This document is a solicitation for hydrocarbons engineering support services for the Bureau of Land Management. The solicitation seeks proposals for a base year and four one-year options to provide two senior hydrocarbon measurement engineers or specialists to support the agency's Production Measurement Team. Duties include developing testing protocols and standards; reviewing applications for measurement equipment and methodology; analyzing test data; preparing reports of findings and recommendations; participating in industry meetings; and assisting with training, regulations, policy, and other projects. The contract will be a 100% small business set-aside. Proposals are due by September 11, 2023 and award is expected by October 20, 2023. Pricing shall be proposed for the base year and option years, including overtime rates. The place of performance will be at the contractor's site remotely via VPN access.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L0123R0004_Amd_0002.pdf | ||
| Sol_140L0123R0004_Amd_0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
LWA
Washington DC 20003 20 M Street SE
BLM ACQ & FA (WO855)
CODE 16. ADMINISTERED BYCODE
X
X
X
541330
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED ORLWA
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
10/20/2023 1300 MD
09/11/2023
3032360097Judith Chamberlin (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140L0123R0004
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 68 OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
15. DELIVER TO
Washington DC 20003 20 M Street SE
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$25.5
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
BLM ACQ & FA (WO855)
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Period of Performance: 04/01/2024 to 09/30/2024
00010 Engineer-Hydrocarbon Support Services per the attached Performance Work Statement
00011 Engineer-Hydrocarbon Support Services Opton Year One (Option Line Item) Period of Performance: 10/01/2024 to 09/30/2025 Continued ...
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
Judith Chamberlin
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
00012 Engineer-Hydrocarbon Support Services
Opton Year Two
(Option Line Item)
Period of Performance: 10/01/2025 to 09/30/2026
00013 Engineer-Hydrocarbon Support Services
Opton Year Three
(Option Line Item)
Period of Performance: 10/01/2026 to 09/30/2027
00014 Engineer-Hydrocarbon Support Services
Opton Year Four
(Option Line Item)
Period of Performance: 10/01/2027 to 09/30/2028
00015 Overtime-Engineer 1 20 HR
This is an estimated quantity for evaluation purposes only.
This line item will be included in the total evaluated price.
00020 Engineer-Hydrocarbon Support Services per the attached Performance Work Statement
00021 Engineer-Hydrocarbon Support Services
Opton Year One
Continued ...
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
68 2 of
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 68
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140L0123R0004
(Option Line Item)
Period of Performance: 10/01/2024 to 09/30/2025
00022 Engineer-Hydrocarbon Support Services
Opton Year Two
(Option Line Item)
Period of Performance: 10/01/2025 to 09/30/2026
00023 Engineer-Hydrocarbon Support Services
Opton Year Three
(Option Line Item)
Period of Performance: 10/01/2026 to 09/30/2027
00024 Engineer-Hydrocarbon Support Services
Opton Year Four
(Option Line Item)
Period of Performance: 10/01/2027 to 09/30/2028
00025 Overtime-Engineer 2 20 HR
This is an estimated quantity for evaluation purposes only.
This line item will be included in the total evaluated price.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
TABLE OF CONTENTS
SECTION 1 – SOLICITATION/CONTRACT FORM
SECTION 2 - GENERAL INFORMATION
SECTION 3 - PRICE SCHEDULE
SECTION 4 - PERFORMANCE WORK STATEMENT
SECTION 5- CLAUSES
SECTION 7 – PROVISIONS
SECTION 8 – INSTRUCTIONS AND CONDITIONS
SECTION 9 – EVALUATION FOR AWARD
BLM HYDROCARBON MEASUREMENT ENGINEERS SOLICITATION: 140L0123R0004 5
SECTION 1 – SOLICITATION/CONTRACT FORM
Please see the attached solicitation Standard Form 1449 – 140L0123R0004
SECTION 2 - GENERAL INFORMATION
2.1 DESCRIPTION
This Request for Proposal (RFP) is issued in accordance with FAR Part 12-Acquisition of Commercial Items and FAR Part 15-Contracting by Negotiation.
2.1.1 The solicitation is a 100% set aside for small businesses.
2.2.1 The Government contemplates award of a contract for Hydrocarbon Engineering Support
Services with a one-year base and four one-year options resulting from this solicitation.
2.2.2 The level of effort of each position is a full time equivalent.
2.3 TERMS AND CONDITIONS
The Contractor shall perform the work identified in Section 4 in accordance with the terms and conditions of this solicitation and resultant contract.
2.4 NON-PERSONAL SERVICES:
This contract is for “non-personal services” as defined in FAR 37.101. Therefore it is understood and agreed that the Contractor and/or the Contractor’s employees:
2.4.1 Shall perform the services specified herein as independent Contractors, not as employees of the government.
2.4.2 Shall manage and administer the work required and bear sole responsibility for complying with any and all technical, schedule, or constraints in the performance of this contract.
