW (Exit MLK) crosswalks Attachment 1 MAP 1 page 7 – Henry Bacon Drive NW, 23rd St NW, Constitution Ave NW Intersections crosswalks Attachment 1 MAP 1 page 8 – Tidal Basin Parking Lot, Maine Ave SW, Tidal Basin parking entrance, Tidal Basin parking exit crosswalks Attachment 1 MAP 1 page 9 – East Potomac Tennis Center, 1090 Ohio Drive SW crosswalks Attachment 1 MAP 1 page 10 – Lincoln Circle crosswalk Attachment 1 MAP 1 page 11 – Lincoln Circle both crosswalks
Optional Line Item 1- Rock Creek Parkway includes the following:
Repaint both East and West bound lanes from Thompson’s Boathouse to Peters Point. This shall include all traffic marking that are on the road including two (2) crosswalks at the entrance to the Boathouse.
Optional Line Item 2- Lincoln Circle includes the following:
Repaint both East and West bound lanes from Peters Point up to the start of Independence Drive. This shall include the traffic ramp exit from Arlington Bridge and the entrance ramp to Lincoln Circle/Parkway Drive.
This shall include all traffic marking that are on the road including five (5) crosswalks and seven (7) lane dividers.
Optional Line Item 3- Buckeye Drive, Jefferson Memorial includes the following:
Repaint all outer and center lane markings, three (3) crosswalks, two (2) turning arrows and lettering and center dividers.
C.5 PERIOD OF PERFORMANCE / DELIVERY DATE
The delivery date is 120 Calendar Days after Notice to Proceed (NTP) is issued. Please note there will be a Period of Performance End Date included in the award, only because the system requires us to have one. The actual performance is 120 Calendars Days after NTP is issued.
The Notice to Proceed will be issued upon approval of all required submittals. Construction Schedule below for submittal and formatting requirements.
Documents Required before and for the Pre-Construction Meeting in which it is anticipated the Notice to Proceed will be issued shortly thereafter.
Document Description Due Date 1 Performance and Payment Bonds 10 days after award 2 Certificate of Insurance (COI) 10 days after award 3 SF-1413 for each prime subcontractor 14 days after award 4 Project Manager Designation Letter 14 days after award 5 Site Safety Plan 18 days after award 6 Traffic Control Plan 18 days after award 7 Quality Control Plan 21 days after award 8 Waste Management Plan 21 days after award 9 Construction Schedule At preconstruction meeting
9 | 67
10 Schedule of Values At preconstruction meeting 11 Product & Material Data Ongoing with long lead time items first
C.6 SPECIAL PROJECT SPECIFICATIONS
All specific details, requirements, and maps are listed in Section J and are considered part of the overall requirements, in addition to everything stated in Section A-J on the award, and K-M in the solicitation.
C.7 GOVERNMENT PROVIDED INFORMATION
• Quality Assurance
• Inspections and Government Acceptance
• CM-16 Submittal Form
• Maps and Pictures
• Specifications
• Product Specifications
• Submittal Log
• Wage Determinations
• Experience Form
• Reference Questionnaire
• Waste Tracking Sheet
C.8 CONTRACTOR AND PRODUCT ADDITIONAL REQUIREMENTS
• The contractor is responsible for adherence to all Occupational Safety and Health Administration (OSHA) Regulation, specifically 29 CFR 1910 - General Industry and 29 CFR 1926 – Construction and applicable State Regulations.
• Contractor shall be responsible for obtaining all required permits, at no additional cost to the Government (if applicable) and scheduling all applicable inspections. All inspections must be signed off on by the COR and completed prior to receipt of final payment.
• All applicable submittals required, which may include warranty, production information, operation, and maintenance documentation, etc. as defined throughout various sections and specifications must be provided to COR and CO prior to submission of final invoice. Invoice will be rejected until the required documentation is submitted. Please refer to Section J for all additional documents.
• All trash and debris removal must be in accordance with local, state, and federal regulations.
• All materials and equipment are to be installed per manufacturer’s installation guidance.
C.9 GENERAL PLACE OF PERFORMANCE AND HOURS OF OPERATION
National Capital Area (NCA) National Mall and Memorial Parks 900 Ohio Drive SW, Washington, DC 20024
Normal operational hours are from 7:00 am to 4:30 PM ET, Monday through Friday.
