Sol_140L2625R0008.pdf
PDF 552 KB Posted
- Attached to
- BDO FY25 FENCE REPAIR
- Solicitation number
- 140L2625R0008
About this file
This is a solicitation document for the Bureau of Land Management (BLM) seeking fence repair services in Idaho for fiscal year 2025. The contract covers fence repair work across three areas: Paddock East (approximately 99 miles), Paddock West (approximately 95 miles), and Lava and Mineral (approximately 31.3 miles), with a total performance period of 270 calendar days from September 15, 2025, to June 20, 2026.
The solicitation is a Lowest Price Technically Acceptable (LPTA) procurement set aside for small businesses, with an estimated contract value between $1,000,000 and $5,000,000. The work involves various fence repair and replacement tasks including wire installation, re-stretching, fence removal, gate installation, post replacement, and wildlife flagging. Potential contractors must comply with Construction Wage Rate Requirements, submit detailed technical proposals demonstrating capabilities, provide past performance references, and meet specific documentation requirements. The proposal submission deadline is September 2, 2025, at 10:00 MDT, with a pre-bid meeting scheduled for August 13, 2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0044012943
BLM ID-STATE OFC HR&ADM SVC (ID953)
1387 S. VINNELL WAY
BOISE ID 83709
LDA
Patricia Fort 2083733910
1x 08/01/2025
140L2625R0008
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
BDO FY25 FENCE REPAIR
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 270 calendar days and complete it within ________________ ________________ calendar days after receiving
Section F
09/02/2025
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
BLM ID STATE OFC HR&ADMN (ID953)
1387 S. VINNELL WAY
BOISE ID 83709
LDA
Patricia Fort
28. NEGOTIATED AGREEMENT 29. AWARD
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
10 U.S.C. 3204(a) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 12/2022) BACK
Continued...
and return
(Contractor is not required to sign this document.) Your offer on this
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 69
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140L2625R0008
Delivery: 06/20/2026
Delivery Location Code: 0011276376
BLM-ID BOISE DISTRICT OFFICE*
3948 DEVELOPMENT AVE
BOISE ID 83705-5389 US
Period of Performance: 09/15/2025 to 06/20/2026
00010 Paddock East
Product/Service Code: Y1PZ
Product/Service Description: CONSTRUCTION OF
OTHER NON-BUILDING FACILITIES
00020 Paddock West
Product/Service Code: Y1PZ
Product/Service Description: CONSTRUCTION OF
OTHER NON-BUILDING FACILITIES
00030 Lava and Mineral
Product/Service Code: Y1PZ
Product/Service Description: CONSTRUCTION OF
OTHER NON-BUILDING FACILITIES
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SOLICITATION NO: 140L2625R0008
PROJECT DESCRIPTION: BDO FY25 Fence Repair Page 4
Type of Contract: Construction, Firm-Fixed Price (FFP), Single Award Contract County: Gem, Payette and Washington Counties, Idaho Type of Construction: Highway
FAR Magnitude: Between $1,000,000 and $5,000,000 NAICS: 238990 Size Standard: $19.0 Million Set-Aside: Total Small Business
Bureau of Land Management Contracting Officer
Name: Patricia A. Fort
Email: pfort@blm.gov
Proposal Submittal Information:
Site Visit: See Section L.7
Questions Due Date: Monday, August 18, 2025, at 10:00 am MDT
Proposal Due Date: Tuesday, September 2, 2025, at 10:00 MDT
Award Selection Process: Lowest Price Technically Acceptable mailto:pfort@blm.gov
PROJECT DESCRIPTION: BDO FY25 Fence Repair Page 5
TABLE OF CONTENTS
Part I - The Schedule
Section A - Solicitation/Contract Form See Standard Form 1442 Section B - Bid Schedule 6 Section C - Specifications/Drawings 12 Section D - Packaging and Marking 12 Section E - Inspection and Acceptance 12 Section F - Deliveries or Performance 12 Section G - Contract Administration Data 14 Section H - Special Contract Requirements 17
Part II - Contract Clauses
Section I - Contract Clauses 20
Part III - List of Documents, Exhibits, and Other Attachments
Section J - List of Attachments 39
Part IV - Representations and Instructions
Section K - Representations, Certifications, and Other Statements of Offerors 50 Section L - Instructions, Conditions and Notices to Offerors 60 Section M - Evaluation Factors for Award 67
PROJECT DESCRIPTION: BDO FY25 Fence Repair Page 6
SECTION B: BID SCHEDULE
Offerors are to complete Blocks 14 - 20 of the SF-1442.