2.4.3 Shall be free from supervision or control by any government employee with respect to the manner or method of performance of the services specified
2.4.4 Shall, pursuant to the government’s right and obligation to inspect, accept, or reject the work, comply with such general direction of the Contracting Officer, or the duly authorized representative of the Contracting Officer as is necessary to ensure accomplishment of the contract objectives.
2.5 INHERENTLY GOVERNMENTAL FUNCTIONS:
In accordance with FAR Part 7.5, Inherently Governmental Functions, this contract shall not be used for the performance of inherently governmental functions.
2.5.1 No Contractor employee shall hold him or herself out to be a Government employee, agent, or representative.
2.5.2 No Contractor employee shall state orally or in writing at any time that he or she is acting on behalf of the Government.
2.5.3 In all communications with third parties in connection with any task under this contract, Contractor employees shall identify themselves as Contractor employees and specify the name of the company for which they work.
BLM HYDROCARBON MEASUREMENT ENGINEERS SOLICITATION: 140L0123R0004 6
2.5.4 In all communications with other Government contractors in connection with any task under this contract, the Contractor employee shall state that they have no authority to in any way change the contract and if the other contractor believes this communication to be a direction to change their contract, they should notify the CO for that contract and not carry out the direction until a clarification has been issued by the CO.
2.5.5 The Contractor shall insure that all of its employees working on this contract are informed of the substance of this article. Nothing in this article shall limit the Government's rights in any way under the other provisions of the contract, including those related to the Government's right to inspect and accept the services to be performed under this contract. The substance of 2.11 shall be included in all subcontracts at any tier.
(End of Section 2)
SECTION 3 - PRICE SCHEDULE
PRICING SCHEDULE
(please see next page)
BLM HYDROCARBON MEASUREMENT ENGINEERS SOLICITATION: 140L0123R0004 7
There may be times during performance of this contract where overtime may be necessary.
The offeror shall provide an overtime rate for each position.
Overtime Hourly Rate
TECHNICAL EXPERTISE BASE OPTION
YEAR 1
OPTION
YEAR 2
OPTION
YEAR 3
OPTION
YEAR 4
Engineer-1 Engineer-2
BLM HYDROCARBON MEASUREMENT ENGINEERS SOLICITATION: 140L0123R0004 8
3.1 PERSONNEL
The contract personnel must possess the education, training, and/or experience described to successfully execute Hydrocarbon support for the Bureau of Land Management (BLM). Resumes must be submitted for the personnel. References and/or previous employers may be contacted by the Government to verify qualifications of individuals.
The contractor(s) must have at least five (5) years of technical experience in hydrocarbon measurement and meter analysis. The BLM requires the contractor to have a Bachelor of Science or Master’s degree in an engineering program. The contractor(s) must be well-versed and have a thorough background knowledge in onshore oil and gas facilities for production measurement. The contractor(s) needs extensive knowledge of the standards from the API, the American Gas Association, the American Society for Testing and Materials, and the Gas Processors Association.
In order to meet the requirement to provide technical reports and recommendations, the contractor(s) must possess a significant and demonstrated knowledge for at least two (2) of the following:
• Coriolis meters,
• Positive displacement meters,
• Automatic tank gauges,
• Differential meters,
• Electronic flow computers,
• Transducers, and
• Other similar oil/gas field equipment.
The contractor(s) must possess excellent technical skills and experience in hydrocarbon measurement and flow analysis for oil and gas practices used by onshore operators. The contractor(s) must work well independently and with remote teams and provide strong communication and writing skills in order to articulate concerns, findings, and recommendations. The contractor(s) will be expected to work independently, meet deadlines, attend all required meetings, and communicate effectively via email and phone. The contractor(s) must maintain all confidentiality of documents and communications. The contractor(s) will furnish all necessary equipment, materials, and personnel necessary for the completion of tasks outlined in this PWS.
During the first 180 days of performance, the Contractor shall make no substitutions of key personnel unless necessitated by illness, death or termination of employment. The Contractor shall notify the Contracting Officer (CO) within fifteen days after the occurrence of any of these three events and provide the information required by paragraph below. After the initial period, the Contractor shall submit the information to the CO at least fifteen days prior to making any permanent substitutions.
The Contractor shall provide: A detailed explanation of the circumstances that necessitate the proposed substitution, and any additional information requested by the CO. The Government retains the right to interview proposed substitutes. Proposed substitutes should have comparable qualifications to the individual being replaced. The CO will notify the Contractor within fifteen days after receipt of all required substitute's personnel information. All proposed substitutes will be subjected to a two-week trial period. Proposed replacements that do not satisfy the Government during that trial period will be removed from the contract at no cost to the Government. The contract will be modified to reflect any approved changes in key personnel.