No work shall occur on weekends or the following Federal Holidays:
New Year’s Day – January 1st
Martin Luther King Junior’s Birthday – Third Monday in January President’s Day – Third Monday in February Memorial Day – Last Monday in May Juneteenth – June 19th
10 | 67
Independence Day – July 4th Labor Day – First Monday in September Columbus Day/Indigenous Peoples Day – Second Monday in October Veteran’s Day – November 11th
Thanksgiving Day – Fourth Thursday in November Christmas Day – December 25th
Note - if any of the holidays stated above fall on a Saturday, the Friday before the actual day is the official day the Government takes for the holiday. If the holiday falls on a Sunday, the Monday after the actual day is the official day the Government takes for the holiday. These dates do not account for any other days or shorten days that may be added prior to any of the holidays mentioned above that may be added at the discretion of any Presidential Administration and implemented by the DOI.
C.10 SITE MANAGEMENT
Maintain walkways, driveways, roads, parking, and project site to be free of all construction debris, equipment, and materials on a daily basis. Maintain site free of hazards at all times. Safety equipment, fencing and barriers shall be installed per safety plan. Erosion control and sedimentation structures shall be constructed in according with EPA standards as needed. All historical and/or archeological issues shall be addressed as needed and stated in the contract and its attachments.
C.11 RECYCLING AND DISPOSAL OF REFUSE
Except for materials specifically indicated or specified to be salvaged for reuse in construction, or turned over to the Government; all refuse, excess or waste materials resulting from construction operations shall become the property of the contractor (excluding native vegetative and soil debris) and shall be recycled and/or disposed of.
All disposals shall be in accordance with federal, state, and local laws and regulations. No disposal, viewing or sale of materials and/or equipment shall be allowed on Government property.
C.12 SAFETY
During the execution of this contract, the Contractor must conform to the rules and regulations, as amended and as set forth by:
• 29 CFR 1910 – OSHA General Industry Regulations & Standards
• 29 CFR 1926 – OSHA Construction Industry Regulations & Standards
• US Army Corps of Engineers “Safety and Health Requirements” Manual No. 385-1-1 (free online -https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/ )
• National Park Service Occupational Safety and Health Program – Reference Manual 50B - Reference
Manual 50B: NPS Occupational Safety and Health Program
• Most Recent Superintendent’s Compendium
General Requirements:
Compliance with Reference Manual 50B (RM-50B), NPS Occupational Safety and Health Program, Section 7.0 Contractor Safety: Contractor Safety program responsibilities shall be considered during the requirements development phase of the acquisition. The Contracting Officer’s Representative (COR) and other park staff shall consult with certified Safety Officers for guidance on RM 50B requirements. A comprehensive safety assessment shall be performed to assure any necessary requirements above and beyond existing federal or state safety and health codes are written into the contract specifications. The COR or park representative shall provide the name of a certified Safety Officer to the CO. The CO will consult with the Safety Officer on contract clauses and special https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/ https://www.nps.gov/subjects/policy/upload/RM-50B_Contents.pdf?msclkid=621da23cc59111ec9bbf5daecf70f928 https://www.nps.gov/subjects/policy/upload/RM-50B_Contents.pdf?msclkid=621da23cc59111ec9bbf5daecf70f928 https://www.nps.gov/nama/learn/management/superintendent-s-compendium.htm
11 | 67 conditions. The COR shall ensure contractor compliance with all safety requirements throughout contract performance.
• Work area shall always be maintained in a clean and safe condition.
• All personnel providing service on-site shall have pictured identification and uniform displaying the name of the company (if appliable).
• All on-site vehicles will also be marked with the company name (if applicable).
• Use of barricades, ropes, signs, or audible signals is required, and the contractor must take all necessary precautions for the protection of the work, property, and safety of the public.
• Any accident or incident, regarding the work under this contract, shall be reported immediately, in writing, to the Contracting Officer.
• Smoking of any kind will not be permitted on premises. The COR/POC may authorize the use of a designated smoking if requested.