BDO FY25 FENCE REPAIR
More than one contract award may be made under this solicitation. You may quote on a single Fence or any combination of Fences. Bids will not be considered for only a part of the Fence. Award will be made to the Lowest Price Technically Acceptable (LPTA) bidder, subject to the availability of funds.
Fuels and Fire: Some of the fences may be located in areas of heavy fuels. The Contractor shall obey and enforce fire prevention measures such as spark arresters, avoidance of high fuel areas where possible, and all other instructions from the Contracting Officers Representative.
PERIOD OF PERFORMANCE (All Fences): 270 Calendar Days
ESTIMATED START DATE: 09/15/2025
PADDOCK EAST (~99 MILES)
Pay Item No. Description
Estimated Quantity
Unit of Measure Unit Price Unit Total
1 Fence Inventory 523,186 Feet $ $
Single Wire Installation with Clipping and Stretching (Barbed or Smooth) 52,319 Feet $ $
Re-stretching, Re-clipping and Splicing Wire (3-Wire, 4-Wire, 5-Wire or Woven Wire) 85,862 Feet $ $
4 Single Wire Removal 52,319 Feet $ $ 5 Fence Removal (Complete) 52,319 Feet $ $
Barbed Wire Fence (3-Wire) - Complete Installation 1 Feet $ $
Barbed Wire Fence (4-Wire) - Complete Installation 52,319 Feet $ $
8 Wire Stay Installation 1 Each $ $
Barbed Wire Gate (4-Wire) - Includes Price to Remove Existing and Install 29 Each $ $
Steel Pipe Post Installation (Single) - Includes Price to Remove Existing and Install + Stretch wire to Panel 1 Each $ $
Steel Pipe Two-Post End Panel - Includes Price to Remove Existing and Install + Stretch wire to Panel 17 Each $ $
Steel Pipe Two-Post Stress Panel - Includes Price to Remove Existing and Install + Stretch wire to Panel 396 Each $ $
PROJECT DESCRIPTION: BDO FY25 Fence Repair Page 7
Steel Pipe Three-Post End Panel - Includes Price to Remove Existing and Install + Stretch wire to Panel 95 Each $ $
Steel Pipe Three-Post Corner Panel - Includes Price to Remove Existing and Install + Stretch wire to Panel 178 Each $ $
Steel Pipe Four-Post Corner Panel - Includes Price to Remove Existing and Install + Stretch wire to Panel 59 Each $ $
Steel Pipe Five-Post Corner Panel - Includes Price to Remove Existing and Install + Stretch wire to Panel 48 Each $ $
Rock Crib - Includes Price to Remove Existing and Install + Stretch wire to Panel 1 Each $ $
Rock Jack (Steel, Easy Fence or Equivalent) - Includes Price to Remove Existing and Install + Stretch wire to Panel 25 Each $ $
Steel 'T' Line Post Installation - New Post (3-Wire, 4-Wire,) Includes Clipping and Stretching 1 Each $ $
Steel 'T' Line Post Installation/ Straighten - Existing Post (3-Wire, 4- Wire) Includes Clipping and Stretching 1 Each $ $
Steel 'T' Line Post Installation- Replace Single Wood Line Post (3-Wire, 4- Wire) Includes Clipping and Stretching 1 Each $ $
Structure Repair - Wood Brace Rail Installation Includes Price to Remove Existing and Install + Stretch wire to Panel 1 Each $ $
Structure Repair-Wood Post Set Includes Price to Remove Existing and Install + Stretch wire to Panel 1 Each $ $
24 Wildlife Flagging-Clip On (5 per 16') 1 Feet $ $
Schedule A Total $
PROJECT DESCRIPTION: BDO FY25 Fence Repair Page 8
PADDOCK WEST (~95 MILES)
Pay Item No. Description
Estimated Quantity
Unit of Measure Unit Price Unit Total
1 Fence Inventory 501,773 Feet $ $
Single Wire Installation with Clipping and Stretching (Barbed or Smooth) 55,950 Feet $ $
Re-stretching, Re-clipping and Splicing Wire (3-Wire, 4-Wire, 5-Wire or Woven Wire) 100,500 Feet $ $
4 Single Wire Removal 55,950 Feet $ $ 5 Fence Removal (Complete) 50,329 Feet $ $
Barbed Wire Fence (3-Wire) - Complete Installation 1 Feet $ $
Barbed Wire Fence (4-Wire) - Complete Installation 50,329 Feet $ $
8 Wire Stay Installation 1 Each $ $
Barbed Wire Gate (4-Wire) - Includes Price to Remove Existing and Install 35 Each $ $
Steel Pipe Post Installation (Single)- Includes Price to Remove Existing and Install + Stretch wire to Panel 1 Each $ $
Steel Pipe Two-Post End Panel - Includes Price to Remove Existing and Install + Stretch wire to Panel 10 Each $ $
Steel Pipe Two-Post Stress Panel - Includes Price to Remove Existing and Install + Stretch wire to Panel 380 Each $ $
Steel Pipe Three-Post End Panel - Includes Price to Remove Existing and Install + Stretch wire to Panel 96 Each $ $
Steel Pipe Three-Post Corner Panel - Includes Price to Remove Existing and Install + Stretch wire to Panel 143 Each $ $
Steel Pipe Four-Post Corner Panel - Includes Price to Remove Existing and Install + Stretch wire to Panel 76 Each $ $
Steel Pipe Five-Post Corner Panel - Includes Price to Remove Existing and Install + Stretch wire to Panel 36 Each $ $
Rock Crib - Includes Price to Remove Existing and Install + Stretch wire to Panel 1 Each $ $
Rock Jack (Steel, Easy Fence or Equivalent) - Includes Price to Remove Existing and Install + Stretch wire to Panel 38 Each $ $
PROJECT DESCRIPTION: BDO FY25 Fence Repair Page 9
Steel 'T' Line Post Installation - New Post (3-Wire, 4-Wire,) Includes Clipping and Stretching 1 Each $ $
Steel 'T' Line Post Installation/ Straighten - Existing Post (3-Wire, 4- Wire) Includes Clipping and Stretching 1 Each $ $
Steel 'T' Line Post Installation- Replace Single Wood Line Post (3- Wire, 4-Wire) Includes Clipping and Stretching 1 Each $ $
Structure Repair - Wood Brace Rail Installation Includes Price to Remove Existing and Install + Stretch wire to Panel 1 Each $ $
Structure Repair-Wood Post Set Includes Price to Remove Existing and Install + Stretch wire to Panel 1 Each $ $
Schedule B Total $
PROJECT DESCRIPTION: BDO FY25 Fence Repair Page 10
LAVA & MINERAL (~31.3 MILES)
Pay Item No. Description
Estimated Quantity
Unit of Measure Unit Price Unit Total
1 Fence Inventory 165,444 Feet $ $
Single Wire Installation with Clipping and Stretching (Barbed or Smooth) 24,816 Feet $ $
Re-stretching, Re-clipping and Splicing Wire (3-Wire, 4-Wire, 5-Wire or Woven Wire) 33,091 Feet $ $
4 Single Wire Removal 24,816 Feet $ $ 5 Fence Removal (Complete) 21,260 Feet $ $
Barbed Wire Fence (3-Wire) - Complete Installation 1 Feet $ $
Barbed Wire Fence (4-Wire) - Complete Installation 21,260 Feet $ $
8 Wire Stay Installation 1 Each $ $
Barbed Wire Gate (4-Wire) - Includes Price to Remove Existing and Install 13 Each $ $
Steel Pipe Post Installation (Single)- Includes Price to Remove Existing and Install + Stretch wire to Panel 1 Each $ $
Steel Pipe Two-Post End Panel - Includes Price to Remove Existing and Install + Stretch wire to Panel 5 Each $ $
Steel Pipe Two-Post Stress Panel - Includes Price to Remove Existing and Install + Stretch wire to Panel 125 Each $ $
Steel Pipe Three-Post End Panel - Includes Price to Remove Existing and Install + Stretch wire to Panel 28 Each $ $
Steel Pipe Three-Post Corner Panel - Includes Price to Remove Existing and Install + Stretch wire to Panel 69 Each $ $
Steel Pipe Four-Post Corner Panel - Includes Price to Remove Existing and Install + Stretch wire to Panel 6 Each $ $
Steel Pipe Five-Post Corner Panel - Includes Price to Remove Existing and Install + Stretch wire to Panel 25 Each $ $
Rock Crib - Includes Price to Remove Existing and Install + Stretch wire to Panel 1 Each $ $
Rock Jack (Steel, Easy Fence or Equivalent) - Includes Price to Remove Existing and Install + Stretch wire to Panel 10 Each $ $
PROJECT DESCRIPTION: BDO FY25 Fence Repair Page 11
Steel 'T' Line Post Installation - New Post (3-Wire, 4-Wire,) Includes Clipping and Stretching 1 Each $ $
Steel 'T' Line Post Installation/Straighten - Existing Post (3-Wire, 4-Wire) Includes Clipping and Stretching 1 Each $ $
Steel 'T' Line Post Installation- Replace Single Wood Line Post (3- Wire, 4-Wire) Includes Clipping and Stretching 1 Each $ $
Structure Repair - Wood Brace Rail Installation Includes Price to Remove Existing and Install + Stretch wire to Panel 1 Each $ $