SECTION 4 - PERFORMANCE WORK STATEMENT
1.0. GENERAL INFORMATION.
This Performance Work Statement (PWS) identifies the engineering support services and activities that are to be furnished in support of the Bureau of Land Management’s (BLM’s) mission.
BLM HYDROCARBON MEASUREMENT ENGINEERS SOLICITATION: 140L0123R0004 9
2.0 BACKGROUND
The BLM is responsible for ensuring the accurate measurement and proper reporting of the volume and quality of oil and gas removed or sold from Federal and Indian leases in order to help ensure proper payment of royalty.
Prior to January 17, 2017, Onshore Order 4 (oil measurement) and Onshore Order 5 (gas measurement), both of which became effective in 1989, established standards for oil and gas measurement. The Government Accountability Office and the Office of Inspector General recommended the BLM update these regulations to incorporate latest industry standards, latest measurement technology and fill in regulatory gaps of Onshore Orders.
On November 16, 2016, the BLM published 43 CFR 3174 and 3175, which replaced Onshore Orders 4 and 5 respectively. Both regulations became effective on January 17, 2017. For Facility Measurement Points (FMP) in-place prior to January 17, 2017, these regulations include phase-in periods for operators to bring existing equipment up to new 3174 and 3175 standards. For gas measurement (3175), these phase periods range from one year to three years, depending on the average flow rate of meter gas measurement. For oil measurement (3174), the phase-in periods also range from one year to three years. However, the oil FMP phase-in periods were tied to FMP application process, which the BLM delayed as a result of issues with Automated Fluid Minerals Support System 2 (AFMSS2). On January 17, 2017, the BLM Headquarters (HQ) issued Instruction Memorandum No. 2017-032, “Partial Delayed Implementation of 43 CFR 3170 Regulations,” providing guidance for the implementation delay.
As mandated in these 3170 regulations, the BLM assembled a team of subject matter experts, named the Production Measurement Team (PMT). The PMT is a panel of members from the BLM, including BLM-contracted experts, that reviews changes in industry measurement technology, methods, and standards to determine whether regulations should be updated, and provides guidance on measurement technologies and methods not addressed in current regulations. The purpose of the PMT is to act as a central advisory body to ensure that oil and gas produced for Federal and Indian leases are accurately measured and properly reported.
The PMT was established in 2017 and has had contract engineers involved since its formation. This contract is expected to provide contract engineering support to the PMT.
3.0 OBJECTIVE
The BLM Division of Fluid Minerals (HQ-310) has a need for two (2) Senior Hydrocarbon Measurement Engineer(s) or Specialist(s) to provide support in the area of measurement and meter analysis as part of the PMT’s implementation of 43 CFR 3170-75. The assigned engineers shall be committed for a minimum of one
(1) year.
4.0 SCOPE OF WORK
Hydrocarbon Measurement Engineers: This position provides engineering support to the BLM HQ-310. The specific tasks are:
Task 1. Develop testing protocols and standards for measurement and metering devices and maintain the
PMT website by describing PMT role and authority; describing the application process including an application submittal portal; describing required testing protocols for each device; describing the PMT review process and conclusions; displaying review status and conclusions; and completing other necessary tasks for development of a process to accept, review, and approve manufacturers’ and operators’ applications for measurement equipment and methodology.
Task 2. Review PMT equipment applications for completeness by ensuring all required components as outlined in the PMT Application Guidance document are included in the application; verifying https://www.blm.gov/policy/im-2017-032 https://www.blm.gov/policy/im-2017-032
BLM HYDROCARBON MEASUREMENT ENGINEERS SOLICITATION: 140L0123R0004 10
submitted testing conforms with applicable American Petroleum Institute (API) standards or standards provided by the PMT; communicating application submission deficiencies to the applicant in an official manner through the PMT; and completing other necessary tasks related to efficient, thorough, and documented review of all submitted applications.
Task 3. Complete data analysis to determine measurement equipment meets BLM standards by independently analyzing applicant’s data in accordance with applicable standards and sound statistical methodology and practice; verifying or invalidating applicant results and conclusions based on impartial, and transparent statistical analysis of applicant data; and completing other necessary tasks to ensure that PMT reviews are complete and thorough; and ensuring changes in industry measurement technology, methods, and standards are accurately reflected in the required testing protocols to ensure that oil and gas produced from Federal and Indian leases is accurately measured and properly reported on.
Task 4. Prepare a report of findings for each PMT measurement equipment analysis by preparing written summary of analysis presented in PMT application; preparing written summary of verification of applicant findings or; preparing written summary to invalidate applicant findings including specifics of application shortcomings; and completing other necessary tasks to document and communicate findings for each application received as well as respond to data requests from BLM, Department of the Interior (DOI), congressional inquiries, industry, media, etc., on PMT activities and accomplishments.
Task 5. Prepare recommendation to approve or deny PMT measurement equipment application by either preparing written recommendation for the BLM to approve application for use of measurement equipment including any specific installation requirements/limitations or operating requirements/limitations in Conditions of Approval or preparing written recommendation for the BLM to not approve application for use of measurement equipment including justification for non-approval and statement of applicant appeal rights and process; transmitting report of findings and recommendations to approve or not approve measurement equipment application to BLM Authorized Officer for final approval and notification of applicant; and completing other necessary tasks to approve or deny submitted applications and transmitting a final decision.
Task 6. Participate in application decision appeal process providing technical expertise for requests for discretionary review by the DOI Assistant Secretary for Land and Minerals Management (ASLM) as delegated by the Assistant Secretary and completing other necessary tasks (which may include additional referencing and indexing of the administrative record above what was required in Tasks 1-5, working with the DOI’s Office of the Solicitor (SOL), and providing additional information as requested by the BLM, ASLM and SOL).
Task 7. Attend and participate in industry meetings, conferences, and standards-writing work groups such as, but not limited to the API Spring and Fall Committee on Petroleum Measurement (COPM) meetings, the International School of Hydrocarbon Measurement (ISHM), the American School of Gas Measurement Technology, the Natural Gas Sampling Technology conference, and any other meetings determined by the PMT Lead as in the BLM’s best interest to fulfill our mission for production accountability. The purpose of participating in these meetings is to:
a. Provide input to the development of measurement standards that the BLM may incorporate in regulations;
b. Review changes to measurement technology, emerging issues, and trends in the measurement industry to provide guidance to the BLM;
BLM HYDROCARBON MEASUREMENT ENGINEERS SOLICITATION: 140L0123R0004 11
c. Provide operator outreach relating to the status of the PMT, regulations, and policy;
d. Meet with operators and manufacturers to discuss specific issues related to the PMT reviews of devices, processes, or methods they have submitted for review;
e. Discuss measurement issues with world-renowned measurement experts who also attend these events; and
f. Attend other meetings as necessary to accomplish PMT’s roles and responsibilities (defined in section A.1) in order to accomplish requirements of sections A.4.1 and A.4.2 and meet the production accountability needs of BLM’s mission.
Task 8. Assist with training BLM personnel on inspection and enforcement techniques on the phone as well as in-person, as required.
Task 9. Develop tools and contracts related to development of Information Technology (IT) applications to assist BLM personnel in their inspections related to BLM-approved equipment and procedures.
Task 10. Assist with industry and BLM outreach and training sessions related to 43 CFR 3170, 3173, 3174, and 3175 regulation revisions.
Task 11. Assist in the development and interpretation of regulations, policy, briefing papers, data calls, hearing materials, and other matters in which the PMT is assigned to work related to BLM oil and gas measurement and verification.
Task 12. Assist with other tasks as related to BLM oil and gas projects.
5.0 CONTRACTOR PERFORMANCE ASSESSEMENT
After completion of this contract, an evaluation will be completed in the Contractor Performance Assessment Reporting System (CPARS) at https://www.cpars.gov/. A CPARS shall be done for contracts over $250,000.00.
PERFORMANCE
OBJECTIVE PERFORMANCE STANDARD Acceptable Quality Level
METHOD OF
SURVELLANCE
PWS Section 4- Performance Work Statement
Timeliness – All documentation and contract requirements submitted within required milestone timeframe(s).
Accuracy – all documents conform to formatting requirements, agency directives, department directives, and submittals contain all information as specified in the PWS.
Professional - Documents and submittals are well organized, grammatically correct and demonstrate sound professional evaluation and analysis.
90%
Reviewed by BLM Contracting Officer Representative (COR) and BLM Project Manager.
6.0 QUALITY
All work shall be checked and technically reviewed and approved by the PMT lead, any concerns with the quality of work shall be reported to the COR and the Contracting Officer (CO). If the quality of work is deemed to be unacceptable the contractor must re-submit the work in an acceptable manner or risk being https://www.cpars.gov/
BLM HYDROCARBON MEASUREMENT ENGINEERS SOLICITATION: 140L0123R0004 12
removed from the contract.
7.0 PLACE OF PERFORMANCE
The contractor engineers are expected to be remote staff and are not required to report to any BLM office.
The contractors will work from their workplace or residence.
8.0 HOURS OF OPERATION
Normal hours of operation are 6:00 a.m. to 6:00 p.m. in the time zone the contractor is located, Monday through Friday, except for Federal holidays.
9.0 OVERTIME
Exceptions for travel to attend meetings, outside the normally scheduled hours on weekends will be allowed with approval. Weekend travel will be paid at an overtime rate. If a contractor is required to work in excess of 40 hours in a week, they will be paid at an overtime rate with approval.
Request(s) for overtime must be submitted from the PMT Lead, with concurrence from the HQ-310 Division Chief, and must include specific task(s) and target date(s) associated with each request. These requests should be rare and must be submitted from the PMT Lead through the Contracting Officer Representative.
10.0 FEDERAL HOLIDAYS
Holidays observed by the contractor shall include all legal holidays observed by the Government, including any Federal Holiday established by Executive Order. These holidays are:
New Year's Day Martin Luther King Day Columbus Day President's Day Memorial Day Juneteenth Day Independence Day Labor Day Veterans' Day Thanksgiving Day Christmas Day Any Federal Holiday Established by Executive Order
11.0 GOVERNMENT FURNISHED EQUIPMENT (GFP)
Government-Furnished Property is all property furnished by the Government to which the Government retains title. Work performed off-site or virtually will require access to the BLM network. Currently this can only occur through the use of Government-provided laptops with Virtual Private Network (VPN) connection which is provided by BLM. The contractor shall propose only the minimum quantity of laptops and any software installations outside of BLMs standard configuration necessary to facilitate the technical requirement to meet the support services.
BLM will not ship any government provided laptops, or mobile devices outside of the continental U.S. or Alaska. The contractor shall not use the government provided laptop, or mobile devices outside of the continental U.S. or Alaska.
The contractor shall be responsible for complying with all existing BLM practices for maintaining and updating their laptop for which all other BLM virtual employees are required to comply. This may include logging into the computer frequently. Typically logging into VPN frequently to receive all updates will ensure the computer remains secure and available for use. However, there may be instances where traveling to and logging directly into the network at a BLM or DOI facility becomes necessary. The contractor shall comply with all requirements to properly use and maintain a BLM laptop.
All government furnished equipment, software, and information will be returned to the government upon completion of this contract.
12.0 GOVERNMENT FURNISHED INFORMATION (GFI)
BLM HYDROCARBON MEASUREMENT ENGINEERS SOLICITATION: 140L0123R0004 13
The Government will furnish to the contractor all necessary current task working papers, project descriptions, program briefing material and other pertinent information, and other documentation or material required in performance of this contract.
During the performance of this contract, the contractor may be granted access to information, such as plans, policies, reports, studies, financial plans, and internal data, or data which has not been released or otherwise made available to the public, the contractor agrees that without prior written approval of the CO it shall not: (1) use such information for any private purpose unless the information has been released or otherwise made available to the public; (2) submit an unsolicited proposal to the Government which is based on such information without full disclosure of any internal information used in preparing their proposal; or (3) release such information unless such information has previously been released or otherwise made available to the public by the Department.
The contractor agrees that to the extent it receives or is given access to proprietary data, or other confidential or privileged technical, business, or financial information under this contract, it shall treat such information in accordance with any restrictions imposed on such information.
13.0 COMMUNICATION
The contractor shall maintain courteous, professional, and quality communications across all areas. This would include communications with other contractors, Government employees and staff members, as well as any other personnel they interact with while conducting business. All work shall be conducted in a team environment and all contractor staff shall cooperate with team members. Contractor staff shall conduct meetings within each technology group to share new technologies, processes, and procedures to ensure consistency of knowledge. The contractor shall make staff available to provide consulting and communication services to local and enterprise-wide teams, boards and working groups on a continuing or ad hoc basis. When working on tasks or projects, the contractor shall transfer knowledge to the Government staff concerning the details of the task or project.
14.0 TRAVEL
The contractor will be required to travel to meetings, conferences, and/or BLM offices. Please plan on a minimum of six (6) travel meetings per year and at least monthly travel may be necessary. Each meeting will be for approximately five (5) days and may include travel on the Sunday and Saturday of the week. Travel should be consistent with the General Services Administration’s (GSA) government travel policy. Please refer to https://www.gsa.gov/travel-resources website for latest rates and policies on Per Diem, Meals & Incidentals (M&IE); Passenger Transportation (airfare and privately owned vehicles); and Lodging.
15.0 IDENTIFICATION OF CONTRACTOR EMPLOYEES
All contract personnel are required to identify themselves as contractors. Whether attending meetings, answering Government telephones, or working in other situations where their contractor status is not obvious to third parties, they must make their status known to avoid creating an impression that they are Government employees. To assist in the identification the following shall be implemented:
15.1 Each contractor employee shall be provided, and shall wear in plain sight, an identification badge which clearly indicates they are a contractor employee while in a Federal facility.
