Sol_140L4326Q0106.pdf

PDF 340 KB Posted

Attached to
WEW RCOVERY PROJECT - WEW HERBICIDE Federal contract opportunity
Solicitation number
140L4326Q0106
Issued by
Department of the Interior Bureau of Land Management Oregon-Washington

About this file

This is a Request for Quotation (RFQ) for herbicide application services at the West Eugene Wetlands in Eugene, Oregon. The solicitation number is 140L4326Q0099, issued on August 12, 2026, with an offer due date of August 31, 2026 at 5:00 PM EDT. Award is contemplated as a firm fixed-price commercial services purchase order for one (1) contract with a period of performance from October 1, 2026 through January 1, 2028.

The requirement involves broadcast and spot spray herbicide treatments across approximately 154 acres (64 acres glyphosate broadcast spray treatment and 90 acres glyphosate or triclopyr spot spray treatment) in a semi-urban wetland ecosystem. All applicators must be fully licensed in the state of Oregon. The contractor will be responsible for all equipment, supplies, and chemicals, with work generally conducted Monday through Friday, 6:00 AM to 6:00 PM, subject to weather conditions and fire danger restrictions. Work must be coordinated with the Contracting Officer's Representative at minimum one week prior to herbicide application. The contract is designated as a Women-Owned Small Business (WOSB) set-aside with a NAICS code of 115310 and size standard of $11.5 million. Electronic quotations must be submitted via email to BLM_OR_WA_Solicitations@ios.doi.gov. Award will be made to the responsible firm whose quote is most advantageous to the Government based on evaluation factors including relevant experience (three prior projects of similar scope within five years), technical approach (including means, methods, schedule, and quality/safety management), and price.

View the file

Other files for this federal contract opportunity

Other files attached to WEW RCOVERY PROJECT - WEW HERBICIDE, newest first.
File Type Posted
Sol_140L4326Q0106_Amd_0003.pdf PDF
Herbicide_Questions_140L4326Q0106_0002.docx DOCX document
Sol_140L4326Q0106_Amd_0002.pdf PDF
Sol_140L4326Q0106_Amd_0001.pdf PDF
A06_Attachment_3_DNA_0001.pdf PDF
A06_Attachment_2_RMP_0001.pdf PDF
A06_Attachment_1_PUP_0001.pdf PDF
B03_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3.AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE

. YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4.

FAR 52.212-3 AND 52.212-5 ARE ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

DATED.

OFFER

ADDENDA

ADDENDA

140L4326Q0106

See Schedule See Schedule

BLM OR-ST OFC PROC MGMT BR(OR952)

1220 SW 3rd Avenue, 12th Floor

PORTLAND OR 97204

08/31/2026 1700 ED

0044054669

Carrie Mahlmeister 5038086205

LHA 100.00

LHA

Matthew Duane

115310

$11.5

08/12/2026

0011276590

ADMINISTERED BY:

BLM OR STATE OFC PROC MGMT-OR952

1220 SW 3rd Avenue, 12th Floor

PORTLAND OR 97204 US

DELIVER TO:

BLM-OR NORTHWEST OREGON (SIUSLAW)

Continued...

STOCK RECORD (S/R)

STANDARD FORM 1449 (REV. 11/2021) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

ACCEPTED,

SIUSLAW RESOURCE AREA

3106 Pierce Pkwy, Ste E

Springfield OR 97477-7910 US

WEW Herbicide Treatment Siuslaw Field Office

Delivery: 01/01/2028

Period of Performance: 10/01/2026 to

01/01/2028

00010 Herbicide Applications

Product/Service Code: F006

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- LAND TREATMENT

PRACTICES

Law Enforcement Vehicle Upfitting SOLICITATION NO. 140L4326Q0099 BLM Lakeview and Burns Districts Page 3 of 30

SECTION B – SERVICES AND PRICES

This requirement is for one(1) Firm Fixed Price Commercial Services Purchase Order for Broadcast Herbicide Treatment in the West Eugene Wetlands located in Eugene, OR.

Item no. Item Description Quantity Unit of Measure

Unit Price Total

0001 Glyphosate Broadcast Spray Treatment

64* AC $

0002 Glyphosate OR Triclopyr Spot Spray Treatment

90* AC $ $

GRAND TOTAL – $

* Estimated Quantity AC = Acre

PERIOD OF PERFORMANCE: See Deliveries or Performance section.

