Sol_140L4322Q0137.pdf
PDF 6 MB Posted
- Solicitation number
- 140L4322Q0137
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_Amendment_2_0003.pdf | ||
| Sol_140L4322Q0137_Amd_0002.pdf | ||
| B08_Amendment_1_0001.pdf | ||
| Sol_140L4322Q0137_Amd_0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
LHA
PORTLAND OR 97204
1220 SW 3rd Avenue, 12th Floor
BLM OR-ST OFC PROC MGMT BR(OR952)
0004276596 CODE 16. ADMINISTERED BYCODE
X
X
X
115310
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED ORLHA
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
08/19/2022 1400 PD
08/03/2022
5419476150Kim Karalus (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140L4322Q0137
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 71 0040585260OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
ROSEBURG OR 97471
777 NW GARDEN VALLEY BOULEVARD
BLM-OR ROSEBURG DISTRICT OFFICE*
15. DELIVER TO
PORTLAND OR 97204
1220 SW 3rd Avenue, 12th Floor
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$8.00
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
BLM OR-ST OFC PROC MGMT BR(OR952)
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Roseburg Hazard Tree Removal
VENDOR POC: _______________________________
VENDOR TELEPHONE: _________________________
VENDOR EMAIL ADDRESS: _____________________
VENDOR UEI NUMBER: _______________________
Delivery: 09/30/2023 (Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
Lisa (Spiral) S O'Neil
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Period of Performance: 10/01/2022 to 09/30/2023
00010 Removal of Hazard Trees from Archie Creek
Product/Service Code: F099
Product/Service Description: NATURAL
RESOURCES/CONSERVATION- OTHER
Period of Performance: 09/01/2022 to 09/30/2023
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
71 2 of
ARCHIE CREEK HAZARD TREE REMOVAL Solicitation # 140L4322Q0137 BLM ROSEBURG DISTRICT Page 3 of 71
Section B – Price Schedule
Item Description Unit Unit Price
1. Heavy Equipment (HE)
a. Excavator with Operator
i. Weight Class as specified: Micro <25k lbs HR ________
ii. Weight Class : HE120-HE150 26k to 39k lbs HR ________
iii. Weight Class: HE200-HE250 65k to 90k lbs
iv. Weight Class: HE300 65k to 90k lbs HR ________
b. Dump Truck (10 Yd) with Operator HR ________
c. Rubber-tired Front End Loader with Operator - SMALL HR ________
d. Rubber-tired Front End Loader with Operator – LARGE HR ________
2. Labor
a. Sawyer/Tree Climber HR ________
b. Laborer HR ________
c. Traffic Control HR ________
3. Mobilization (between worksites in the project area)
a. 0-10 miles EA ________
b. 11-20 miles EA ________
HR = Hour; EA = Each
Period of Performance 9/1/2022 – 9/30/2024
BLM ROSEBURG DISTRICT Page 4 of 71
Section C – Statement of Work
1. INTRODUCTION AND OVERVIEW
This statement of work will be issued as a firm-fixed price contract for Roseburg District Hazard Tree Removal. The project work will focus on improvements for various habitats, developed recreation areas, and roadsides. Improvements will include but are not limited to: 1) removal of identified hazards,
2) creating and/or enhancing habitats, 3) thinning riparian areas (cut and leave), 4) decommissioning roads and skid trails, 5) road, recreational trail and facility improvements, and 6) other riparian management activities.
1.2 Scope of Work
Contractor shall furnish all necessary management, labor, supervision, equipment, materials, transportation, and any other incidentals to perform the work herein.
This work will be completed within the perimeter of the Archie Creek Fire as referenced in the vicinity map and the government estimated quantities table. Multiple mobilizations may be needed but will be discussed with contractor to maximize use of resources and time. It will be incumbent upon the government to identify refuse locations and areas for disposal of slash and excess fuels from hazard tree falling and associated activities.
Resource preservation is of paramount importance. Equipment design and function must be used to minimize resource disturbance. Equipment that does not minimize resource disturbance and/or efficiently meet project objectives may be rejected by the COR. The Contractor is encouraged to propose alternative ways to achieve project objectives but will not be implemented until approved by the COR.
