Round Valley Road Rock Hauling
Solicitation number
140L4326Q0090
Issued by

About this file

This is a Request for Quotation (RFQ) for rock hauling services on federal lands managed by the Bureau of Land Management (BLM).

The solicitation seeks a firm fixed-price commercial service contract for the delivery of approximately 550 tons of crushed aggregate (1½" minus) to Round Valley Road in Oregon. The contractor must provide all labor, equipment, tools, materials, and transportation necessary to acquire and deliver the crushed aggregate to the eastern portion of Round Valley Road by August 31, 2026. The performance period runs from the award date through August 31, 2026. Payment will be made on a per-ton basis for delivered material, with quantity determined by load counts or stockpile measurements at completion of crushing operations. The contractor is responsible for equipment cleaning to prevent noxious weed transfer, developing a Spill Prevention, Control, and Countermeasure Plan, maintaining hazardous material spill clean-up kits, and complying with all applicable federal and state safety regulations, including Mine Safety and Health Administration requirements and Oregon fire season requirements. Additional requirements include equipment inspection prior to work commencement, submission of aggregate gradation and safety plans within 14 days, and adherence to work hour restrictions (half hour before sunrise to half hour after sunset, no weekend or federal holiday work unless authorized).

Award will be made to the responsible firm whose quote is most advantageous to the Government, considering relevant experience and price. Quoters must demonstrate at least three similar projects completed as prime contractors within five years and demonstrate local market knowledge of Oregon conditions. The solicitation is designated for women-owned small businesses (WOSB) with a 100% set-aside. Electronic quotations must be submitted via email to Christy_webster@ios.doi.gov, with questions due within three business days of the solicitation closing date (July 22, 2026, 5:00 PM local time). The BLM Lakeview District, Klamath Falls Field Office administers the contract with delivery to BLM-OR Klamath Falls Resource Area. Service Contract Act wage determinations apply, and all invoicing must be submitted electronically through the U.S. Department of the Treasury's Invoice Processing Platform System.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3.AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE

. YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4.

FAR 52.212-3 AND 52.212-5 ARE ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

DATED.

OFFER

ADDENDA

ADDENDA

140L4326Q0090

See Schedule See Schedule

BLM OR-ST OFC PROC MGMT BR(OR952)

1220 SW 3rd Avenue, 12th Floor

PORTLAND OR 97204

07/22/2026 1700 PD

0044052182

Christy Webster 5038086074

LHA 100.00

LHA

Christy Webster

484110

$34

07/17/2026

0011276557

ADMINISTERED BY:

BLM OR-ST OFC PROC MGMT BR(OR952)

1220 SW 3rd Avenue, 12th Floor

PORTLAND OR 97204 US

DELIVER TO:

BLM-OR KLAMATH FALLS RESOURCE AREA

Continued...

STOCK RECORD (S/R)

STANDARD FORM 1449 (REV. 11/2021) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

ACCEPTED,

2795 ANDERSON AVE BLDG 25

KLAMATH FALLS OR 97603 US

Round Valley Round Rock Hauling

Delivery: 08/31/2026

Period of Performance: 07/23/2026 to

08/31/2026

00010 Delivery of crushed aggregate

Product/Service Code: Z1LB

Product/Service Description: MAINTENANCE OF

HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS

Rock Hauling, Round Valley Road, Oregon SOLICITATION NO. 140L4326Q0090 BLM Lakeview District, Klamath Falls Field Office Page 3 of 22

SECTION B – SERVICES AND PRICES

This requirement is for one (1) Firm Fixed Price Commercial Service Contract for rock hauling in Round Valley Road, Oregon.

BASE

Item no. Item Description Quantity Unit of

Measure Unit Price Total

0010 1 ½” Minus Delivered Ton 550 $ $

GRAND TOTAL $

(End of Section B)

BLM Lakeview District, Klamath Falls Field Office Page 4 of 22

SECTION C – STATEMENT OF WORK

C.1.0 GENERAL: The purpose of this contract is to acquire services for acquiring commercial crushed aggregate (1 ½” minus) for delivery to Round Valley Road. Bid work includes all equipment, tools, materials, labor, and for acquisition and transportation to deliver +/- 550 Tons of crushed aggregate to the eastern portion of Round Valley Road as shown in the drawings. Delivered material to be placed in the field as directed by Lakeview District Road Crew. The delivered aggregate will be spread and compacted by the BLM. Maps and drawings are included as an attachment.

C.1.1 Description of Work: Contractor shall provide all labor and equipment sufficient to deliver crushed rock to the Round Valley Road.

C.1.2 Location: See attached plans.

C.1.3 SAFETY: Contractor shall strictly adhere to all applicable Federal and State Safety regulations, including fire advisories and restrictions. Contractor follow Mine Safety and Health Administration (MSHA) requirements for Quarry Pit developments.

C.1.4 Spill Prevention, Control, and Countermeasure Plan (SPCC): The Contractor shall develop and submit a modified SPCC Plan as defined under 40 CFR Part 112. The SPCC Plan will be reviewed and accepted by the Contracting Officer (CO) prior to initiating project work. The SPCC Plan shall, as a minimum, contain the following information:

1. Response Priorities

2. Contractor Representative in Charge

3. Duties of Contractor Personnel

4. Contractor Emergency Response Procedures

5. Contents of Spill Containment Kit (SCK)

6. Spill Response Diagram

C.2.0 DEFINITIONS:

Target Values (TV) – A number established as a center for operating a given process.

Once established, adjustments should be made in the process as necessary to maintain a central tendency about the target value. Test results obtained from a well-controlled process should cluster closely around the established target value and the mean of the test results should be equal to or nearly equal to the established target value.

AASHTO – American Association of State Highway and Transportation Officials

ASTM – American Society of Testing and Materials

BLM Lakeview District, Klamath Falls Field Office Page 5 of 22

CFR – Code of Federal Regulations

CO – Contracting Officer

DOT - Department of Transportation

EPA – Environmental Protection Agency

FAR - Federal Acquisition Regulation

FHWA – Federal Highway Administration

GSA – General Services Administration

MSHA - Mine Safety and Health Administration

MUTCD – Manual on Uniform Traffic Control Devices

NIST – National Institute of Standards and Technology

OSHA – Occupational Safety and Health Administration

USC – United States Code

C.3.0 CONTRACTOR-FURNISHED ITEMS: Contractor shall furnish all labor, tools, materials, supplies, and equipment necessary to perform the work specified.

C.4.0 GOVERNMENT FURNISHED ITEMS: Crushed aggregate and ‘crusher fines’ from previous crushing operation at Doherty Slide Quarry will be provided by the BLM.

C.5.0 SPECIFIC TASKS

Contractor shall through mechanical means crush aggregate to the desired size and gradation. Material shall be stockpiles at the locations designated on the site drawings.

Contractor shall provide quality control and material testing to ensure produced rock meets the required gradation.

C.5.1 EQUIPMENT INSPECTION: All drilling equipment shall be in clean and working condition prior to entering public lands. The Government will inspect all equipment for cleanliness prior to entering public lands as an effort to reduce noxious weed transfer.

C5.1.1 SPECIAL EQUIPMENT CLEANING REQUIREMENTS: In order to prevent the spread of noxious weeds, the Contractor shall clean all construction equipment prior to moving it to the project area. This cleaning shall remove all soil, plant parts, seeds, vegetative matter, or other debris that could contain or hold seeds. Only construction and maintenance equipment, and the equipment necessary to transport said equipment, so cleaned and inspected by the Forest Service will be allowed to operate within the project area. This

BLM Lakeview District, Klamath Falls Field Office Page 6 of 22 requirement does not apply to service vehicles, water trucks, pickups, cars, and/or similar vehicles.

Contractor shall employ whatever cleaning methods necessary to ensure that construction and maintenance equipment is free of noxious weeds. Equipment shall be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material.

Equipment or components disassembly, or the need for specialized tools, are not required.

Unless otherwise agreed, Contractor shall give the BLM at least 24 hours notice when equipment is ready for inspection. Notification will include an agreed upon location where the equipment will be available for inspection by the BLM. The BLM shall approve the methods of cleaning. The equipment shall be cleaned prior to moving onto this project. This work is incidental to the pay item.

C.5.3 HAZARDOUS MATERIAL SPILL CLEAN-UP KIT: A hazardous material spill clean-up kit shall be maintained and readily available for potential use on the project at each work site. All employees will be trained in the use of the kit and trained in procedures to follow if a spill occurs.

As a minimum, spill clean-up kits shall contain the following items:

• 1 case absorbent pads suitable for absorbing hydraulic fluid, engine oil, and fuel

• 1 gallon “Plug-a-Dike” or equivalent material

• A 19-liter capacity (five gallon) mixing container

C.5.4 Submittals:

C.5.4.1 The following submittals are required for this project:

Referenced by

Contract clause or Time of Government

Title Specification No. Review After Submittal

Aggregate Gradation 14 Days

Safety Plan Accident Prevention clause 14 Days

[FAR 52.236-13]

14 Days

BLM Lakeview District, Klamath Falls Field Office Page 7 of 22

Project Schedule

C.5.4.2 The Government will have 14 working days to review any pre-task submittals necessary; i.e.

Spill Prevention, Control and Countermeasure Plan.

C.5.4 Quality Assurance: The work shall comply with codes and standards applicable to each type of work.

C.6.0 MEASUREMENT AND PAYMENT

C.6.1.1 Mobilization

Payment will be made at the lump sum price shown in the Schedule of Items.

C.6.1.2 Crushed Aggregate Delivered

Payment will be made at the per cubic yard price shown in the Schedule of Items. Material quantity will be determined by load counts and or measuring stockpiles at the completion of crushing operations.

C.6.2 METHOD OF MEASUREMENT

All items shall be paid for per unit of measure as described in the Schedule of Items, Section B.

All material, equipment and labor necessary to perform the work for each item shall be incidental to that item.

C.6.3 PAYMENT

Unit price pay items shall be paid for by the actual quantities performed, rounded to the nearest whole unit of measure as listed in the Schedule of Items, Section B.

(End of Section C)

BLM Lakeview District, Klamath Falls Field Office Page 8 of 22

SECTION F – DELIVERIES OR PERFORMANCE

F.1.0 PERIOD OF PERFORMANCE

The contract shall commence from date of award through August 31, 2026.

F.2.0 PROGRESS PLAN

At the prework conference, the Contractor shall provide to the COR a written "work progress plan" that details its proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.

F.3.0 STOP WORK ORDER

The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage.

Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either-

(1) Cancel the stop-work order; or

(2) Terminate the work covered by the order as provided in contract clause 52.212-4.

If a stop-work order is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work.

The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if-

(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and

(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.

If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.

If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.

(End of Section F)

BLM Lakeview District, Klamath Falls Field Office Page 9 of 22

SECTION G – CONTRACT ADMINISTRATION DATA

The following local clauses are provided in full text:

ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP)

(FEB 2021)

Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice Processing Platform System (IPP).

“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Products or Commercial Services included in commercial products or commercial services contracts.

The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice

1. Invoice billed according to contract line items and rates.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contract (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 – 5 business days of the contract award date.

Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

(End of Section G) https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov

BLM Lakeview District, Klamath Falls Field Office Page 10 of 22

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1.0 ACCESS

In the event of a site/facility closure, the Contractor shall not perform or make deliveries to the site/facility until it is reopened by the Government, unless otherwise instructed by the Contracting Officer or their designated representative.

H.2.0 WORK HOURS

Unless otherwise specified in Section C, Specifications, work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. No work will be done on Saturday, Sunday, or Federal holidays unless authorized by the COR.

H.3.0 ENVIRONMENTAL INTERRUPTION OF WORK

H.3.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions, fire danger, or because it is impracticable to work during the winter season. The Contractor will be given a resume work order which will document the date the work suspension ends. An allowance has been included in the contract time for all environmental delays. The count of contract time will therefore continue during all periods of suspension due to normal weather conditions, including fire danger. The Contractor will not be entitled to additional contract time for any suspensions except to the extent that they are due to unusually severe weather conditions. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration.

H.3.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, identified under BLM Manual 6840, are discovered to be present in or adjacent to the project area.

H.4.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA

H.4.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.

H.4.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the Contracting Officer immediately in writing giving the location and nature of the findings.

H.4.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract.

H.4.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.

H.5.0 ENVIRONMENTAL IMPACT

All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13

BLM Lakeview District, Klamath Falls Field Office Page 11 of 22

October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);

the Endangered Species Act, as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ); and the Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ). Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.

H.6.0 HAZARDOUS MATERIALS

Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.

Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR

1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.

H.7.0 GREEN PROCUREMENT REQUIREMENTS

In the performance of this service or construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, if applicable:

• U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.

• USDA Biobased product listings published at www.biopreferred.gov.

• Energy Star® product listings published at www.energystar.gov/products.

• FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product-categories

Contractor shall comply with all reporting requirements stated in the applicable clause(s):

• 52.223-1 Biobased Product Certification

• 52.223-2 Reporting of Biobased Products under Service and Construction Contracts

• 52.223-4 Recovered Material Certification

• 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items

H.8.0 RESTORATION OF RESOURCES

H.8.1 Cleanup - The Contractor is responsible for cleaning up all camp and worksites before leaving the area.

Final payment or other alternative deemed feasible may be withheld until the Contractor has complied with this requirement.

http://www.epa.gov/cpg/products.htm http://www.bioprefferd.gov/ http://www.energystar.gov/products http://energy.gov/eere/femp/covered-product-categories http://energy.gov/eere/femp/covered-product-categories

BLM Lakeview District, Klamath Falls Field Office Page 12 of 22

H.8.2 Site and Access Roads – Site and public or private access roads negligently damaged by the Contractor shall be restored to the same condition they were in at the commencement of work, at the expense of the Contractor.

H.9.0 UNAUTHORIZED PERSONNEL

The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to restricted areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.

H.10.0 OREGON FARM/FOREST LABOR CONTRACTOR'S LICENSE

If the State of Oregon requires an Oregon Farm/Forest Labor Contractor's License, then the contractor awarded this contract and all first-tier subcontractors shall be required to obtain and maintain, during the term of this contract, such a license. Contractors not having a current license will be required to furnish evidence of having obtained such license within ten (10) days after receipt of written notification of contract award. Failure to obtain, keep and maintain a current license during the term of this contract or the extension thereof shall be a basis for termination for default.

Information on obtaining this license may be obtained from:

Bureau of Labor and Industries Contact: Licensing Unit Wage and Hour Division Telephone: (503) 373-1463 3865 Wolverine St. NE; E-1 Fax: (503) 373-7636 Salem, OR 97305-1268

H.12.0 FIRE DANGER SEASON

If the COR allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR and outlined in the attachment at the end of this section.

BLM Lakeview District, Klamath Falls Field Office Page 13 of 22

FIRE REQUIREMENTS PROCEDURES OUTLINE

This outline covers the fire protection requirements of a contractor or private party who performs service or construction contracts on BLM land. In western Oregon, the BLM allows Oregon Forest Law (ORS) and Oregon Administrative Rules (OAR) to apply to these operations on BLM lands rather than develop similar rules applicable only to BLM lands.

1. CLOSED FIRE SEASON

The closed fire season means that fire season has been declared. ORS 477.505 gives the State Forester the authority to establish the fire season. The authority has been delegated to the District Foresters around the state who issue public notices through the newspapers and radio when fire season will be closed for their individual districts.

Closed fire season depends upon the drying of forest fuels, rainfall, and time of year. During the closed fire season, the following requirements must be met:

• Fire tools must be on site;

• Fire extinguisher must be in all vehicles;

• Chainsaws must have a .023-inch mesh screen installed in the exhaust;

• Only unmodified saws are to be used in the forest;

• Approved spark arresters must be on all internal combustion engines;

• Watchman service must be provided for 3 hrs after shutdown of power equipment for the day;

• No smoking is permitted while working or traveling through any operations area in the forest;

• No use of explosives is permitted unless approved by the State Forester's representative;

• Permits to burn are required unless waived by a representative of the State Forester.

• Permits to operate power-driven machinery shall be obtained by the Contractor prior to commencing operations unless waived by a representative of the State Forester (ORS 47.625).

Changes or modifications to the above requirements are possible depending upon changes in State of Oregon law and requirements of the State Districts and Protective Associations.

2. FIRE PRECAUTION LEVELS

There are 4 fire precaution levels that begin with level 1 at the start of the closed fire season and can go through level 4 if conditions warrant. The fire precaution levels restrict certain forest operations as the fire danger increases.

It is the responsibility of the individual operating on forest land to know the precaution level for the day and take the correct fire precautions. There are no precaution levels prior to the closed fire season. Each fire precaution level requires adherence to the restrictions applicable to all lower levels in addition to the limits placed by that level.

Level 1 is the lowest level of fire danger usually occurring early in the season and perhaps again after significant rainfall during the season. All requirements listed above apply. Waivers may be issued by the State Districts or Protective Associations and these MUST be approved by the BLM. Waivers will only be considered if the conditions on the work site are not as severe as predicted. The requirements for fire tools on site, screens installed in saws, and fire extinguishers with saws will not be waived.

Level 2 is the partial hootowl where saws can operate from first light in the morning until 1:00 p.m. in the afternoon.

From 1:00 p.m. until the end of the day saws are to be shut down. Waivers for operating beyond the 1:00 p.m.

shutdown will be evaluated on a site-by-site basis.

Level 3 is the partial shutdown of all forest industrial operations and shuts down contractor operations with few exceptions. Waivers may be issued on a site-by-site basis.

Level 4 is the general shutdown of all contractor operations. Waivers will not be issued. Landowners are permitted entry into their lands.

ORS. 477.066 requires that an operator on forest land take immediate action to control and extinguish a fire on forest land. The contractor shall take this action and notify the BLM and the nearest State of Oregon District office immediately.

BLM Lakeview District, Klamath Falls Field Office Page 14 of 22

OAR. 629-43-030 requires watchmen to be:

• Physically capable and experienced in operating any firefighting equipment on site.

• On duty for 3 hours after the shutdown of the last power-driven equipment for the day.

• Furnished adequate facilities for transportation and communications in order to summon assistance if needed.

• Patrolling and visually inspecting all sites where work was done during the day.

3. FIRE TOOLS REQUIRED DURING CLOSED FIRE SEASON

The operator/contractor shall furnish fire tools to all personnel on site using the following combinations.

NUMBER OF PERSONNEL_______________________________

1- 4 5 6 7 8 9 10 11 12 13 14

KIND OF TOOLS NUMBER OF TOOLS REQUIRED_________________________

Pulaskis 1 1 1 1 1 1 2 2 2 2 2

Shovels 2 2 2 3 3 3 3 4 4 5 5

Hazel hoes 1 2 3 3 4 5 5 5 6 6 6

In addition to the above handtools, the operator/contractor must provide a backpack pump can filled with water located with the tool box in a readily available area.

All shovels are to be size 0 or larger, long handled. All tools shall be sharp and ready for service. Fire extinguishers as follows:

For chainsaws - 8 oz. capacity by weight.

For vehicles - UL rating of at least 4 BC.

4. ADDITIONAL WATER SUPPLY

Contractor shall comply with ORS 477.615 during fire season when inside or within one-eighth of one mile of a state forest protection district and furnish additional water supply and equipment for use in fire suppression in conformity with the rules promulgated by the Oregon State Forester, when directed by the Oregon State Forester in writing. When required, all water supply and equipment components shall be maintained and ready for immediate use.

During fire season when operating a stationary internal combustion engine inside or within one eighth of one mile of a state forest protection district, Contractor shall comply with ORS 477.650 and provide a water supply, with equipment for its use in fire suppression for each engine, in conformity with the rules promulgated by the Oregon State Forester. All water supply and equipment components shall be maintained and ready for immediate use.

(End of Special Contract Requirements)

BLM Lakeview District, Klamath Falls Field Office Page 15 of 22

SECTION I – CONTRACT CLAUSES

The following clauses are incorporated by reference:

Number Date Title 52.212-4 Mar-26 Terms and Conditions—Commercial Products and Commercial Services 52.203-17 Nov-23 Contractor Employee Whistleblower Rights 52.204-13 Mar-26 System for Award Management—Maintenance 52.209-10 Nov-15 Prohibition on Contracting with Inverted Domestic Corporations 52.219-6 Jan-26 Notice of Total Small Business Set-Aside 52.222-3 Jul-03 Convict Labor 52.222-19 Mar-26 Child Labor—Cooperation with Authorities and Remedies 52.222-36 Jun-20 Equal Opportunity for Workers with Disabilities 52.222-41 Aug-18 Service Contract Labor Standards 52.222-42 May-14 Statement of Equivalent Rates for Federal Hires 52.222-50 Oct-25 Combating Trafficking in Persons 52.222-62 Jan-22 Paid Sick Leave Under Executive Order 13706 52.222-90 Apr-26 Addressing DEI Discrimination by Federal Contractors.

52.223-23 May-24 Sustainable Products and Services 52.226-8 May-24 Encouraging Contractor Policies to Ban Text Messaging While Driving 52.232-33 Oct-18 Payment by Electronic Funds Transfer—System for Award Management 52.232-40 Mar-23 Providing Accelerated Payments to Small Business Subcontractors 52.232-9X May-06 Fast Payment Procedure 52.233-3 Aug-96 Protest After Award 52.233-4 Oct-04 Applicable Law for Breach of Contract Claim 52.240-91 Mar-26 Security Prohibitions and Exclusions 52.244-6 Apr-26 Subcontracts for Commercial Products and Commercial Services

The following clauses are provided in full text:

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://acquisition.gov/

(End of Clause)

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.

BLM Lakeview District, Klamath Falls Field Office Page 16 of 22

(b) The use in this solicitation or contract of any Department of the Interior Acquisition Regulation (48 CFR Chapter

14) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

(End of Clause)

1452.201-70 AUTHORITIES AND DELEGATIONS (SEP 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

(End of clause)

1452.203-70 RESTRICTIONS ON ENDORSEMENTS—DEPARTMENT OF THE INTERIOR (JUL 1996)

BLM Lakeview District, Klamath Falls Field Office Page 17 of 22

The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in FAR 31.205-1, in a manner which states or implies that the product or service provided is approved or endorsed by the Government, or is considered by the Government to be superior to other products or services. This restriction is intended to avoid the appearance of preference by the Government toward any product or service. The Contractor may request the Contracting Officer to make a determination as to the propriety of promotional material.

(End of clause)

(End of Section I)

BLM Lakeview District, Klamath Falls Field Office Page 18 of 22

SECTION J – LIST OF ATTACHMENTS

Attachment No. Title Pages

1 Service Contract Act Wage Determination 7 The latest wage determination shall be incorporated at the time of award.

(End of Section J)

BLM Lakeview District, Klamath Falls Field Office Page 19 of 22

SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

K.1.0 SIGNATURE EXTENSION

If the Offeror is a partnership or a joint venture, all partners or joint venture representatives are required to sign as contractors. Signatures shall be provided below:

Name:_________________________ Name:________________________

Title:__________________________ Title:_________________________

The following provisions are incorporated by reference:

52.225-20 Aug-09 Prohibition on Conducting Restricted Business Operations in Sudan-Certification 52.225-25 Jun-20 Prohibition on Contracting with Entities Engaging in Certain Activities or

Transactions Relating to Iran-Representation and Certifications

52.240-90 Mar-26 Security Prohibitions and Exclusions Representations and Certifications

(End of Section K)

BLM Lakeview District, Klamath Falls Field Office Page 20 of 22

SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS OR RESPONDENTS

L.1.0 GENERAL. This is a Request For Quotation (RFQ). An award notice will be posted on the Contract

Opportunities website located at www.sam.gov upon award. The award notice will include the awardee’s name and address and total award amount.

L.1.1 Electronic Response. The quotation shall be electronically submitted via email to

Christy_webster@ios.doi.gov.

L.1.2 Requests for Information. Questions regarding this solicitation must be submitted in writing to via e-mail to blm_or_so_952_mail@blm.gov and christy_webster@ios.doi.gov within 3 business days of the solicitation closing date.

L.1.3 Quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

L.2.0 QUOTATION INSTRUCTIONS. The quotation shall be submitted in two parts consisting of a (1) non-price and (2) price section.

L.2.1 FORMAT AND CONTENT OF NON-PRICE SECTION. The non-price section shall be organized by evaluation factor and sequenced in the below order. The respondent shall address the following factors in sufficient narrative and qualitative detail to be evaluated.

Evaluation Factors:

Relevant Experience –

(a) Respondent shall demonstrate their specialized experience by furnishing at least three (3) projects of similar scope and magnitude to this requirement that were completed as a Prime Contractor within five (5) years of the solicitation closing date. Experience information shall include:

• Customer/contracting agency

• Contract number

• Contract title with location

• Identify whether experience was as a Prime or Subcontractor

• Award date

• Initial award amount

• Award amount at contract completion

• Contract completion date

• Actual completion date

• Description of project

• Describe relevant experience and any unique conditions and/or challenges

(b) Local Market Knowledge. Respondents shall demonstrate their specialized experience with similar work in project location or locations that have similar conditions to those found in the local area. The local area is defined as Oregon. The Respondent, through these projects, must demonstrate knowledge of local weather, transportation complexities, subcontracts and local market conditions.

L.2.2 FORMAT AND CONTENT OF PRICE SECTION

L.2.2.1 Submit the completed Standard Form 1449 and all acknowledged amendments, if any.

http://www.sam.gov/ mailto:christy_webster@ios.doi.gov

BLM Lakeview District, Klamath Falls Field Office Page 21 of 22

L.2.2.2 Evaluation Factor, Price. The Offeror shall remit a completed price schedule (Section B). The Respondent shall enter unit price and extended total for each item listed in Section B. The price shall include all necessary supervision, management, labor, transportation, equipment, materials, any other direct incidental costs, overhead and profit, unless the cost is identified as a separately priced contract line item.

L.2.2.3 The Respondent shall complete and submit all applicable Representations, Certifications and Other

Statements of Offerors. In accordance with FAR 4.1201, representations and certifications shall be submitted to the System for Award Management (www.sam.gov) and updated at least annually to ensure they are kept current, accurate, and complete.

The following provisions are incorporated by reference:

52.212-1 Mar-26 Instructions to Offerors—Commercial Products and Commercial Services

52.204-7 Mar-26 System for Award Management—Registration.

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a firm fixed-price type of contract resulting from this solicitation.

(End of provision)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

Federal Acquisition Regulation: https://acquisition.gov/ Department of the Interior Acquisition Regulation (CFR, Title 48, Chapter 14): https://acquisition.gov/diar

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the provision.

(b) The use in this solicitation of any Department of the Interior Acquisition Regulation (48 CFR Chapter 14) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

(End of Provision)

(End of Section L) http://www.orca.bpn.gov/

BLM Lakeview District, Klamath Falls Field Office Page 22 of 22

SECTION M – EVALUATION FACTORS FOR AWARD

M.1.0 BASIS OF AWARD

This solicitation will result in the award of a Firm Fixed-Price Commercial Service Purchase Order in accordance with the provisions herein this section. Price shall be fair and reasonable.

The following provisions are provided in full text:

52.212-2 – EVALUATION – COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAR 2026)

(a) Evaluation factors. The Government will award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors will be used to evaluate offers:

Relevant Experience and Price.

(b) Options (if applicable). The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. The evaluation of options does not obligate the Government to exercise the option(s).

(c) Notice of award. A written notice of award or acceptance of an offer furnished to the successful Offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.

Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of provision)

1510-52.213-70 – EVALUATION OF QUOTATIONS

Award will be made to the responsible firm whose quote is most advantageous to the Government, price and other factors considered. Other factors for this solicitation include past performance of the quoter. Past performance information may be based on the Government's knowledge of and previous experience with the quoter, or other reasonable basis.

(End of Section M)

Solicitation/Contract/Order for commercial products and commercial services
Requisition number
Contract number
Award/Effective date
Order number
Solicitation number
Solicitation issue date
For solicitation information call:
Name
Telephone number
Offer due date/local time
Issued by
Code
This acquisition is
NAICS
Size standard
Delivery for free on board (FOB) destination unless block is marked
Discount terms
This contract is a rated order under the defense priorities and allocations system - DPAS
Rating
Method of solicitation
Deliver to
Code
Administered by
Code
Contractor/Offeror
Code
Facility code
Telephone number
Check if remittance is different and put such address in offer
Payment will be made by
Code
Submit invoices to address shown in block 18a unless block below is checked
Accounting and appropriation data
Total award amount
Solicitation incorporates by reference
Addenda
Contract/purchase order incorporates by reference
Addenda
Contractor is required to sign this doc. and return:
Award of contract: reference
Signature of offeror/contractor
Name and title of signer
Signer date signed
Signature of contracting officer
Name of contracting officer
Contracting officer date signed
Authorized for local reproduction. Previous edition is not usable
Standard Form 1449 (Rev. 11/2021)
Quantity in column 21 has been
Signature of authorized government representative
Date
Printed name and title of authorized government representative
Mailing address authorized government representative
Telephone number of authorized government representative
Email number of authorized government representative
Ship number
Voucher number
Amount verified correct for
Payment
Check number
Stock record (S/R)
S/R account number
S/R voucher number
Paid by
I certify this account is correct and proper for payment
Signature and title of certifying officer
Date
Received by
Received at
Date received
Total containers
Standard Form 1449 (rev. 11/2021) Back

52.212-2 – EVALUATION – COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAR 2026)