Working in a Federal building or federally controlled indoor workspaces:
In order to take steps to prevent the spread of COVID-19 and to protect the health and safety of all Federal employees, onsite contractors, visitors to Federal buildings or Federally controlled indoor workspaces, and other individuals interacting with the Federal workforce, employees under the subject contract who are required to work on site in Federal buildings or Federally controlled indoor worksites must comply with requirements located at https://www.saferfederalworkforce.gov/overview/
C.13 FIRE CONTROL
Contractor's Responsibility for Contractor-Caused Fires. The contractor, whether or not directed by the NPS, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by contractor's employees, whether set directly or indirectly as a result of contractor operations.
The contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the contractor's employees or resulting from contract operations.
(1) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material must be stored either in a separate building used exclusively for such storage, or at a site when all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the NPS when unusually hazardous conditions exist.
(2) Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.
C.14 TEMPORARY FACILITIES
(a) STAGING AREA: The contractor shall arrange the location for exterior stockpiling of materials (i.e. storage) with the COR/POC. The contractor must be present when any materials are delivered to ensure proper placement within the designated location. The Government will provide an adequate staging area as close to the construction site as practicable.
The Government will NOT provide any secured storage/staging areas for the contractor. The contractor shall be responsible for protecting materials stockpiled against adverse weather, damage, theft, and other risks of loss. The https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.saferfederalworkforce.gov%2Foverview%2F&data=05%7C01%7CCraig_Madison%40nps.gov%7C017321ae3ce54b2e4c0b08da482089d1%7C0693b5ba4b184d7b9341f32f400a5494%7C0%7C0%7C637901601831734573%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=vS0Y1s9ZuYGaL%2BfGyy9vfOMdP5VDFAL1SffEADbd3qQ%3D&reserved=0
12 | 67
Government assumes no responsibility for material or equipment left in the storage area. Barbed wire nor razor wire is permitted to be used for security purposes for this requirement.
(b) SANITARY FACILITIES: Toilet facilities will not be provided by the Government.
(c) WATER, AND ELECTRICITY: Water is not available on site. Electricity may not be available, depending on the location. Should water and electricity not be readily available, the contractor shall provide these services as needed to perform the required work.
(d) TELEPHONE: The Contractor may elect to hook-up commercial phone services using the local telephone service provider, at no cost to the Government. Cell phone or wireless access may or may not be available at the construction site.
C.15 LANDSCAPE PRESERVATION
A. The contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
B. Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or wastewater from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
C. Temporary Erosion and Sedimentation Control: Provide effective erosion control measures to prevent soil erosion and discharge of soil-bearing water runoff at the earliest feasible stage of construction. Regularly inspect and maintain the measures in effective working order. Promptly stop work in area(s) of any ineffective erosion control measures.
D. Tree and Plant Protection: Install temporary fencing located outside the drip line of trees to protect from damage from construction operations. Protect the tree root systems from damage, flooding, and erosion.
E. Dust: Utilize effective means to prevent generation of wind-borne dust (typically watering or application of other approved dust control measures) and to prevent sediment from leaving the work site and/or entering storm sewers and water bodies. Method must be approved by the COR.
G. Damage: Protect adjacent vegetation, property, structures, and improvements from damage.
H. Hazardous Materials: Perform any hazardous materials work in strict accordance with governing hazardous materials regulations. Workers shall be knowledgeable and well trained in the handling of project-specific hazardous materials.
I. Spill Control: Provide effective spill containment measures at the earliest feasible stage of construction.
Regularly inspect and maintain the measures in effective working order.
C.16 EXISTING UTILITIES
13 | 67
The contractor shall field verify all utility locations before digging or trenching. This shall include but not be limited to the use of sonic, electronic, or magnetic detection devices, by noting pull box and utility box locations at the surface, use of locator services, and by test pitting at no additional cost to the Government. The contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government.
C.17 CONSTRUCTION SCHEDULE
The Contractor shall submit for approval an initial practicable graphic construction schedule in PDF format at the preconstruction meeting as described in FAR 52.236-15 – Schedules for Construction Contracts. The Construction Schedule shall be in the form of a Progress Chart of suitable scale to indicate appropriately the percentage of the work schedule for completion by a given date. The Construction Schedule shall be replicated and associated with monetary values and titled Schedule of Values. The Schedule of Values shall be submitted to the COR and CO for review and approval at the preconstruction meeting. The Construction Schedule and Schedule of Values must include at least:
• Show the order in which the Contractor proposes to perform the work.