Structure Repair-Wood Post Set Includes Price to Remove Existing and Install + Stretch wire to Panel 1 Each $ $
Schedule C Total $
PROJECT DESCRIPTION: BDO FY25 Fence Repair Page 12
SECTION C: SPECIFICATIONS/DRAWINGS
See Section J for additional attachments to include project specifications and drawings.
SECTION D: PACKAGING AND MARKING
Packaging and marking of deliverables shall be IAW the Contractor’s standard commercial practices.
SECTION E: INSPECTION AND ACCEPTANCE
E.1 52.252-2 Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/browse/index/far#
Clause Title Date 52.246-12 Inspection of Construction August 1996 52.246-13 Inspection -- Dismantling, Demolition, or Removal of Improvements August 1996
E.2 Final Inspection and Acceptance
Final completion of the punch list items, submission of all required submittals, and final cleanup of the project site shall be completed before the contract’s required completion date. The Contracting Officer or his/her designated representative will perform final inspection. Acceptance of the work will occur only upon written notice of acceptance by the ordering Contracting Officer, or any other Warranted Contracting Officer employed by the Bureau of Land Management (BLM) and performing authorized duties in conjunction with this contract.
The contracts required completion date is 270 calendar days after receipt of the notice to proceed.
SECTION F: DELIVERIES OR PERFORMANCE
F.1 52.252-2 Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/browse/index/far#
Clause Title Date 52.211-13 Time Extensions September 2000 52.211-18 Variation in Estimated Quantity April 1984 52.236-11 Use and Possession Prior to Completion April 1984 https://www.acquisition.gov/browse/index/far#
PROJECT DESCRIPTION: BDO FY25 Fence Repair Page 13
F.2 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 270 calendar days after receipt of Notice to Proceed. *The time stated for completion shall include final cleanup of the premises.
*The Government recognizes that seasonal climatic conditions may occur that restrict or prohibit normal construction activities. The anticipated length of the seasonal delay for this project is 0 days. This number of days has been included in calculating the stated period of performance. Therefore, the contract period of performance will not be extended due to normal seasonal weather delays.
F.3 52.211-12 Liquidated Damages--Construction (Apr 1984)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,000.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
F.4 52.236-15 Schedules for Construction Contracts (Apr 1984)
(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.
(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
PROJECT DESCRIPTION: BDO FY25 Fence Repair Page 14
F.5 Simultaneous Performance
If a Contractor receives award of more than one contract, simultaneous performance will be required. All work must be completed within the timeframe allowed for each contract.
SECTION G: CONTRACT ADMINISTRATION DATA
G.1 Authorities and Delegations (Sep 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.
The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.
Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence.
Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
PROJECT DESCRIPTION: BDO FY25 Fence Repair Page 15
G.2 Contractor Performance Assessment Reporting System (Dec 2015)
1. FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2. The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3. We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5. Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
(a) Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.
(b) Your comments should focus on objective facts in the AO's narrative and should a)provide your views on the causes and ramifications of the assessed performance.
(c) All information provided should be reviewed for accuracy prior to submission.
(d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating
"No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
(e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
(f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6. The following guidelines apply concerning your use of the past performance evaluation:
(a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
(b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
(c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
https://www.cpars.gov/
PROJECT DESCRIPTION: BDO FY25 Fence Repair Page 16
7. If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period. A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
G.3 Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (Apr 2013)
Payment requests must be submitted electronically through the U.S. Department of the Treasury's Internet Payment Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor.
To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions- Commercial Items included in commercial item contracts. The IPP website address is https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
1. Invoice date and Government Contract Number
2. Billing period specified with beginning and ending dates. The beginning date must not be later than the completion date or within any previous billing dates.
3. The accounting must follow the approved schedule of values as described in the specification attachment.
4. Total amount due for the billing period
5. Certification of Progress Payment
6. Payrolls (Mail weekly)
7. Substantiation of Subcontractor Payment
8. Certification with final payment request.
9. A Release of Claims (See 1452.204-70) with a request for final payment.
The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
G.4 Local Internet Payment Platform (IPP) Hotline
To check payment status, contact the Payment Hotline at 877-480-9724 or 303-236-2850. You will need to leave a message with the following information:
1. Company Name
2. Contract Number
3. Invoice Number
4. Invoice Amount
5. A brief description of why you are calling
6. Your contact information http://www.ipp.gov/ mailto:ippgroup@bos.frb.org
PROJECT DESCRIPTION: BDO FY25 Fence Repair Page 17
If you do not receive a callback from the Payment Hotline within 72 hours, please contact the Contracting Officer with the day and time you contacted the Payment Hotline.
G.5 Government Point of Contact
Patricia A. Fort, Contracting Officer pfort@blm.gov Bureau of Land Management 1387 S. Vinnell Way Boise, ID 83709-1657 Telephone: (208) 373-3910
SECTION H: SPECIAL CONTRACT REQUIREMENTS
H.1 Work Hours
The performance period established for this contract is based upon all work being conducted during regular working hours between 7:00 am and 6:00 pm, Monday through Friday, excluding government holidays. If the Contractor desires to carry on work outside regular hours, including Saturdays, Sundays, and government holidays, a request must be submitted to the Contracting Officer in sufficient time to allow satisfactory arrangements to be made by the Government for access to the work site and inspection.
In addition to any holidays declared by Executive Orders, the following Federal Legal Holidays are observed:
New Year’s Day, Martin Luther King Jr. Day, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day
H.2 Communications
“Time” for communications received after 3:00 pm, after 12:00 pm locally on Fridays, or after 12:00 pm locally prior to a holiday will not start until the next business day. All times are local Mountain time.
H.3 Fire Danger Season
If the Contracting Officer Representative (COR) allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR.
H.4 Drawings
(a) Typical Drawings. Any drawings titled typical are general only and dimensions of each structure will be fixed by the Contracting Officer to adapt the design to existing conditions at the structure location.
(b) Reduced Size Drawings. Any drawings identified as "REDUCED SIZE DRAWINGS" appearing in the solicitation are photographically reduced in size. Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. Prospective bidders desiring to review a copy of the full- size drawings may contact the Contracting Officer identified in the solicitation.
mailto:pfort@blm.gov
PROJECT DESCRIPTION: BDO FY25 Fence Repair Page 18
H.5 Preservation of Historical and Archeological Data
(a) The Historic and Archeological Data Preservation Act of 1974 provides for the preservation of historical and archeological data that might otherwise be lost as the result of alterations to the terrain caused by a federal or federally licensed activity or program.
(b) If, in connection with operations under this contract, the Contractor, subcontractors, or the employees of any of them, discovers, encounters or becomes aware of any possible historical or archeological data, objects or sites of cultural value on the project area, such as historical ruins, graves or grave markers, fossils, or artifacts, the Contractor shall immediately suspend all operations in the vicinity of the cultural value and shall notify the Contracting Officer in writing, giving the location and nature of the findings.
No objects of cultural resource value may be removed.
(c) Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the Changes clause.
(d) The Contractor will be responsible for protecting the cultural resources within the effected area from damage. In addition, the contractor will be liable for all damage to the identified cultural resources caused by their actions or the actions of their agents or representatives. The Contractor shall immediately notify the Contracting Officer or his representative if any damage occurs to any cultural resource and immediately suspend work in the area in which damage has occurred until authorized to proceed.
(e) The Contractor agrees to insert this paragraph in all subcontracts that involve the performance of work on the terrain of the site.
H.6 Safety and Quality Control Plan
Following contract award, the contractor must provide effective quality assurance and safety plans for acceptance by the Government.
H.7 Limitations on Subcontracting Reporting
In accordance with 52.219-14 Limitations on Subcontracting, the prime contractor must perform at least 15% of the cost of the contract, excluding the cost of materials with its own employees and employees of a similarly situated subcontractor. A similarly situated subcontractor is a small business concern subcontractor that is a participant of the same SBA program that qualified the prime contractor as an eligible offeror and awardee of the contract. The contractor is responsible for ensuring compliance with the Limitation on Subcontracting.
At the conclusion of the period of performance and prior to final payment, the contractor shall submit a Limitation on Subcontracting Report directly to the Contracting Officer. The following information is required as part of the report: 1) the total amount paid to the Prime during the performance period broken out by labor and materials 2) list of Similarly Situated Subcontractors and the amounts paid to each during the performance period broken out by labor and materials 3) list of any other subcontractors and the amounts paid to each during the performance period broken out by labor and materials.
If the Contracting Officer review of the report finds that the contractor is not in compliance for the period of performance, the contractor will be notified in writing. Penalties for failure to comply are described in 13 CFR 125.6(h) which states: Whoever violates the requirements set forth in paragraph (a) of this section shall be subject to the penalties prescribed in 15 U.S.C. 645(d), except that the fine shall be treated as the greater of $500,000 or the dollar amount spent, in excess of permitted levels, by the entity on subcontractors.
PROJECT DESCRIPTION: BDO FY25 Fence Repair Page 19
A party's failure to comply with the spirit and intent of a subcontract with a similarly situated entity may be considered a basis for debarment on the grounds, including but not limited to, that the parties have violated the terms of a Government contract or subcontract pursuant to FAR 9.406-2(b)(1)(i) (48 CFR 9.406-2(b)(1)(i)).
H.8 Environmental Impact
All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control Act, as amended (33 U.S.C.
1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ); the Endangered Species Act, as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ); and the Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ). Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.
H.9 Hazardous Materials
Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/ or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas.
Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.
Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR 1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.
H.10 Unauthorized Personnel
The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.
PROJECT DESCRIPTION: BDO FY25 Fence Repair Page 20
PART II - CONTRACT CLAUSES
SECTION I: CONTRACT CLAUSES
I.1 52.252-2 Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/browse/index/far#
Clause Title Date 52.202-1 Definitions June 2020 52.203-3 Gratuities April 1984 52.203-5 Covenant Against Contingent Fees May 2014 52.203-6 Restrictions on Subcontractor Sales to the Government June 2020 52.203-7 Anti-Kickback Procedures June 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity May 2014
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity May 2014 52.203-12 Limitation on Payments to Influence Certain Federal Transactions June 2020 52.203-17 Contractor Employee Whistleblower Rights and Requirement to
Inform Employees of Whistleblower Rights Nov 2023
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
January 2017
52.204-9 Personal Verification Contractor Personnel January 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract
Awards June 2020
52.204-13 System for Award Management Maintenance October 2018 52.204-14 Service Contract Reporting Requirements October 2016 52.204-18 Commercial and Government Entity Code Maintenance August 2020 52.204-19 Incorporation by Reference of Representations and Certifications December 2014 52.204-23 Prohibition on Contracting for Hardware, Software, and Services
Developed or Provided by Kaspersky Lab and Other Covered Entities December 2023
52.204-30 Federal Acquisition Supply Chain Security Act Orders—Prohibition December 2023 52.209-6 Protecting the Government's Interest when Subcontracting with
Contractors Debarred, Suspended, Proposed for Debarment or Voluntarily Excluded
January 2025
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations November 2015 52.215-2 Audit and Records-Negotiated June 2020 52.215-8 Order of Precedence-Uniform Contract Format October 1997 52.219-6 Notice of Total Small Business Set Aside November 2020 52.219-8 Utilization of Small Business Concerns January 2025 52.219-14 Limitations on Subcontracting October 2022 52.219-28 Postaward Small Business Program Rerepresentation January 2025 52.222-1 Notice to the Government of Labor Disputes March 2020 52.222-3 Convict Labor June 2003 52.222-4 Contract Work Hours and Safety Standards Act - Overtime
Compensation May 2018
PROJECT DESCRIPTION: BDO FY25 Fence Repair Page 21
52.222-6 Construction Wage Rate Requirements August 2018 52.222-9 Apprentices and Trainees (July 2005) (Deviation) February 2025 52.222-10 Compliance with Copeland Act Requirements February 1988 52.222-11 Subcontracts (Labor Standards) May 2014 52.222-12 Contract Termination-Debarment May 2014 52.222-13 Compliance with Davis-Bacon and Related Act Regulations. February 1988 52.222-14 Disputes Concerning Labor Standards February 1988 52.222-15 Certification of Eligibility February 1988 52.222-40 Notification of Employee Rights under the National Labor Relations
Act December 2010
52.222-50 Combating Trafficking in Persons October 2020 52.222-54 Employment Eligibility Verification January 2025 52.222-62 Paid Sick Leave under Executive Order 13706 January 2022 52.223-2 Reporting of Biobased Products under Service and Construction
Contracts (DEVIATION Feb 2025) May 2024
52.223-3 Alt I Hazardous Material Identification and Material Safety Data - Alternate I
July 1995
52.225-13 Restrictions on Certain Foreign Purchases February 2021 52.227-1 Authorization and Consent December 2007 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement June 2020 52.227-4 Patent Indemnity - Construction Contracts December 2007 52.226-7 Drug-Free Workplace May 2024 52.228-11 Individual Surety--Pledge of Assets February 2021 52.228-12 Prospective Subcontractor Requests for Bonds December 2022 52.228-14 Irrevocable Letter of Credit November 2014 52.229-3 Federal, State and Local Taxes April 2003 52.232-5 Payments under Fixed-Price Construction Contracts September 2002 52.232-16 Alt I Progress Payments - Alternate I November 2021 52.232-17 Interest May 2014 52.232-23 Assignment of Claims May 2014 52.232-27 Prompt Payment for Construction Contracts January 2017 52.232-39 Unenforceability of Unauthorized Obligations June 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors March 2023 52.233-1 Alt I Disputes - Alternate I December 1991 52.233-3 Protest After Award August 1996 52.233-4 Applicable Law for Breach of Contract Claim October 2004 52.236-5 Material and Workmanship April 1984 52.236-6 Superintendence by the Contractor April 1984 52.236-8 Other Contracts April 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements April 1984
52.236-10 Operations and Storage Areas April 1984 52.236-11 Use and Possession Prior to Completion April 1984 52.236-12 Cleaning Up April 1984 52.236-13 Accident Prevention November 1991 52.236-14 Availability and Use of Utility Services April 1984 52.236-17 Layout of Work April 1984
PROJECT DESCRIPTION: BDO FY25 Fence Repair Page 22
52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities
November 2024
52.242-13 Bankruptcy July 1995 52.242-14 Suspension of Work April 1984 52.243-4 Changes June 2007 52.244-6 Subcontracts for Commercial Products and Commercial Services
(January 2025) (Deviation) February 2025
52.245-1 Government Property (Government Property Furnished) September 2021 52.245-9 Use and Charges (Government Property Furnished) August 2010 52.248-3 Value Engineering-Construction - Alternate I April 1984 52.249-3 Termination for Convenience of the Government (Dismantling, Demolition, or Removal of Improvements) April 2012
52.249-10 Default (Fixed-Price Construction) April 1984
I.2 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021)
(a) Definitions. As used in this clause— Backhaul means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network). Backhaul can be wireless (e.g., microwave) or wired (e.g., fiber optic, coaxial cable, Ethernet). Covered foreign country means The People’s Republic of China. Covered telecommunications equipment or services means–
(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities); (2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities); (3) Telecommunications or video surveillance services provided by such entities or using such equipment; or (4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.
Critical technology means– (1) Defense articles or defense services included on the United States Munitions List set forth in the International Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations; (2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export Administration Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled- (i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or (ii) For reasons relating to regional stability or surreptitious listening; (3) Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities); (4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal Regulations (relating to export and import of nuclear equipment and material); (5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such Code, or part 73 of title 42 of such Code; or (6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control Reform Act of 2018 (50 U.S.C. 4817).
Interconnection arrangements means arrangements…