15.2 Contractor employees shall identify themselves as such in all correspondence, such as e-mails or faxes, originating from a Government provided source.
15.3 Contractor employees shall not attend Government all employee meetings or other inherently Governmental meetings unless specifically notified. All such notifications shall be coordinated through the Contracting Officer and contract manager. If attendance at a recurring meeting is necessary for accomplishment of contractual requirements a blanket notification may be executed.
https://www.gsa.gov/travel-resources
BLM HYDROCARBON MEASUREMENT ENGINEERS SOLICITATION: 140L0123R0004 14
15.4 To the maximum extent practicable, consistent with their duties, contractor employees shall identify themselves as such in telephone conversations using a Government provided telephone.
16.0 SECURITY
The contractor shall be required to obtain the required contractor identification badge and sign any releases and participate in any training required to use Government equipment and operate Government hardware and software. The Government will retain rights to all intellectual property produced in the course of this contract.
If violated, the Government reserves the right to require dismissal of the contractor.
17.0 SECURITY REQUIREMENTS
The BLM places the utmost importance on IT Security to ensure that Information is safeguarded. The BLM uses multiple layers of security starting at the Internet gateway all the way down to the individual user's permissions/privileges and their desktop configuration. The BLM also has a very active IT Security monitoring and analysis program in which systems and users’ activities are logged and analyzed.
17.1 Security Background Investigation. Performance of this contract requires contractor personnel to have a federal government-issued Personal Identity Verification (PIV) credential before being allowed unsupervised access to a DOI [facility and/or information system].
17.2 Initiate the Request. The Contracting Officer Representative (COR) will be the requesting official and will make arrangements through a DOI Access Card Sponsor for personal identity verification and DOI Access Card issuance.
17.3 Initiate a Background Investigation. The Bureau uses the e-QIP for all background investigations or reinvestigations. To initiate an investigation, the Contractor, in collaboration with the COR, will complete an e-QIP Request Form. This request form is available through the COR. The COR will submit the completed request form to the Bureau Personnel Security Officer (PSO). The PSO will enter the information into e-QIP to either establish a new applicant profile or determine if an existing investigation that meets Bureau requirements is on file. The PSO will then contact the applicant to provide additional information and instructions. Generally, the Contractor is required to complete the following forms:
• e-QIP application (on-line)
• Fair Credit Release
• OF-306
• Fingerprints via USAccess Credentialing Centers
The Contractor shall complete the required background investigation forms and submit them to the PSO. The PSO shall determine if individuals meet the required background investigation standards and citizenship requirements, and then make a suitability determination. Minimum standards used in suitability determinations are contained in the DOI Departmental Manual Part 441. The Government will pay for any background investigations required for contractor employees. If the Contractor employee’s background investigation is returned as unfavorable, the Government reserves the right to request reimbursement of the actual costs for the investigation from the Contractor.
17.4 Contractor employees must give, and authorize others to give, full, frank, and truthful answers to relevant and material questions needed to reach a suitability determination. Refusal or failure to furnish or authorize provision of information may constitute grounds for denial or revocation of credentials. Government personnel may contact the contractor personnel being screened or investigated in person, by telephone or in writing, and the Contractor must ensure they are available for such contact.
BLM HYDROCARBON MEASUREMENT ENGINEERS SOLICITATION: 140L0123R0004 15
17.5 The background investigation should be requested well in advance of the start of work for Contractor employees as even the basic level of investigation can take up to 30 days to complete.
The requirement to obtain a favorable background clearance requires U.S. Citizenship and could also be validated by a previous U.S. Federal Government clearance. In addition, the Contractor should assess all prospective Contractor employees in advance of initiating a background investigation as the success of prospective Contractor employee's in obtaining a satisfactory adjudication is not likely if the answer is "Yes" to question 9, 10, 11, or 13 on the OF-306 Form for the prospective Contractor employee.
17.6 At least two weeks before start of contract performance, the Contractor must identify all contractor and subcontractor personnel who will require [physical and/or logical] access for performance of work under this contract. Physical Access means routine, unescorted or unmonitored access to nonpublic areas of a federally controlled facility. Logical Access means routine, unsupervised access to a Level 3 or 4 Federally controlled information system.
17.7 Before starting work under this contract, a National Criminal History Check (NCHC) will be initiated to verify the identity of the individual applying for clearance and to determine the individual's suitability for the position.
If the NCHC adjudication is favorable, a DOI Access Card will be issued for that individual. If the adjudication is unfavorable, the credentials will not be issued, and the contractor must make other arrangements for performance of the work. In the event of a disagreement between the Contractor and the Government concerning the suitability of an individual to perform work under this contract, DOI shall have the right of final determination.
17.8 Contractor employees who have been successfully adjudicated will be issued DOI Access Cards, which must be activated at a USAccess Credentialing Center. Those Contractor employees not located within a reasonable travel time of a USAccess Credentialing Center will be screened and issued alternate credentials, such as temporary access badges.
17.9 During performance of the contract, the Contractor must keep the COR/COTR apprised of changes in personnel to ensure that performance is not delayed by compliance with credentialing processes.
Cards that have been lost, damaged, or stolen must be reported to the COR/COTR and Issuing Office within 24 hours. If reissuance of expired credentials is needed, it must be coordinated through the
COR/COTR.
17.10 At the end of contract performance, or when a contractor employee is no longer working under this contract, the Contractor must ensure that all identification cards are returned to the COR/COTR.
17.11 This security requirement must be incorporated into any subcontracts that require subcontractor personnel to have routine unsupervised access to a federally controlled facility for more than 180 calendar days or any unsupervised access to a federally controlled Level 3 or 4 information system.
a. Access to Government Facilities. Access to BLM facilities will not be granted to Contractor employees until approved by the BLM Security Office and the individual requiring access has a security background investigation initiated.
b. Access to Information and Systems. Access to BLM Information and Systems will not be granted until approved by the BLM IT Security Manager and the individual requiring access has an adjudicated security background investigation. In addition, the Contractor employees will be limited to the roles/privileges necessary for the Contractor employees to perform his/her work assignments. These roles/privileges can be limited or revoked by the https://www.opm.gov/forms/pdf_fill/of0306.pdf
BLM HYDROCARBON MEASUREMENT ENGINEERS SOLICITATION: 140L0123R0004 16
Government.
c. Connection to BLM's Internal IT Network. Only BLM owned and approved IT equipment is authorized to connect to and access the internal network and resources. Connection of non-BLM approved equipment must be requested, well in advance of the need, and approved by the BLM IT Security Manager.
18.0 TRAINING:
In the performance of work under this PWS, the contractor is required to provide fully trained personnel to perform the required services. No direct cost reimbursement will be made by the Government for training contractor employees who are not proficient in the applicable technologies that the contract supports. In cases where the Government replaces equipment, systems and software or introduces new equipment, systems and software which are significantly different from those previously supported, reimbursement may be considered.
In advance of any training, the contractor will work with the COR to request the type of training necessary, for which personnel, quantity, and estimated costs from 3 different sources. This information will then be provided to the CO for negotiation and modification to the contract.
18.1 BLM Training. The following training will be required to be successfully completed by all CONTRACTOR employees, as applicable. After initial successful completion, the training is required annually.
18.1.1 . All contractors who create, access, or dispose of BLM data or information are required to complete web-based training courses on Records Management, the Freedom of Information Act, and the Privacy Act. This training takes approximately two hours.
18.1.2 . All contractors who are given BLM IT accounts, have access to BLM's internal IT network or IT resources are required to complete web-based general IT Security training and web-based role-specific IT Security training. This training takes approximately two hours.
18.1.3 All contractors are required to take the No Federal Employee Antidiscrimination and Retaliation (FEAR) Act Biennial Training. The training takes approximately two hours.
19.0 NON-DISCLOSURE AGREEMENT
As determined by the CO, prior to beginning work under this contract the contractor shall submit, to the COR and CO, a signed Non- Disclosure Agreement (NDA) from all employees that will be working on the contract.
19.1 . Application / Data Security. Contractors may have access to privileged and confidential materials of the United States Government. These printed and electronic documents are for internal use only and remain the sole property of the United States Government. Some of these materials are protected by the Privacy Act of 1974 (AMENDED) and Title 38 Code of Federal Regulations (Title 38). Unauthorized disclosure of Privacy Act or Title 38 covered materials is a criminal offense. Each contractor employee will be given access to only the information and facilities needed to perform the work associated with the contract.
19.2. System Security. The contractor shall comply with all the Federal, Office of Management and Budget (OMB), and DOI policies, directives, procedures, and memorandums in effect at BLM. Copies to be provided upon award.
20.0 DATA
BLM HYDROCARBON MEASUREMENT ENGINEERS SOLICITATION: 140L0123R0004 17
All information generated and maintained under this contract, to include government- furnished information, must be available for Government review upon request. The contractor concurs that all information collected as a result of efforts under the contract are the property of the US Government and shall not be released either formally or informally without the consent of BLM. The Government has unlimited rights to all data and deliverables under this contract. The Government shall retain custody of all records associated with contractor deliverables and shall have exclusive control in the distribution of all written deliverables. If the contractor uses proprietary data in their proposal or in any other communication, it shall be marked appropriately.
21.0 Website:. Any updates or modifications to the BLM websites shall be in compliance with Section 508 of the Rehabilitation Act. The contractor shall also comply with applicable specifications and standards found in the National Institute of Standards and Technology's (NIST) Federal Information Processing Standards Publications (FIPS PUBs) (http://www.nist.gov/itl/fips.cfm), and the use of ANSI/EIA Standard 748 (As Amended) Earned Value Management System (EVMS).
http://webstore.ansi.org/FindStandards.aspx?SearchString=EIA-748- C&SearchOption=0&PageNum=0&SearchTermsArray=null%7cEIA-748-C%7cnull.
22.0 CONTRACTING OFFICER REPRESENATIVE (COR
A COR will be appointed by the CO for this contract.
23.0 BLM CONTACTS:
Bureau of Land Management National Headquarters Washington, DC 20240 Office
Contracting Officer’s Representative - to be added at award
Contract Contracting Officer Judy Chamberlin E-Mail: jchamberlin@blm.gov
24.0 ATTACHMENTS
Attachment Title Pages 1 Past Performance Questionnaire 3
SECTION 5- CLAUSES
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
FAR Clauses - https://www.acquisition.gov/browse/index/far DOI Clauses - http://www.acquisition.gov/diar
NUMBER CLAUSE TITLE DATE
52.203-17 Contractor Employee Whistleblower Rights and Requirement to
Inform Employee of Whistleblower Rights Jun 2020 http://webstore.ansi.org/FindStandards.aspx?SearchString=EIA-748-mailto:jchamberlin@blm.gov https://www.acquisition.gov/browse/index/far http://www.acquisition.gov/diar
BLM HYDROCARBON MEASUREMENT ENGINEERS SOLICITATION: 140L0123R0004 18
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORER-COMMERICIAL PRODUCTS AND COMMERICAL SERVICES
(JUNE 2023)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (AUG 1996) ( 31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or
52.204-2 Security Requirements March 2021 52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications Dec 2014 52.204-25 Prohibition on Contracting for Certain Telecommunications and
Video Surveillance Services or Equipment Nov 2021
52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services
Dec 2022
52.224-1 Privacy Act Notification Apr 1984 52.224-2 Privacy Act Apr 1984 52.232-7 Payments under Time and Materials and Labor Hour Contracts. Aug 2012 52.239-1 Privacy or Security Safeguards Apr 2012 52.245-1 Government Property Sep 2021 52.242-15 Stop Work Order Aug 1989 52.242-17 Government Delay of Work Apr 1984 52.245-1 Government Property Jan 2017 52.245-9 Use and Charges “Apr 2012 https://www.acquisition.gov/far/part-52#FAR_52_203_19 https://www.acquisition.gov/far/part-52#FAR_52_204_23 https://www.acquisition.gov/far/part-52#FAR_52_204_25 https://www.acquisition.gov/far/part-52#FAR_52_209_10 https://www.acquisition.gov/far/part-52#FAR_52_232_40 https://www.govinfo.gov/link/uscode/31/3903 https://www.govinfo.gov/link/uscode/31/3903 https://www.govinfo.gov/link/uscode/10/3801 https://www.acquisition.gov/far/part-52#FAR_52_233_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_233_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3
BLM HYDROCARBON MEASUREMENT ENGINEERS SOLICITATION: 140L0123R0004 19
__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) ( 41 U.S.C. 4704 and 10 U.S.C. 4655).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) ( 41 U.S.C. 3509)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
_X_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).
__ (5) [Reserved].
_X_ (6) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).
__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).
_X_ (8) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L. 117-328).
_X_ (9) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) ( 31 U.S.C. 6101 note).
X__ (10) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) ( 41 U.S.C. 2313).
__ (11) [Reserved].
__ (12) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022) ( 15 U.S.C. 657a).
__ (13) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) ( 15 U.S.C. 657a).
__ (14) [Reserved]
_X_ (15) (i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) ( 15 U.S.C. 644).
__ (ii) Alternate I (MAR 2020) of 52.219-6.
__ (16) (i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) ( 15 U.S.C. 644).
__ (ii) Alternate I (MAR 2020) of 52.219-7.
_X_ (17) 52.219-8, Utilization of Small Business Concerns (OCT 2022) ( 15 U.S.C. 637(d)(2) and (3)).
__ (18) (i) 52.219-9, Small Business Subcontracting Plan (OCT 2022) ( 15 U.S.C. 637(d)(4)).
https://www.acquisition.gov/far/part-52#FAR_52_203_6 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.govinfo.gov/link/uscode/10/4655 https://www.acquisition.gov/far/part-52#FAR_52_203_13 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_203_15 https://www.acquisition.gov/far/part-52#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_204_14 https://www.acquisition.gov/far/part-52#FAR_52_204_15 https://www.acquisition.gov/far/part-52#FAR_52_204_27 https://www.acquisition.gov/far/part-52#FAR_52_209_6…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .