Sol_140G0125Q0065.pdf

PDF 363 KB Posted

Attached to
CONSTRUCT STEEL STORAGE/WORKSHOP BUILDIN Federal contract opportunity
Solicitation number
140G0125Q0065
Issued by
Department of the Interior US Geological Survey Office of Acquisitions and Grants

About this file

This document is a Request for Proposal (RFP) for constructing a steel storage/workshop building at the USGS Conte Anadromous Fish Lab Facility in Turners Falls, Massachusetts. The project requires excavating and grading a site for a concrete slab, pouring a 30'x44'x6" monolithic slab, erecting a 20'x40' steel building with specified doors and windows, and completing site demobilization. The solicitation is set aside for small businesses, with a project magnitude between $70,000 and $140,000, and a performance period of 61 days after notice to proceed.

Key procurement details include Solicitation Number 140G0125Q0065, with proposals due by April 8, 2025, at 10:00 am PST. A mandatory site visit is scheduled for March 26, 2025, at 9:00 am EST. The anticipated contract award date is April 14, 2025, and vendors must be registered in the System for Award Management (SAM). The procurement will be conducted by the Department of the Interior US Geological Survey Office of Acquisitions and Grants, using NAICS code 236220 with a size standard of $45.0 million. Proposals should be emailed to Dayna Parkin at dparkin@usgs.gov, with questions submitted at least 5 calendar days before the proposal due date.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION CALL

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0044005293

USGS OAG RESTON ACQUISITION BRANCH

205 NATIONAL CENTER

12201 SUNRISE VALLEY DRIVE

RESTON VA 20192

GRB

Dayna Parkin 703-648-7374

103/19/2025

140G0125Q0065

INVITATION FOR BID

REQUEST FOR PROPOSAL

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Indian Small Business Economic Enterprise (ISBEE) Set-aside

Reference Section M.1 for Evaluation Factors and Section L.14 for Instructions Site

Visit Information: FAR 52.236-27 section F for list of Deliverables

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

14 61 calendar days and complete it within ________________ ________________ calendar days after receiving

04/08/2025

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 12/2022)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USGS OAG RESTON ACQUISITION BRANCH

205 NATIONAL CENTER

RESTON VA 20192

GRB

Dayna Parkin

28. NEGOTIATED AGREEMENT 29. AWARD

and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

10 U.S.C. 3204(a) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 12/2022) BACK

Continued...

and return

(Contractor is not required to sign this document.) Your offer on this

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 57

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140G0125Q0065

Contractor shall perform in accordance with the

Statement of Work herein. Questions must be submitted by email only. In accordance with the solicitation requirement to submit questions no later than 5 calendar days before quotes are due.

Delivery: 61 Days After Notice to Proceed

Delivery Location Code: 0011277576

Conte Anadromous Fish Lab

One Migratory Way P O Box 796

Turners Falls MA 01376-0796 US

Period of Performance: 05/06/2025 to 08/01/2025

00010 The contractor shall provide all labor, material, tools, equipment, and supervision necessary to construct a Steel Storage/Workshop Building at the Conte Anadromous Fish Lab (CAFL) in accordance with the statement of work herein.

Product/Service Code: Y1EB

Product/Service Description: CONSTRUCTION OF

MAINTENANCE BUILDINGS

For questions on this solicitation contact Dayna

Parkin, dparkin@usgs.gov.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

SECTION B - Supplies or Services B.1 Supplies Or Services And Prices/Costs B.2 Contract Type

SECTION C - Description/Specifications C.1 52.223-23 Sustainable Products and Services. (MAY 2024) C.2 GS0231 Technical Liaison-Technical Direction (NOV 2014) C.3 GS0347 Indoor Air Quality During Construction (MAR 2008)

SECTION D - Packaging and Marking SECTION E - Inspection and Acceptance

E.1 52.246-12 Inspection of Construction. (AUG 1996) E.2 52.246-13 Inspection - Dismantling, Demolition, or Removal of Improvements. (AUG 1996)

SECTION F - Deliveries or Performance F.1 Deliveries and Performance F.2 Period of Performance F.3 Place of Performance F.4 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) F.5 52.236-15 Schedules for Construction Contracts. (APR 1984) F.6 52.242-14 Suspension of Work. (APR 1984) F.7 GS0919 Legal Holidays (JUN 2021) F.8 GS1354 List of subcontractors (Construction) (JUL 2001) F.9 GS1125 Schedule of Prices (Construction) July 2001

SECTION G - Contract Administration Data G.1 GS1126 Invoicing and Performance Statements (JUL 2001) G.2 GS1131 Unilateral Deobligation of Unexpended Funds (MAY 2013) G.3 DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (February 2021)