1.3 Objectives
The overall objective of this project is to remove hazards for health and public safety, restore function of developed recreation areas, trail systems and to improve habitat throughout the Archie Creek Fire area.
2. REFERENCES
All applicable documents referenced in this SOW are listed below. Where appropriate, a brief annotation should be provided to indicate the relevance of the document. Reference any specific requirements with regard to the use of these documents in performing the work under this SOW.
Northwestern and Coastal Oregon ROD/Resource Management Plan, 2016, USDI-BLM. This is the overarching management plan for managing BLM-administered land within the Swiftwater Field Office.
3. REQUIREMENTS / EQUIPMENT / TASKS
This section defines the requirements in terms of tasks to be performed, the end results/deliverables to be achieved, within the period of performance as specified in section 1.4.
Initial Mobilization -per piece of equipment- Initial mobilization is defined as the initial movement of a piece of equipment to a project site within the boundaries of the Coos Bay District and Roseburg District
BLM ROSEBURG DISTRICT Page 5 of 71
BLM. The necessary number of mobilizations per piece of equipment will be specified by the COR.
Access to all sites will be by existing paved, gravel, or natural surface roads. Equipment shall be power washed clean of dirt and grease prior to equipment delivery to project site. Equipment cleaning should be included in Initial Mobilization pay item.
Site Mobilization -per piece of equipment - Site mobilization is defined as the transport of heavy equipment from one site to the next via flatbed trailer (low-boy). Project sites must be specified on the same pre-work order. Project sites must be less than 20 miles of the initial site location. The necessary number of site mobilizations will be specified in the pre-work. Should heavy equipment encounter invasive species prior to a site mobilization, equipment may be required to be power washed at an approved on site or near site location.
Project Work Period - All ground-disturbing operations with the potential to impact streams are to be conducted during periods of low stream flow and dry weather. All in-stream work shall follow stream-specific Oregon Department of Fish and Wildlife (ODFW) guidelines for the in-water work period unless a waiver is obtained from ODFW and National Marine Fisheries Service (NMFS) by the BLM. These in-water work dates vary by location, but are generally July through mid-September. The COR will designate the appropriate in-water work period for each project. There is some potential for periodic shutdown due to high precipitation and sediment loading at the discretion of the Government Representative. Work periods would be dependent on the Oregon Department of Forestry’s Industrial Fire Precaution Levels.
Equipment Hydraulic Fluid – All equipment operating instream and in riparian areas, and handling materials to be placed instream, will utilize vegetable based or other non-toxic hydraulic fluid. Vegetable based hydraulic fluid or other non-toxic hydraulic fluid must be approved by COR prior to project implementation.
Cable Yarder with Operator
3.1 If trees are determined to be unsafe to cut, lift, or pull, the COR may indicate an alternate tree, or delete the tree from the project without penalty. Use of yarders equipped with traction devices on tracks (lugs or dogs) or rubber tires (chains) or operation of tracked equipment on paved roads requires pre-authorization in writing (email) from the COR prior to mobilization of the equipment.
3.1.1 Trees to be pulled may be as large as 64 inches DBH. Trees to be pulled and repositioned into the channel may range from 25-500 feet from the active stream channel. The number and locations of trees to be pulled over will be identified as part of the pre-work. Trees to be pulled over will be selected by the COR. If the tree selected by the COR is unable to be pulled over the COR may request that the tree be directionally felled instead (jacks may be required in this circumstance).
3.1.2 Trees and trees with root wads attached will be yarded from roadway to be placed in stream channels with one end suspension where equipment access is limited. Trees and trees with root wads may be yarded up to 1,000 feet. Trees and trees with root wads may then be re-positioned in the stream channel. When yarding trees with root wad attached minimize ground disturbance and damage by suspending the root wad end of the log the greatest extent practicable.
BLM ROSEBURG DISTRICT Page 6 of 71
3.1.3 Refuse such as cars, tires, appliances, and other collected items may be yarded from remote locations.
Excavator with Operator
3.2 Whole trees shall be uprooted at collection sites and stockpiled for loading and transport.
Preservation of rootwads is imperative; loosening roots system from ground may require additional efforts such as ground soaking or other mechanical loosening around the root system. Logs and root wads shall be moved from the collection site or stockpile locations and along roads that lead to instream project sites. Moving logs and rood wads to stream must be effective and efficient using as few passes as possible with intent to minimize effects to the riparian area resources. The excavator should use hydraulic thumb with teeth, grapples, log tongs, and/or chokers to lift, swing, and place logs and root wads.
3.2.1 Rock shall be moved from stockpile locations or from the adjacent road side drop sites to the access trails with the front-end loader and or excavator and placed in the streams with the excavator.
Boulder size classes shall be installed individually, in clusters, adjacent to logs as anchors or with log placement to form cascades, and to create weirs. In addition, some material shall be placed along banks for bank protection and cover. Most boulders will be 2-5 feet across with varying depths and heights but some boulders may be more than 6 feet across.
3.2.2 Some areas of stream beds shall be excavated to create pool or jump pool habitat. Excavated materials may be used to armor neighboring structures or may be placed away from stream channels as required by the COR. The excavator may also be used in some areas to create off-channel rearing habitats.
3.2.3 The Contractor shall construct access trails for movement of the equipment and material to the stream channel. These trails will be flagged and pre-designated by the COR. Any deviation from the marked trails must be approved by the COR. Soil, rock, boulders, small trees, and brush may require clearing. All access construction shall be accomplished with due regard for environmental considerations. Slash mats may be required to minimize soil compaction and trail width. Operations within the stream channel shall involve movement over stream bed, banks, and bedrock, and through water approximately three (3) feet in depth.
3.2.4 All access roads, skid trails, and skid roads shall be decommissioned after use. Decommissioning may occur via aquatic and riparian habitat restoration activities. Decommissioning shall include excavator tillage to a depth ranging from 15-24 inches and placing organics, trees, and brush along the skid trails/roads and equipment access routes. Tillage may occur with the use of the modified ripper shanks or, bucket with a maximum of one cubic yard capability with rock teeth and hydraulic thumb.
Where tillage is not appropriate, waterbars, drain-dips or lead-off ditches shall be created to direct surface water from the road prism to the forest floor. Skid trails shall be restored to the original contour. The Contractor shall install an earthen, boulder, or log barricades at locations specified by the COR to block the road from future motorized traffic. Government provided native seed and mulch shall be used on all bare soil created during project implementation.
3.2.5 New culvert installation (cross drain and small streams crossings) shall occur on recreational trails and BLM managed roads. Culvert sizing and designs will be specified at pre-work. The contractor shall
BLM ROSEBURG DISTRICT Page 7 of 71 replace cross drain and small stream crossings. Culverts removed by the contractor shall be recycled appropriately. A flow diversion/de-watering structure shall be utilized under certain circumstances.
Log Truck with Operator and Self-Loader with Operator
3.3 Logs from designated log storage yards or along existing roads or landings within the Coos Bay or Roseburg Districts shall be transported to the project location as specified by the COR. Log storage areas may include several locations and unloading of logs may also include several different locations within the project area. Transported log lengths and weights shall be within legal limits for state and local transportation regulations. Occasionally, logs with rootwads shall be transported.
Dump Truck with Operator and Rock
3.4 Contractor-furnished rock shall be delivered to designated project site locations as described at pre-work. Graded mixed stream and quarry rock size will vary from 3/4 inch minus to 6 feet in diameter on the longest axis with varying heights and depths. Individual rocks will not exceed 3 cubic yards. The Government retains discretion over rock source to assure efficiency, rock competency/quality, and invasive species control.
3.4.1 The Contractor shall provide an excavator or front-end loader to the quarry, when no services are otherwise available, for loading rock into the dump trucks. All dump trucks shall have the capability of hauling at least 10 cubic yards of rock, and be able to dump boulders at project sites without further assistance from the excavator or front-end loader.