(End of Supplies/Services and Prices/Costs)

(End of Section B)

BLM Lakeview and Burns Districts Page 4 of 30

SECTION C – STATEMENT OF WORK

1. TITLE – West Eugene Wetlands, 751 S Danebo Ave, Eugene OR 97402– Herbicide Applications

2. GENERAL –

The West Eugene Wetlands consists of heavily degraded prairie ecosystems located in the Willamette Valley. The West Eugene Wetlands exist in a semi-urban environment and therefore have some unique requirements surrounding habitat restoration. Herbicide application is necessary to achieve restoration and recovery goals set by the US Fish and Wildlife Service.

3. OBJECTIVE –

The objective of this effort is to reduce non-native and native invasive plants throughout the West Eugene Wetlands.

Habitat types may include, but are not limited to, upland prairie, wet prairie, oak savanna, oak woodland, ash swale, emergent, and vernal pools. This will be accomplished as part of an integrated pest management plan, which includes the use of approved herbicides.

4. SPECIFIC TASKS –

The following tasks shall be performed with Government direction:

a. Apply herbicides via backpack sprayer or vehicle mounted sprayer

b. Apply herbicides via broadcast sprayer

Treatment type Chemical Acres Broadcast Glyphosate 64 Spot Spray Glyphosate OR Triclopyr 90

Treatment acreages in the above table are estimates. Total acreage of treatments will depend upon a variety of factors including funding availability, phenology, weather, fire danger, and growth patterns.

All treatments will be coordinated with the COR at a minimum of one (1) week prior to starting the application of herbicide to allow for the posting of herbicide application notice signs by BLM and notification of adjacent landowners. The COR must approve all chemicals (including specific formulation and trade name), adjuvants, surfactants, additives, and application rates before the contractor may begin spraying. A general list of approved substances can be found in section 1 of Attachment 1, Pesticide Use Proposal (PUP) ORN000-24-001-P.

Contractor will be permitted to use an ATV/UTV to transport pre-mixed chemical solutions to the spray crew on approved routes. Clean OHVs to remove mud and plant material prior to off-road travel.

All requirements in the Pesticide label will be followed. The label is the law.

Contractor will use all PPE as required by the label. If the contractor is found to be using inadequate PPE by the COR, work will be paused until proper PPE can be located and utilized.

Contractor and BLM must follow all applicable Standard Operating Procedures and best management practices as outlined in Appendix E of Attachment 2, Record of Decision and Resource Management Plan, West Eugene Wetlands, April 2015, and Attachment B of Attachment 3, the WEW Integrated Herbicide use and Restoration Strategy 2024-2027 (DOI-BLM-ORWA-N030-2023-0015-DNA).

Herbicides, dyes, or adjuvants shall not be dumped on BLM or private lands during the implementation of this contract. While conducting herbicide treatments, the Contractor shall only clean backpack sprayers, hoses, or other equipment containing herbicide mixtures on BLM lands, not on private lands (other than Contractor’s). Rinsate shall only be poured on untreated noxious weed patches where no non-target plants would be impacted. No equipment

BLM Lakeview and Burns Districts Page 5 of 30 shall be rinsed within 100 feet of a water body.

Any herbicide spills shall be cleaned up following the spill plan provided by the contractor. All herbicide spills shall be reported to the COR immediately.

At a minimum, Contractor shall:

a. Take immediate action to minimize spill contamination, pending the arrival of containment personnel and equipment.

b. Immediately plug leak at the source herbicide container.

c. Immediately confine spill to a holding area.

d. Secure available equipment and personnel to construct ponding areas to prevent the herbicide spill from reaching any waterways.

e. After taking emergency procedures for containment, begin clean-up and disposal operations.

f. Notify the necessary local, state and federal authorities - i.e. help can be received from:

Chemical Transportation Emergency Center (Chemtrec) 800-424-9300 - Emergencies only or

Oregon Emergency Response System (OERS) (800)452-0311 NWOD BLM Hazmat Coordinator: Rebecca Hile – (458)231-1533

5. REPORTING REQUIREMENTS –

a. Pesticide Activity Reports (PARs) will be completed and delivered to the COR within 24 hours of the application.

Virtual or Physical copies are both acceptable.

b. A final report summarizing the work performed and any comments by the contractor shall be submitted to the COR at the end of the contract period of performance.

6. QUALIFICATION REQUIREMENTS –

All applicators must be fully licensed as required in the state of Oregon. The crew lead/supervisor must be able to communicate effectively with the COR or BLM representative. The crew lead/supervisor and all members of the crew must be able to accurately identify the target species.

Statement of Non-Personal Services

No personal services shall be performed under this task order. No Contractor employee shall be directly supervised by the Government. If the Contractor believes any Government action or communication has been given that would create a personal services relationship between the Government and any Contractor employee, the Contractor shall promptly notify the Contracting Officer (CO) of this communication or action.

The Contractor shall not perform any inherently governmental actions under this contract. No Contractor employee shall hold him or herself out to be a Government employee, agent, or representative. No Contractor employee shall state orally or in writing at any time that he or she is acting on behalf of the Government. In all communications with third parties in connection with this contract, Contractor employees shall identify themselves as Contractor employees and specify the name of the company for which they work.

The Contractor shall ensure that all of its employees working on this contract are informed of the substance of this article. Nothing in this article shall limit the Government's rights in any way under the other provisions of the contract, including those related to the Government’s right to inspect and accept the services to be performed under this contract. The substance of this article shall be included in all subcontracts at any tier.

7. PLACE AND PERIOD OF PERFORMANCE, WORK DAYS–

a. Place of Performance: Work will take place on BLM owned land in the West Eugene Wetlands.

BLM Lakeview and Burns Districts Page 6 of 30

b. Period of Performance: The period of performance will being once the contract is awarded and conclude on 1/01/2028.

c. Level of Effort: Work will require a mixture of technicians and supervisors.

d. Work Days: Work will generally be completed Monday through Friday, 6:00 AM to 6:00 PM. Exceptions may be made, with the approval of the COR, to take advantage of beneficial atmospheric conditions.

8. PREWORK MEETING –

A prework meeting will be held before the treatment window opens. The COR will provide the contractor with keys, maps, and physical PAR sheets. The maps will include zones marked for parking, chemical mixing, and disposal of rinsate. Digital PARs and georeferenced maps will be sent to the contractor electronically before the meeting.

9. SECURITY –

None required; the effort is unclassified.

10. CONTRACTING OFFICER REPRESENTATIVE (COR) –

The COR is responsible for monitoring the progress of this effort and completing all actions in COR appointment letter. All formal correspondence is sent to the COR of record for the SSP task. All treatments will be coordinated with the COR at a minimum of one (1) week prior to the starting the application of the herbicide to allow for the posting of herbicide application notice signs. The COR may work with a designated Project Inspector to communicate with the contractor and fulfill the non-administrative requirements of the contract as needed.

11. RELEVANCE

This work will support the BLM’s mission of conserving natural resources.

12. GOVERNMENT FURNISHED PROJECT MATERIALS & EQUIPMENT (GFE).

The government can supply water at the West Eugene Wetlands Project Office to refill spray tanks if necessary. All other equipment, supplies, and chemicals will be provided by the contractor.

(End of Section C)

BLM Lakeview and Burns Districts Page 7 of 30

SECTION F – DELIVERIES OR PERFORMANCE

F.1.0 PERIOD OF PERFORMANCE

The contract shall commence from 10/01/2026 – 01/01/2028.

F.2.0 PROGRESS PLAN

At the prework conference, the Contractor shall provide to the COR a written "work progress plan" that details its proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.

F.3.0 STOP WORK ORDER

The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage.

Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either-

(1) Cancel the stop-work order; or

(2) Terminate the work covered by the order as provided in contract clause 52.212-4.

If a stop-work order is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work.

The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if-

(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and

(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.

If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.

If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.

(End of Section F)

BLM Lakeview and Burns Districts Page 8 of 30

SECTION G – CONTRACT ADMINISTRATION DATA

ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP)

(FEB 2021)

Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice Processing Platform System (IPP).

“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Products or Commercial Services included in commercial products or commercial services contracts.

The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice

1. Invoice billed according to contract line items and rates.

2. If partial payment is billed and the invoice states a lump sum, the invoice shall include an itemized breakdown and narrative progress summary of the work performed during this invoice period.

3. If final payment is billed, the last invoice shall state “FINAL”.

4. Contractor’s Release of Claims shall be submitted with the final invoice.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contract (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 – 5 business days of the contract award date.

Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

(End of Section G) https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov

BLM Lakeview and Burns Districts Page 9 of 30

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1.0 ACCESS

In the event of a site/facility closure, the Contractor shall not perform or make deliveries to the site/facility until it is reopened by the Government, unless otherwise instructed by the Contracting Officer or their designated representative.

H.2.0 WORK HOURS

Unless otherwise specified in Section C, Specifications, work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. No work will be done on Saturday, Sunday, or Federal holidays unless authorized by the COR.

H.3.0 ENVIRONMENTAL INTERRUPTION OF WORK

H.3.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions, fire danger, or because it is impracticable to work during the winter season. The Contractor will be given a resume work order which will document the date the work suspension ends. An allowance has been included in the contract time for all environmental delays. The count of contract time will therefore continue during all periods of suspension due to normal weather conditions, including fire danger. The Contractor will not be entitled to additional contract time for any suspensions except to the extent that they are due to unusually severe weather conditions. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration.

H.3.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, identified under BLM Manual 6840, are discovered to be present in or adjacent to the project area.

H.4.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA

H.4.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.

H.4.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the Contracting Officer immediately in writing giving the location and nature of the findings.

H.4.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract.

H.4.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.

H.5.0 ENVIRONMENTAL IMPACT

All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control

BLM Lakeview and Burns Districts Page 10 of 30

Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);

the Endangered Species Act, as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ); and the Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ). Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.

H.6.0 HAZARDOUS MATERIALS

Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.

Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR

1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.

H.7.0 GREEN PROCUREMENT REQUIREMENTS

In the performance of this service or construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, if applicable:

• U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.

• USDA Biobased product listings published at www.biopreferred.gov.

• Energy Star® product listings published at www.energystar.gov/products.

• FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product-categories

Contractor shall comply with all reporting requirements stated in the applicable clause(s):

• 52.223-1 Biobased Product Certification

• 52.223-2 Reporting of Biobased Products under Service and Construction Contracts

• 52.223-4 Recovered Material Certification

• 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items

H.8.0 RESTORATION OF RESOURCES

H.8.1 Cleanup - The Contractor is responsible for cleaning up all camp and worksites before leaving the area.

Final payment or other alternative deemed feasible may be withheld until the Contractor has complied with this requirement.

H.8.2 Site and Access Roads – Site and public or private access roads negligently damaged by the Contractor shall be restored to the same condition they were in at the commencement of work, at the expense of the Contractor.

http://www.epa.gov/cpg/products.htm http://www.bioprefferd.gov/ http://www.energystar.gov/products http://energy.gov/eere/femp/covered-product-categories http://energy.gov/eere/femp/covered-product-categories

BLM Lakeview and Burns Districts Page 11 of 30

H.9.0 UNAUTHORIZED PERSONNEL

The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to restricted areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.

H.10.0 OREGON FARM/FOREST LABOR CONTRACTOR'S LICENSE

If the State of Oregon requires an Oregon Farm/Forest Labor Contractor's License, then the contractor awarded this contract and all first-tier subcontractors shall be required to obtain and maintain, during the term of this contract, such a license. Contractors not having a current license will be required to furnish evidence of having obtained such license within ten (10) days after receipt of written notification of contract award. Failure to obtain, keep and maintain a current license during the term of this contract or the extension thereof shall be a basis for termination for default.

Information on obtaining this license may be obtained from:

Bureau of Labor and Industries Contact: Licensing Unit Wage and Hour Division Telephone: (503) 373-1463 3865 Wolverine St. NE; E-1 Fax: (503) 373-7636 Salem, OR 97305-1268

H.11.0 FIRE DANGER SEASON

If the COR allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR and outlined in the attachment at the end of this section

The following clause is provided in full text:

SECURITY REQUIREMENTS: FACILITY ACCESS and INFORMATION TECHNOLOGY (August 2016)

(a) All Contractor employees must have an "Enter on Duty" (EOD) approval issued by the Bureau Personnel Security Office (PSO) before they begin performing work on any Bureau contract. The Contractor must ensure that all employees requesting an EOD are citizens of the United States of America, or an alien who has been lawfully admitted for permanent residence or employment (indicated by immigration status) as evidenced by Immigration and Naturalization Service documentation and the employee must have resided in the United States for a minimum of 3 years. The EOD may be issued in advance of a completed Background Investigation and may be rescinded by the PSO at any time. However, all contractors who require network access are required to complete the identity proofing process, and must be able to obtain a successfully adjudicated National Criminal History Check (NCHC) and National Agency Check with Inquiries (NACI) or higher to stay on the contract.

(b) Starting Work - Contractor employees with an approved EOD may begin performing unsupervised work on Bureau contracts. To remain on the contract, the Contractor employees will need a completed favorable Background Investigation.

(c) Rescission of EOD - The PSO may rescind the EOD at any time. This may occur as the result of additional information obtained or the final results of the background investigation.

(d) Background Investigation - Contractor employees who will have unsupervised access to Bureau facilities, access to the Department of the Interior (DOI) information technology (IT) systems or DOI data, or will develop custom applications, must have a favorably adjudicated background investigation from the Office of Personnel Management (OPM). Existing clearances at the same or higher level are acceptable upon the PSO’s review and approval. If the employee does not already have a complete investigation, they must apply for one. The

BLM Lakeview and Burns Districts Page 12 of 30 employee may begin work with an EOD, but must receive a favorable background investigation to continue working on the contract. The background investigation includes obtaining fingerprints through a USAccess Credentialing Center for an FBI criminal history and a credit report. Once the investigation has been scheduled by OPM, the Bureau will receive advance reports. If those reports are favorable, the Bureau PSO will issue the EOD. The type of background investigation required is based on the risk/sensitivity level designation. Citizenship requirements and guidance for determining the appropriate type of background investigation required for the designated risk/sensitivity level are contained in DOI Departmental Manual (DM) Part 441. The DM is available on the Internet at http://elips.doi.gov/app_home/index.cfm?fuseaction=home.

(e) Electronic Questionnaire for Investigations Processing (e-QIP) – The Bureau uses the e-QIP for all background investigations or reinvestigations. To initiate an investigation, the Contractor, in collaboration with the COR, will complete an e-QIP Request Form. This request form is available through the COR. The COR will submit the completed request form to the Bureau PSO. The PSO will enter the information into e-QIP to either establish a new applicant profile or determine if an existing investigation that meets Bureau requirements is on file. The PSO will then contact the applicant to provide additional information and instructions. Generally, the Contractor is required to complete the following forms:

▪ e-QIP application (on-line)

▪ Fair Credit Release

▪ OF-306

▪ Fingerprints via USAccess Credentialing Centers

The Contractor shall complete the required background investigation forms and submit them to the PSO. The PSO shall determine if individuals meet the required background investigation standards and citizenship requirements, and then make a suitability determination. Minimum standards used in suitability determinations are contained in the DOI Departmental Manual Part 441. The Government will pay for any background investigations required for contractor employees. If the Contractor employee’s background investigation is returned as unfavorable, the Government reserves the right to request reimbursement of the actual costs for the investigation from the Contractor.

(f) Reinvestigation - Contractor employees occupying high risk public trust positions must be reinvestigated every 5 years. A reinvestigation may be initiated prior to the normal periodic reinvestigation schedule when an individual’s continued ability to meet the minimum background investigation standards is in question. The electronic fingerprints on file in the USAccess system will be electronically submitted to OPM for the reinvestigation. The PSO shall review the records and documentation and make the suitability determination.

(g) Disputes - In the event of a disagreement between the Contractor and the Government concerning the suitability of a particular employee to perform work under this contract, the Government has the right of final determination. Determinations under this requirement are subject to the Disputes Clause, FAR 52.233-1. Failure of the Contractor to comply with the requirements of this clause could constitute grounds for termination for default.

(h) Physical Security Requirements - DOI Access Cards.

(1) Contractor employees must have a DOI Access Card before being given unsupervised access to a Government facility.

(2) To gain unsupervised access to Government facilities, Contractor employees must present their

DOI Access Card for examination by the security guard or electronically authenticate their DOI Access Card, as required. Contractor employees must keep their DOI Access Card in a shielded card holder, and visually display the card at all times while in the facility. Refusal or repeated neglect to display the DOI Access Card may result in limiting Contractor employee’s access to Government facilities or revoking of authorized access.

(3) When a Contractor employee is no longer working under this award, the Contractor is responsible for returning all DOI Access Cards, keys, and other Government property issued to that employee. The Contactor shall coordinate all returns with the COR. The COR is responsible for ensuring the Contractor complies with these requirements. However, failure by the Contractor to comply with these requirements may result in the Contractor’s liability for all costs associated with correcting any resultant breech in building security.

