Roseburg District Hazard Tree Removal-Archie Creek
Solicitation number
140L4322Q0137
Issued by

View the file

Other files

File Type Posted
B08_Amendment_2_0003.pdf PDF
Sol_140L4322Q0137_Amd_0002.pdf PDF
Sol_140L4322Q0137_Amd_0001.pdf PDF
Sol_140L4322Q0137.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 1 - Solicitation #140L4322Q0137

ARCHIE CREEK HAZARD TREE REMOVAL

BLM ROSEBURG DISTRICT

Section B – Price Schedule-REVISED

Item Description Unit Unit Price

HR ________

HR ________

HR ________

HR ________

HR ________

HR ________

HR ________

HR ________

HR ________

EA ________

1. Heavy Equipment (HE)

a. Excavator with Operator

i. Weight Class as specified: Micro <25k lbs

ii. Weight Class : HE120-HE150 26k to 39k lbs

iii. Weight Class: HE200-HE250 48k to 60k lbs

iv. Weight Class: HE300 65k to 90k lbs

b. Dump Truck (10 Yd) with Operator

c. Rubber-tired Front End Loader with Operator - SMALL

d. Rubber-tired Front End Loader with Operator – LARGE

2. Labor

a. Sawyer/Tree Climber

b. Laborer

c. Traffic Control

3. Mobilization (between worksites in the project area)

a. Initial mobilization to the project area

b. Interim mobilization between worksites 0-10 miles

c. Interim mobilization between worksites 11-20 miles

d. Final demobilization

EA ________

HR = Hour; EA = Each

Period of Performance 9/1/2022 – 9/30/2024

EA ________

EA ________

ARCHIE CREEK HAZARD TREE REMOVAL

BLM ROSEBURG DISTRICT

Amendment 1 - Solicitation #140L4322Q0137

VENDOR QUESTIONS AND ANSWERS

Question 1: Vendor noticed a typo on the item list.

Answer 1: Edited Excavator Weight Class HE200-HE250 from 65k to 90k lbs. to 48k to 60k lbs.

Question 2: Vendor noticed there are two intermediate mobilization line items for the short moves, but there are no line items for the initial move in and move out.

Answer 2: Line Item 3. Mobilization has been changed to reflect initial move in and demobilization. As well short move mobilizations have been better defined as mobilization between worksites.