SECTION H - Special Contract Requirements H.1 GS1326 Indemnity (JUL 2001) H.2 GS1338 Notice to Government of Delays (JUL 2001) H.3 GS1348 Accident Reporting (APR 2003) H.4 GS1440 Wage Determination Applicable (JUL 2001)

H.5 SECURITY REQUIREMENTS: FACILITY ACCESS AND INFORMATION TECHNOLOGY SECURITY

REQUIREMENTS: FACILITY ACCESS and INFORMATION TECHNOLOGY (AUG 2016)

SECTION I - Contract Clauses I.1 52.204-9 Personal Identity Verification of Contractor Personnel. (JAN 2011) I.2 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUN 2020) I.3 52.204-13 System for Award Management Maintenance. (OCT 2018) I.4 52.204-18 Commercial and Government Entity Code Maintenance. (AUG 2020) I.5 52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014) I.6 52.209-2 Prohibition on Contracting With Inverted Domestic Corporations-Representation. (NOV 2015) I.7 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (NOV 2015) I.8 52.211-18 Variation in Estimated Quantity. (APR 1984) I.9 52.213-4 Terms and Conditions - Simplified Acquisitions (Other Than Commercial Products and Commercial Services). (JAN 2025) I.10 52.215-8 Order of Precedence - Uniform Contract Format. (OCT 1997) I.11 52.219-28 Post-Award Small Business Program Rerepresentation. (FEB 2024) I.12 52.222-1 Notice to the Government of Labor Disputes. (FEB 1997) I.13 52.222-3 Convict Labor. (JUN 2003) I.14 52.222-6 Construction Wage Rate Requirements. (AUG 2018) I.15 52.222-7 Withholding of Funds. (MAY 2014) I.16 52.222-8 Payrolls and Basic Records. (JUL 2021) I.17 52.222-9 Apprentices and Trainees. (JUL 2005) I.18 52.222-10 Compliance With Copeland Act Requirements. (FEB 1988) I.19 52.222-11 Subcontracts (Labor Standards). (MAY 2014) I.20 52.222-12 Contract Termination - Debarment. (MAY 2014) I.21 52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations. (MAY 2014)

I.22 52.222-14 Disputes Concerning Labor Standards. (FEB 1988) I.23 52.222-15 Certification of Eligibility. (MAY 2014) I.24 52.222-21 Prohibition of segregated facilities. (APR 2015) I.25 52.222-26 Equal Opportunity. (SEP 2016) I.26 52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015) I.27 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Method). (AUG 2018) I.28 52.222-36 Equal Opportunity for Workers with Disabilities. (JUN 2020) I.29 52.222-50 Combating Trafficking in Persons. (NOV 2021) I.30 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts. (MAY 2024) I.31 52.223-3 Hazardous Material Identification and Material Safety Data. (FEB 2021) I.32 52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2024) I.33 52.223-10 Waste Reduction Program. (MAY 2024) I.34 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons. (MAY 2024) I.35 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners. (MAY 2024) I.36 52.225-9 Buy American - Construction Materials. (OCT 2022) I.37 52.225-13 Restrictions on Certain Foreign Purchases. (FEB 2021) I.38 52.226-7 Drug-Free Workplace. (MAY 2024) I.39 52.226-8 Encouraging Contractor Policies To Ban Text Messaging While Driving. (MAY 2024) I.40 52.228-2 Additional Bond Security. (OCT 1997) I.41 52.228-5 Insurance - Work on a Government Installation. (JAN 1997) I.42 52.228-11 Individual Surety-Pledge of Assets. (FEB 2021) I.43 52.228-12 Prospective Subcontractor Requests for Bonds. (DEC 2022) I.44 52.228-13 Alternative Payment Protections. (JUL 2000) I.45 52.228-14 Irrevocable Letter of Credit. (NOV 2014) I.46 52.232-5 Payments Under Fixed-Price Construction Contracts. (MAY 2014) I.47 52.232-17 Interest. (MAY 2014) I.48 52.232-23 Assignment of Claims. (MAY 2014) I.49 52.232-27 Prompt Payment for Construction Contracts. (JAN 2017) I.50 52.232-33 Payment by Electronic Funds Transfer - System for Award Management. (OCT 2018) I.51 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (MAR 2023) I.52 52.233-1 Disputes. (MAY 2014) I.53 52.233-2 Service of Protest. (SEP 2006) I.54 52.236-2 Differing Site Conditions. (APR 1984) I.55 52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) I.56 52.236-5 Material and Workmanship. (APR 1984) I.57 52.236-7 Permits and Responsibilities. (NOV 1991) I.58 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984) I.59 52.236-14 Availability and Use of Utility Services. (APR 1984) I.60 52.236-17 Layout of Work. (APR 1984) I.61 52.243-5 Changes and Changed Conditions. (APR 1984) I.62 52.244-6 Subcontracts for Commercial Products and Commercial Services. (NOV 2024) I.63 52.246-21 Warranty of Construction. (MAR 1994) I.64 52.252-2 Clauses Incorporated by Reference. (FEB 1998) I.65 52.252-6 Authorized Deviations in Clauses. (NOV 2020) I.66 1452.204-70 Release of Claims (JUL 1996) I.67 1452.225-70 Use of Foreign Construction Materials (JUL 1996) I.68 1452.228-70 Liability Insurance (JUL 1996) I.69 1452.236-70 Prohibition Against Use of Lead-based Paint (JUL 1996) I.70 1452.280-1 Notice of Indian Small Business Economic Enterprise set-aside. (FEB 2021) I.71 1452.280-2 Notice of Indian Economic Enterprise set-aside. (FEB 2021) I.72 1452.280-3 Indian Economic Enterprise subcontracting limitations. (FEB 2021) I.73 1452.280-4 Indian Economic Enterprise representation. (FEB 2021) I.74 52.219-6 Notice of Total Small Business Set-Aside (DEVIATION 2019-01) I.75 52.219-14 Limitations on Subcontracting (DEVIATION 2022-10)

SECTION J - List of Documents, Exhibits, and Other Attachments SECTION K - Representations, Certifications, and Other Statements of Bidders

K.1 52.204-8 Annual Representations and Certifications. (JAN 2025) K.2 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.

(NOV 2021)

K.3 52.222-22 Previous Contracts and Compliance Reports. (FEB 1999) K.4 52.223-1 Biobased Product Certification. (MAY 2024) K.5 52.223-4 Recovered Material Certification. (MAY 2008) K.6 52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran- Representation and Certifications. (JUN 2020)

SECTION L - Instructions, Conditions, and Notices to Bidders L.1 52.204-7 System for Award Management. (NOV 2024) L.2 52.204-16 Commercial and Government Entity Code Reporting. (AUG 2020) L.3 52.204-22 Alternative Line Item Proposal. (JAN 2017) L.4 52.215-1 Instructions to Offerors - Competitive Acquisition. (NOV 2021) L.5 52.216-1 Type of Contract. (APR 1984) L.6 52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. (MAY 2014) L.7 52.222-23 Notice of Requirement for Affirmative Action To Ensure Equal Employment Opportunity for Construction.

(FEB 1999)

L.8 52.225-10 Notice of Buy American Requirement - Construction Materials. (MAY 2014) L.9 52.236-27 Site Visit (Construction). (FEB 1995) L.10 52.236-27 Site Visit (Construction). (FEB 1995) - Alternate I (FEB 1995) L.11 52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) L.12 1452.215-71 Use and Disclosure of Proposal Information-Department of the Interior. (APR 1984) L.13 1452.233-2 Service of Protest L.14 52.215-1 Instructions to Offerors Supplement to 52.215-1 L.15 GS2320 Evaluation Factors

SECTION M - Evaluation Factors for Award M.1 GS2335 Evaluation and Award - Negotiated

SECTION B - Supplies or Services

B.1 Supplies Or Services And Prices/Costs

CLIN Description Unit Qty Job 00010 Construct a 20' x 40' steel storage building 1 Job

B.2 Contract Type

Firm Fixed-Price

SECTION C - Description/Specifications

C.1 52.223-23 Sustainable Products and Services. (MAY 2024)

(a) Definitions. As used in this clause-

Biobased product means a product determined by the U.S. Department of Agriculture (USDA) to be a commercial product or industrial product (other than food or feed) that is composed, in whole or in significant part, of biological products, including renewable domestic agricultural materials and forestry materials, or that is an intermediate ingredient or feedstock. The term includes, with respect to forestry materials, forest products that meet biobased content requirements, notwithstanding the market share the product holds, the age of the product, or whether the market for the product is new or emerging. (7 U.S.C. 8101) (7 CFR 3201.2).

Recovered material means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process. (42 U.S.C. 6903).

Sustainable products and services means products and services that are subject to and meet the following applicable statutory mandates and directives for purchasing:

(1) Statutory purchasing programs.

(i) Products containing recovered material designated by the U.S. Environmental Protection Agency (EPA) under the Comprehensive Procurement Guidelines (42 U.S.C. 6962) (40 CFR part 247) (https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products).

(ii) Energy- and water-efficient products that are ENERGY STAR® certified or Federal Energy Management Program (FEMP)- designated products (42 U.S.C. 8259b) (10 CFR part 436, subpart C) (https://www.energy.gov/eere/femp/search-energy-efficient-products and https://www.energystar.gov/products?s=mega).