(i) Issuance & Maintenance - DOI Access Cards

(1) Process: To obtain a DOI Access Card the COR will use the online DOIAccess System to initiate the access request. Contractor employees will receive email notificat ions to enroll at a USAccess Credentialing Center with two forms of identification, and after adjudication, a second email notification to pick up and activate their DOI Access Card. The Contractor employee shall schedule an enrollment appointment at a USAccess center at least two weeks prior to the targeted EOD.

BLM Lakeview and Burns Districts Page 13 of 30

(2) Contractor Responsibilities: Contractor employees must complete actions in a timely manner to prepare for on-boarding and access to DOI network resources. The Contractor shall allow their personnel sufficient time to schedule and attend an enrollment appointment at the USAccess center prior to the contract start date. If the Contractor employee’s DOI Access Card becomes lost or stolen, the contractor employee shall notify the COR immediately to request a new DOI Access Card.

(3) COR Responsibilities: The COR (or designated individual) and Contractor shall maintain a listing of all Contractor employees who received a DOI Access Card, the date the card was issued, the date the electronic certificates expire (3 years from issue date), and the date the DOI Access Card expires (5 years from issue date). If the Contractor employee’s DOI Access Card or certificates will expire before the contract is completed, the COR (or designated individual) and Contractor is responsible for ensuring that the Contractor employee visits a USAccess center to update certificates on the existing card or obtain a new DOI Access Card. No later than one week prior to the DOI Access Card’s certificate or card expiration, the COR (or designated individual) shall notify the Contractor that DOI Access Card actions are required. The COR (or designated individual) and the Contractor shall update their listing to reflect the new issue date, certificate expiration date and card expiration date.

(j) Information Technology Security Requirements.

(1) Training – If contractor employees require access to any DOI/IT systems, the Contractor shall ensure its employees complete all Bureau/DOI required IT security training. The Contractor’s employees shall complete this training before being granted access to Bureau/DOI data or being issued network access. The current training requirements are: (i) annual end-user IT Security Awareness, (ii) annual IT Resources Rules of Behavior, and (iii) annual Role-Based Security training for IT professionals. The Contractor shall comply with all Bureau/DOI IT security training requirements in effect during contract performance. The COR will notify the Contractor of all Bureau mandatory IT training. The Contractor shall submit training completion certificates to the COR for all required training. Failure to meet this training requirement may result in removal of the contractor employee from the contract. The Bureau will determine if the contractor can later return to the contract.

(2) Access to Contractor’s Facilities for IT audit purposes - The Contractor shall afford Bureau and the Department of the Interior Office of Inspector General access to the Contractor’s and subcontractors’ facilities, installations, operations, documentation, databases, and personnel used in performance of the contract.

Access shall be provided to the extent required to carry out a program of IT inspection, investigation, and audit that will safeguard against threats and hazards to the integrity, availability, and confidentiality of Government data or to the function of computer systems operated on behalf of the Government and to preserve evidence of computer crime. If the Contractor questions the Government employee’s right to access its facilities, it should contact the CO for resolution.

(3) Contractor Location - Custom software development and outsourced operations shall be located in the United States to the maximum extent practical. If such services are proposed to be performed abroad, the Contractor shall provide an acceptable security plan that addresses the mitigation of problems related to communication, control, and protecting the confidentiality, integrity, and availability of IT systems and information.

(4) Applicable Standards - The Contractor shall follow all applicable Federal, DOI, and Bureau Bulletins, Directives, Guidelines, Manuals, Processing Standards, Memoranda, Policies and Standards; applicable OMB Memoranda; and all current National Institute of Standards & Technology (NIST) Special Publications. To comply with Federal Acquisition Regulation Subpart 39.101(d), contractors shall use the common security configurations available from the NIST website at http://checklists.nist.gov. NIST documents are available on the internet at http://csrc.nist.gov/publications/PubsSPs.html. OMB memoranda are available on the internet at http://www.whitehouse.gov/omb/memoranda/. The Contractor shall request copies of DOI and Bureau documents by contacting the COR.

(5) Incident Reporting - The Contractor shall immediately report computer security incidents affecting Bureau/DOI data and systems in accordance with the Bureau Computer Incident Response policy. The Contractor shall request copies of the Bureau Computer Incident Response policy by contacting the COR.

