This is a Request for Quotes (RFQ) for commercial services issued by the Bureau of Land Management (BLM) Kingman Field Office. The solicitation number is 140L3726Q0124, with a solicitation issue date of 07/17/2026 and an offer due date of 07/30/2026 at 9:00 a.m. Mountain Daylight Time. Questions are due by 07/23/2026. This acquisition is set aside for small business with a NAICS code of 541620 (Environmental Consulting Services) and a size standard of $19.0 million. The solicitation is for one task: development of a Vegetation Management Plan (VMP) and Environmental Assessment (EA) for BLM-managed lands within the Kingman Field Office in northwestern Arizona, covering approximately 2.4 million acres. The period of performance runs from 10/15/2026 through 10/14/2027, with a delivery date of 10/14/2027. Award will be made on a firm-fixed-price basis to the responsible vendor whose quote conforms to the solicitation and technical evaluation factors.
The contractor must develop a landscape-scale VMP outlining vegetation management goals, treatment types, implementation strategies, and mitigation measures, along with a geospatial analysis identifying potential treatment areas. The EA must analyze up to three alternatives and address resources including air quality, cultural resources, fuels and fire management, threatened and endangered species, vegetation, water quality, wilderness, and wildlife. Key deliverables include a project management plan, draft and final VMP, external scoping letter and report, draft and final EA with FONSI and decision record components, and an indexed decision file. The contractor must conduct biweekly project management meetings, ensure Section 508 compliance for all publicly available documents, and incorporate conservation measures from relevant environmental impact statements. Optional tasks include facilitating external scoping meetings and providing litigation support and FOIA response assistance. The solicitation requires submission of resumes for key personnel positions, including a Project Manager, Environmental Planner, Geospatial Analyst, and various subject matter specialists (Air Quality, Archeologist, Ecologist, Wildlife Biologist, Hydrologist, Fire Management, Recreation, Rangeland Management, and Soil Science specialists). Contractors must submit quotes by email to daniel_rosales@ios.doi.gov and must be registered and active in the System for Award Management (SAM), providing their Unique Entity ID (UEI) and CAGE code with their quote.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_Attachment_3_Clauses_and_Provisions.pdf | ||
| B08_Attachment_2_Map_KFO_SMA.zip | ZIP file | |
| B08_Attachment_1_SOW_07162026.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3.AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
. YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4.
FAR 52.212-3 AND 52.212-5 ARE ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
DATED.
OFFER
ADDENDA
ADDENDA
140L3726Q0124
See Schedule See Schedule
BLM FA-NTL INTRAGCY FIRE CTR(FA250)
3833 S. DEVELOPMENT AVE.
BOISE ID 83705
07/30/2026 0900 MD
0044048214
Daniel Rosales
LFA 100.00
LFA
Daniel Rosales
541620
$19
07/17/2026
0011276253
ADMINISTERED BY:
BLM FA NTL INTRAGCY FIRE (FA250)
3833 S. DEVELOPMENT AVE.
BOISE ID 83705 US
DELIVER TO:
BLM-AZ KINGMAN FIELD OFFICE
Continued...
STOCK RECORD (S/R)
STANDARD FORM 1449 (REV. 11/2021) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
ACCEPTED,
2755 MISSION BOULEVARD
KINGMAN AZ 86401-3629 US
The following attachments are included in this solicitation:
Attachments:
1. SOW, 07/16/2026, 15 Pages
2. MAP_KFO_SMA (Zip File), 07/16/2026, 1 Page
3. Provisions and Clauses, 07/16/2026, 8 Pages
Delivery: 10/14/2027
Period of Performance: 10/15/2026 to
10/14/2027
Kingman Field Office Vegetation Management Plan and Programmatic Environmental Assessment
00010 KFO Vegetation Mgmt Plan
Product/Service Code: B510
Product/Service Description: SPECIAL
STUDIES/ANALYSIS- ENVIRONMENTAL ASSESSMENTS
VEGETATION MANAGEMENT PLAN AND ENVIRONMENTAL ASSESSMENT,
BUREAU OF LAND MANAGEMENT, KINGMAN FIELD OFFICE, AZ.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR 12.202(b)(1), as supplemented with additional information included in this notice.
This announcement and attachments constitute the only solicitation; quotes are being requested, and a written solicitation will not be issued. Consider this solicitation (140L3726Q0124) as a Request for Quotes (RFQ). This solicitation documents incorporate provisions and clauses in effect through Federal acquisition Circular 2026-01. This solicitation is set-aside for small business. NAICS 541620– Environmental Consulting Services. The small business size standard is $19.0 million. Product Service Code B510 – Studies & Analyses Environmental Assessments.
The resulting purchase order will be a firm-fixed price type purchase order. (SEE
ATTACHMENT 140L3726Q0124 – RFQ PACKAGE FOR COMPLETE SOW, MAP, AND
CLAUSES / PROVISIONS.)
Department of Interior, Bureau of Land Management, Kingman Field Office has a requirement to perform Vegetation Management Plan and Environmental Assessment.
Item Supplies/Services Qty Unit of Issue
Total
00010 Vegetation Management Plan and Environmental Assessment
1 EA $
SITE VISIT: No scheduled site visit. However, Contact COR William Boyet @, cboyet@blm.gov if you should have questions pertaining to site visit. Vendors may visit the site at their convenience prior to due date submittal of quote (Technical questions solicitation questions, submit through email to the Contracting Officer).
In accordance with the procedures in FAR Part 12, RFQ 140L3726Q0124 is available for viewing through electronic commerce via website at https://sam.gov.
The Government will award a contract and/or purchase order resulting from this solicitation to the responsible vendor whose quote conforms to the solicitation and in accordance with the technical evaluation factors.
Questions are due Thursday, July 23, 2026, 9:00 a.m. Mountain Daylight Time. Quotes are due Thursday, July 30, 2026, 9:00 a.m. Mountain Daylight Time. Contractors MUST submit quotes by email to daniel_rosales@ios.doi.gov.
Note: Any contractor to submit an acceptable quote or awarded a government contract must be registered and active in the System for Award Management (SAM). Contractors must register at www.sam.gov.
Contractors must submit their Unique Entity ID (UEI) and CAGE code with their quote.
Sign SF-1449 and any amendments that may be posted to www.sam.gov.
UEI ______________________
Solicitation No. 140L3726Q0124 Page 3 of 28
CAGE ____________________
For further information about this requirement, offerors should contact daniel_rosales@ios.doi.gov.
The provisions and clauses attached apply to this solicitation.
Attachments:
1. SOW, 07/16/2026, 15 Pages
2. MAP_KFO_SMA (Zip File), 07/16/2026, 1 Page
3. Provisions and Clauses, 07/16/2026, 8 Pages
Solicitation No. 140L3726Q0124 Page 4 of 28
07/16/2026
Attachment 1: Statement of Work for KFO Vegetation Management Plan and Environmental Assessment
Section 1: Background
The Bureau of Land Management (BLM) Kingman Field Office (KFO) is seeking assistance with the preparation of a Vegetation Management Plan (VMP) and Environmental Assessment (EA). The KFO manages about 2.4 million acres of public land in northwestern Arizona, south and east of the Colorado River (Map 1). Within this area, KFO manages 12 Areas of Critical Environmental Concern (ACECs), approximately five river segments under consideration for Wild and Scenic River designation, 85 active grazing allotments, three Herd Management Areas, nine Wilderness Areas, and habitat for numerous sensitive, threatened, and endangered species (BLM 1993, 1995, 2023a).
Vegetation communities within KFO are diverse with five Major Land Resource Areas that occur within the field office, including Colorado Plateau, Mogollon Transition North, Mogollon Transition South, Mojave Basin and Range, and Sonoran Basin and Range (NRCS 2006) (Map 2). Vegetation communities include aspen communities, ponderosa pine associations, pinyon-juniper woodland, Great Basin and Plains grassland, semi-desert grassland, desert scrub, interior chaparral, and riparian. The plant composition, structure, and function of these vegetation communities have historically been affected by factors including grazing, drought, climate change, historic suppression of natural wildfire, and the introduction and spread of invasive species.
The BLM is responsible for managing vegetation communities within its jurisdiction to serve the broader resource objectives of applicable resource management plans (RMPs) and land use plans. The Kingman RMP (BLM 1995) lists the following resource/area goals and objectives:
- “Implement management prescriptions to restore and maintain riparian-wetland areas so 75 percent or more are in proper functioning condition and good or better ecological status by 1997” (Resource Area Goals, p. 17);
- “Maintain and enhance wildlife habitat to ensure viable populations and natural diversity” (Resource Area Goals, p. 18);
- “Preserve and enhance threatened and endangered species and their habitats” (Resource Area Goals, p. 18);
- “Determine ecological site conditions and potentials; manage vegetation for desired plant communities which will maximize multiple use benefits and maintain a thriving natural ecological balance” (Resource Area Goals, p. 18);
- “Rehabilitate all surface disturbances to the extent practicable at the end of use to protect soil, vegetation, water and other environmental values and to blend the disturbed site into surrounding terrain and settings” (Resource Area Goals, p. 18);
- “Close and rehabilitate roads where there is no public or administrative need to keep them open” (Areas Requiring Special Management, p. 19);
Solicitation No. 140L3726Q0124 Page 5 of 28
- “Land treatments to manage vegetation or practices to reduce erosion should be planned, implemented and maintained to minimize adverse impacts on water quality” (Rangeland Management, p. 24);
- “Vegetative treatment projects are implemented where plant cover or soil productivity is being lost, to achieve a desired plant community or to meet activity plan objectives. Such treatments include mechanical treatments (chaining), herbicide applications, prescribed fir e, reseeding and construction of control structures. Seeding may include mixtures of native and naturalized species found growing in the geographic area” (Rangeland Management, p. 24).
Additionally, objectives within the Arizona Statewide Land Use Plan Amendment for Fire, Fuels, and Air Quality Management (Arizona Fire LUPA) include: “[…] adaptive management for wildfire; allow wildfire to resume a more natural ecological role within each ecosystem; the use of prescribed fire; and mechanical, chemical or biological treatments to meet resource objectives and reduce hazardous fuels on public land inside and outside Wildland-Urban Interface (WUI) areas.” “Each vegetation community is maintained within its natural range of variation in plant composition, structure, and function, and fuel loads are maintained below levels that are considered to be hazardous” (BLM 2004, p. 2-1). Desired Future Conditions are detailed within Table 2.1 and Appendix C within the Arizona Fire LUPA.
KFO currently uses manual, mechanical, chemical, and prescribed fire treatments to reduce wildfire risk and maintain and restore vegetation communities on BLM-managed lands on a project-by-project basis.
KFO has determined that a landscape-scale approach to Integrated Vegetation Management (IVM) is needed to manage vegetation communities more effectively. KFO is seeking assistance with developing a field office-wide VMP and associated EA. The VMP would outline treatment methods to maintain and restore KFO vegetation communities to meet objectives identified by the land use plans, as outlined above. The EA would analyze and disclose the potential impacts of a proposed plan and alternatives.
Section 2: Scope and Schedule
The Contractor shall develop a VMP that provides treatment options to maintain and improve vegetation communities and to meet KFO vegetation and fire and fuels management objectives. The Contractor shall also prepare an EA to analyze and disclose the potential impacts of the VMP and alternatives.
Resources analyzed in detail within the EA could include air quality, areas of critical environmental concern, cultural resources, fuels and fire management, human health and public safety, lands and realty, recreation, migratory birds, rangeland, soils, threatened or endangered species. vegetation, water quality, wilderness, and wildlife. The analysis area for the VMP includes all BLM-managed land within KFO jurisdiction (Map 1). This will require coordination and work with the KFO’s Interdisciplinary Team (ID Team) and field managers.
Contract deliverables for the VMP and EA include developing a project schedule and management plan;
coordinating regular project management meetings with project leadership, including preparing and distributing agendas and meeting notes in a timely manner; preparing and sending a letter or postcard, as well as up to three maps, for external scoping and posting on BLM’s ePlanning National NEPA Register (ePlanning); compiling a scoping report that documents comment responses; ensuring that any substantive comments received during external scoping are appropriately addressed in the EA; preparing a Finding of No Significant Impact (FONSI), if appropriate; assisting BLM with drafting a Decision Record; and compiling and maintaining the project Decision File.
Solicitation No. 140L3726Q0124 Page 6 of 28
Optional tasks are subject to availability of funding and may be executed in any order, simultaneously, or not at all. These tasks include facilitating an external scoping virtual meeting; and assembling the Administrative Record for litigation support and FOIA response.
The VMP shall include the various treatment methods to achieve desired future conditions of vegetation communities within KFO. Treatment methods should be selected based on the vegetation community and may include a combination of prescribed fire, manual, mechanical, chemical, and prescribed grazing treatments, seeding, transplanting vegetation, and erosion control and stream restoration structures. The VMP should also include fence construction to manage grazing utilization to protect treatments and development of water facilities to replace the loss of livestock and wildlife water resources during and after treatments. The VMP shall include a geospatial analysis documenting the status and trends of vegetation communities and identifying vegetation communities that have departed from desired future conditions and objectives including wildfire risks and threats. This assessment may include analysis of KFO’s internal datasets as well as external resources. This assessment should provide KFO with information to identify priority treatment areas that align with land use plan objectives. In addition to priority treatment areas identified through geospatial analysis, the VMP will allow KFO’s ID Team to identify additional treatment areas through future assessment of vegetation communities during site visits and evaluation of monitoring data, reports, and various resources.
Endangered Species Act Section 7 Consultation: BLM Arizona produced a programmatic statewide Biological Assessment (BA) for vegetation treatment projects and engaged with United States Fish and Wildlife Service (USFWS) in programmatic Endangered Species Act (ESA) Section 7 Consultation (BLM 2025a). In September 2025, USFWS concurred with BLM’s effects determinations that the proposed project may affect but is not likely to adversely affect the species and critical habitats addressed. Within the corresponding Biological Opinion (BO), USFWS categorized levels of further coordination needed into three tiers. If treatments incorporate all conservation measures listed in the BA, USFWS concurs with BLM’s effects determination and no further coordination is needed. For treatments that deviate from the proposed action or treatments that can incorporate all conservation measures except one or more measures, BLM must provide the USFWS with additional site-specific information and additional conservation measures for consideration for coverage under the programmatic consultation (USFWS 2025). For projects that the programmatic consultation does not cover, informal or formal project-specific consultation is necessary. KFO expects that many of the treatments included in the VMP will align with BLM Arizona’s BA. Conservation measures identified in the BO shall be incorporated into the VMP to the extent practicable. At BLM KFO’s discretion, the BLM may conduct follow-up consultation with USFWS to address concerns with discrepancies between treatments proposed within the VMP and USFWS-approved conservation measures.
National Historic Preservation Act Section 106 Consultation: Land management agencies within Arizona cooperatively developed the Arizona Vegetation and Range Management Programmatic Agreement (PA) to establish alternative procedures for implementation of Section 106 of the National Historic Preservation Act. The PA covers a variety of vegetation and range management activities that are expected to have effects on historic properties that are similar and repetitive or regional in scope.
KFO plans to adhere to this PA for tribal coordination for the overall project.
Solicitation No. 140L3726Q0124 Page 7 of 28
The herbicides and treatment methods identified within the VMP must align with those analyzed within three Programmatic Environmental Impact Statements (PEIS): Final Vegetation Treatments Using Herbicides on Bureau of Land Management Lands in 17 Western States Programmatic Environmental Impact Statement (BLM 2007), Vegetation Treatments Using Aminopyralid, Fluroxypr, and Rimsulfuron (BLM 2016), and Final Programmatic Environmental Impact Statement Addressing Vegetation Treatments Using Herbicides (BLM 2023b). These documents analyze the effects of herbicides for treating vegetation on public lands in the 17 western states and identify impacts on the natural and human environment associated with herbicide use. The corresponding Records of Decision (RODs) approved the use of the listed herbicide active ingredients on BLM-managed lands in the 17 western states as outlined in the proposed actions. Appropriate Standard Operating Procedures and conservation measures identified in these PEIS RODs shall be incorporated into the VMP.
The period of performance (POP) for this contract is from October 15, 2026, through October 14, 2027.
The Contractor will identify a schedule for completion of tasks within this POP.
Section 3: Tasks to be Performed
Task 1: Kickoff Meeting, Project Meetings and Project Management The Contractor shall schedule and conduct an initial virtual kickoff meeting within fifteen (15) calendar days of the POP. During this meeting, the Contractor and KFO will review the scope of work (SOW), discuss the draft work plan and preliminary schedule, and address any outstanding topics. Following the kickoff meeting, the Contractor shall revise the work plan and schedule as necessary based on feedback received. Within fifteen (15) calendar days following the kickoff meeting, the Contractor shall submit an updated work plan and preliminary schedule. The work plan must outline the tasks and methodologies to be used to complete the project within the 12-month/75-page requirements for Environmental Assessments and within the defined POP. The work plan shall include a detailed schedule showing anticipated completion times for each task. The Contractor shall be responsible for maintaining and updating the project schedule throughout the duration of the project to reflect progress and any necessary adjustments.
To ensure ongoing coordination, the Contractor shall organize and lead biweekly virtual project management calls. The Contractor will be responsible for preparing and distributing meeting agendas in advance, capturing meeting notes, and providing those notes to the BLM Project Manager. If both the Contractor and BLM agree that a scheduled call is not necessary during certain phases of the project, the call may be canceled. Depending on the stage of the contract, the frequency of calls may increase or decrease as needed. The Contractor shall distribute notes from each biweekly call to all participants and other interested parties as identified by the BLM.
The Contractor shall assist BLM as necessary in coordinating with any Cooperating Agencies, identified participating agencies and Tribes with jurisdictional authority or special expertise over resources that could be impacted by the proposed project.
Solicitation No. 140L3726Q0124 Page 8 of 28
Task 1 Deliverables:
Deliverable Due Date
Agenda for Kickoff Meeting 3 business days prior to the kickoff meeting
Kickoff Meeting 15 days after POP start
Project Schedule Finalized within 30 days of POP start, updated as necessary
Project Management Plan Finalized within 30 days of POP start
Meeting Notes 3 business days after each meeting
Task 2: Section 508 Compliance The BLM shall review and approve the template of all documents and products prior to their production.
All products that will be made publicly available shall comply with the requirements of Section 508 of the Rehabilitation Act of 1973, as follows:
Electronic content that will be made publicly available must be Section 508 Compliant by meeting current Web Content Accessibility Guidelines (WCAG) standards and conformance requirements. Electronic content includes but is not limited to: PDF files, Microsoft Word documents, Microsoft Excel documents, Microsoft PowerPoint files, Adobe InDesign files, audio files, video files, and multimedia files.
Documents and products intended for publication shall be prepared from 508 compliant templates. Guidance on Section 508 compliance is available at https://www.section508.gov/create/documents/.
The Contractor must provide proof that the electronic document is Section 508 compliant up to current Web Content Accessibility Guidelines (WCAG) standards by delivering an Accessibility Conformance Report (ACR). An example of an ACR would be an Adobe Acrobat Accessibility Report including additional confirmation that the document’s reading order, tag structure, and color contrast were manually confirmed for compliance. The ACR must be delivered with the final version of the content prior to publication.
Task 3: Develop VMP For the development of the VMP, KFO will provide the Contractor with desired future conditions of vegetation communities, priority treatment areas to reduce wildfire risk (e.g. WUI areas) within KFO, and compatible treatment methods to achieve these conditions. The Contractor will work with the resource specialists to understand the VMP needed to proceed with the proposed vegetation management goals and implementation strategies. The Safford Field Office Vegetation Management Plan EA (BLM 2024) and Dillon Field Office Programmatic Vegetation Management EA (BLM 2025b) may be referenced as an example VMPs (consolidated into EAs); however, vegetation communities, management objectives, treatment methods, and resource concerns differ from those within KFO.
Solicitation No. 140L3726Q0124 Page 9 of 28
The Contractor shall develop a landscape-scale VMP for BLM-managed land within KFO outlining vegetation management goals, treatment types, implementation strategies, project design features, and mitigation measures. The VMP shall include a geospatial analysis to identify potential treatment areas by documenting the status and trends of vegetation communities and identifying vegetation communities that have departed from desired future conditions and objectives. This assessment may include analysis of KFO’s internal data, including rangeland trend monitoring data, terrestrial AIM data, and proper functioning condition (PFC) assessments, as well as external resources, including but not limited to Wildfire Risk layers (e.g., WUI Silvis), Natural Resource Conservation Service’s (NRCS’s) Soil Survey Geographic Database, NRCS’s Ecological Site Descriptions (ESDs), NRCS’s State and Transition Models (STMs), aerial imagery, LANDFIRE data, and Rangeland Analysis Platform (RAP) data. In addition to potential treatment areas identified through geospatial analysis, the VMP will allow KFO’s ID Team to identify additional treatment areas through future assessment of the vegetation communities during site visits and evaluation of monitoring data, reports, and various resources. Methods used to assess vegetation condition may include but are not limited to those outlined in BLM’s Integrated Vegetation Management Handbook (BLM 2008).
The Contractor will receive current GIS data of all linear features, boundaries, and land status in KFO and work with BLM specialists to develop geospatial products for the VMP.
The Contractor will provide KFO a draft VMP with included geospatial analysis consistent with the project schedule. The Contractor shall include any geospatial products developed in GIS format with associated metadata. The BLM will review the document and provide feedback (using track changes and comments within Microsoft Word) within thirty (30) calendar days. The contractor shall respond to BLM comments and produce a revised draft for BLM’s review and approval. Once approved by the BLM, the Contractor will finalize the VMP and provide the BLM with finalized copies of the VMP (suitable for posting on ePlanning) in accordance with the project schedule.
Task 3 Deliverables Deliverable Due Date
Draft VMP Per Project Schedule
Revised Draft VMP Per Project Schedule
Final VMP Per Project Schedule
Task 4: Conduct External Scoping for EA The Contractor shall develop a letter/postcard to stakeholders for external scoping for review and approval by KFO. The Contractor shall electronically send the letter/postcard to stakeholders with working email addresses. For stakeholders without working email addresses, the Contractor shall send the letter/postcard via USPS. KFO anticipates that most stakeholders have working email addresses and no more than 20 letters would be sent via USPS. KFO will provide the Contractor a list of stakeholders, including government to government/Tribal and cooperating agencies to include.
Contractor shall provide a comprehensive scoping report that organizes and summarizes substantial comments by theme collected during the scoping period and develops comment responses.
Solicitation No. 140L3726Q0124 Page 10 of 28
KFO shall review and approve letter/postcard prior to its production. All products that will be made publicly available shall comply with the requirements of Section 508 of the Rehabilitation Act of 1973 as noted in Task 2. KFO will post the materials and scoping report on ePlanning.
Task 4 Deliverables Deliverable Due Date
External Scoping Letter/Postcard Per Project Schedule
Scoping Report Within 30 days of the close of the comment period
Task 5: Develop Environmental Assessment (EA)_ The Contractor shall set up a meeting with KFO’s resource specialists based on the Contractor’s finalized schedule to discuss the EA needed. The Contractor shall prepare an EA to analyze and disclose the potential impacts of the VMP and alternatives. The EA will analyze up to three alternatives: the no action alternative, the proposed VMP, and the VMP with modifications. Resources analyzed in detail within the EA could include air quality, areas of critical environmental concern, cultural resources, fuels and fire management, human health and public safety, lands and realty, recreation, migratory birds, rangeland, soils, threatened or endangered species, vegetation, water quality, wilderness, and wildlife.
The Contractor shall ensure that any substantive comments received during external scoping are appropriately addressed in the EA.
The Contractor shall provide KFO the draft EA based on the project schedule. The Contractor shall submit separate chapters to KFO for review as they are ready. A preliminary draft of Chapter 2, Alternatives, is especially helpful in making sure that the agency and Contractor are on the same page before the full impact assessment is completed. The Contractor shall include any geospatial products developed in GIS format with associated metadata. The BLM will review the submitted documents and provide feedback (using track changes and comments within Microsoft Word) within twenty (20) calendar days of submission. The contractor shall respond to BLM comments and produce a revised draft for BLM’s review and approval. Once approved by the BLM, the Contractor shall finalize the EA and provide the BLM with finalized copies of the EA (suitable for posting on ePlanning), a draft FONSI (if appropriate) and draft components of a Decision Record for Authorized Officer (AO) review, timeline based on Contractor proposed schedule. During the BLM review, the AO shall have the opportunity to address any required edits or changes to the document.
Task 5 Deliverables
Deliverable Due Date
Draft EA Per Project Schedule
Revised Draft EA and Draft FONSI/Decision Record Per Project Schedule
Final EA and Revised Draft FONSI/Decision Record Per Project Schedule
Solicitation No. 140L3726Q0124 Page 11 of 28
Task 6: Decision File The Contractor shall compile and record the Decision File for the EA. The Decision File is the set of documents and materials that the BLM considered, directly or indirectly (e.g., through staff), in making the final decision. The Decision File shall include all the factual, technical, and scientific material or data used to prepare the VMP and the EA, or considered in making the decision for the EA, whether or not those materials or data support the decision. The Contractor shall provide keywords for staff to search and compile e-mail correspondence for the Decision File. The contractor shall provide an e-mail address to KFO for staff to forward e-mail correspondence to. The Contractor shall compile the emails sent from the team.
Assembling the Decision File may include: reviewing materials for relevancy; preparing separate indices of the documents relevant to the EA (including separate indices for any privileged or FOIA exempt documents); and preparing a final record. The Contractor shall house the Decision File electronically in a searchable SharePoint and catalog it according to the BLM’s policy.
Task 6 Deliverables Deliverable Due Date
Electronic, Indexed Decision File Within 45 days of publishing the FONSI/Decision Record
OPTIONAL TASKS
Optional tasks are subject to availability of funding and may be executed in any order, simultaneously, or not at all.
Optional Task 1: Facilitate External Scoping Meeting for EA The Contractor may be tasked to schedule, prepare materials for, and facilitate a preliminary virtual public scoping meeting with the goals of identifying resource concerns and discussing alternatives.
Consistent with Task 4, outlined above, Contractor would provide a comprehensive report that summarizes substantial comments, by theme, collected during the scoping period and develop comment responses by theme. The Contractor would host the meeting on appropriate virtual platform (such as Teams or Zoom for Government). The BLM anticipates no more than 50 external attendees.
KFO will provide Contractor with a list of stakeholders, including Tribal and cooperating agencies forty-five (45) calendar days prior to the meeting date.
KFO shall review and approve the template of all meeting materials prior to their production. All products that will be made publicly available shall comply with the requirements of Section 508 of the Rehabilitation Act of 1973 as noted in Task 2.
Solicitation No. 140L3726Q0124 Page 12 of 28
Optional Tank 1 Deliverables Deliverable Due Date
Public Meeting Advertisements 30 days prior to the meeting date
Public Meeting Presentation 30 days prior to the meeting date
Public Meeting Transcript and List of Attendees Within 30 days of the meeting date
Scoping Report Within 30 days of the close of the comment period
Optional Task 2: Litigation Support and FOIA Response The Contractor may be tasked to support the assembly, organization, indexing, updating, maintaining and copying of documents from the Decision File for the Administrative Record (AR) submitted to a court for lawsuits. All record documents within the AR shall be consecutively organized with Bates numbering. ARs that would be submitted to a court in response to a lawsuit shall be converted to portable document format, indexed with hyperlinks, and placed on a single flash drive. Multiple copies may be required depending upon the number of parties to the case. This task may also include correcting, amending or supplementing the AR as necessary throughout the litigation process.
The Contractor may also be required to support assembling responses to Freedom of Information Act (FOIA) requests from the Decision File. This task would include reviewing the FOIA request and searching the Decision File for responsive documents.
Optional Task 2 Deliverables
Deliverable Due Date
Administrative Record Within 15 days of exercising this option
FOIA Within 15 days of exercising this option
Solicitation No. 140L3726Q0124 Page 13 of 28
Section 4: Deliverables
Deliverable Due Date
Project Schedule Completed within 30 days of POP start
Project Management Plan Completed within 30 days of POP start
Draft VMP Per Project Schedule
Revised Draft VMP Per Project Schedule
Final VMP Per Project Schedule
External Scoping Letter/Postcard Per Project Schedule
Scoping Report Within 30 days of the comment period closure
Draft EA Per Project Schedule
Revised Draft EA and Draft FONSI/Decision Record Per Project Schedule
Final EA and Revised Draft FONSI/Decision Record Per Project Schedule
Electronic, Indexed Decision File Within 45 days of publishing the FONSI/Decision Record
Section 5: Government Furnished Items and Services
The BLM will:
Assign a COR to act as a single point of contact for the Contractor.
Assign a BLM Project Manager, if determined necessary to support the project (this may be the same individual as the COR).
Provide a current list of stakeholders and contact information Provide a list of available data which may include available format(s) and metadata.
Provide IDT participation, which will be scheduled to the mutual agreement of the Contractor and the BLM, a specified number of days in advance of the virtual meeting. IDT will provide necessary resource information based on the agreed upon schedule.
Provide all necessary document templates for the EA, FONSI, and Decision Record.
Add to the Decision File, if necessary, and review the final Decision File provided by the
Contractor.
Schedule BLM review periods.
Update, compile, reformat, and furnish data from the BLM’s databases as needed for use in the
VMP and EA.
Manage and update the project on ePlanning.
Solicitation No. 140L3726Q0124 Page 14 of 28
Section 6: Contractor Furnished Items and Services
The Contractor shall furnish all labor, equipment, supervision, transportation, travel, materials, supplies, and incidentals, except those indicated as government-furnished, to perform all work necessary for completion tasks in this Order.
Section 7: Key Personnel
The Contractor shall designate key personnel in its organization and key roles that meet the minimum requirements listed below. Resumes shall be submitted for each Key Personnel position. Additional years of experience or higher education may be substituted to meet the minimum requirements for all positions (EXCEPT the Socioeconomic Specialist), if pre-approved by the BLM CO and COR. All Key Personnel included in the quote MUST be the same individuals assigned to the project. Reference NEPA BPA PWS Section 8.3 for specifics on replacing Key Personnel and approvals.
Key Personnel Position
Minimum Years of Experience
Minimum Education Requirements
Description/Additional Details
Project Manager-specific to KFO VMP and EA
At least 5 years of project experience demonstrated with NEPA and/or Land Use Planning
At least a bachelors degree in environmental planning, environmental policy, natural resource management, or a related discipline.
(Project management certificate preferred)
Contractor’s principal point of contact for communications with BLM.
Oversees all subcontractors and specialists, manages workflows to meet timelines.
Environmental Planner
At least 5 years of project experience demonstrated with preparing NEPA documents and at least 3 years supporting BLM NEPA actions.
At least a bachelor’s degree in environmental planning, environmental policy, natural resource management, or a related discipline.
Contractor’s lead as the principal author and analyst for the EA. Ensures compliance with current DOI NEPA regulations.
Coordinates with resource specialists.
Geospatial Analyst
At least 3 years of applied GIS experience with proficiency in spatial analysis relevant to vegetation management and NEPA support.
A bachelor’s degree in GIS, environmental science, or related discipline. (GIS
Develops spatial layers, conducts landscape-scale analysis, models vegetation change, produces maps for VMP and EA.
Solicitation No. 140L3726Q0124 Page 15 of 28
Key Personnel Position
Minimum Years of Experience
Minimum Education Requirements
Description/Additional Details certificate preferred.)
Air Quality Specialist
At least 3 years of experience conducting air quality analysis, emissions quantification, or regulatory compliance for NEPA or similar environmental reviews. Familiarity with the Clean Air Act.
A bachelor’s degree in environmental science, atmospheric science, engineering, or a related field.
Contractor’s lead for assessing the potential effect of the proposed action and alternatives on air quality.
Archeologist At least 3 years of experience conducting Section 106 compliance work on public lands and effects analysis for NEPA compliance.
A bachelor’s degree in archaeology, anthropology, or related field.
Contractor’s lead for assessing the potential effects of the proposed action and alternatives on cultural resources.
Ecologist At least 3 years of experience conducting ecological assessments and evaluating impacts of vegetation manipulation or restoration treatments.
Familiarity with ecosystems within the KFO planning area.
Bachelor’s degree in ecology, biology, natural resources, or a related science (Master’s degree is preferred).
Assists with VMP development. Contractor’s lead for assessing the potential effects of the proposed action and alternatives on vegetation.
Wildlife Biologist
At least 3 years of experience in wildlife surveys, habitat assessments, and biological impact analysis for NEPA or ESA compliance.
Knowledge of wildlife and habitat relationships within ecosystems of the KFO planning area.
Bachelor’s degree in wildlife biology, zoology, ecology, or related field.
Contractor’s lead for assessing the potential effects of the proposed action and alternatives on wildlife, migratory birds, and threatened and endangered species.
Hydrologist At least 3 years of experience conducting hydrologic assessments, watershed analysis, or surface and groundwater evaluations.
Bachelor’s degree in hydrology, geomorphology, geology, environmental science, or related field.
Contractor’s lead for assessing the potential effects of the proposed action and alternatives on surface and ground water quality.
Solicitation No. 140L3726Q0124 Page 16 of 28
Key Personnel Position
Minimum Years of Experience
Minimum Education Requirements
Description/Additional Details
Fire Management Specialist
At least 3 years of experience in fuels management and fire behavior modeling.
Knowledge of fuel and fire behavior and treatment strategies for ecosystems within the KFO planning area.
Bachelor’s degree in fire ecology, forestry, natural resources, or related field.
Assists with VMP development. Contractor’s lead for assessing the potential effects of the proposed action and alternatives on fire and fuels.
Recreation Specialist
At least 3 years of experience conducting recreation, visual resource, and wilderness impact analysis for public land management agencies.
A bachelor’s degree in recreation resource management, outdoor recreation planning, natural resource management, or related field.
Contractor’s lead for assessing the potential effects of the proposed action and alternatives on recreational uses, visual resources, and wilderness characteristics.
Rangeland Management Specialist
At least 3 years of experience in rangeland monitoring and management within BLM grazing allotments or comparable settings.
A bachelor’s degree in rangeland management, natural resources, ecology, or related science.
Contractor’s lead for assessing the potential effects of the proposed action and alternatives on grazing allotments and livestock use.
Soil Scientist At least 3 years of experience assessing soil resources for public land management agencies.
Demonstrated experience evaluating soil conditions and vegetation treatment effects within arid and semi-arid ecosystems.
A bachelor’s degree in soil science, soil ecology, geology, or related field.
Contractor’s lead for assessing the potential effects of the proposed action and alternatives on soil resources.
Solicitation No. 140L3726Q0124 Page 17 of 28
REFERENCES
Bureau of Land Management (BLM). 1993. Kingman Resource Area. Proposed Resource Management Plan and Final Environmental Impact Statement. Available online at:
http://azmemory.azlibrary.gov/cdm/ref/collection/feddocs/id/482.
_____. 1995. Record of Decision (ROD) and Resource Management Plan (RMP).
_____. 2004. Arizona Statewide Land Use Plan Amendment for Fire, Fuels, and Air Quality
Management and ROD.
_____. 2007. Final Vegetation Treatments Using Herbicides on Bureau of Land Management Lands in 17 Western States Programmatic Environmental Impact Statement and ROD. Available online at: https://eplanning.blm.gov/eplanning-ui/project/70300/510.
_____. 2008. Integrated Vegetation Management Handbook (H-1740-2). Available online at:
https://www.blm.gov/sites/blm.gov/files/uploads/Media_Library_BLM_Policy_Handbook_H- 1740-2.pdf
_____. 2016. Final Vegetation Treatments Using Aminopyralid, Fluroxypr, and Rimsulfuron Programmatic Environmental Impact Statement and ROD. Available online at:
https://eplanning.blm.gov/eplanning-ui/project/70301/510.
_____. 2023a. Kingman Field Office Grazing Allotments. GIS Shapefiles.
_____. 2023b. Final Programmatic Environmental Impact Statement Addressing Vegetation Treatments
Using Herbicides and ROD. Available online at:
https://eplanning.blm.gov/Documents/?id=2faf04d1-a7f2-f011-8407- 001dd806295a&spid=dc662883-a8f2-f011-8407-001dd80c29f3
_____. 2024. Safford Field Office Vegetation Management Plan Environmental Assessment. Available online at: https://eplanning.blm.gov/Documents/?id=e731f28f-a7f2-f011-8406- 001dd802fdea&spid=0cd9f452-a8f2-f011-8406-001dd80ef717
_____. 2025a. Biological Assessment for the BLM Arizona Integrated Vegetation Management
Program. Submitted to U.S. Fish and Wildlife Service, Arizona Ecological Services Office, Phoenix, AZ.
_____. 2025b. Dillon Field Office Programmatic Vegetation Management Environmental Assessment.
Available online at: https://eplanning.blm.gov/Documents/?id=0d55b2e3-a7f2-f011-8406- 001dd802fdea&spid=8f02c98c-a8f2-f011-8407-001dd803d067
Natural Resources Conservation Service (NRCS). 2006. United States Department of Agriculture.
Land Resource Regions and Major Land Resource Areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296.
Solicitation No. 140L3726Q0124 Page 18 of 28
U.S. Fish and Wildlife Service (USFWS). 2025. Memorandum: BLM Arizona Integrated Vegetation Management Program, Concurrence for ESA Section 7 Consultation (2025-0004178-S7-001).
Solicitation No. 140L3726Q0124 Page 19 of 28
Attachment 2 MAP_KFO_SMA ZIP FILE 07/16/2026
Solicitation No. 140L3726Q0124 Page 20 of 28
Contract Clauses (07/16/2026)
52.252-2 Clauses Incorporated by Reference. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
FAR Clauses: www.acquisition.gov/far/part-52
DOI Clauses: www.acquisition.gov/diar/part-1452-solicitation-provisions-and-contract-clauses
Revolutionary FAR Overhaul Clauses: www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
(End of clause)
Clauses Incorporated by Reference
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)
52.204-13 System for Award Management Maintenance. (DEVIATION MAR 2026)
52.204-14 Service Contract Reporting Requirements (DEVIATION MAR 2026)
52.204-19 Incorporation by Reference of Representations and Certifications (DEVIATION MAR 2026)
52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for
Debarment (DEVIATION MAY 2026)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (DEVIATION MAY 2026)
52.212-4 Terms and Conditions—Commercial Products and Commercial Services. (DEVIATION MAR 2026)
52.219-6 Notice of Total Small Business Set-Aside (DEVIATION JAN 2026)
52.219-28 Post-Award Small Business Program Representation (DEVIATION JAN 2026)
52.222-3 Convict Labor (DEVIATION MAY 2026)
52.222-35 Equal Opportunity for Veterans (DEVIATION MAY 2026)
52.222-36 Equal Opportunity for Workers with Disabilities (DEVIATION MAY 2026)
52.222-37 Employment Reports on Veterans (DEVIATION MAY 2026)
52.222-41 Service Contract Labor Standards (DEVIATION MAY 2026)
52.222-42 Statement of Equivalent Rates for Federal Hires (MAY 2014)
52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option
Contracts) (AUG 2018)
52.222-50 Combatting Trafficking in Persons (DEVIATION MAY 2026)
52.222-53 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-
Requirements (DEVATION NOV 2025)
52.222-54 Employment Eligibility Verification (DEVIATION MAY 2026)
52.222-55 Minimum Wages for Contractor Workers under Executive Order 14026 (DEVIATION MAY 2026)
52.222-62 Paid Sick Leave Under Executive Order 13706 (DEVIATION MAY 2026)
52.222-90 Addressing DEI Discrimination by Federal Contractors (DEVIATION APR 2026)
52.223-23 Sustainable Products (DEVIATION MAY 2026)
Solicitation No. 140L3726Q0124 Page 21 of 28
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY 2024)
52.232-34 Payment by Electronic Funds Transfer-System for Award Management (OCT 2018)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (MAR 2023)
52.233-3 Protest After Award. (AUG 1996) - Alternate I (JUN 1985)
52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)
52.237-2 Protection of Government Buildings, Equipment, and Vegetation. (APR 1984)
52.240-91 Security Prohibitions and Exclusions (DEVIATION MAR 2026)
52.242-13 Bankruptcy. (JUL 1995)
52.242-15 Stop-Work Order. (AUG 1989)
52.242-17 Government Delay of Work. (APR 1984)
52.244-6 Subcontracts for Commercial Products and Commercial Services (DEVIATION MAY 2026)
52.245-1 Government Property (SEP 2021)
52.245-9 Use and Charges (APR 2012)
Clauses Incorporated by Full Text
52.252-6 Authorized Deviations in Clauses. (NOV 2020)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of (DEVIATION) after the date of the clause.
(b) The use in this solicitation or contract of any Department of the Interior Regulation (48 CFR 14) clause with an authorized deviation is indicated by the addition of (DEVIATION) after the name of the regulation.
(End of clause)
1452.201-70 Authorities and delegations. (SEP 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it
Solicitation No. 140L3726Q0124 Page 22 of 28 considers to have been issued without proper…