• Show the dates on which the Contractor contemplates starting and completing the several salient features of the project.
• Identify long lead items and Government furnished property (if applicable).
The Contractor must submit updated schedule at least bi-monthly to the COR depicting progress of the work completed to date. The Contractor must notify the COR/CO in writing whenever there are significant departures from the approved Construction Schedule. Any requests to modify the Construction Schedule, in writing to the Contracting Officer with an explanation for the deviation.
C.18 ENVIRONMENTAL REGULATIONS
All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by their subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to:
• Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards;
• Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ);
• Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);
• Endangered Species Act, as amended (16 U.S.C. Sec 1531 ET SEQ);
• Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ);
• National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ);
• Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ);
• Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ).
Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.
C.19 PRESERVATION OF HISTORICAL/ARCHEOLOGICAL/CULTURAL RESOURCES
A. Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of terrain because of any Federal construction project.
14 | 67
B. The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, cultural, or archeological data the contractor must notify the CO and COR in writing within 24 hours of first discovery. The notification must indicate time of discovery, the nature of the findings and location.
C. Immediately stop work if paleontological, archaeological, or historical remains (including burials or skeletal material) are encountered, until work is permitted to resume by written order from the CO. the contractor must notify the CO and COR in writing within 24 hours of first discovery. The notification must indicate time of discovery, the nature of the findings and location. The CO and/or COR will notify the Regional Archaeologist, so the provisions of 36 CFR 800.7 (Resources Discovered During Construction) and other relevant laws are followed. Work in other areas may proceed as approved by the CO.
D. Where appropriate by reason of discovery, the CO may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract which are incorporated by reference at the Task Order Level.
E. The Contractor must insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.
C.20 HARARDOUS MATERIALS
Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed.
If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract.
The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize, or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation, or coating. Non-friable asbestos containing materials do not normally release airborne asbestos fiber during routine handling and end-use.
However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR 1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.
C.21 HAZARDOUS MATERIAL IDENTIFICATION
Submit Safety Data Sheet (SDS)’s as required per 29 CFR 1910.1200 as amended. The contractor must provide one digital copy of each SDS for applicable hazardous chemicals used and/or provided in performance of any work under this contract.
C.22 MATERIAL & EQUIPMENT TRANSPORTATION, HANDLING AND STORAGE
A. Contactor shall have a representative on site to receive material deliveries, and the contractor shall remain responsible for all material deliveries whether their representative is on site at the time of delivery or not.
15 | 67
B. Government-owned equipment is not available for Contractor’s use to accomplish any Work, and Government buildings and other facilities are not available for storage of Contractor’s materials, equipment, and tools.
C. Transport, handle, and store materials and equipment in accordance with the manufacturer’s written instructions, and in a secure manner.
D. Store products that are subject to damage by the elements, under cover in a weathertight enclosure above ground, with ventilation adequate to prevent condensation. Protect liquids from freezing.
E. Promptly remove from the project site any materials or equipment that are damaged or are otherwise unsuitable.
F. Additional Permitting, fees, and coordination may be required working within the limits of Washington, DC.
Additional restrictions may be imposed due to unforeseen events or security threats in Washington, DC.
C.23 CONSTRUCTION QUALITY CONTROL PLAN
A. Designate in writing a single person to oversee and manage on-site quality control activities.
B. The Contractor is responsible for quality control of all project work including any sub-contracted work, and to submit thorough documentation that work fully complies with the construction documents and project permits.
C. Quality control processes include but are not limited to proactively:
1. Ensuring compliance with the construction documents and project permits.
2. Make vertical work plumb and make horizontal work level.
3. Managing specialty subcontractors.
4. Reviewing and processing samples, mock-ups, shop drawings and other construction submittals.
5. Ensuring that the workers have the appropriate expertise and proper equipment to perform the work.
6. Effectively utilizing third-party sampling & testing services (typically for earthwork gradation, compaction, concrete & asphalt testing, welding, pile driving and other specialty inspections).
7. Initialing timely reviews and corrective actions to substrates prior to proceeding with subsequent work.
8. Timely involvement of industry specialists such as manufacturer representatives.
9. Managing system commissioning.
10. Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated, and maintain headroom clearance of 96” in occupied spaces and 90” in unoccupied spaces.
11. Training NPS personnel in system operation & maintenance.
12. Timely involvement of local authorities having jurisdiction.
13. Load-Limits: Heavy equipment operated on NPS roads and parking areas shall comply with highway-legal load limits unless explicitly approved otherwise.
D. Field-verify all dimensions and conditions prior to performing the work. Notify the COR of any conflicts.
E. Improvements shall be constructed in accordance with the product manufacturer’s written instructions and standards.
F. Welding, if applicable, shall be performed by licensed welders and in compliance with American Welding Society recommended practices, structurally sound, and shall be neat in appearance.
G. Any work that must be performed by a licensed/certified technician (i.e. Electricians, Plumbers, HVAC
Technicians, etc.) shall be performed by state-licensed/certified technicians. The applicable state-license/certification must be from the State where the work is performed, not exceptions.
16 | 67
H. All, telecommunication (included telephone, data, radio, TV, similar) systems shall be installed and comply with current NPS Policy – if applicable.
C.24 DAMAGES
The Contractor shall assume all risks of injury to persons or property in connection with the performance of work under this contract shall indemnify and save harmless the Government against all claims, causes of action, cost and expense, because of bodily injuries, death, or damages to Property arising from all work activities of the Contractor.
If due to fault, neglect, dishonesty of the contractor, his agency or employees, loss or damage to government property is incurred during the performance of this task order, the contractor shall be responsible for the same.
The government, at its option, in lieu of repayment, may require the contractor to replace at his own expense, all property as directed by the Contracting Officer.
C.25 CONSTRUCTION/PROJECT MANAGER
The contractor shall provide a responsible Construction/Project Manager to represent the contractor in all matters pertaining to work under this contract. The Construction/Project Manager shall have the responsibility of overall supervision, quality control, cost estimating and be responsible for the management of all ongoing work. The Construction/Project Manager must be available in person, by telephone, or radio to respond to any and all problems during normal working hours. The response from the Project Manager must be within 1 hours after receiving the notification and should be in the same means as the request. Written follow up notification (via email is acceptable) must be provided to COR/POC within 24 hours, which confirms response.
The proposed Construction/Project Manager must be included in response to solicitation and must be the Construction/Project Manager responsible for the Contract after award throughout performance. If during the term of this contract, the contractor changes or replaces the Construction/Project Manager, the contractor must notify the COR and CO in writing within 3 business days of the proposed change, or as soon as possible if the departure was unplanned or unexpected.
C.26 SITE SUPERINTENDENT
The Contractor shall provide a responsible site superintendent to represent the contractor in the field in all matters pertaining under this contract including, but not limited to construction, day-to-day coordination of activities, control over employees and subcontractors, and coordination with local Government personnel. The site superintendent may also be designated the Construction/Project Manager.
The site superintendent must be onsite for at least three (3) hours per workday. When they are not on site, they must be available by telephone, radio or other means of communication in order to respond to any and all problems during normal working hours. The response from the Site Superintendent must be within 1 hour after receiving the notification and should be in the same means as the request.
The site superintendent shall be responsible for on-site Quality Control and shall sign all contract submittal transmittal sheets. Site superintendent shall maintain on site a file containing the following project documents when applicable.
� Executed Contract � Contract Drawings � Contract Specifications � Quality Control Plan – (up to date) � As-Built Drawing – (up to date) � Modifications
17 | 67
This file shall be maintained and available to the Contracting Officer upon request.
The proposed site superintendent must be included in response to the solicitation and must be the site superintendent responsible for the contract after award throughout performance. If during the term of this contract, the contractor changes or replaces the site superintendent, the contractor must notify the COR and CO in writing within 3 business days of the proposed change, or as soon as possible if the departure was unplanned or unexpected.
C.27 ADDITIONAL REQUIREMENTS FOR CONTRACTOR AND PRODUCT INSTALLATION
The contractor is required to:
• Comply with applicable requirements of the following standards and with the most current federal and national codes (including amendments, changes, and updates), which include but are not limited to:. Where these standards conflict with other specified requirements, the most restrictive requirement shall govern.
o 2021 National Fire Protection Association (NFPA) Fire Code
• 2022 NFPA 12 – Standard on Carbon Dioxide Extinguishing Systems o Architectural Barriers Act (ABA) o 2021 International Building Code o American Concrete Institute (ACI) standards
• 302 Recommended Practice for Concrete Floor and Slab Construction
• 304 Measuring, Mixing, Transporting, and Placing Concrete.
• 305 Hot Weathering Concrete
• 316 Construction of Concrete Pavements and Concrete Bases.
o American Society for Testing and Materials (ASTM): C 94/94M Ready Mixed Concrete
• C 150 Portland Cement
• C 171 Sheet Materials for Curing Concrete
• ASTM D 8
• ASTM D 242
• ASTM D 692
• D 698 Moisture-Density Relations of Soils and Soil-Aggregate Moistures Using 5.5-lb. (2.5-kg)
Rammer and 12-in. (304.8-mm) Drop
• ASTM D 1073
• D 1752 Preformed Sponge Rubber and Cork Expansion Joint Fillers for Concrete Paving and
Structural Construction
• ASTM D 3515
• ASTM D 3666
• ASTM D 3910
• ASTM E1155 SOFf 35 SOFl 25 o Architectural Barriers Act (ABA):
o Portland Cement Association (PCA):
• Ref. 1 Finishing Concrete Surfaces Exposed Aggregate Finishes for Slabs.
o District of Columbia Department of Transportation (DCDOT): Specifications Standard Specifications for
Highways and Structures Division 400.
o AI MS-22, "Construction of Hot Mix Asphalt Pavements," o AASHTO MP 1, PG 64-22, PG 58-28, PG 70-22.
o FS TT-P-115, Type I or AASHTO M 248, Type N o FS TT-P-1952 o AASHTO M 247, Type 1
• All local and state requirements, which may include inspections and licensing requirements for specific trades.
18 | 67
• Adherence to all Occupational Safety and Health Administration (OSHA) Regulation, specifically 29 CFR 1910 -
General Industry and 29 CFR 1926 – Construction and applicable State Regulations.
• Adhere to specific NPS site/location requirements that are operate under additional guidance and regulations specific to a NPS Location in addition to the Federal Acquisition Regulations and other Federal Regulations.
These include but are not limited to:
o Superintendent’s Compendium’s - which supplement Title 36 of the Code of Federal Regulations and other US Code and CFR Titles that apply to areas managed by the National Park Service with park-specific regulations related to park management. Check each Park Service Website and indicated above in Section C.10 to locate Superintendent’s Compendium if not stated.
o Directors Orders - Director's Orders and Related Documents/NPS Office of Policy – which can have an impact on work performed.
• Provide and install equipment, systems, etc. per manufacturer’s installation guidance.
C.28 SUBMITTALS
A. Definition: Submittals – are documents, samples, and other information that must be delivered to the CO and/or COR on a project before work even starts on a project. The NPS further defines Submittals as:
1. Action Submittals – are those that typical require some kind of action before any can proceed (i.e.
Product Submittals, Safety Plan, Construction Schedules, Differing Site Conditions, etc.
2. Information Submittals - are those that typically require no action to proceed (i.e. Certificate of
Insurance, Performance and Payment Bonds, Informational RFI’s, etc.
B. Submittals may be in the form of digital documentation and/or actual physical samples as indicated.
C. All submittals must be submitted on the NPS - CM-16 form, and the CM-16 form must be filled out correctly with all the blocks completed as appropriate. If submittals are submitted without the CM-16 form, they will be rejected until submitted on correct form. This requirement for a CM-16 also applies if the Contractor provides submittals through ProCore or similar Project Management System, other than email.
D. Salient characteristics of the materials proposed for use shall be clearly identified in the submittal and must match the salient characteristics as stated in Scope of Work, Specifications, Drawings and/or other documentation. The Project Manager must certify that he has reviewed the submittal and has determined that the submittal is in full compliance with the requirements of the Contract. Any illegible, incomplete, or uncertified submittals will be rejected.
E. Submittals shall be approved by the CO and/or COR prior to any work being performed or materials being delivered to the job site. The Contractor shall be responsible for all costs incurred and not subject to Government reimbursement on products/materials that were ordered or for any work that was performed if the submittals were…