(6) Assessment and Authorization (A&A) and Continuous Monitoring.– The Contractor shall comply with Bureau policy when developing, upgrading, modifying or supporting applications and/or systems that require A&A and Continuous Monitoring. The Contractor shall request copies of Bureau A&A policy by contacting the COR. The A&A requirement does not apply when the Contractor's employees merely access data or have "read only" access.

(k) Documentation - The Contractor shall document all work performed and ensure that the appropriate Assessment and Authorization (A&A) documents are updated to reflect the work performed and the current state of

BLM Lakeview and Burns Districts Page 14 of 30

Bureau systems and networks. The Documentation requirement does not apply when the Contractor's employees merely access data or have "read only" access.

(l) Personnel Changes, Contractor Request - The Contractor shall immediately notify the COR and PSO when an employee is reassigned or leaves the Contractor’s employment and prior to any termination. The Contractor must adhere to the Bureau or Office’s mandatory exit clearance procedure. Once the COR has been notified that a Contractor employee is leaving the contract, the COR will initiate the exit clearance process in the DOIAccess System and forward to the Contractor the necessary instructions and form required to be completed prior to the contractor's employee’s departure. This form must be completed by the Contractor's employee and signed by both the Contractor's employee and the COR and then forwarded to the bureau/office specific program responsible for employee, volunteer, and contractor departures.

(m) Personnel Removal, Government Request - The Government retains the right to direct the Contractor to remove any prime or subcontractor personnel, regardless of prior clearance or background investigation adjudication status, whose actions, while assigned to this contract, clearly conflict with the security interests of the Government. The justification for the Government’s direction to remove Contractor personnel will be documented and provided to the Contractor by the CO.

(n) Subcontract Inclusion - The requirements of this clause must be incorporated into any subcontract if the subcontractor’s employee must have access to Bureau facilities.

(End of clause)

INTERNET PROTOCOL version 6 (June 2012

Any system hardware, software, firmware and/or networked component (voice, video or data) developed, procured, or acquired in support and/or performance of this contract shall be capable of transmitting, receiving, processing, forwarding and storing digital information across system boundaries utilizing system packets that are formatted in accordance with commercial standards of Internet Protocol (IP) version 6 (IPv6) as set forth in the USGv6 Profile (NIST Special Publication 500-267) and corresponding declarations of conformance defined in the USGv6 Test Program. In addition, this system shall maintain interoperability with IPv4 systems and provide at least the same level of performance and reliability capabilities of IPv4 products.

1. Specifically, any new IP product or system developed, acquired, or produced must:

a. Interoperate with both IPv6 and IPv4 systems and products, and

b. Have available contractor/vendor IPv6 technical support for development and implementation and fielded product management.

2. As IPv6 evolves, the Contractor commits to upgrading or providing an appropriate migration path for each item developed, delivered or utilized at no additional cost to the Government. The Contractor shall retrofit all non- IPv6 capable equipment, as defined above, that is fielded under this contract with IPv6 capable equipment, at no additional cost to the Government.

3. The contractor shall provide technical support for both IPv4 and IPv6.

4. Any system or software must be able to operate on networks supporting IPv4, IPv6 or one that supports both.

5. Any product whose non-compliance is discovered and made known to the Contractor within one year after acceptance shall be upgraded, modified or replaced to bring it into compliance at no additional cost to the Government.

(End of clause)

1510-52.222-70 MIGRANT SEASONAL AGRICULTURAL WORKERS PROTECTION ACT REGISTRATION

MAINTENANCE

(a) As set forth in Title 29, Part 500 of the Code of Federal Regulations, Migrant and Seasonal Agricultural Worker Protection, the Contractor shall maintain all necessary U.S. Department of Labor registrations during the performance period of this contract. Failure to maintain a valid registration is grounds for termination of this contract.

http://www.nist.gov/itl/antd/upload/usgv6-v1.pdf

BLM Lakeview and Burns Districts Page 15 of 30

(b) In compliance with the Migrant and Seasonal Agricultural Worker Protection Act, the Contractor shall provide the following to meet minimum safety and health standards for housing employees when camping on Federal lands:

(1) A shelter to provide protection from the elements. Where heat adequate for weather conditions is not provided, other arrangements should be made to protect the workers from the cold.

(2) Sanitary facilities for storing food. Ice chests or coolers, with ice supply made from potable water replenished as necessary, to meet the requirement for storage of perishable food items.

(3) An adequate and convenient potable water supply, approved by the appropriate health authority, in each camp for drinking and cooking purposes. As an alternative, commercial bottled water may be used.

(4) Toilet and hand washing facilities adequate for the capacity of the camp, at not less than a 1:15 ratio, supplied with adequate toilet paper. Such facilities shall be maintained in a sanitary condition.

(5) Fly-tight, rodent-tight, impervious, cleanable or single service containers to be used for the storage of garbage. Such containers shall be kept clean and emptied when full.

(6) Basic first aid supplies under the charge of a person trained to administer first aid.

(7) A laundry tray or tub for every 30 workers, or transportation, at least weekly, to a commercial laundromat for all workers.

(End of clause)

BLM Lakeview and Burns Districts Page 16 of 30

FIRE REQUIREMENTS PROCEDURES OUTLINE

This outline covers the fire protection requirements of a contractor or private party who performs service or construction contracts on BLM land. In western Oregon, the BLM allows Oregon Forest Law (ORS) and Oregon Administrative Rules (OAR) to apply to these operations on BLM lands rather than develop similar rules applicable only to BLM lands.

1. CLOSED FIRE SEASON

The closed fire season means that fire season has been declared. ORS 477.505 gives the State Forester the authority to establish the fire season. The authority has been delegated to the District Foresters around the state who issue public notices through the newspapers and radio when fire season will be closed for their individual districts.

Closed fire season depends upon the drying of forest fuels, rainfall, and time of year. During the closed fire season, the following requirements must be met:

• Fire tools must be on site;

• Fire extinguisher must be in all vehicles;

• Chainsaws must have a .023-inch mesh screen installed in the exhaust;

• Only unmodified saws are to be used in the forest;

• Approved spark arresters must be on all internal combustion engines;

• Watchman service must be provided for 3 hrs after shutdown of power equipment for the day;

• No smoking is permitted while working or traveling through any operations area in the forest;

• No use of explosives is permitted unless approved by the State Forester's representative;

• Permits to burn are required unless waived by a representative of the State Forester.

• Permits to operate power-driven machinery shall be obtained by the Contractor prior to commencing operations unless waived by a representative of the State Forester (ORS 47.625).

Changes or modifications to the above requirements are possible depending upon changes in State of Oregon law and requirements of the State Districts and Protective Associations.

2. FIRE PRECAUTION LEVELS

There are 4 fire precaution levels that begin with level 1 at the start of the closed fire season and can go through level 4 if conditions warrant. The fire precaution levels restrict certain forest operations as the fire danger increases.

It is the responsibility of the individual operating on forest land to know the precaution level for the day and take the correct fire precautions. There are no precaution levels prior to the closed fire season. Each fire precaution level requires adherence to the restrictions applicable to all lower levels in addition to the limits placed by that level.

Level 1 is the lowest level of fire danger usually occurring early in the season and perhaps again after significant rainfall during the season. All requirements listed above apply. Waivers may be issued by the State Districts or Protective Associations and these MUST be approved by the BLM. Waivers will only be considered if the conditions on the work site are not as severe as predicted. The requirements for fire tools on site, screens installed in saws, and fire extinguishers with saws will not be waived.

Level 2 is the partial hootowl where saws can operate from first light in the morning until 1:00 p.m. in the afternoon.

From 1:00 p.m. until the end of the day saws are to be shut down. Waivers for operating beyond the 1:00 p.m.

shutdown will be evaluated on a site-by-site basis.

Level 3 is the partial shutdown of all forest industrial operations and shuts down contractor operations with few exceptions. Waivers may be issued on a site-by-site basis.

Level 4 is the general shutdown of all contractor operations. Waivers will not be issued. Landowners are permitted entry into their lands.

ORS. 477.066 requires that an operator on forest land take immediate action to control and extinguish a fire on forest land. The contractor shall take this action and notify the BLM and the nearest State of Oregon District office immediately.

BLM Lakeview and Burns Districts Page 17 of 30

OAR. 629-43-030 requires watchmen to be:

• Physically capable and experienced in operating any firefighting equipment on site.

• On duty for 3 hours after the shutdown of the last power-driven equipment for the day.

• Furnished adequate facilities for transportation and communications in order to summon assistance if needed.

• Patrolling and visually inspecting all sites where work was done during the day.

3. FIRE TOOLS…

This is the start of the file's text. The full file is on GovTribe.