3.4.2 For some projects, the contractor may be responsible for end-hauling of waste material to designated waste sites.
3.4.3 Contractor shall be responsible for the delivery of new culverts to project sites, or, removed culverts to be recycled.
Sawyer/Tree-climber
3.5 A sawyer/tree-climber will be identified at pre-work for each specific project. A tree climber will be expected to operate a chainsaw, set chokers, and perform other task while aloft in tree. A variety of choker lengths may be needed to accomplish log movement by the excavator, skidder, or front end loader. The choker cable shall be hooked and unhooked to the excavator/loader bucket by the choker-setter/sawyer. In some cases this material shall be cut (bucked to sizes designated by the COR) by the sawyer to facilitate its placement into the stream. The sawyer shall be equipped to cut logs up to 64 inches in diameter.
3.5.1 In addition a sawyer shall be needed for projects which contain developed recreation sites, roadside hazard trees, or riparian thinning. Sawyers shall cut trees specified by the COR within the riparian area. Trees will be up to 64 inches and may consist of hardwoods or conifers. No hang ups shall be left in place. Directional felling of trees will be required. Stump height will be minimized to industry standard.
3.5.2 As part of the tree pulling, a choker/setter will be required to complete the tasks. If the tree selected by the COR is unable to be pulled over then the COR may request that the tree be cut instead.
BLM ROSEBURG DISTRICT Page 8 of 71
3.5.3 Large wood source material will come from forest stands, blowdown sites, riparian areas, and roadsides. A sawyer will be necessary to fall, buck, and limb trees so that it can be moved to a specific stream location. In some instances cutting the tree into several pieces may be necessary. The sawyer shall be equipped to cut logs up to 64 inches in diameter.
3.5.4 Tree climbing will generally be needed for tree pulling activities in order to set the choker, shackle, cables, or other connecting equipment at a sufficient height, generally ½ tree height, to efficiently lever the tree down with yarding equipment/excavators.
3.5.5 All trees used for tail-holds shall be padded, cribbed, strapped or otherwise protected to avoid severe cambium damage. No more than 50 percent of the cambium at the bole at the point of disturbance is exposed. Notching shall occur only when necessary and shall not remove more than 50 percent of the cambium at the bole at the point of disturbance.
Rubber Tired Front End Loader with Operator
3.6 Logs and root wads may be moved (yarded) from the adjacent road side or stockpile locations or thinning locations to the access trails with the front-end loader as identified by the COR. Log size will be up to 64 inches in diameter and up to 80 feet in length. A variety of choker lengths may be needed to accomplish log movement.
3.6.1 Boulders shall be moved from stockpile locations or from the adjacent road side drop sites to the access trails with the front-end loader and placed in the streams with the excavator. Most boulders will be 2-5 feet across with varying depths and heights but some boulders may be more than 6 feet across on the long axis.
Rubber-Tired Skidder with Operator
3.7 Logs and root wads or trees with rootwads may be moved from the adjacent road side or stockpile locations or thinning locations to the access trails with the skidder. Some logs, down trees, logs with rootwads and rootwads shall be pulled (yarded) to the stream channel with the rubber tired skidder as identified by the COR. Source trees may be thinned from nearby areas or be trucked in and stockpiled.
The skidder shall transport these trees from the source location to the structure site area. A variety of choker lengths may be needed to accomplish log movement. Log size will be up to 64 inches in diameter and up to 80 feet in length.
Track Dozer with Operator
3.8 The contractor shall be required to temporarily open an old road in order for the excavator to remove cross drain and stream crossing culverts. The dozer shall construct drain dips throughout the decommissioned road segment to aid with road drainage.
3.8.1 Rock shall be moved from stockpile locations or from the adjacent road side drop sites to the access trails with the dozer and placed in the streams with the excavator. Most processed rock will range from 3/4 inch minus to 6 inch diameter. Most boulders will be 2-5 feet across with varying depths and heights but some boulders may be more than 6 feet across.
BLM ROSEBURG DISTRICT Page 9 of 71
Flow diversion structure/de-watering
3.9.1 The contractor shall install a flow diversion/de-watering structure that is designed, furnished, installed, tested, and monitored to control stream and ground-water flow away from the excavated site allowing work to proceed on dry, stable subgrades. This structure is designed to divert stream flow around the project site and maintain downstream water quality. The structure will divert perennial streams with a bankfull width of less than eight feet. Cofferdam out-take, gravity or pump diversion must be cleared of vertebrate aquatic species and be screened from immigration of vertebrate species by Government Fisheries Biologist prior to instream activities. Written notification from the COR indicating clearance has occurred is required prior to commencing instream activities.
3.9.2 The contractor shall be required to provide a pumping device to the project site that removes standing water from the excavation site. Contractor shall submit a written diagram of the location of proposed pumping sites and discharge areas and get written (email) approval for these sites from the COR prior to implementation. All small gasoline engines operated within 25 feet of the stream shall have a suitable spill containment structure approved by COR prior to installation, fueling, and operation.
Vibratory Tamper
3.10 A vibratory tamper shall be required to compact soils and or gravels around new culvert installations or similar work to contract specifications.
Laborer(s)
3.11 Laborers shall perform a variety of tasks such as but not limited to: 1) native seeding and mulching,
2) installing erosion blanket, 3) native vegetation planting, 4) manual removal of non-native plant species with hand tools, 5) operating vibratory tamper, 6) installation and operation of flow diversion structures, 7) ground set chokers and 8) assisting equipment operator with a variety of on-the-ground operations.
Miscellaneous Equipment as Specified
3.12 Specialized equipment not specified above needed to increase effectiveness and/or efficiency, in order to maximize project objectives.
Special Requirements
3.13 Invasive Weed Control-In order to prevent the spread of invasive weeds, the Contractor shall thoroughly wash all vehicles and equipment to be used on the contract including the undercarriage and treads, using a water pressure hose, prior to entry on BLM lands. The COR will make a visual inspection of the vehicle. Washing may be required during the progress of the contract if the COR suspects that a vehicle or equipment has been contaminated with infected soil.
4 TASKS
For specific guidance on how to accomplish each task, please refer to Section 3 – Requirements and Tasks. The following is a condensed list of tasks for easy reference.
Cut and removal of hazard trees from rec sites, roadsides, etc. within the project area.
Pile debris as directed by COR.
BLM ROSEBURG DISTRICT Page 10 of 71
Clear roads of downed material.
Deck material as needed, location to be determined by COR.
End haul material to designated sites (determined by the COR).
5. PERFORMANCE
7.1 Contract Time - A Notice to Proceed will be issued at the prework conference. This award will be issued with an effective date to begin work. The Contractor shall be required to commence work within three (3) calendar days after the effective date as stipulated by the award and shall execute the work diligently.
7.2 Work Progress - Work must progress in a timely manner due to the in-water work period as specified by the COR and/or the Oregon Department of Fish and Wildlife (ODF&W). The purpose is to complete the work during periods of low stream flow to minimize impacts to the stream channel and fish species.
7.3 Shutdown Due to Adverse Conditions - If the Contractor is unable to perform the work due to project shutdown because of adverse weather or soil or other conditions, the Contractor should consider removing its equipment from the project location to a location that will ensure it is safe from vandalism and theft. The Contractor shall return to the site within 3 calendar days from the date of receipt of written notice that such conditions no longer exist and shall resume operations.
(End of Statement of Work)
SECTION E – INSPECTION AND ACCEPTANCE
The following clause is incorporated by reference:
Clause Title Date
52.246-1 CONTRACTOR INSPECTION REQUIREMENTS APR 1984
The Government will inspect the equipment under this contract at the project site, unless otherwise mutually agreed to prior to utilization of the equipment. Equipment not meeting the requirements of the specifications will be rejected. The Contractor will be required to replace all equipment not meeting the specifications.
There will be a Government representative frequently present at the project site during the operation who will inspect the work to be performed.
(End of Inspection and Acceptance)
SECTION F – DELIVERIES OR PERFORMANCE
F.1.0 PERIOD OF PERFORMANCE
September 1, 2022 to September 30, 2024. The period of performance is over 1 year due to environmental and seasonal restrictions for the protection of wildlife, fisheries, and fire. As additional
BLM ROSEBURG DISTRICT Page 11 of 71 funding is identified, this contract may be modified to incorporate those additional funds to accomplish additional work within the same scope.
Deliverables/Milestones
The Government requires the following from contractors in order to monitor progress and ensure compliance:
Weekly Status Report and check-in meetings.
Monthly Progress Report.
On-site meetings to clarify site needs and resource concerns.
The contractor shall provide one hard copy of each deliverable and one electronic version.
F.2.0 PROGRESS PLAN
At the prework conference, the Contractor shall provide to the COR a written "work progress plan" that details its proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.
The following clause is incorporated by reference:
52.242-15 STOP WORK ORDER AUG 1989
(End of Deliveries or Performance)
BLM ROSEBURG DISTRICT Page 12 of 71
SECTION G – CONTRACT ADMINISTRATION DATA
The following local clauses are provided in full text:
CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (JULY 2010)
(a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR42.15.
(b) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available for Government use in evaluating past performance as part of a source selection action.
(c) We request that you furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.
(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://cpars.gov/. The CPARS User Manual, registration for On Line Training for Contractor Representatives, and a practice application may be found at this site.
(e) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation, and the report will be accessible at https://cpars.gov/ Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, blocks 1 - 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating ''No comment" in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment." Your response is due within 30 calendar days after receipt of the CPAR.
(f) The following guidelines apply concerning your use of the past performance evaluation:
(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.
(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
BLM ROSEBURG DISTRICT Page 13 of 71
(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.
(g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30- day review period.
(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
(End of clause)
ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP)
(APR 2013)
Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice Processing Platform System (IPP).
“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Products and Commercial Services included in commercial products and commercial services contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice
1. Invoice billed according to contract line items and rates.
2. If partial payment is billed and the invoice states a lump sum, the invoice shall include an itemized breakdown and narrative progress summary of the work performed during this invoice period.
3. If final payment is billed, the last invoice shall state “FINAL”.
4. Contractor’s Release of Claims shall be submitted with the final invoice.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contract (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 – 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
(End of Contract Administration Data)
BLM ROSEBURG DISTRICT Page 14 of 71
SECTION H – SPECIAL CONTRACT REQUIREMENTS
1.0 ACCESS
In the event of a site/facility closure, the Contractor shall not perform or make deliveries to the site/facility until it is reopened by the Government, unless otherwise instructed by the Contracting Officer or their designated representative.
2.0 WORK HOURS
Unless otherwise specified in Section C, Specifications, work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. No work will be done on Saturday, Sunday, or Federal holidays unless authorized by the COR.
3.0 ENVIRONMENTAL INTERRUPTION OF WORK
3.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions, fire danger, or because it is impracticable to work during the winter season. The Contractor will be given a resume work order which will document the date the work suspension ends. An allowance has been included in the contract time for all environmental delays. The count of contract time will therefore continue during all periods of suspension due to normal weather conditions, including fire danger. The Contractor will not be entitled to additional contract time for any suspensions except to the extent that they are due to unusually severe weather conditions. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration.
3.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, identified under BLM Manual 6840, are discovered to be present in or adjacent to the project area.
4.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA
4.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.
4.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the Contracting Officer immediately in writing giving the location and nature of the findings.
4.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract.
4.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.
5.0 ENVIRONMENTAL IMPACT
All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);
the Endangered Species Act, as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16
BLM ROSEBURG DISTRICT Page 15 of 71
U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ); and the Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ). Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.
6.0 HAZARDOUS MATERIALS
Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.
Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR
1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.
7.0 GREEN PROCUREMENT REQUIREMENTS
In the performance of this service or construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, if applicable:
U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.
USDA Biobased product listings published at www.biopreferred.gov.
Energy Star® product listings published at www.energystar.gov/products.
FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product-categories
Contractor shall comply with all reporting requirements stated in the applicable clause(s):
52.223-1 Biobased Product Certification 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts 52.223-4 Recovered Material Certification 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items 52.223-15 Energy Efficiency in Energy Consuming Products 52.223-17 Affirmative Procurement of EPA Designated Items in Service and Construction Contracts
8.0 RESTORATION OF RESOURCES
8.1 Cleanup - The Contractor is responsible for cleaning up all camp and worksites before leaving the area.
Final payment or other alternative deemed feasible may be withheld until the Contractor has complied with this requirement.
8.2 Site and Access Roads – Site and public or private access roads damaged by the Contractor shall be restored to the same condition they were in at the commencement of work, at the expense of the Contractor.
9.0 UNAUTHORIZED PERSONNEL
BLM ROSEBURG DISTRICT Page 16 of 71
The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to restricted areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.
10.0 OREGON FARM/FOREST LABOR CONTRACTOR'S LICENSE
If the State of Oregon requires an Oregon Farm/Forest Labor Contractor's License, then the contractor awarded this contract and all first-tier subcontractors shall be required to obtain and maintain, during the term of this contract, such a license. Contractors not having a current license will be required to furnish evidence of having obtained such license within ten (10) days after receipt of written notification of contract award. Failure to obtain, keep and maintain a current license during the term of this contract or the extension thereof shall be a basis for termination for default.
Information on obtaining this license may be obtained from:
Bureau of Labor and Industries Contact: Licensing Unit Wage and Hour Division Telephone: (503) 373-1463 3865 Wolverine St. NE; E-1 Fax: (503) 373-7636 Salem, OR 97305-1268
11.0 FIRE DANGER SEASON
If the COR allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR and outlined in the attachment at the end of this section.
1510-52.222-70 – MIGRANT SEASONAL AGRICULTURAL WORKERS PROTECTION ACT
REGISTRATION MAINTENANCE
(a) As set forth in Title 29, Part 500 of the Code of Federal Regulations, Migrant and Seasonal Agricultural Worker Protection, the Contractor shall maintain all necessary U.S. Department of Labor registrations during the performance period of this contract. Failure to maintain a valid registration is grounds for termination of this contract.
(b) In compliance with the Migrant and Seasonal Agricultural Worker Protection Act, the Contractor shall provide the following to meet minimum safety and health standards for housing employees when camping on Federal lands:
(1) A shelter to provide protection from the elements. Where heat adequate for weather conditions is not provided, other arrangements should be made to protect the workers from the cold.
(2) Sanitary facilities for storing food. Ice chests or coolers, with ice supply made from potable water replenished as necessary, to meet the requirement for storage of perishable food items.
(3) An adequate and convenient potable water supply, approved by the appropriate health authority, in each camp for drinking and cooking purposes. As an alternative, commercial bottled water may be used.
(4) Toilet and hand washing facilities adequate for the capacity of the camp, at not less than a 1:15 ratio, supplied with adequate toilet paper. Such facilities shall be maintained in a sanitary condition.
(5) Fly-tight, rodent-tight, impervious, cleanable or single service containers to be used for the storage of garbage. Such containers shall be kept clean and emptied when full.
(6) Basic first aid supplies under the charge of a person trained to administer first aid.
BLM ROSEBURG DISTRICT Page 17 of 71
(7) A laundry tray or tub for every 30 workers, or transportation, at least weekly, to a commercial laundromat for all workers.
FIRE REQUIREMENTS PROCEDURES OUTLINE
This outline covers the fire protection requirements of a contractor or private party who performs service or construction contracts on BLM land. In western Oregon, the BLM allows Oregon Forest Law (ORS) and Oregon Administrative Rules (OAR) to apply to these operations on BLM lands rather than develop similar rules applicable only to BLM lands.
1. CLOSED FIRE SEASON
The closed fire season means that fire season has been declared. ORS 477.505 gives the State Forester the authority to establish the fire season. The authority has been delegated to the District Foresters around the state who issue public notices through the newspapers and radio when fire season will be closed for their individual districts.
Closed fire season depends upon the drying of forest fuels, rainfall, and time of year. During the closed fire season, the following requirements must be met:
Fire tools must be on site;
Fire extinguisher must be in all vehicles;
Chainsaws must have a .023-inch mesh screen installed in the exhaust;
Only unmodified saws are to be used in the forest;
Approved spark arresters must be on all internal combustion engines;
Watchman service must be provided for 3 hrs after shutdown of power equipment for the day;
No smoking is permitted while working or traveling through any operations area in the forest;
No use of explosives is permitted unless approved by the State Forester's representative;
Permits to burn are required unless waived by a representative of the State Forester.
Permits to operate power-driven machinery shall be obtained by the Contractor prior to commencing operations unless waived by a representative of the State Forester (ORS 47.625).
Changes or modifications to the above requirements are possible depending upon changes in State of Oregon law and requirements of the State Districts and Protective Associations.
2. FIRE PRECAUTION LEVELS
There are 4 fire precaution levels that begin with level 1 at the start of the closed fire season and can go through level 4 if conditions warrant. The fire precaution levels restrict certain forest operations as the fire danger increases.
It is the responsibility of the individual operating on forest land to know the precaution level for the day and take the correct fire precautions. There are no precaution levels prior to the closed fire season. Each fire precaution level requires adherence to the restrictions applicable to all lower levels in addition to the limits placed by that level.
Level 1 is the lowest level of fire danger usually occurring early in the season and perhaps again after significant rainfall during the season. All requirements listed above apply. Waivers may be issued by the State Districts or Protective Associations and these MUST be approved by the BLM. Waivers will only be considered if the conditions on the work site are not as severe as predicted. The requirements for fire tools on site, screens installed in saws, and fire extinguishers with saws will not be waived.
Level 2 is the partial hootowl where saws can operate from first light in the morning until 1:00 p.m. in the afternoon.
From 1:00 p.m. until the end of the day saws are to be shut down. Waivers for operating beyond the 1:00 p.m.
shutdown will be evaluated on a site-by-site basis.
Level 3 is the partial shutdown of all forest industrial operations and shuts down contractor operations with few exceptions. Waivers may be issued on a site-by-site basis.
Level 4 is the general shutdown of all contractor operations. Waivers will not be issued. Landowners are permitted entry into their lands.
BLM ROSEBURG DISTRICT Page 18 of 71
ORS. 477.066 requires that an operator on forest land take immediate action to control and extinguish a fire on forest land. The contractor shall take this action and notify the BLM and the nearest State of Oregon District office immediately.
OAR. 629-43-030 requires watchmen to be:
Physically capable and experienced in operating any firefighting equipment on site.
On duty for 3 hours after the shutdown of the last power-driven equipment for the day.
Furnished adequate facilities for transportation and communications in order to summon assistance if needed.
Patrolling and visually inspecting all sites where work was done during the day.
3. FIRE TOOLS REQUIRED DURING CLOSED FIRE SEASON
The operator/contractor shall furnish fire tools to all personnel on site using the following combinations.
NUMBER OF PERSONNEL_______________________________
1- 4 5 6 7 8 9 10 11 12 13 14
KIND OF TOOLS NUMBER OF TOOLS REQUIRED_________________________
Pulaskis 1 1 1 1 1 1 2 2 2 2 2
Shovels 2 2 2 3 3 3 3 4 4 5 5
Hazel hoes 1 2 3 3 4 5 5 5 6 6 6
In addition to the above handtools, the operator/contractor must provide a backpack pump can filled with water located with the tool box in a readily available area.
All shovels are to be size 0 or larger, long handled. All tools shall be sharp and ready for service. Fire extinguishers as follows:
For chainsaws - 8 oz. capacity by weight.
For vehicles - UL rating of at least 4 BC.
4. ADDITIONAL WATER SUPPLY
Contractor shall comply with ORS 477.615 during fire season when inside or within one-eighth of one…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .