Sol_140L4326Q0080.pdf
PDF 458 KB Posted
- Attached to
- Northwest Oregon Multiple Fence Repairs Federal contract opportunity
- Solicitation number
- 140L4326Q0080
About this file
Solicitation Summary
This is a Request for Quotation (RFQ) for a Firm Fixed Price construction contract for multiple fence repairs at three locations in northwest Oregon for the Bureau of Land Management (BLM). The solicitation number is 140L4326Q0080, with an offer due date of July 15, 2026, at 12:00 PM Pacific Time. The contract is set aside for small business concerns, specifically women-owned small businesses (WOSB), with a NAICS code of 238990 and a size standard of $19 million. Award is expected on or about November 2, 2026, with a performance period from August 3, 2026, to November 1, 2026.
The three line items require demolition and replacement of fences at Molalla, OR; Willamina, OR; and Shotgun (Marcola), OR, each as a lump-sum contract item. The contractor must commence work within 30 calendar days of receiving notice to proceed and complete all work within 90 days. Evaluation will be based on two factors in descending order of importance: (1) Relevant Experience, requiring demonstration of at least three similar projects completed as a prime contractor within six years, including local market knowledge of northwest Oregon conditions; and (2) Price. The government intends award without discussions to the responsible respondent offering the best value. Additional requirements include compliance with Davis-Bacon wage rates, submission of certified payrolls, liability insurance of $500,000 per person/occurrence, electronic invoicing through the Invoice Processing Platform, security clearances for contractor personnel, and adherence to environmental, fire safety, and archaeological preservation regulations specific to BLM lands in Oregon.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_1_Wage_Determination_OR20260001.pdf | ||
| Attachment_Section_C_SOW_-_Multiple_Fence_Repairs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3.AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
. YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4.
FAR 52.212-3 AND 52.212-5 ARE ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
DATED.
OFFER
ADDENDA
ADDENDA
140L4326Q0080
See Schedule See Schedule
BLM OR-ST OFC PROC MGMT BR(OR952)
1220 SW 3rd Avenue, 12th Floor
PORTLAND OR 97204
07/15/2026 1200 PD
0044051715
Joseph Duncan 5038086535
LHA 100.00
Matthew Duane
238990
$19
07/02/2026
0011276581
DELIVER TO:
BLM-OR NORTHWEST OR (ADMIN|ENG|REC)
1717 FABRY RD SE
SALEM OR 97306 US
Delivery: 11/01/2026
Period of Performance: 08/03/2026 to
Continued...
STOCK RECORD (S/R)
STANDARD FORM 1449 (REV. 11/2021) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
ACCEPTED,
11/02/2026
00010 Northwest Oregon Multiple Fence Repairs
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
Period of Performance: 08/03/2026 to
11/01/2026
Northwest Oregon Multiple Fence Repairs SOLICITATION NO. 140L4326Q0080 BLM Northwest Oregon District Page 3 of 56
Section Title Part I—The Schedule
A Solicitation/contract form B Bid schedule C Specifications/Drawings D Packaging and marking E Inspection and acceptance F Deliveries or performance G Contract administration data H Special contract requirements
Part II—Contract Clauses I Contract clauses
Part III—List of Documents, Exhibits, and Other Attachments
J List of attachments Part IV—Representations and Instructions
K Representations, certifications, and other statements of offerors
L Instructions, conditions, and notices to offerors M Evaluation factors for award
BLM Northwest Oregon District Page 4 of 56
SECTION B – BID SCHEDULE
This requirement is for one (1) Firm Fixed Price Construction contract for Multiple Fence Repairs in Molalla OR, Willamina OR, and Marcola OR for the BLM Northwest Oregon District.
Schedule of Items Item No. Description QTY Unit of
Measure Unit Price Total Price
0001 Demolish and Replace Fence at Molalla 1 Lump Sum $ $
0002 Demolish and Replace Fence at Willamina 1 Lump Sum $ $
0003 Demolish and Replace Fence at Shotgun 1 Lump Sum $ $
TOTAL ITEMS 1-3 $ $
Company Name:_____________________________________________________________________
Company Point of Contact:_____________________________________
Phone Number:______________________________________________
Email:_____________________________________________________
SAM UEI No.:_____________________________________________________________
PERFORMANCE PERIOD: See Section F below.
