This is a solicitation for exhibit fabrication services for Everglades National Park. The contractor shall provide all labor, materials, facilities and travel to detail, fabricate, transport, store on site temporarily, and install all exhibit elements for the Guy Bradley Visitor Center. Key deliverables include fabrication drawings, content samples, graphic proofs, shop inspections, exhibit installation by June 27, 2021, and completion of any outstanding work by September 10, 2021. The solicitation is a small business set-aside for NAICS code 337212 with a size standard of $7.5 million. Quotes are due by September 17, 2020. The award will be made based on technical capability, management plan, key personnel, past performance, and price.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. Solicitation Number 140P1120R0006 is issued as a Request for Proposal (RFP) constitutes the entire solicitation. Proposals and price quotations with detailed breakdown are being requested. This acquisition will be conducted pursuant to FAR Part 13. This solicitation document incorporates all mandatory commercial item provisions and clauses in effect through Federal Acquisition Circular 2020-08, effective August 13, 2020. This is a small business set-aside. The North American Industry Classification System (NAICS) code is 337212, Custom Architectural Woodwork and Millwork Manufacturing, and the related small business size standard is $7.5 Million. Questions are due on or before 10:00 am ET September 8, 2020. Responses are due on or before 10:00 am ET September 17, 2020.
REQUIREMENT: The contractor shall provide all services including labor, materials, facilities, and travel necessary to detail, fabricate, transport to the site, and install all exhibit and lighting elements for Everglades National Park, in accordance with the specifications as detailed in this solicitation and its attachments.
Due to space limitations, the complete commercial item specifications are contained in Solicitation Number 140P1120R0006. Interested contractors should download this document. The National Park Service is not responsible for locating or securing any information that is not identified in the quotation.
The following Federal Acquisition Regulation (FAR) clauses and provisions are applicable to this announcement and are available at www.acquisition.gov.
52.212-1 Instructions to Offerors-Commercial Items; 52.212-2 Evaluation-Commercial Items;
52.212-3 Offeror Representations and Certifications-Commercial Items; 52.212-4 Contract Terms and Conditions-Commercial Items; 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Items; 52.232-33 Payment by Electronic Funds Transfer-Central Contractor Registration; 52.233-1 Disputes in Solicitations and Contracts; 52.233-4 Applicable Law for Breach of Contract Claim; and 52.245-1 Government Property.
Questions shall be sent via email to dee_dee_bender@nps.gov by 10:00am ET September 8, 2020.
Questions submitted using any other method will not be entertained. The Point of Contact for this requirement is Dee Dee Bender, Contracting Officer. Offerors who contact anyone outside of the Office of Acquisition Management regarding this requirement, may automatically be excluded from competition.
All quotation information shall be submitted for receipt no later than 10:00 am ET on September 17, 2020. Offerors are hereby notified that if your quotation is not received by the date/time and at the location specified in this announcement, that it will be considered late. The quote shall be submitted electronically via email to dee_dee_bender@nps.gov with the Subject line clearly identifying “Solicitation Number 140P1120R0006 – Exhibit Fabrication for Everglades National Park.” Offers by telephone, transmitted via facsimile (fax), or submitted using any other method will not be accepted.
All contractors must be registered in www.SAM.gov to be considered eligible for award.
mailto:dee_dee_bender@nps.gov mailto:dee_dee_bender@nps.gov www.SAM.gov%2520 www.SAM.gov%2520
140P1120R0006
1. REQUEST NO.
5a. ISSUED BY
NAME
a. NAME
c. STREET ADDRESS
d. CITY
10. PLEASE FURNISH QUOTATIONS TO
THE ISSUING OFFICE IN BLOCK 5a ON
OR BEFORE CLOSE OF BUSINESS (Date)
2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG.1
RATING
6. DELIVERY BY (Date)
7. DELIVERY
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
PAGE OF PAGES
5b. FOR INFORMATION CALL: (No collect calls)
TELEPHONE NUMBER
AREA CODE NUMBER
8. TO:
b. COMPANY
e. STATE f. ZIP CODE
c. CITY
d. STATE e. ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
THIS RFQ
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
IS IS NOT A SMALL BUSINESS SET ASIDEX
08/26/2020 0040493295
1 64
67 Mather Place IDC Building Harpers Ferry WV 25425
NPS, HFC - Acquisition Management 09/30/2021
NPS, Harpers Ferry Center
IDC Building, 67 Mather Place
Harpers Ferry
WV 25425
304 535-6227Shelia Bender
09/17/2020 1000 ET
FOB DESTINATION
OTHER
(See Schedule)X
ITEM NO.
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice.
The contractor shall provide all services including labor, materials, facilities, and travel necessary to detail, fabricate, transport to the site, and install all exhibit and lighting elements for Everglades National Park, in accordance with the specifications as detailed in this solicitation and its attachments.
Legacy Doc #: NPS
Continued ...
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations
13. NAME AND ADDRESS OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
a. NAME OF QUOTER
AREA CODE
NUMBER
15. DATE OF QUOTATION
b. TELEPHONE are are not attached
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA - FAR (48 CFR) 53.215-1(a)
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 64
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P1120R0006
00010 Exhibit Fabrication for Everglades National Park
TOTAL FIRM-FIXED-PRICE
Product/Service Code: Y1PB
Product/Service Description: CONSTRUCTION OF
EXHIBIT DESIGN (NON-BUILDING)
Delivery: 09/30/2021
Period of Performance: 09/30/2020 to 09/30/2021
00020 Exhibit Fabrication for Everglades National Park
TRAVEL COSTS (FIRM-FIXED-PRICE)
Product/Service Code: Y1PB
Product/Service Description: CONSTRUCTION OF
EXHIBIT DESIGN (NON-BUILDING)
Delivery: 09/30/2021
Period of Performance: 09/30/2020 to 09/30/2021
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Solicitation Number 140P1120R0006
EXHIBIT FABRICATION SERVICES
EVERGLADES NATIONAL PARK
1. PROJECT BACKGROUND
Everglades National Park was the first national park in the United States set aside solely for its biological resources rather than its scenic or historic values.
The Guy Bradley (formerly “Flamingo”) Visitor Center lies roughly 45 miles from the park’s gateway city of Homestead and roughly 80 miles from Miami. It is the park’s innermost coastal destination at the terminus of a long entrance road at the southern tip of mainland Florida. The park counts roughly 110,000 vehicles in the area annually, and the total park visitation across all districts is roughly one million annually. Nearby services and amenities include a campground, marina, and numerous recreational concessions. The park constructed this facility as part of the NPS Mission 66 program in the early 1960s.
It is on the National Register of Historic Places and contains numerous distinctive design elements, especially the “Miami Modern” style.
The structure incurred heavy damage from hurricanes in 2005 and 2017. The park’s administration has committed to renovating the structure as a visitor center. Construction has begun and is expected to reach completion in summer of 2021. Installation of the new exhibits will be one of the last steps prior to opening the new visitor center.
Due to the park’s high international profile, the high expectations of donors, and the long anticipation for this opening, the National Park Service seeks the highest quality of artistry, durability, and project management. The new exhibits are designed with multiple three-dimensional models and scenes. Exhibit fabricators will need to coordinate with a complex and lengthy building construction operation.
2. GENERAL REQUIREMENTS
The project shall be the fabrication and installation of new exhibits for the Guy Bradley Visitor Center at Everglades National Park (EVER) in Florida. The project includes coordination, via the appointed contracting officer’s representative (COR), with park staff, contracted exhibit designers, contracted architects, and contracted construction firms.
The contractor shall provide all services including labor, materials, facilities, and travel necessary to detail, fabricate, transport to the site, store temporarily on site, and install all exhibit elements in accordance with the specifications as detailed in this contract and its attachments.
All work under this contract shall be performed in accordance with the terms herein (including all attachments). The government shall furnish, as appropriate, required data, materials, and access to project information necessary to perform the planning and production of work as required.
2.1. Point of Contact
The contractor’s Project Manager (PM) shall be the primary point of contact between the contractor and COR. The contractor’s PM shall have full authority to act for the contractor on all matters relating to this contract, and shall perform the following work:
1. Be available to take or respond to telephone calls or electronic mail messages during normal hours of operation (8:30 am–5:00 pm local time).
2. Establish office procedures to ensure that messages are relayed to the Project Manager when out of the office or because of time zone differences.
3. Respond to emergency messages from the COR on the same day they are received. All non-urgent messages from the COR shall be responded to in no more than two (2) business days.
2.2. Quality Control
The contractor shall provide quality control to ensure that all elements of project work meet the requirements of the contract specifications and that all modifications are implemented. The Project Manager shall provide routine inspections of in-house and subcontracted work to ensure it meets contract specifications and shall oversee the quality of work produced and implemented at all phases of the project. Any work found not acceptable or compliant with the specifications shall be corrected prior to inspection or review by the COR. The contractor shall oversee all work during installation to ensure that it adheres to contract specifications and schedule for completion. Ensure that all work not acceptable or compliant with the specifications is corrected prior to inspection or review by the COR.
2.3. Government Furnished Property
The contractor shall receive, inspect, and inventory all government-furnished materials and ensure that this material is forwarded to the appropriate unit or person within the contractor’s organization for use in the project. The Project Manager shall notify, in writing via email, the COR within seven (7) days after receipt if government-furnished materials are not satisfactory for their intended purpose. The Project Manager shall notify the COR via email as soon as possible, but no later than three (3) business days, if government-furnished materials are lost or damaged while in the contractor’s possession. The contractor shall be responsible for the security and protection of government-furnished property or materials in connection with this contract. Following acceptance of all work by the government, the contractor shall return to the COR all government-furnished property.
2.3.1. Post Award Meeting
The following listed government-furnished property shall be provided at the post award meeting:
1. All production-ready graphic files except the GL numbers listed below.
2. All artifacts or accessioned objects (AO) listed in Attachment 10: EVER
Flamingo PD2 Content and Specifications shall be available for measurement and photographing.
2.3.2. Exhibit Fabrication
1. The following listed government-furnished property will be adjusted by the
Planning & Design contractor or the government, and the production-ready graphic files shall be provided during exhibit fabrication prior to graphics printing:
a. GL-01.02-100
b. GL-02.01-115
c. GL-02.01-120
d. GL-02.04-100
e. GL-03.01-100
f. GL-03.01-110
g. GL-03.01-130
h. GL-03.01-140
i. GL-03.01-150
j. GL-03.01-180
k. GL-04.02-100
l. GL-04.03-100
m. GL-05.01-140
n. GL-05.02-120
o. GL-06.01-130A
p. GL-06.02-130
2. The following listed government-furnished property shall be provided during exhibit fabrication for installation:
All AOs listed in Attachment 10: EVER Flamingo PD2 Content and Specifications.
2.4. Schedule
The contractor shall schedule, coordinate, oversee, and manage work produced and installed under this contract. Track work progress to ensure that the project is completed according to the schedule.
Coordinate and confirm the dates for all submittals and meetings with the COR. Provide a monthly status report to the COR that includes the status of the project, issues that affect the schedule and budget, and an updated schedule based on the information at hand.
The contractor shall produce a detailed, complete project schedule listing all required submittals and their review times. The project schedule shall include shop inspections, site visits, installation activities, and closeout submittals.
The contractor shall submit a preliminary project schedule to the COR for review and approval seven
(7) working days prior to the post award meeting. The contractor shall update the approved schedule and resubmit to the COR three (3) working days prior to every project status meeting for the life of the project.
The contractor shall coordinate and confirm dates with the COR for shipment, delivery, and installation at the exhibit site.
2.5. Meetings, Travel, and Presentations
Meet with the Contracting Officer and COR as specified below. The contractor shall document all issues discussed and decisions made relative to the project. The contractor shall prepare and distribute to the COR a trip report or meeting minutes of all telephone conversations, site visits, in-person meetings, or other discussions related to the project.
Meeting Purpose Location or Type
Required Contractor Attendees
Duration/Days on site
Post-award meeting and site visit
At Park Project Manager Three, 8-hour days
Building Prep site visit
At Park Project Manager One, 8-hour days
Preliminary Shop Inspection
At Contractor Facility
Project Manager Two, 8-hour days
Final Shop Inspection
At Contractor Facility
Project Manager Two, 8-hour days
Installation At Park Project Manager, Installation Crew
(TBD)
To be proposed by contractor
Audio Description Installation & Testing
At Park Project Manager, Audio Describer
One, 8-hour days
2.6. Submittals
At any point in the exhibit fabrication process the COR may require informal submittals of the contractor’s work-in-progress to document the current status and level of production of the project.
The contractor shall coordinate all submittals and review them for legibility, accuracy, completeness, and compliance with contract requirements. Forward all submittals to the COR for review and approval.
Receive all reviewed submittals and take appropriate action according to the approval or rejection by the COR, as follows:
1. Approved Submittals – The contractor shall ensure that all changes, revisions, or additions required by review comments are addressed and incorporated into future submittals.
2. Rejected Submittals - When submittals are rejected, the COR will notify the contractor, in writing, identifying the reasons for rejection. The contractor shall ensure that the submittal is completed and/or revised as required and resubmitted within the time scheduled by the COR.
Reasons for rejection include:
a. Incomplete Submittals – Approval of the submittal is delayed because required elements are missing. The contractor shall submit all missing elements.
b. Unacceptable Submittals – The submittal is rejected due to poor quality of work or work that does not otherwise meet the established project goals. The contractor shall submit new material.
2.6.1. Copies and Delivery
One (1) electronic PDF copy of each document submittal are required. Two (2) copies of graphic prints and material samples are required. One (1) physical model samples, mock-ups, and prototypes are required. Submittals shall be sent via overnight delivery service unless otherwise specified in the scope of work below.
2.6.2. Transmittal Sheet
The contractor shall include a transmittal in the form of a printed letter, pdf document, e-mail, or fax cover sheet along with all samples, proofs, prints, reports, digital files, digital images, and multimedia files, sent from the contractor to the COR. This includes all copies sent to the park or other copied recipients. The transmittal shall include the following minimum information:
• "From" (Contractor's name and contact information)
• "To" (COR's name)
• Date submittal was shipped
• Project name and park name
• Itemized list of contents
• List of copied recipients who received the same submittals
2.7. Accessibility
Exhibits fabricated for the National Park Service shall follow the latest published version of the Programmatic Accessibility Guidelines for National Park Service Interpretive Media. These guidelines are a combination of best practices, NPS and Department of the Interior directives, and federal laws.
Federal laws include the Architectural Barriers Act, Sections 504 and 508 of the Rehabilitation Act as amended, and the 21st Century Communications and Video Accessibility Act.
Accessibility requirements for visitors with specific disabilities shall be addressed. If the designed project poses particular challenges to accessibility, the fabricator shall propose accessibility solutions.
See the Programmatic Guidelines for National Park Service Interpretive Media for requirements addressed under specific disabilities.
2.7.1. Audiovisual Accessibility for Exhibits
Every audio, silent video, and audiovisual program in every exhibit is required to provide descriptive audio, hearing assistance, captions, and/or navigation buttons, as follows:
2.7.1.1. Audio-only Programs
Audio-only programs require hearing assist for the hard of hearing and captions for the deaf. The hearing assist requirement may be met using either sound wands with volume control and rest, or a FM transmitter and handheld receiver. Captions for the deaf are displayed on a monitor synched with the audio.
2.7.1.2. Silent Video Programs
Silent videos require descriptive audio for people who are blind or have low vision, and notification, via on-screen caption or label adjacent to the monitor, for the deaf or hard of hearing that the video is silent. Delivery of descriptive audio is provided in the exhibit through a headset jack, a sounds wand, or via Wi-Fi streaming in conjunction with the Exhibit Audio Description Tour app. When descriptive audio is delivered via headset jack, a label with the raised AD symbol and headset icon is required.
2.7.1.3. Audiovisual Programs
Audiovisual programs in exhibits require descriptive audio for people who are blind or have low vision, hearing assist for the hard of hearing, and captions for the deaf. Any of the delivery methods for audio-only programs and silent video programs may be used to meet these requirements.
2.7.1.4. Navigation Buttons
Touch screen user interfaces require external control navigation buttons for people with limited mobility.
3. FABRICATION AND INSTALLATION SERVICES
3.1. Fabrication General Services
The contractor shall provide all technical, professional, non-personal services, including all labor, materials, equipment, supplies, facilities, travel, management, and supervision necessary to provide EVER with exhibit fabrication and installation services for the Guy Bradley Visitor Center. Work required is production of exhibits (including Pre-Fabrication submittals, and Fabrication); Shop Inspections (Preliminary and Final); Building Preparation; Installation (including Primary Installation, Punch List, and Audio Description); and Closeout. Work includes travel to the park areas to meet with the park staff, inspect sites, assess or recommend rehabilitation plans and/or scope of work, prepare cost estimates, provide or confirm measurements, and fabricate and install exhibits.
3.2. NPS Specifications
The contractor shall perform all services required hereunder in accordance with this Statement of Work (SOW) and all attachments.
3.3. Design Control
In fabricating exhibitions hereunder, the contractor shall take into account as essential design and production considerations the following: life safety, barrier-free design, accessibility/universal design, sustainability, energy conservation, artifact conservation including daylight modulation from skylights and windows, if applicable, control of sound-spill from AV programs, security provisions, integration and compliance with existing architecture where relevant, lamping, functionality, maintenance, conservation, and durability restrictions.
3.4. Codes and Standards
All Exhibitions shall be produced and installed in accordance with applicable codes, standards, parameters or regulations noted in this or other sections of this Contract, and in the location in which the exhibit shall be installed. In case of conflict between codes, standards, or regulations, the most stringent requirement shall apply.
3.4.1. Reference to standard specifications of any technical society, organization, or association, or to codes, manuals, or regulations of Federal or local authorities shall mean the latest standard, code manual, regulation, specification, or tentative specification adopted and published at least thirty (30) days prior to submittal of proposals, unless specifically stated otherwise.
3.4.2. Any code, standard, regulation, or specification listed below, in the attachments or otherwise referenced herein, that references the “authority having jurisdiction”, “local authority”, or “governmental authority” shall be interpreted to refer to the Contracting Officer as being this authority for purposes of interpreting/clarifying codes, standards, regulations, and specifications.
3.5. Post-award Conference Call
Upon award, the contractor shall participate in a project kick-off conference call to review contracting requirements and procedures with the project CO and COR.
3.6. Production Support
The Fabrication contractor shall facilitate production support from the Planning and Design contractor and anticipate the Planning and Design contractor’s attendance on project conference calls, meetings, and reviews.
3.7. Production
Work in this phase shall include production of all exhibit elements in accordance with the design intent as described in the Production Design documents. Work in this phase is organized into two (2) sub-phases: Pre-Fabrication Submittals and Fabrication. Pre-Fabrication includes the development of project documents that must be approved before production can occur. Fabrication includes all tasks required to complete the production of exhibit elements.
3.7.1. Pre-Fabrication Submittals
During this phase, the contractor shall:
1. Attend a post-award meeting as follows:
a. Submit a meeting agenda to the COR for review and approval not later than seven
(7) days prior to the post award meeting.
b. Travel to EVER to attend a post award meeting with the COR and park personnel.
The meeting shall be three (3) eight-hour working days. The date of the meeting shall be determined within three (3) weeks of the contract award.
c. Orient to the site and review of existing site conditions and construction documents.
d. Conduct general project review, including the exhibit design drawings and work requirements.
e. Receive, review, inspect, document, and secure all government-furnished material, including drawings, planning documents, reference and source materials, and other project-related material.
f. Inspect, measure, and document accessioned and non-accessioned objects to be used in the exhibits, verifying final dimensions of AOs listed in Attachment 10:
EVER Flamingo PD2 Content and Specifications.
2. Prepare and submit an Exhibit Production Plan, as follows:
a. Establish key project milestones and timeframes for review for 25%, 40%, 60%, 80%, and 95% completion.
b. At each milestone, the contractor shall provide a revised exhibit production plan that reflects the current status of production.
c. The Exhibit Production Plan shall include the AV Production Plan.
3. Provide Fabrication Shop Drawings, as follows:
a. Modifications. The general design requirements shown in Attachment 9: EVER
Flamingo PD2 Exhibit Drawing Package, Attachment 10: EVER Flamingo PD2 Content and Specifications, Attachment 11: EVER Flamingo PD2 Lighting and AV Specifications, and Attachment 12: EVER Flamingo PD2 Graphic Layout Package are intended to establish basic dimensions of units or modules, profiles, and sight lines of members. Within these limitations, the contractor shall be responsible for any modifications or additions as required to meet accessibility, durability, and safety standards as outlined in Attachment 1, Exhibit Planning, Design, and Fabrication Specifications. The contractor shall submit proposed modifications to the COR for review and approval prior to implementing changes.
The contractor shall maintain the visual design concept and operational features as shown, including members’ sizes, profiles, and alignment of components.
b. Object cases. The requirements in Attachment 1, Exhibit Planning, Design, and Fabrication Specifications—Section 18, Object Preservation and Protection shall take precedence over design and production notes shown in Attachment 9: EVER Flamingo PD2 Exhibit Drawing Package. The contractor shall propose, for review and approval by the COR, any modifications to case design, dimensions, materials, finishes, mechanisms, object layouts, and case furniture that are required to meet NPS specifications.
c. Object mounts. The contractor shall propose and produce final case layouts based on layouts as shown in Attachment 9: EVER Flamingo PD2 Exhibit Drawing Package. The contractor shall propose and produce all necessary object mounts.
d. Electrical. The contractor shall provide equipment specifications, and a lighting and wiring diagram for all exhibit lighting as designed and specified in Attachment 9: EVER Flamingo PD2 Exhibit Drawing Package and Attachment 11: EVER Flamingo PD2 Lighting and AV Specifications. Building wiring and power shall be completed by the park. The contractor shall be responsible for acquiring and installing new track and fixtures, and for connecting fixtures to park-provided power throughout the exhibits. The contractor shall ensure that all physical loads are supported by adequate equipment and/or mounting devices as dictated by the state of Florida.
4. Provide Electronic Equipment submittals including plan drawings, wiring diagrams, and catalog cuts.
5. Provide two (2) physical copies of Material Sample Boards.
3.7.2. Fabrication
Each fabrication task may require a sub-series of steps to complete, and the contractor is not required to complete tasks in the order outlined below. All tasks shall be completed in accordance with Attachment 1, Exhibit Planning, Design, and Fabrication Specifications—Section 27, Quality and Safety Standards for Fabrication. Fabrication tasks include the following:
3.7.2.1. Content Specialties
Content Specialties under this contract include tactile (or touchable) models, non-tactile models and props, reproduction historic objects, and maps. All content specialties are enumerated in Attachment 10: EVER Flamingo PD2 Content and Specifications.
1. Illustrations, Artwork, and new Photography. All illustrations, artwork, and new photography shown in the Graphics and Content Specialties Reference Packages shall be supplied by the design contractor via the COR for this contract.
2. Models (non-touchable). Models that are out of reach of visitors and located in the diorama shall be anatomically accurate, with a high degree of realism including details such a realistic feathers, beaks, eyes, skins, scales, and other finish surfaces.
The production process for non-touchable models shall be as follows:
a. Refer to Attachment 10: EVER Flamingo PD2 Content and Specifications for design intent, purpose, style, and other production details.
b. Submit a rough pencil sketch of the model in the approved style, in accordance with the Attachment 10: EVER Flamingo PD2 Content and Specifications, for review and approval.
c. Submit a more refined sketch that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR.
d. Submit a revision that shall incorporate any additional corrections, changes, modifications, or deficiencies identified by the COR.
e. Submit a sample of the finish proposed for each model, including, but not limited to: feather, scale, scute, skin (animal and vegetable), geological surface. Where a particular type of finish is intended for multiple models, such as a feather or scale, the contractor shall submit only two total samples to show how it differs per model.
f. Submit one (1) positive or other 3D draft of the model. The model samples shall be adequately sized to provide review of materials, colors, and finishes; and shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR during iterative review of the sketches.
g. Submit the final model that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR.
3. Models and Props (touchable). Models and props that are within reach of visitors shall be highly durable and able to withstand touch by thousands of visitors. The production process for touchable models shall be as follows:
a. Refer to Attachment 10: EVER Flamingo PD2 Content and Specifications for design intent, purpose, style, and other production details.
b. For commercially available tactiles, the contractor shall provide at least two photographs of every model or prop proposed to be purchased. The contractor shall describe in a brief narrative how the model or prop is to be prepared for display and safety. Items d. and e. do not apply to commercially available products.
c. The contractor shall submit the results of a test of the intended production materials in the form of photographs and a brief narrative. The test shall subject the intended production materials to typical commercially available DEET mosquito repellent and sunscreen.
d. Submit a rough pencil sketch of the model in the approved style, in accordance with the Attachment 10: EVER Flamingo PD2 Content and Specifications, for review and approval, except in the case of commercially available products.
e. Submit a revision that shall incorporate any additional corrections, changes, modifications, or deficiencies identified by the COR, except in the case of commercially available products.
f. Submit one (1) positive or other 3D draft of the object. The samples shall be adequately sized to provide review of materials, colors, and finishes; and shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR during iterative review of the sketches.
g. Submit the final model or prop that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR.
4. Reproduction Historic Objects. The production process for reproduction historic objects shall be as follows:
a. Refer to Attachment 10: EVER Flamingo PD2 Content and Specifications for design intent, purpose, style, and other production details.
b. Submit a rough pencil sketch of the object in the approved style, in accordance with the Attachment 10: EVER Flamingo PD2 Content and Specifications, for review and approval.
c. Submit a more refined sketch that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR.
d. Submit one (1) 3D sample of the object that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR, and shall clearly show the final materials, finishes, textures, and styles in progress.
e. Submit the final reproduction historic object that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR.
5. Map Models. The production process for building and bay map models shall be as follows:
a. Refer to the Attachment 10: EVER Flamingo PD2 Content and Specifications for design intent, purpose, style, and other production details
b. The contractor shall submit the results of a test of the intended production materials in the form of photographs and a brief narrative. The test shall subject the intended production materials to typical commercially available DEET mosquito repellent and sunscreen.
c. Submit one (1) full-sized paper proof of the tactile map. The proofs shall include geologic and topographical features, where appropriate, and all specified labels.
The proof shall illustrate relief via color, texture, or the contractor’s recommended manner.
d. Submit three (3) foam mock-ups of a minimum 12”x12” section of the map, including a difference vertical exaggeration on each sample.
e. Submit one (1) 12”x12” painted sample of the map that depicts an actual 12”x12” segment of the map
f. Submit a minimum of five (5) photographs of work-in-progress as the topographic map or model is in production, prior to clear-coat or final finish application
g. Submit the final tactile map that shall incorporate all corrections, changes, and modifications identified by the COR in the previous map samples.
6. Electronic Programs. The production process for electronic programs shall be in accordance with Attachment 5: National Park Service Standard Specifications for Planning, Design, Production, and Installation of Electronic Programs, and as described below. In addition, as part of the Exhibit Production Plan provided during pre-fabrication submittals, the contractor shall submit an AV Production Plan that describes and schedules the production process required to produce each Electronic Program (EP) for review and approval by the COR. Refer to Attachment 10: EVER Flamingo PD 2 Content and Specifications for specific details and a full list of EPs.
a. Pre Production:
i. Scripts: The contractor shall provide the AV Production Plan and script, narrative, or storyboard for review and approval. The AV Production Plan shall describe all elements required, including a list of sources required to produce the program as outlined. The contractor shall submit, at minimum, a draft and revised draft for review.
ii. Conceptual Design: For the interactive touchscreen program, the contractor shall review the conceptual design in Attachment 10: EVER Flamingo PD2 Content and Specifications and submit a revised version for review.
b. Production:
The contractor shall research, procure, and obtain all materials to be included as content for each program. This includes, but is not limited to still images, film or video footage, artwork, music, sound effects, and professional talent. The contractor shall submit proposed stock audio and video recordings and still imagery to the COR for review and approval.
i. Work-in-Progress Review I: Enough of the structure and content should be completed in this phase to evaluate the validity of the approach and to determine if changes or modifications are needed to meet the project objectives.
ii. Interpretive Text: Based on the task order and GFP, the contractor may be required to incorporate, rewrite, edit, and/or write and edit original text.
iii. Scripts: If video or audio is specified as a part of the digital interactive program, a script is required unless provided as GFP.
iv. Audiovisual Production: If video or audio is specified as a part of the digital interactive program, the audiovisual process for production shall be followed.
v. Fully Executed Section: The contractor shall submit one fully functioning representative section based on the flow chart for review and approval. If the program is complex and has numerous unique sections, multiple representative sections shall be submitted.
vi. Graphics: In addition to the graphics presented in the fully functioning sections, a list of proposed graphics shall be submitted for review and approval.
vii. Animation: Storyboards, graphic layouts, modeling, and sample demonstrations illustrating movement, shall be submitted as a part of the review process before the final execution of the animation occurs.
c. Post Production:
i. Rough Cuts: The contractor shall submit a rough cut for review. Multiple rough cuts and edit scripts may be required until approved by the COR.
Each rough cut shall be submitted with a revised script that corresponds to the most current edited version of the program. If animation is included, conceptual designs for all animation elements shall be submitted electronically for review and approval.
ii. License Agreements: The contractor shall submit a narrative description or spreadsheet that accounts for the copyright sources of all audiovisual elements (images, video or film footage, artwork, graphics, animations, music, sound effects, interviews, etc.) proposed for use in the program— including public domain materials, purchased stock materials, and government-furnished materials—before the final project is produced. For those materials that are restricted, license agreements shall be submitted.
Upon review and approval of the license agreements by the COR, any license that fails to meet the requirements as specified in the contract or the task order shall be returned to the contractor for revision. If the specified rights cannot be obtained, the contractor shall replace the element unless written approval for a deviation is furnished by the Contracting Officer.
iii. Release forms: The contractor shall submit, electronically via email, scanned copies of all NPS Release Forms for talent (narrators, interviewees, and other acquired material); and scanned copies of all license agreements and contracts acquired by the contractor or copyrighted and restricted material being used in the production concurrent with the submission of the final fine cut.
iv. Music Samples: Music samples from a minimum of three professional film composers or library music sources shall be submitted for review and approval unless otherwise specified in the task order. All samples shall be appropriate to the tone, mood, style, and pacing of the film.
v. Narrator Samples: A selection of a minimum of four narrator samples per voice role shall be submitted electronically for review and selection.
vi. Lower-Thirds and Other On-Screen Text: Samples of the proposed font and design style for any lower-third name identifications, graphics, credits, and any other on-screen text. Samples of proposed font and placement for SDH subtitles.
vii. Fine Cuts: The contractor shall submit a fine cut and edit script for review and approval prior to the final on-line edit and sound mix. Fine cuts shall include the approved library music of a selection of the approved composer’s music, sound effects, best resolution archival images or footage, draft motion graphics and/or animations, and all on-screen text and graphics (excluding credits). Multiple fine cuts and edit scripts may be required until approved by the COR. Each fine cut shall be submitted with a revised script that corresponds to the most current edited version of the program. The fine cut shall be revised until it is ready for the online edit.
viii. On-Line Edit, Sound Design and Mix, and Color Correction: The contractor shall submit the final edited version of the program with final sound design, mix and color correction for review and approval.
d. Accessibility:
i. Submit scripts for Audio Description (AD) and Subtitles for the Deaf and
Hard of Hearing scripts to the COR for review and approval.
ii. Submit a transcript describing each sound clip used in audio programs, for use by visitors who are Deaf or Hard of Hearing, to the COR for review and approval.
iii. For programs without audio, there shall be an icon or text indicating the program has no audio, placed either on-screen or in proximity to the program monitor. Submit proposed icon or text to the COR for review and approval.
e. Final Deliverables:
Upon completion of the project, all elements shall be submitted to the COR in accordance with Attachment 5: National Park Service Standard Specifications for
Planning, Design, Production, and Installation of Electronic Programs Section 12, Completion Report and Final Deliverables. The contractor shall provide a digital version of each final electronic program with a completed AV Completion Report, form provided as Attachment 8, AV Completion Report.
3.7.2.2. Mock-Ups and Prototypes
Mock-ups refer to working models that are fabricated simply, quickly, and at minimal cost in order to test a concept. They are full-scale representations of portions of an exhibit for the purpose of review, testing, and evaluation. Mock-ups are for review only, and shall not be incorporated into the final exhibit.
Prototypes are more refined than mock-ups, and closer to the final product in material, fabrication, and operation. Prototypes are portions of an exhibit such as an artifact case or an interactive mechanism that has a particular need to be reviewed and tested prior to fabrication of more elements of the same design.
The contractor shall refer to Attachment 9, EVER PD2 Exhibit Drawing Package and to Attachment 10: EVER Flamingo PD2 Content and Specifications.
1. Mock-ups:
The contractor shall submit the following mock-ups to the COR for testing, review, and approval. Mock-ups that are approved, or approved with comments, shall be fabricated in final materials or finishes, and shall incorporate all corrections, changes, and modifications identified by the COR. Mock-ups that are found to be deficient, shall be revised and resubmitted for testing, review, and approval.
a. X4.300: a mock-up demonstrating caster access on mobile exhibits
b. X4.304: a mock-up demonstrating hinged flip-up panels
c. X5.300: a mock-up of the diorama, to determine if lighting is adequate as designed.
2. Prototypes:
The contractor shall submit the following prototypes to the COR for review and approval. Prior to the Preliminary Shop Inspection, the contractor shall provide the COR a report, with photo documentation, of the performance of the prototypes. All prototypes shall be available at the Preliminary Shop Inspection for review and testing.
All prototypes shall be corrected in accordance with the review and approval by the COR before being incorporated into the final exhibit.
a. X1.301: a prototype of the Salinity table rotating disks
b. CE-03.01-412: a prototype of the reproduction fishing hut to show concealment of speakers and simulated lighting
c. X1.302: a prototype of concrete panel construction
d. X2.303: a prototype of detail 5, mosquito meter
e. X4.305: a prototype of the manatee rib lift mechanism
3.7.2.3. Exhibit Structures, Cabinetry, and Casework
The contractor shall provide adequate personnel and facilities to fabricate all structures and exhibit elements as required under this contract. The contractor’s project manager shall ensure the safety of staff and the quality of fabricated elements and shall facilitate reviews of work throughout fabrication.
All exhibit structures, cabinetry, and casework shall adhere to the highest safety, environmental, and quality standards set under the law, and in accordance with Attachment 1, Exhibit Planning, Design, and Fabrication Specifications.
Casework shall be in accordance with Attachment 9: EVER Flamingo PD2 Exhibit Drawing Package, and with Attachment 2: Exhibit Conservation Guidelines.
3.7.2.4. Case Layouts and Artifact Mounts
The contractor shall design and produce all final case layouts and artifact mounts required, in accordance with Attachment 9: EVER Flamingo PD2 Exhibit Drawing Package, with Attachment 1: Exhibit Planning, Design, and Fabrication Specifications, and with Attachment 2: Exhibit Conservation Guidelines.
3.7.2.5. Exhibit Graphics
The contractor shall provide fabrication of all two-dimensional exhibit graphics, except GL-01.01-100, GL-01.01-140, GL-01.01-145, and GL-01.01-190, which will be produced and installed by the building general contractor. Graphic source material shall be government-furnished to the fabrication contractor in a digital format. The contractor shall be responsible for the following:
1. Review all government-furnished materials and notify the COR if the materials are inadequate for production.
2. Prepare digital files for specified output.
3. Scan high resolution images as needed.
4. Link image and vector files to graphic layout files.
5. Adjust digital files for color corrections and bleed as needed.
6. Provide creative graphic design services to incorporate government-provided illustrations, artwork, and new photography into graphic layout files for production.
7. Produce two (2) copies of full-sized unlaminated graphic proofs, samples, and layouts for review and approval by the COR prior to the Preliminary Shop Inspection; at the Preliminary Shop Inspection, provide full-sized unlaminated graphic proofs of all revisions requested during review.
8. Provide two (2) material production samples of each type of graphic substrate for review and approval by the COR.
9. Provide final, corrected graphic layouts.
3.7.2.6. Electronic Programs and Equipment
The contractor shall acquire all necessary content, edit, and produce all Electronic Programs specified as EP numbers listed in Attachment 10: EVER Flamingo PD 2 Content and Specifications. All Electronic Programs (EP) and associated Electronic Equipment (EE) shall be in compliance with the Information and Communication Standards of the Rehabilitation Act (see Section508.gov) and in accordance with Attachment 5: National Park Service Standard Specifications for the Production and Installation of Electronic Programs. Equipment; and, software components shall be carefully coordinated to ensure an effective presentation. Equipment compatibility relative to the designer’s vision is a critical element.
The contractor shall be responsible for testing of all electronic equipment, and for the successful installation of all electronic programs that are part of the exhibits, including those that are government-provided.
3.7.2.7. Audio Description
Audio description shall include all exhibit elements. Exhibit elements include text, graphics, tactiles, interactives, scenic elements, electronic programs (audio and video), and navigational instruction.
During Fabrication, the Contractor shall provide the following:
1. Audio Description Production Plan, including Table of Contents with AD segment titles and submenus congruent with Scenes, Content Groups, and individual exhibit elements;
2. Audio Description diagram indicating power sources, styles, and locations of AD triggering hardware;
3. Audio Description draft script based on approved Table of Contents, triggers locations, exhibit drawings, exhibit elements, and production-ready graphics, which shall be available for testing during Installation.
3.8. Shop Inspections
Work in this phase shall include the facilitation of visits by the COR to the contractor’s facility to view and inspect work on all exhibit elements. The contractor shall facilitate two (2) shop inspections by the
COR.
3.8.1. Preliminary Shop Inspection
The contractor shall facilitate review of exhibits at the 60% completion milestone, at a date to be determined in consultation with the COR. The contractor shall provide the following at the Preliminary Shop Inspection:
1. Primary exhibit structures without final finishes.
2. Custom vitrine for the accessioned objects in Scene 03.
http://section508.gov/
3. Full-sized, unlaminated graphic proofs of any graphic layouts requiring revision during the previous graphic sample review.
4. Samples of natural history models in three-dimensional draft as specified in 3.7.2.1. - 2 (Models – non-touchable). The contractor shall select for inspection a variety of models to compose 60% completion. The variety shall include the following and any others at the contractor’s discretion:
a. CE-04.01-416 Life-size manatee
b. CE-04.02-421 Life-size crocodile
c. CE-04.03-429 Life-size tarpon
d. CE-04.04-436 Life-size red mangrove
e. At least two representative bird species
f. At least two other representative fish species
g. At least two representative invertebrate species
h. At least two other representative vegetation species
5. Samples of tactile models in three-dimensional draft as specified in 3.7.2.1. – 3 (Models and Props – touchable). The contractor shall select for inspection a variety of models to compose 60% completion. The variety shall include the following and any others at the contractor’s discretion:
a. CE-04-01.417 manatee snout
b. CE-04.01-419 mangrove
c. CE-04.02-423 crocodile hatchling
d. CE-04.02-424 crocodile jaw
e. CE-04.04-439 shell tool
f. CE-05.02-459, 460, or 461 bird beak (only one)
6. Mock-ups and prototypes listed in 3.7.2.2., above.
3.8.2. Final Shop Inspection
All exhibit structures, graphics, and content specialties shall be complete and fully operational for the final inspection, at a date to be determined in consultation with the COR.