(iii) Biobased products meeting the content requirement of the USDA under the BioPreferred® program (7 U.S.C.

8102) (7 CFR part 3201) (https://www.biopreferred.gov).

(iv) Acceptable chemicals, products, and manufacturing processes listed under EPA's Significant New Alternatives Policy (SNAP) program, which ensures a safe and smooth transition away from substances that contribute to the depletion of stratospheric ozone (42 U.S.C. 7671l) (40 CFR part 82, subpart G) (https://www.epa.gov/snap).

(2) Required EPA purchasing programs.

(i) WaterSense® labeled (water efficient) products and services (https://www.epa.gov/watersense/watersense-products).

(ii) Safer Choice-certified products (products that contain safer chemical ingredients) (https://www.epa.gov/saferchoice/products).

(iii) Product and services that meet EPA Recommendations of Specifications, Standards, and Ecolabels in effect as of October 2023 (https://www.epa.gov/greenerproducts/recommendations-specifications-standards-and-ecolabels-federal-purchasing).

(b) Requirements.

(1) The sustainable products and services, including the purchasing program and type of product or service, that are applicable to this contract, and any products or services that are not subject to this clause, will be set forth in the statement of work or elsewhere in the contract.

(2) The Contractor shall ensure that the sustainable products and services required by this contract are-

(i) Delivered to the Government;

(ii) Furnished for use by the Government;

(iii) Incorporated into the construction of a public building or public work; and

(iv) Furnished for use in performing services under this contract, where the cost of the products is a direct cost to this contract (versus costs which are normally applied to the Contractor's general and administrative expenses or indirect costs). This includes services performed by contractors performing management and operation of Government-owned facilities to the same extent that, at the time of award, an agency would be required to comply if an agency operated or supported the facility.

(3)(i) Except as provided in paragraph (b)(3)(ii) of this clause, sustainable products and services must meet the applicable standards, specifications, or other program requirements at time of quote or offer submission; and

(ii) Sustainable products and services must meet the EPA Recommendations of Specifications, Standards, and Ecolabels in effect as of October 2023.

(c) Resource. The Green Procurement Compilation (GPC) available at https://sftool.gov/greenprocurement provides a comprehensive list of sustainable products and services and sustainable acquisition guidance. The Contractor should review the GPC when determining which purchasing programs apply to a specific product or service.

(End of clause)

C.2 GS0231 Technical Liaison-Technical Direction (NOV 2014)

(a) The performance required herein shall be subject to the technical direction of the Technical Liaison (TL) as identified below. As used herein, "technical direction" is defined as direction to the contractor that fills in details, suggests possible lines of approach, or otherwise supplements the scope of the work set forth herein and shall not constitute a new assignment, and does not supersede or modify any article or clause of this contract.

(b) The Technical Liaison is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the

Disputes Clause;

(4) Terminate, for any reason, the contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government. Only a warranted Contracting Officer is authorized to obligate funds on this or any other contract action.

(c) The contractor shall immediately notify the Contracting Officer in writing if the Technical Liaison has taken an action (or fails to take action) or issues direction (written or oral) that the contractor considers to exceed the above limitations.

(d) The Technical Liaison assigned for this contract is:

Name: TBD After Award

Telephone Number: []

Email: []

Address Line 1: []

Address Line 2: []

Address Line 3: []

(e) Only the Contracting Officer may designate a different Technical

Liaison.

C.3 GS0347 Indoor Air Quality During Construction (MAR 2008)

(a) The contractor shall control contaminants at the source and/or operate the space in such a manner that the GSA indicator levels for carbon monoxide (CO), carbon dioxide (CO2 ), and formaldehyde (HCHO) are not exceeded. The indicator levels for office areas shall be:

CO - 9 parts per million (ppm) time-weighted average (TWA - 8-hour sample); CO2 - 1000 ppm (TWA); formaldehyde

- 0.1 ppm (TWA).

(b) The contractor shall make a reasonable attempt to apply insecticides, paints, glues, adhesives, and heating, ventilating and air conditioning (HVAC) system cleaning compounds with highly volatile or irritating organic compounds, outside of working hours. The contractor shall provide at least 72 hours advance notice to the Government before applying noxious chemicals in occupied spaces, and adequately ventilate those spaces during and after application.

(c) To the greatest extent possible, contractor shall sequence the installation of finish materials so that materials that will be high emitters of Volatile Organic Compounds (VOCs) are installed and allowed to cure before installing interior finish materials, especially soft materials that are woven, fibrous, or porous in nature, that may adsorb contaminants and release them over time.

(d) Where demolition or construction work occurs adjacent to occupied space, contractor shall erect appropriate barriers (noise, dust, odor, etc.) and take necessary steps to minimize interference with the occupants. This includes maintaining acceptable temperature, humidity and ventilation in the occupied areas during window removal, window replacement, or similar types of work.

(e) A final flush-out period of 48 to 72 hours should be provided before occupancy. Contractor shall ventilate with 100 percent outside air at the recommended air change rate (ASHRAE Standard 62) during installation of materials and finishes. If outside air would cause unacceptable inside temperature levels, humidity levels, and/or air quality, an alternate ventilation plan may be submitted to the Contracting Officer for approval.

(f) The contractor shall promptly investigate indoor air quality (IAQ) complaints and shall implement the necessary controls to address the complaint when requested to do so by the Contracting Officer.

(g) The Government reserves the right to conduct independent IAQ assessments and detailed studies in space it occupies, as well as in space serving the Government-leased space (e.g., common use areas, mechanical rooms, HVAC systems, etc.). The contractor shall assist the Government in its assessments and detailed studies by making available information on building operations and contractor activities, and providing access to space for assessment and testing, if required, and implement corrective measures required by the Contracting Officer.

SECTION D - Packaging and Marking

SECTION E - Inspection and Acceptance

E.1 52.246-12 Inspection of Construction. (AUG 1996)

E.2 52.246-13 Inspection - Dismantling, Demolition, or Removal of Improvements. (AUG 1996)

SECTION F - Deliveries or Performance

F.1 Deliveries and Performance

Deliverable Reference Due Delivery To All labor, materials, and equipment necessary to construct all items described in performance work statement and attachments

Performance Work Statement NTP + 61 USGS

Project Schedule and Timeline Performance Work Statement Kick-Off Meeting COR

Payment Bond or Irrevocable Letter of Credit Section I: 52.228-13

Within 14 days after receipt of contact award

CO

Proof of Liability Section I: 1452.228-70 Within 14 days after receipt of contract award

CO

Schedule of Prices Section F: GS1125 Within 14 days after receipt of contract award

CO

List of Subcontractors Section F: GS1354 Within 14 days after receipt of contract award

CO

Schedule for Construction Section F: 52.236-15 Within 5 days after work commences

COR CO

Monthly Contract Performance Statement Section G: GS1126, paragraph (c)

Submit at the same as invoice for progress payment

COR

Progress Meetings

Discuss

(1) Estimated project completion

(2) Value of completed work

- For each separately rice line item.

- For each of the significant construction categories contained in the approved Schedule of Prices;

(3) Difficulties encountered and remedial action taken during the reporting period and anticipated activity during the subsequent reporting period.

Biweekly COR CO

Invoices Section G: DOI Electronic Invoicing Section G:

GS1126

No more often than monthly IPP Web Page

DI-137 Release of Claims Section I: 1452.204-70 Prior to submitting final invoice

CO

Final Invoices N/A After submitting

Release of Claims

IPP

Certification of Progress Payment (if requesting progress payment) Section I: 52.232-5

As work proceeds

- No more often than monthly

COR

Weekly Payrolls for contractor and each subcontractor

The contractor is required to submit copies of all payrolls. The prime contractor is responsible for submission of copies of payrolls by all subcontractors.

This information may be submitted in any form. The optional form is WH-347 from the Department of Labor may be used and is available at:

http://www.doi.gov/whd/forms/wh347.pdf

Date of the payroll week covered

22.406(c) for examination of payrolls and statements.

Further compliance checking may done IAW FAR

22.406-7.

SF-1413 Statement and Acknowledgement (including the subcontractor's signed and dated acknowledgement that the clauses set forth in paragraph (b) of FAR 52.222-

11 have been included in the subcontract)

Section I: 52.222-11

The contractor is required to submit statement and acknowledgement to the Contracting Officer on the

Standard Form (SF) 1413.

Within 14 days after award of this contract and within 14 days after the award of each subcontract thereafter

CO

F.2 Period of Performance

Completion of 61 days after Notice to Proceed is issued

F.3 Place of Performance

USGS Conte Anadromous Fish Lab Facility One Migratory Way Turners Falls, MA 01376

F.4 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 14 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 61. The time stated for completion shall include final cleanup of the premises.

(End of clause)

* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

F.5 52.236-15 Schedules for Construction Contracts. (APR 1984)

(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.

(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.

(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor's right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.

(End of clause)

F.6 52.242-14 Suspension of Work. (APR 1984)

F.7 GS0919 Legal Holidays (JUN 2021)

F.8 GS1354 List of subcontractors (Construction) (JUL 2001)

For purposes of monitoring compliance with the insurance and payroll reporting requirements of this contract, the contractor shall furnish a listing of all subcontractors to the Contracting Officer within 14 calendars days after contract award.

F.9 GS1125 Schedule of Prices (Construction) July 2001

In accordance with the clause FAR 52.232-05, Payments under Fixed-Price Construction Contracts, the contractor shall, within 10 days after receipt of notice of award, submit to the Contracting Officer for approval, a Schedule of Prices. This schedule shall consist of a detailed breakdown of the contract price, segregated under each of the significant construction categories. It shall state the quantities for each of the various types of work, the unit prices, and extended totals.

Subcontractors who may be involved in more than one category of work must provide the same breakout data for each category. The submission of the required data shall not otherwise affect the contract terms.

SECTION G - Contract Administration Data

G.1 GS1126 Invoicing and Performance Statements (JUL 2001)

Invoicing and Performance Statements (Construction)

(a) A copy of each invoice submitted with an IPP payment request must be submitted to:

U.S. Geological Survey TBD After Award

Attn: [ ]

(b) Invoices for progress payments may be submitted no more frequently than monthly.

(c) Invoices for progress payments must be accompanied by a contract Performance Statement, which shall show in detail the estimated percentage of completion and value of completed performance for each separately priced line item or, if applicable, each of the significant construction categories contained in the approved Schedule of Prices.

(d) See clause 52.232-5 for certification requirements.

G.2 GS1131 Unilateral Deobligation of Unexpended Funds (MAY 2013)

The contractor shall submit all invoices under the award no later than 90 calendar days after the period of performance has expired, unless a request for extension has been submitted to the Contracting Officer. After 120 days has passed since the expiration of the performance period, the government reserves the right to issue a unilateral modification deobligating any unexpended funds, and to initiate closeout procedures.

G.3 DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (February 2021)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice [Contracting Officer to edit and include the documentation required under this contract]:

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

SECTION H - Special Contract Requirements

H.1 GS1326 Indemnity (JUL 2001)

The contractor herein is "an independent contractor" and shall obtain all necessary insurance to protect himself from liability arising out of this contract. The contractor hereby agrees to indemnify and hold the Government harmless in connection with, any loss or liability from damage to or destruction of property or from injuries to or death of persons (including the agents and employees of both parties) if such damage, destruction, injury or death arises out of, or is caused by performance of work under this contract, unless such damage, destruction, injury or death is caused solely by the active negligence of the Government, its agents or employees. The contractor agrees to include this clause, appropriately modified, in all subcontracts to be performed under this contract.

H.2 GS1338 Notice to Government of Delays (JUL 2001)

In the event the contractor encounters difficulty in meeting performance requirements, or when it anticipates difficulty in complying with the contract delivery schedule or date, or whenever the contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this contract, the contractor shall immediately notify the contracting officer and the COR (if one has been designated), in writing, giving pertinent details.

This data shall be informational only in character. Notice under this provision shall not be construed as a waiver by the Government of any delivery schedule or date or of any rights or remedies provided by law or under this contract.

H.3 GS1348 Accident Reporting (APR 2003)

If an accident occurs on Government-controlled facilities, a report must be provided to the Contracting Officer's Representative and the Contracting Officer within 48 hours. An accident is defined as an event which causes injury, illness, or loss or damage to Government-owned or private property. The contractor will cooperate with any ensuing Government accident investigation.

H.4 GS1440 Wage Determination Applicable (JUL 2001)

In the performance of this contract, the contractor shall comply with the requirements of U.S. Department of Labor Wage Determination Number MA20240003 dated 03/14/2025. The wage determination is incorporated into this contract as Attachment 1

H.5 SECURITY REQUIREMENTS: FACILITY ACCESS AND INFORMATION TECHNOLOGY SECURITY

REQUIREMENTS: FACILITY ACCESS and INFORMATION TECHNOLOGY (AUG 2016)

(a) All Contractor employees must have an "Enter on Duty" (EOD) approval issued by the Bureau Personnel Security Office (PSO) before they begin performing work on any Bureau contract. The Contractor must ensure that all employees requesting an EOD are citizens of the United States of America, or an alien who has been lawfully admitted for permanent residence or employment (indicated by immigration status) as evidenced by Immigration and Naturalization Service documentation and the employee must have resided in the United States for a minimum of 3 years. The EOD may be issued in advance of a completed Background Investigation and may be rescinded by the PSO at any time. However, all contractors who require network access are required to complete the identity proofing process, and must be able to obtain a successfully adjudicated National Criminal History Check (NCHC) and National Agency Check with Inquiries (NACI) or higher to stay on the contract.

(b) Starting Work - Contractor employees with an approved EOD may begin performing unsupervised work on Bureau contracts. To remain on the contract, the Contractor employees will need a completed favorable Background Investigation.

(c) Rescission of EOD - The PSO may rescind the EOD at any time. This may occur as the result of additional information obtained or the final results of the background investigation.

(d) Background Investigation - Contractor employees who will have unsupervised access to Bureau facilities, access to the Department of the Interior (DOI) information technology (IT) systems or DOI data, or will develop custom applications, must have a favorably adjudicated background investigation from the Office of Personnel Management (OPM). Existing clearances at the same or higher level are acceptable upon the PSO's review and approval. If the employee does not already have a complete investigation, they must apply for one. The employee may begin work with an EOD, but must receive a favorable background investigation to continue working on the contract. The background investigation includes obtaining fingerprints through a USAccess Credentialing Center for an FBI criminal history and a credit report. Once the investigation has been scheduled by OPM, the Bureau will receive advance reports. If those reports are favorable, the Bureau PSO will issue the EOD. The type of background investigation required is based on the risk/sensitivity level designation. Citizenship requirements and guidance for determining the appropriate type of background investigation required for the designated risk/sensitivity level are contained in DOI Departmental Manual (DM) Part 441. The DM is available on the Internet at http://elips.doi.gov/app_home/index.cfm?fuseaction=home.

(e) Electronic Questionnaire for Investigations Processing (e-QIP)'s The Bureau uses the e-QIP for all background investigations or reinvestigations. To initiate an investigation, the Contractor, in collaboration with the COR, will complete an e-QIP Request Form. This request form is available through the COR. The COR will submit the completed request form to the Bureau PSO. The PSO will enter the information into e-QIP to either establish a new applicant profile or determine if an existing investigation that meets Bureau requirements is on file. The PSO will then contact the applicant to provide additional information and instructions. Generally, the Contractor is required to complete the following forms:

e-QIP application (on-line)

Fair Credit Release

OF-306

Fingerprints via USAccess Credentialing Centers

The Contractor shall complete the required background investigation forms and submit them to the PSO. The PSO shall determine if individuals meet the required background investigation standards and citizenship requirements, and then make a suitability determination. Minimum standards used in suitability determinations are contained in the DOI Departmental Manual Part 441. The Government will pay for any background investigations required for contractor employees. If the Contractor employee's background investigation is returned as unfavorable, the Government reserves the right to request reimbursement of the actual costs for the investigation from the Contractor.

(f) Reinvestigation - Contractor employees occupying high risk public trust positions must be reinvestigated every 5 years. A reinvestigation may be initiated prior to the normal periodic reinvestigation schedule when an individual's continued ability to meet the minimum background investigation standards is in question. The electronic fingerprints on file in the USAccess system will be electronically submitted to OPM for the reinvestigation. The PSO shall review the records and documentation and make the suitability determination.

(g) Disputes - In the event of a disagreement between the Contractor and the Government concerning the suitability of a particular employee to perform work under this contract, the Government has the right of final determination.

Determinations under this requirement are subject to the Disputes Clause, FAR 52.233-1. Failure of the Contractor to comply with the requirements of this clause could constitute grounds for termination for default.

(h) Physical Security Requirements - DOI Access Cards.

(1) Contractor employees must have a DOI Access Card before being given unsupervised access to a Government facility.

(2) To gain unsupervised access to Government facilities, Contractor employees must present their DOI Access Card for examination by the security guard or electronically authenticate their DOI Access Card, as required.

Contractor employees must keep their DOI Access Card in a shielded card holder, and visually display the card at all times while in the facility. Refusal or repeated neglect to display the DOI Access Card may result in limiting Contractor employee's access to Government facilities or revoking of authorized access.

(3) When a Contractor employee is no longer working under this award, the Contractor is responsible for returning all DOI Access Cards, keys, and other Government property issued to that employee. The Contactor shall coordinate all returns with the COR. The COR is responsible for ensuring the Contractor complies with these requirements. However, failure by the Contractor to comply with these requirements may result in the Contractor's liability for all costs associated with correcting any resultant breech in building security.

(i) Issuance & Maintenance - DOI Access Cards

(1) Process: To obtain a DOI Access Card the COR will use the online DOIAccess System to initiate the access request. Contractor employees will receive email notifications to enroll at a USAccess Credentialing Center with two forms of identification, and after adjudication, a second email notification to pick up and activate their DOI Access Card. The Contractor employee shall schedule an enrollment appointment at a USAccess center at least two weeks prior to the targeted EOD.

(2) Contractor Responsibilities: Contractor employees must complete actions in a timely manner to prepare for on-boarding and access to DOI network resources. The Contractor shall allow their personnel sufficient time to schedule and attend an enrollment appointment at the USAccess center prior to the contract start date. If the Contractor employee's DOI Access Card becomes lost or stolen, the contractor employee shall notify the COR immediately to request a new DOI Access Card.

(3) COR Responsibilities: The COR (or designated individual) and Contractor shall maintain a listing of all Contractor employees who received a DOI Access Card, the date the card was issued, the date the electronic certificates expire (3 years from issue date), and the date the DOI Access Card expires (5 years from issue date). If the Contractor employee's DOI Access Card or certificates will expire before the contract is completed, the COR (or designated individual) and Contractor is responsible for ensuring that the Contractor employee visits a USAccess center to update certificates on the existing card or obtain a new DOI Access Card. No later than one week prior to the DOI Access Card's certificate or card expiration, the COR (or designated individual) shall notify the Contractor that DOI Access Card actions are required. The COR (or designated individual) and the Contractor shall update their listing to reflect the new issue date, certificate expiration date and card expiration date.

(i) Information Technology Security Requirements.

(1) Training - If contractor employees require access to any DOI/IT systems, the Contractor shall ensure its employees complete all Bureau/DOI required IT security training. The Contractor's employees shall complete this training before being granted access to Bureau/DOI data or being issued network access. The current training requirements are: (i) annual end-user IT Security Awareness, (ii) annual IT Resources Rules of Behavior, and (iii) annual Role-Based Security training for IT professionals. The Contractor shall comply with all Bureau/DOI IT security training requirements in effect during contract performance. The COR will notify the Contractor of all Bureau mandatory IT training. The Contractor shall submit training completion certificates to the COR for all required training. Failure to meet this training requirement may result in removal of the contractor employee from the contract. The Bureau will determine if the contractor can later return to the contract.

(2) Access to Contractor's Facilities for IT audit purposes - The Contractor shall afford Bureau and the Department of the Interior Office of Inspector General access to the Contractor's and subcontractor's facilities, installations, operations, documentation, databases, and personnel used in performance of the contract. Access shall be provided to the extent required to carry out a program of IT inspection, investigation, and audit that will safeguard against threats and hazards to the integrity, availability, and confidentiality of Government data or to the function of computer systems operated on behalf of the Government and to preserve evidence of computer crime. If the Contractor questions the Government employee's right to access its facilities, it should contact the CO for resolution.

(3) Contractor Location - Custom software development and outsourced operations shall be located in the United States to the maximum extent practical. If such services are proposed to be performed abroad, the Contractor shall provide an acceptable security plan that addresses the mitigation of problems related to communication, control, and protecting the confidentiality, integrity, and availability of IT systems and information.

(4) Applicable Standards - The Contractor shall follow all applicable Federal, DOI, and Bureau Bulletins, Directives, Guidelines, Manuals, Processing Standards, Memoranda, Policies and Standards; applicable OMB Memoranda; and all current National Institute of Standards & Technology (NIST) Special Publications. To comply with Federal Acquisition Regulation Subpart 39.101(d), contractors shall use the common security configurations available from the NIST website at http://checklists.nist.gov. NIST documents are available on the internet at http://csrc.nist.gov/publications/PubsSPs.html. OMB memoranda are available on the internet at http://www.whitehouse.gov/omb/memoranda/. The Contractor shall request copies of DOI and Bureau documents by contacting the COR.

(5) Incident Reporting - The Contractor shall immediately report computer security incidents affecting Bureau/DOI data and systems in accordance with the Bureau Computer Incident Response policy. The Contractor shall request copies of the Bureau Computer Incident Response policy by contacting the COR.

(6) Assessment and Authorization (A&A) and Continuous Monitoring. - The Contractor shall comply with Bureau policy when developing, upgrading, modifying or supporting applications and/or systems that require A&A and Continuous Monitoring. The Contractor shall request copies of Bureau A&A policy by contacting the COR. The A&A requirement does not apply when the Contractor's employees merely access data or have "read only" access.

(j) Documentation - The Contractor shall document all work performed and ensure that the appropriate Certification & Accreditation documents are updated to reflect the work performed and the current state of Bureau systems and networks. The Documentation requirement does not apply when the Contractor's employees merely access data or have "read only" access.

(k) Personnel Changes, Contractor Request - The Contractor shall immediately notify the COR and PSO when an employee is reassigned or leaves the Contractor's employment and prior to any termination. The Contractor must adhere to the Bureau or Office's mandatory exit clearance procedure. Once the COR has been notified that a Contractor employee is leaving the contract, the COR will initiate the exit clearance process in the DOIAccess System and forward to the Contractor the necessary instructions and form required to be completed prior to the contractor's employee's departure. This form must be completed by the Contractor's employee and signed by both the Contractor's employee and the COR and then forwarded to the bureau/office specific program responsible for employee, volunteer, and contractor departures.

(…