THIS SOLICITATION IS SET ASIDE FOR SMALL BUSINESS CONCERNS.
(End of Section B)
BLM Northwest Oregon District Page 5 of 56
SECTION C – SPECIFICATIONS/DRAWINGS
See Attachment Section C Statement of Work (SOW).
(End of Section C)
BLM Northwest Oregon District Page 6 of 56
SECTION D – PACKAGING AND MARKING
Section Does Not Apply
(End of Section D)
BLM Northwest Oregon District Page 7 of 56
SECTION E – INSPECTION AND ACCEPTANCE
The following clauses are incorporated by reference:
52.246-12 INSPECTION OF CONSTRUCTION AUG 1996
(End of Section E)
BLM Northwest Oregon District Page 8 of 56
SECTION F – DELIVERIES OR PERFORMANCE
F.1.0 PERIOD OF PERFORMANCE
The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
F.2.0 PROGRESS PLAN
At the prework conference, the Contractor shall provide to the COR a written "work progress plan" that details its proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.
(End of Section F)
BLM Northwest Oregon District Page 9 of 56
SECTION G – CONTRACT ADMINISTRATION DATA
G.1.0 In accordance with FAR clause 52.223-2, Reporting of Biobased Products Under Service and Construction Contracts, the Contractor is required to annually report the product types and dollar value of any USDA-designated biobased products purchased during the previous fiscal year (October 1- September 30) through the System for Award Management (SAM). The report is due no later than October 31 of each year during contract performance and at the end of contract performance. Failure to submit the report into SAM in a timely manner may result in contractual remedies.
G.2.0 In accordance with FAR clause 52.223-11, Ozone-Depleting Substances [and/or FAR clause 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners], the Contractor is required to label products that contain ozone-depleting substances and comply with the applicable requirements of sections 608 and 609 of the Clean Air Act (42 U.S.C. 7671g and 7671h).
The following local clauses are provided in full text:
CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (JULY 2010)
(a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR42.15.
(b) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available for Government use in evaluating past performance as part of a source selection action.
(c) We request that you furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.
(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/. The CPARS User Manual, registration for On Line Training for Contractor Representatives, and a practice application may be found at this site.
(e) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, blocks 1 - 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating ''No comment" in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be https://www.cpars.gov/ http://www.cpars.csd.disa.milj/ https://www.cpars.gov/ http://www.cpars.csd.disa.mil/
BLM Northwest Oregon District Page 10 of 56 annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment." Your response is due within 30 calendar days after receipt of the CPAR.
(f) The following guidelines apply concerning your use of the past performance evaluation:
(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.
(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.
(g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30- day review period.
(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
(End of clause)
ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP)
(FEB 2021)
Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice Processing Platform System (IPP).
“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Products or Commercial Services included in commercial products or commercial services contracts.
The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice
1. Invoice billed according to contract line items and rates.
2. Certified payrolls and Statement of Compliance in accordance with clause 52.222-8.
3. If partial payment is billed and the invoice states a lump sum, the invoice shall include an itemized breakdown and narrative progress summary of the work performed during this invoice period.
4. If final payment is billed, the last invoice shall state “FINAL”.
5. Contractor’s Release of Claims shall be submitted with the final invoice.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contract (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 – 5 business days of the contract award date.
Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov
BLM Northwest Oregon District Page 11 of 56
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Section G)
BLM Northwest Oregon District Page 12 of 56
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1.0 ACCESS
In the event of a site/facility closure, the Contractor shall not perform or make deliveries to the site/facility until it is reopened by the Government, unless otherwise instructed by the Contracting Officer or their designated representative.
H.2.0 WORK HOURS
Unless otherwise specified in Section C, Specifications, work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. No work will be done on Saturday, Sunday, or Federal holidays unless authorized by the COR.
H.3.0 ENVIRONMENTAL INTERRUPTION OF WORK
H.3.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work where the Contractor proceeds during unsafe adverse weather or site conditions, and/or fire danger. Historical average days of severe weather have been included in the performance period. The Contractor will not be entitled to additional contract time or compensation for any such suspensions except when unusually severe weather or unforeseen conditions exist.
H.3.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, identified under BLM Manual 6840, are discovered to be present in or adjacent to the project area.
H.4.0 DRAWINGS
H.4.1 Reduced Size Drawings. Drawings appearing in this package may be photographically reduced in size.
Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. The Contractor may request full-size drawings from the Contracting Officer.
H.5.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA
H.5.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.
H.5.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the Contracting Officer immediately in writing giving the location and nature of the findings.
H.5.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract.
H.5.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.
H.6.0 SUBSTITUTION – PROCESSION OF WORK
Any proposed key personnel, minimum qualifications for incoming or replacement key personnel, subcontractors, processes, procedures or materials included in the quotation are hereby incorporated into the contract. Performance shall be limited to the personnel, qualifications, firms, procedures, and materials
BLM Northwest Oregon District Page 13 of 56 that were specifically identified in the quotation accepted. The Contractor shall obtain the Contracting Officer’s written consent before making any substitutions or changes. All substitutions or replacements shall comply with the terms and conditions of the contract.
H.7.0 ENVIRONMENTAL IMPACT
All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);
the Endangered Species Act, as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ); and the Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ). Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.
H.8.0 HAZARDOUS MATERIALS
Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.
Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR
1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.
H.9.0 GREEN PROCUREMENT REQUIREMENTS
In the performance of this service or construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, if applicable:
• U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.
• USDA Biobased product listings published at www.biopreferred.gov.
• Energy Star® product listings published at www.energystar.gov/products.
• FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product-categories
Contractor shall comply with all reporting requirements stated in the applicable clause(s):
• 52.223-1 Biobased Product Certification
• 52.223-2 Reporting of Biobased Products under Service and Construction Contracts
• 52.223-4 Recovered Material Certification http://www.epa.gov/cpg/products.htm http://www.bioprefferd.gov/ http://www.energystar.gov/products http://energy.gov/eere/femp/covered-product-categories http://energy.gov/eere/femp/covered-product-categories
BLM Northwest Oregon District Page 14 of 56
• 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items
H.10.0 UNAUTHORIZED PERSONNEL
The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to restricted areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.
H.11.0 CONSTRUCTION WAGE RATES APPLICABLE TO TRUCK DRIVERS
29 CFR 5.2(j) limits coverage of construction contractor or subcontractor employees performing as truck drivers under the Davis-Bacon Act (FAR 52.222-6) to only their time spent directly upon the "site of the work" or when hauling between the site of the work and a facility which is dedicated to and located in the proximity of the actual construction location. Other transportation of materials or supplies to or from the site of work by employees of the construction contractor or subcontractor is not “construction” at the site of work and accordingly is not subject to the Davis-Bacon Act.
H.12.0 FIRE DANGER SEASON
If the COR allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR and outlined in the attachment at the end of this section.
H.13.0 SUBMITTALS
H.13.1 LIABILITY INSURANCE
In accordance with clause 1452.228-70, upon contract award submit a copy of an acceptable insurance certificate to the Contracting Officer prior to beginning the work by sending it to blm_or_so_952_mail@blm.gov and jeduncan@ios.doi.gov.
The following clause is provided in full text:
SECURITY REQUIREMENTS: FACILITY ACCESS and INFORMATION TECHNOLOGY (August 2016)
(a) All Contractor employees must have an "Enter on Duty" (EOD) approval issued by the Bureau Personnel Security Office (PSO) before they begin performing work on any Bureau contract. The Contractor must ensure that all employees requesting an EOD are citizens of the United States of America, or an alien who has been lawfully admitted for permanent residence or employment (indicated by immigration status) as evidenced by Immigration and Naturalization Service documentation and the employee must have resided in the United States for a minimum of 3 years. The EOD may be issued in advance of a completed Background Investigation and may be rescinded by the PSO at any time. However, all contractors who require network access are required to complete the identity proofing process, and must be able to obtain a successfully adjudicated National Criminal History Check (NCHC) and National Agency Check with Inquiries (NACI) or higher to stay on the contract.
(b) Starting Work - Contractor employees with an approved EOD may begin performing unsupervised work on Bureau contracts. To remain on the contract, the Contractor employees will need a completed favorable Background Investigation.
(c) Rescission of EOD - The PSO may rescind the EOD at any time. This may occur as the result of additional information obtained or the final results of the background investigation.
(d) Background Investigation - Contractor employees who will have unsupervised access to Bureau facilities, access to the Department of the Interior (DOI) information technology (IT) systems or DOI data, or will develop custom applications, must have a favorably adjudicated background investigation from the Office of Personnel Management (OPM). Existing clearances at the same or higher level are acceptable upon the PSO’s
BLM Northwest Oregon District Page 15 of 56 review and approval. If the employee does not already have a complete investigation, they must apply for one. The employee may begin work with an EOD, but must receive a favorable background investigation to continue working on the contract. The background investigation includes obtaining fingerprints through a USAccess Credentialing Center for an FBI criminal history and a credit report. Once the investigation has been scheduled by OPM, the Bureau will receive advance reports. If those reports are favorable, the Bureau PSO will issue the EOD. The type of background investigation required is based on the risk/sensitivity level designation. Citizenship requirements and guidance for determining the appropriate type of background investigation required for the designated risk/sensitivity level are contained in DOI Departmental Manual (DM) Part 441. The DM is available on the Internet at http://elips.doi.gov/app_home/index.cfm?fuseaction=home.
(e) Electronic Questionnaire for Investigations Processing (e-QIP) – The Bureau uses the e-QIP for all background investigations or reinvestigations. To initiate an investigation, the Contractor, in collaboration with the COR, will complete an e-QIP Request Form. This request form is available through the COR. The COR will submit the completed request form to the Bureau PSO. The PSO will enter the information into e-QIP to either establish a new applicant profile or determine if an existing investigation that meets Bureau requirements is on file. The PSO will then contact the applicant to provide additional information and instructions. Generally, the Contractor is required to complete the following forms:
▪ e-QIP application (on-line)
▪ Fair Credit Release
▪ OF-306
▪ Fingerprints via USAccess Credentialing Centers
The Contractor shall complete the required background investigation forms and submit them to the PSO. The PSO shall determine if individuals meet the required background investigation standards and citizenship requirements, and then make a suitability determination. Minimum standards used in suitability determinations are contained in the DOI Departmental Manual Part 441. The Government will pay for any background investigations required for contractor employees. If the Contractor employee’s background investigation is returned as unfavorable, the Government reserves the right to request reimbursement of the actual costs for the investigation from the Contractor.
(f) Reinvestigation - Contractor employees occupying high risk public trust positions must be reinvestigated every 5 years. A reinvestigation may be initiated prior to the normal periodic reinvestigation schedule when an individual’s continued ability to meet the minimum background investigation standards is in question. The electronic fingerprints on file in the USAccess system will be electronically submitted to OPM for the reinvestigation. The PSO shall review the records and documentation and make the suitability determination.
(g) Disputes - In the event of a disagreement between the Contractor and the Government concerning the suitability of a particular employee to perform work under this contract, the Government has the right of final determination. Determinations under this requirement are subject to the Disputes Clause, FAR 52.233-1. Failure of the Contractor to comply with the requirements of this clause could constitute grounds for termination for default.
(h) Physical Security Requirements - DOI Access Cards.
(1) Contractor employees must have a DOI Access Card before being given unsupervised access to a Government facility.
(2) To gain unsupervised access to Government facilities, Contractor employees must present their
DOI Access Card for examination by the security guard or electronically authenticate their DOI Access Card, as required. Contractor employees must keep their DOI Access Card in a shielded card holder, and visually display the card at all times while in the facility. Refusal or repeated neglect to display the DOI Access Card may result in limiting Contractor employee’s access to Government facilities or revoking of authorized access.
(3) When a Contractor employee is no longer working under this award, the Contractor is responsible for returning all DOI Access Cards, keys, and other Government property issued to that employee. The Contactor shall coordinate all returns with the COR. The COR is responsible for ensuring the Contractor complies with these requirements. However, failure by the Contractor to comply with these requirements may result in the Contractor’s liability for all costs associated with correcting any resultant breech in building security.
(i) Issuance & Maintenance - DOI Access Cards
(1) Process: To obtain a DOI Access Card the COR will use the online DOIAccess System to initiate the access request. Contractor employees will receive email notificat
BLM Northwest Oregon District Page 16 of 56 ions to enroll at a USAccess Credentialing Center with two forms of identification, and after adjudication, a second email notification to pick up and activate their DOI Access Card. The Contractor employee shall schedule an enrollment appointment at a USAccess center at least two weeks prior to the targeted EOD.
(2) Contractor Responsibilities: Contractor employees must complete actions in a timely manner to prepare for on-boarding and access to DOI network resources. The Contractor shall allow their personnel sufficient time to schedule and attend an enrollment appointment at the USAccess center prior to the contract start date. If the Contractor employee’s DOI Access Card becomes lost or stolen, the contractor employee shall notify the COR immediately to request a new DOI Access Card.
(3) COR Responsibilities: The COR (or designated individual) and Contractor shall maintain a listing of all Contractor employees who received a DOI Access Card, the date the card was issued, the date the electronic certificates expire (3 years from issue date), and the date the DOI Access Card expires (5 years from issue date). If the Contractor employee’s DOI Access Card or certificates will expire before the contract is completed, the COR (or designated individual) and Contractor is responsible for ensuring that the Contractor employee visits a USAccess center to update certificates on the existing card or obtain a new DOI Access Card. No later than one week prior to the DOI Access Card’s certificate or card expiration, the COR (or designated individual) shall notify the Contractor that DOI Access Card actions are required. The COR (or designated individual) and the Contractor shall update their listing to reflect the new issue date, certificate expiration date and card expiration date.
(j) Information Technology Security Requirements.
(1) Training – If contractor employees require access to any DOI/IT systems, the Contractor shall ensure its employees complete all Bureau/DOI required IT security training. The Contractor’s employees shall complete this training before being granted access to Bureau/DOI data or being issued network access. The current training requirements are: (i) annual end-user IT Security Awareness, (ii) annual IT Resources Rules of Behavior, and (iii) annual Role-Based Security training for IT professionals. The Contractor shall comply with all Bureau/DOI IT security training requirements in effect during contract performance. The COR will notify the Contractor of all Bureau mandatory IT training. The Contractor shall submit training completion certificates to the COR for all required training. Failure to meet this training requirement may result in removal of the contractor employee from the contract. The Bureau will determine if the contractor can later return to the contract.
(2) Access to Contractor’s Facilities for IT audit purposes - The Contractor shall afford Bureau and the Department of the Interior Office of Inspector General access to the Contractor’s and subcontractors’ facilities, installations, operations, documentation, databases, and personnel used in performance of the contract.
Access shall be provided to the extent required to carry out a program of IT inspection, investigation, and audit that will safeguard against threats and hazards to the integrity, availability, and confidentiality of Government data or to the function of computer systems operated on behalf of the Government and to preserve evidence of computer crime. If the Contractor questions the Government employee’s right to access its facilities, it should contact the CO for resolution.
(3) Contractor Location - Custom software development and outsourced operations shall be located in the United States to the maximum extent practical. If such services are proposed to be performed abroad, the Contractor shall provide an acceptable security plan that addresses the mitigation of problems related to communication, control, and protecting the confidentiality, integrity, and availability of IT systems and information.
(4) Applicable Standards - The Contractor shall follow all applicable Federal, DOI, and Bureau Bulletins, Directives, Guidelines, Manuals, Processing Standards, Memoranda, Policies and Standards; applicable OMB Memoranda; and all current National Institute of Standards & Technology (NIST) Special Publications. To comply with Federal Acquisition Regulation Subpart 39.101(d), contractors shall use the common security configurations available from the NIST website at http://checklists.nist.gov. NIST documents are available on the internet at http://csrc.nist.gov/publications/PubsSPs.html. OMB memoranda are available on the internet at http://www.whitehouse.gov/omb/memoranda/. The Contractor shall request copies of DOI and Bureau documents by contacting the COR.
(5) Incident Reporting - The Contractor shall immediately report computer security incidents affecting Bureau/DOI data and systems in accordance with the Bureau Computer Incident Response policy. The Contractor shall request copies of the Bureau Computer Incident Response policy by contacting the COR.
(6) Assessment and Authorization (A&A) and Continuous Monitoring.– The Contractor shall comply with Bureau policy when developing, upgrading, modifying or supporting applications and/or systems that require A&A and Continuous Monitoring. The Contractor shall request copies of Bureau A&A policy by contacting the COR. The A&A requirement does not apply when the Contractor's employees merely access data or have "read only" access.
BLM Northwest Oregon District Page 17 of 56
(k) Documentation - The Contractor shall document all work performed and ensure that the appropriate Assessment and Authorization (A&A) documents are updated to reflect the work performed and the current state of Bureau systems and networks. The Documentation requirement does not apply when the Contractor's employees merely access data or have "read only" access.
(l) Personnel Changes, Contractor Request - The Contractor shall immediately notify the COR and PSO when an employee is reassigned or leaves the Contractor’s employment and prior to any termination. The Contractor must adhere to the Bureau or Office’s mandatory exit clearance procedure. Once the COR has been notified that a Contractor employee is leaving the contract, the COR will initiate the exit clearance process in the DOIAccess System and forward to the Contractor the necessary instructions and form required to be completed prior to the contractor's employee’s departure. This form must be completed by the Contractor's employee and signed by both the Contractor's employee and the COR and then forwarded to the bureau/office specific program responsible for employee, volunteer, and contractor departures.
(m) Personnel Removal, Government Request - The Government retains the right to direct the Contractor to remove any prime or subcontractor personnel, regardless of prior clearance or background investigation adjudication status, whose actions, while assigned to this contract, clearly conflict with the security interests of the Government. The justification for the Government’s direction to remove Contractor personnel will be documented and provided to the Contractor by the CO.
(n) Subcontract Inclusion - The requirements of this clause must be incorporated into any subcontract if the subcontractor’s employee must have access to Bureau facilities.
(End of clause)
BLM Northwest Oregon District Page 18 of 56
FIRE REQUIREMENTS PROCEDURES OUTLINE
This outline covers the fire protection requirements of a contractor or private party who performs service or construction contracts on BLM land. In western Oregon, the BLM allows Oregon Forest Law (ORS) and Oregon Administrative Rules (OAR) to apply to these operations on BLM lands rather than develop similar rules applicable only to BLM lands.
1. CLOSED FIRE SEASON
The closed fire season means that fire season has been declared. ORS 477.505 gives the State Forester the authority to establish the fire season. The authority has been delegated to the District Foresters around the state who issue public notices through the newspapers and radio when fire season will be closed for their individual districts.
Closed fire season depends upon the drying of forest fuels, rainfall, and time of year. During the closed fire season, the following requirements must be met:
• Fire tools must be on site;
• Fire extinguisher must be in all vehicles;
• Chainsaws must have a .023-inch mesh screen installed in the exhaust;
• Only unmodified saws are to be used in the forest;
• Approved spark arresters must be on all internal combustion engines;
• Watchman service must be provided for 3 hrs after shutdown of power equipment for the day;
• No smoking is permitted while working or traveling through any operations area in the forest;
• No use of explosives is permitted unless approved by the State Forester's representative;
• Permits to burn are required unless waived by a representative of the State Forester.
• Permits to operate power-driven machinery shall be obtained by the Contractor prior to commencing operations unless waived by a representative of the State Forester (ORS 47.625).
Changes or modifications to the above requirements are possible depending upon changes in State of Oregon law and requirements of the State Districts and Protective Associations.
2. FIRE PRECAUTION LEVELS
There are 4 fire precaution levels that begin with level 1 at the start of the closed fire season and can go through level 4 if conditions warrant. The fire precaution levels restrict certain forest operations as the fire danger increases.
It is the responsibility of the individual operating on forest land to know the precaution level for the day and take the correct fire precautions. There are no precaution levels prior to the closed fire season. Each fire precaution level requires adherence to the restrictions applicable to all lower levels in addition to the limits placed by that level.
Level 1 is the lowest level of fire danger usually occurring early in the season and perhaps again after significant rainfall during the season. All requirements listed above apply. Waivers may be issued by the State Districts or Protective Associations and these MUST be approved by the BLM. Waivers will only be considered if the conditions on the work site are not as severe as predicted. The requirements for fire tools on site, screens installed in saws, and fire extinguishers with saws will not be waived.
Level 2 is the partial hootowl where saws can operate from first light in the morning until 1:00 p.m. in the afternoon.
From 1:00 p.m. until the end of the day saws are to be shut down. Waivers for operating beyond the 1:00 p.m.
shutdown will be evaluated on a site-by-site basis.
Level 3 is the partial shutdown of all forest industrial operations and shuts down contractor operations with few exceptions. Waivers may be issued on a site-by-site basis.
Level 4 is the general shutdown of all contractor operations. Waivers will not be issued. Landowners are permitted entry into their lands.
BLM Northwest Oregon District Page 19 of 56
ORS. 477.066 requires that an operator on forest land take immediate action to control and extinguish a fire on forest land. The contractor shall take this action and notify the BLM and the nearest State of Oregon District office immediately.
OAR. 629-43-030 requires watchmen to be:
• Physically capable and experienced in operating any firefighting equipment on site.
• On duty for 3 hours after the shutdown of the last power-driven equipment for the day.
• Furnished adequate facilities for transportation and communications in order to summon assistance if needed.
• Patrolling and visually inspecting all sites where work was done during the day.
3. FIRE TOOLS REQUIRED DURING CLOSED FIRE SEASON
The operator/contractor shall furnish fire tools to all personnel on site using the following combinations.
NUMBER OF PERSONNEL_______________________________
1- 4 5 6 7 8 9 10 11 12 13 14
KIND OF TOOLS NUMBER OF TOOLS REQUIRED_________________________
Pulaskis 1 1 1 1 1 1 2 2 2 2 2
Shovels 2 2 2 3 3 3 3 4 4 5 5
Hazel hoes 1 2 3 3 4 5 5 5 6 6 6
In addition to the above handtools, the operator/contractor must provide a backpack pump can filled with water located with the tool box in a readily available area.
All shovels are to be size 0 or larger, long handled. All tools shall be sharp and ready for service. Fire extinguishers as follows:
For chainsaws - 8 oz. capacity by weight.
For vehicles - UL rating of at least 4 BC.
4. ADDITIONAL WATER SUPPLY
Contractor shall comply with ORS 477.615 during fire season when inside or within one-eighth of one mile of a state forest protection district and furnish additional water supply and equipment for use in fire suppression in conformity with the rules promulgated by the Oregon State Forester, when directed by the Oregon State Forester in writing. When required, all water supply and equipment components shall be maintained and ready for immediate use.
During fire season when operating a stationary internal combustion engine inside or within one eighth of one mile of a state forest protection district, Contractor shall comply with ORS 477.650 and provide a water supply, with equipment for its use in fire suppression for each engine, in conformity with the rules promulgated by the Oregon State Forester. All water supply and equipment components shall be maintained and ready for immediate use.
(End of Section H)
BLM Northwest Oregon District Page 20 of 56
SECTION I – CONTRACT CLAUSES
NOTE: Clauses identified as FAR Overhual can be observed at this location: https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52.
The following clauses are incorporated by reference:
Clause Title Date
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL
CONFIDENTIALITY AGREEMENTS OR STATEMENTS
JAN 2017
52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR
PERSONNEL
JAN 2011
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS
MAR 2026 –
RFO Overhaul
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE MAR 2026–
RFO Overhaul
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE AUG 2020
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS
NOV 2015
52.211-13 TIME EXTENSIONS SEPT 2000
52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE JAN 2026– RFO
Overhaul
52.219-28 POSTAWARD SMALL BUSINESS REREPRESENTATION JAN 2026– RFO
Overhaul
52.222-3 CONVICT LABOR MAY 2026–
RFO Overhaul
52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS MAY 2026–
RFO Overhaul
52.222-7 WITHHOLDING OF FUNDS MAY 2026-RFO
Overhaul
52.222-8 PAYROLLS AND BASIC RECORDS MAY 2026-RFO
Overhaul
52.222-9 APPRENTICES AND TRAINEES MAY 2026-RFO
Overhaul
52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS FEB 1988
52.222-11 SUBCONTRACTS (LABOR STANDARDS) MAY 2014
52.222-12 CONTRACT TERMINATION – DEBARMENT MAY 2014
52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE
REQUIREMENTS AND RELATED REGULATIONS
MAY 2014
52.222-14 DISPUTES CONCERNING LABOR STANDARDS FEB 1988
52.222-15 CERTIFICATION OF ELIGIBILITY MAY 2014
52.222-50 COMBATING TRAFFICKING IN PERSONS MAY 2026-RFO
Overhaul
52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 JAN 2022
52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS APR 2026-RFO
Overhaul
52.223-6 DRUG-FREE WORKPLACE MAY 2001
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES FEB 2021
52.227-1 AUTHORIZATION AND CONSENT DEC 2007
52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND
COPYRIGHT INFRINGEMENT
DEC 2007
52.227-17 RIGHTS IN DATA – SPECIAL WORKS DEC 2007
52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS MAY 2014
52.232-23 ASSIGNMENT OF CLAIMS MAY 2014
https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
BLM Northwest Oregon District Page 21 of 56
52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS JAN 2017
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR
AWARD MANAGEMENT
OCT 2018
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS
MAR 2023
52.233-1 DISPUTES MAY 2014
52.233-1 DISPUTES – ALTERNATE I DEC 1991
52.233-3 PROTESTS AFTER AWARD AUG 1996
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM OCT 2004
52.236-2 DIFFERING SITE CONDITIONS JAN 2026– RFO
Overhaul
52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK JAN 2026– RFO
Overhaul
52.236-5 MATERIAL AND WORKMANSHIP JAN 2026– RFO
Overhaul
52.236-6 SUPERINTENDENCE BY THE CONTRACTOR JAN 2026– RFO
Overhaul
52.236-7 PERMITS AND RESPONSIBILITIES JAN 2026– RFO
Overhaul
52.236-8 OTHER CONTRACTS JAN 2026– RFO
Overhaul
52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,
EQUIPMENT, UTILITIES, AND IMPROVEMENTS
JAN 2026– RFO
Overhaul
52.236-10 OPERATIONS AND STORAGE AREAS JAN 2026– RFO
Overhaul
52.236-11 USE AND POSSESSION PRIOR TO COMPLETION JAN 2026– RFO
Overhaul
52.236-12 CLEANING UP JAN 2026– RFO
Overhaul
52.236-13 ACCIDENT PREVENTION JAN 2026– RFO
Overhaul
52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS JAN 2026– RFO
Overhaul
52.236-17 LAYOUT OF WORK JAN 2026– RFO
Overhaul
52.242-14 SUSPENSION OF WORK APR 1984
52.243-5 CHANGES AND CHANGED CONDITIONS OCT 2026-RFO
Overhaul
52.244-5 COMPETITION IN SUBCONTRACTING DEC 1996
52.245-1 GOVERNMENT PROPERTY SEP 2021
52.245-9 USE AND CHARGES APR 2012
52.246-21 WARRANTY OF CONSTRUCTION MAR 1994
52.248-3 VALUE ENGINEERING - CONSTRUCTION OCT 2025
52.249-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT
(FIXED-PRICE)
APR 1984
52.253-1 COMPUTER GENERATED FORMS JAN 1991
The following clauses are provided in full text:
52.240-93 – BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (MAR
2026 RFO Overhaul)
(a) Definitions. As used in this clause—
BLM Northwest Oregon District Page 22 of 56
Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
Federal contract information—
(1) Means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government; but
(2) Does not include information provided by the Government to the public (such as on public websites) or simple transactional information (such as information necessary to process payments).
Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
Information system means a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .